A low-voltage area theoretical line loss simulation device and simulation method
By using a low-voltage distribution area theoretical line loss simulation device and method, the system simulates the lines, loads, photovoltaic and reactive power modules in the distribution area, demonstrating the impact of nine factors on line loss. This addresses the problem of insufficient understanding of the theoretical principles of line loss among grassroots employees and improves the theoretical research capabilities of line loss management.
Patent Information
- Application Number
- CN202310108137.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-02-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-02-02
AI Technical Summary
The grassroots employees of power supply companies do not have much understanding of the theoretical principles of line loss in low-voltage distribution areas, and they have no intuitive feeling about the impact of the setting values of the nine factors on the theoretical line loss, which is not conducive to in-depth research on the reasonable target value of theoretical line loss.
A low-voltage distribution area theoretical line loss simulation device is provided, including a theoretical line loss simulation module, a calculation module, a display module, and a main control module. By simulating the line, load, photovoltaic, and reactive power modules of the distribution area, the device simulates the impact of nine factors on line loss. The main control module controls the switching of each module to calculate and display the changes in line loss.
It enables an intuitive simulation and demonstration of theoretical line loss in low-voltage distribution areas, helping operators understand the impact of nine factors on line loss and improving the theoretical research capabilities of line loss management.
Smart Images

Figure CN116050167B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of power system device simulation, and in particular to a low-voltage distribution area theoretical line loss simulation device and simulation method. Background Technology
[0002] Line loss qualification rate is one of the most important economic and technical indicators for power supply enterprises. Its management level not only reflects the power supply enterprise's grid operation and comprehensive management capabilities but also directly affects its economic benefits. In recent years, the State Grid Corporation of China has issued "Research on Theoretical Calculation Methods of Line Loss in Low-Voltage Distribution Areas" and "Research on Reasonable Target Values for Line Loss Management in Distribution Areas with Small Electricity Consumption and Small Negative Loss," proposing ideas for calculating reasonable ranges for line loss in low-voltage distribution areas. However, currently, the daily line loss management work of grassroots employees in power supply stations mainly focuses on mitigating and managing line losses, with limited understanding of the principles of theoretical line loss. They lack an intuitive understanding of the impact of the nine factor settings on theoretical line loss, hindering in-depth research into reasonable target values for theoretical line loss. Summary of the Invention
[0003] In order to simulate the theoretical line loss of a real low-voltage distribution area and demonstrate to the operator the influence of nine factors on the theoretical line loss, this application provides a low-voltage distribution area theoretical line loss simulation device and simulation method.
[0004] On the one hand, this application provides a theoretical line loss simulation device for low-voltage distribution areas, which adopts the following technical solution:
[0005] A low-voltage distribution area theoretical line loss simulation device includes a theoretical line loss simulation module, a theoretical line loss calculation module, a display module, and a main control module.
[0006] The theoretical line loss simulation module includes a line module, a load module, a photovoltaic module, and a reactive power module. The load module, photovoltaic module, and reactive power module are connected through the line module. The four modules are adjustable in multiple settings and can be combined to form a variable simulation area.
[0007] The line module is used to simulate the line structure of the transformer substation, and different line resistances are set to simulate different grid structures and power supply radii of the substation.
[0008] The load module is used to simulate the user load in a low-voltage distribution area. Different load intensities can be set to simulate different load rates. The load module can arbitrarily set the load location when the same load rate is set, and different end-user electricity proportions can be set by adjusting the load ratio of the end users of the line module. The load phase sequence of the load module can be arbitrarily set, and different degrees of three-phase imbalance can be achieved by switching the load phase sequence under the same load rate. Different load characteristics can be simulated by presenting different fluctuations at the same load rate. By setting different load rates, three-phase imbalances, load characteristics, and end-user electricity proportions, different voltage drops can be achieved on the line module, realizing different degrees of first- and last-terminal voltage drops.
[0009] The photovoltaic module is used to simulate photovoltaic power generation in the transformer substation. By setting different power generation intensities and comparing them with a specified load rate, it simulates different percentages of photovoltaic power generation connected to the grid.
[0010] The reactive load is used to simulate the user's reactive load. By setting reactive loads of different intensities, different load rates are set to simulate different power factors.
[0011] The main control module is used to input the nine factors of the transformer area to be simulated, and according to the input factor control theory, the line loss simulation module includes the line module, load module, photovoltaic module and reactive power module, which switch different levels to simulate the transformer area under the specified nine factors through the interaction of the four modules.
[0012] The theoretical line loss calculation module is used to read the electricity consumption data of the simulated transformer area and calculate the theoretical line loss of the transformer area.
[0013] The display module is used to display the theoretical line loss value calculated by the theoretical line loss module.
[0014] The low-voltage distribution area theoretical line loss simulation device is characterized in that the nine factors input by the main control module include: percentage of electricity supplied to the grid, percentage of electricity supplied to end users, voltage drop between the first and last terminals, power factor, three-phase imbalance, load characteristics, load rate, grid structure, and power supply radius.
[0015] The low-voltage distribution area theoretical line loss simulation device is characterized in that the main control module calculates and sets the load module to a specified level based on the input grid structure and power supply radius; calculates and sets the load module to a specified level based on the input load rate, three-phase imbalance, load characteristics, end-user power percentage, and first-end voltage drop; calculates and sets the photovoltaic module to a specified level based on the input on-grid power percentage; and calculates and sets the reactive power module to a specified level based on the input power factor.
[0016] The low-voltage distribution area theoretical line loss simulation device is characterized in that the theoretical line loss calculation module reads the power consumption data of the simulated distribution area, including the voltage and current data of the first and last ends of the load module and each intermediate branch node, and calculates the loss value on its line. The ratio of the loss value to the load rate is the theoretical line loss of the simulated distribution area.
[0017] This application also provides a method for simulating theoretical line loss in low-voltage distribution areas, characterized by comprising:
[0018] A. Trainees input the nine factors of the transformer area to be simulated through the main control module;
[0019] B. The main control module switches the line module, load module, photovoltaic module, and reactive power module of the line loss simulation module to the corresponding gear according to the input nine factors control theory to simulate the simulated transformer area under the nine factors.
[0020] C. The theoretical line loss calculation module reads the power consumption data of the simulated transformer area and calculates the theoretical line loss;
[0021] D. The display module of the simulated transformer area displays the calculated simulated theoretical line loss.
[0022] The theoretical line loss simulation method further includes theoretical line loss trial calculation: trainees manually modify any one of the nine factors through the main control module, the simulated transformer area switches the theoretical line loss simulation module state again according to the modified nine factors, and the modified simulated theoretical line loss is automatically calculated by the theoretical line loss calculation module and displayed on the display module, thereby demonstrating to the trainees the degree of influence of the nine factors on the theoretical line loss of the transformer area.
[0023] After adopting the above technical solution, the present invention has the following beneficial effects:
[0024] This invention can simulate the theoretical line loss of a real transformer area on a simulation device, and supports operators to manually modify any factor and simulate the changes in theoretical line loss after modification on the device, allowing operators to intuitively feel the impact of the nine factors on the changes in theoretical line loss. Attached Figure Description
[0025] Figure 1 This is a structural diagram of the theoretical line loss simulation device in the embodiments of this application;
[0026] Figure 2 This is a diagram of the low-voltage distribution area structure simulated by the theoretical line loss simulation module in the embodiments of this application;
[0027] Figure 3 This is a flowchart of the theoretical line loss simulation method in the embodiments of this application. Detailed Implementation
[0028] To better understand the purpose, technical solution, and advantages of this application, the application is described and explained below in conjunction with the accompanying drawings and embodiments.
[0029] like Figure 1 As shown in the figure, this application discloses a low-voltage distribution area theoretical line loss simulation device, including a theoretical line loss simulation module, a theoretical line loss calculation module, a display module, and a main control module.
[0030] The theoretical line loss simulation module includes a line module, a load module, a photovoltaic module, and a reactive power module. The load module, photovoltaic module, and reactive power module are connected through the line module. The four modules are adjustable in multiple settings and can be combined to form a variable simulation area.
[0031] The main control module is used to input the nine factors of the transformer area to be simulated, and according to the input factor control theory, the line loss simulation module includes the line module, load module, photovoltaic module and reactive power module, which switch different levels to simulate the transformer area under the specified nine factors through the interaction of the four modules.
[0032] The theoretical line loss calculation module is used to read the electricity consumption data of the simulated transformer area and calculate the theoretical line loss of the transformer area.
[0033] Furthermore, the theoretical line loss calculation module reads the power consumption data of the simulated transformer area, including the voltage and current data of the first and last ends of the load module and each branch node in the middle, and calculates the loss value on its line. The ratio of the loss value to the load rate is the theoretical line loss of the simulated transformer area.
[0034] The display module is used to display the theoretical line loss value calculated by the theoretical line loss module.
[0035] Furthermore, the nine factors input to the main control module include: percentage of electricity used in the network, percentage of electricity used by end users, voltage drop between the first and last terminals, power factor, three-phase imbalance, load characteristics, load rate, network structure, and power supply radius.
[0036] The theoretical line loss simulation module is characterized by:
[0037] The line module is used to simulate the line structure of the transformer substation, and different line resistances are set to simulate different grid structures and power supply radii of the transformer substation.
[0038] The load module is used to simulate the user load in a low-voltage distribution area. Different load intensities can be set to simulate different load rates. The load module can arbitrarily set the load location under the same load rate, and different end-user electricity proportions can be set by adjusting the load ratio of the end-users at the end of the line module. The load phase sequence of the load module can be arbitrarily set, and different degrees of three-phase imbalance can be achieved by switching the load phase sequence under the same load rate. Different load characteristics can be simulated by presenting different fluctuations under the same load rate. By setting different load rates, three-phase imbalances, load characteristics, and end-user electricity proportions, different voltage drops can be achieved on the line module, realizing different degrees of first- and last-terminal voltage drops.
[0039] The photovoltaic module is used to simulate photovoltaic power generation in the transformer area. By setting different power generation intensities and comparing them with a specified load rate, it simulates different percentages of photovoltaic grid-connected power generation.
[0040] The reactive load is used to simulate the user's reactive load. By setting reactive loads of different intensities, the load rate is set to simulate different power factors.
[0041] like Figure 2 The image shows an example transformer substation simulated by the theoretical line loss simulation module. The substation is divided into two main branches. The line module is set between the branch and the load. A variable resistor R is set between each line segment to simulate different line resistances. The load module is set at the end of the line module. Different loads are set to simulate different substation load rates. The photovoltaic module and reactive power module are set at the rear end of each load module. Different reverse loads and reactive power loads are set for the substation.
[0042] Furthermore, the main control module calculates and sets the load module to a specified level based on the input grid structure and power supply radius; calculates and sets the load module to a specified level based on the input load rate, three-phase imbalance, load characteristics, end-user power percentage, and first-end voltage drop; calculates and sets the photovoltaic module to a specified level based on the input on-grid power percentage; and calculates and sets the reactive power module to a specified level based on the input power factor.
[0043] Furthermore, the implementation method of the theoretical line loss simulation module to simulate the nine factors is as follows:
[0044] Network structure and power supply radius: The network structure mainly involves the materials of the power supply lines in the transformer substation, which are divided into cables, overhead insulated cables, overhead bare conductors, and hybrid types. The power supply radius mainly involves the length of the power supply lines. This application uses the line resistance of a simulated transformer substation to simulate the network structure and power supply radius. Figure 2 The resistor R on the line is used to simulate the line resistance of a real transformer substation. The resistance value of R can be arbitrarily changed to simulate the resistance corresponding to different power supply radii of different grid structures.
[0045] Load rate: such as Figure 2 The loads of the simulated transformer area shown can be switched. When all loads are turned on, the load rate of the simulated transformer area is 100%. Switching between different loads simulates different load rates of the transformer area.
[0046] Percentage of electricity fed into the grid: Photovoltaic modules are installed at the end of each load. The photovoltaic modules simulate reverse electricity by means of photovoltaic inverters, and can switch between two modes: a balance grid connection mode where the surplus electricity generated is fed into the grid and a full grid connection mode where the surplus electricity generated is fed into the grid. Different percentages of electricity fed into the grid are simulated by outputting reverse electricity of different power.
[0047] End-user power percentage: According to the line structure, branch 1.2 is the farthest end branch, and the three users 1.2.1 to 1.2.3 are the end loads of the transformer area. At this time, setting different loads for these three users can simulate different percentages of power consumption of the end users in the transformer area.
[0048] Voltage drop at the beginning and end: According to the line structure, loads 1.2.1 to 1.2.3 are the end users. Under a certain load rate, different line voltage drops are simulated by adjusting the line resistance at branch 1.2.
[0049] Power factor: The reactive power module at the end of each load module can reduce the power factor of the load relative to the total load of the distribution area by generating reactive loads. Different power reactive loads can be set to simulate different power factors of the distribution area. The reactive power module can be set to inductive loads and capacitive loads.
[0050] Three-phase imbalance: The load phase sequence of the load module can be switched arbitrarily. By switching the specified load to other phases, different degrees of three-phase imbalance in the transformer area can be simulated.
[0051] Load characteristics: Load characteristics reflect the time distribution of load rate, simulating different fluctuations in the load curve when the load rate of the transformer area is constant, thus simulating different load characteristics of the transformer area.
[0052] This invention also includes a method for simulating theoretical line losses in low-voltage distribution areas, such as... Figure 3 As shown, the feature includes:
[0053] A. Trainees input the nine factors of the transformer area to be simulated through the main control module;
[0054] B. The main control module switches the line module, load module, photovoltaic module, and reactive power module of the control theory line loss simulation module to the corresponding level according to the input power consumption characteristics.
[0055] C. The theoretical line loss calculation module reads the power consumption data of the simulated transformer area and calculates the theoretical line loss;
[0056] D. The display module of the simulated transformer area displays the calculated simulated theoretical line loss.
[0057] The theoretical line loss simulation method further includes theoretical line loss trial calculation: trainees manually modify any one of the nine factors through the main control module, the simulated transformer area switches the theoretical line loss simulation module state again according to the modified nine factors, and the modified simulated theoretical line loss is automatically calculated by the theoretical line loss calculation module and displayed on the display module, thereby demonstrating to the operators the degree of influence of the nine factors on the theoretical line loss of the transformer area.
[0058] Furthermore, the theoretical line loss calculation module calculates the theoretical line loss as follows:
[0059] E. After the theoretical line loss control module switches the corresponding state according to the nine input factors, the theoretical line loss calculation module reads the total meter reading of the simulated transformer area and the electricity consumption of each user, and calculates the theoretical line loss x in the current state according to the line loss calculation formula:
[0060] x=(W 总表 -∑W 用户 ) / W 总表
[0061] Furthermore, at this point, by modifying any parameter of the nine factors through the control software, the transformer area is simulated to switch states according to the modified factors, and the theoretical line loss x' after the updated state is recalculated.
[0062] x'=(W' 总表 -∑W' 用户 ) / W' 总表
[0063] At this point, the effect value Δx of this factor on the theoretical line loss is:
[0064] Δx=x'-x
[0065] The influence rate y of this factor on the theoretical line loss is:
[0066] y = Δx / x
[0067] This device and method demonstrate to grassroots staff the impact of nine factors on theoretical line loss in low-voltage distribution areas. However, this example is merely a characteristic of the given conditions, and the embodiments of this application should not be limited by these conditions. Changes in the total number of outgoing lines, branch lines, and the number of users in similar physical devices are all within the scope of conventional design.
[0068] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A low-voltage transformer area theoretical line loss simulation device, characterized in that, It includes a theoretical line loss simulation module, a theoretical line loss calculation module, a display module, and a main control module; The theoretical line loss simulation module includes a line module, a load module, a photovoltaic module, and a reactive power module. The load module, photovoltaic module, and reactive power module are connected through the line module. The four modules have multiple adjustable settings and can be combined to form a variable simulated transformer area. The line module is used to simulate the line structure of the transformer substation. By setting resistors R with variable resistance values on each line segment, it simulates different grid structures and power supply radii of the transformer substation. The load module is used to simulate the user load in a low-voltage distribution area. Different load intensities can be set to simulate different load rates. Under the same load rate, the load module can arbitrarily set the load location, and different end-user electricity proportions can be set by adjusting the load ratio of the end-users in the line module. The load phase sequence of the load module can be arbitrarily set, and different degrees of three-phase imbalance can be achieved by switching the load phase sequence under the same load rate. Different load characteristics can be simulated by presenting different fluctuations under the same load rate. By setting different load rates, three-phase imbalances, load characteristics, and end-user electricity proportions, different voltage drops can be achieved on the line module, realizing different degrees of first- and last-terminal voltage drops. The photovoltaic module is used to simulate photovoltaic power generation in the transformer area. By setting different power generation intensities and comparing them with a specified load rate, it simulates different percentages of photovoltaic power fed into the grid. The photovoltaic module can switch between two modes: a surplus grid-connected mode where the self-generated and self-consumed surplus is fed into the grid, and a full grid-connected mode where the self-generated power is not fully fed into the grid. By outputting reverse power of different power, it simulates different percentages of grid-connected power. The reactive power module is used to simulate the user's reactive load. By setting reactive loads of different intensities, it can simulate different power factors by comparing them with a specified load rate. The reactive power module can be set to both inductive and capacitive loads. The main control module is used to input nine factors of the transformer area to be simulated, and to control the line module, load module, photovoltaic module, and reactive power module included in the theoretical line loss simulation module to switch different levels according to the input nine factors. The simulation of the transformer area under the specified nine factors is achieved through the interaction of the four modules. The main control module is also used to receive modification instructions from the trainees for any of the nine factors after completing a theoretical line loss simulation, and to control the switching state of the theoretical line loss simulation module again according to the modified nine factors. The modified theoretical line loss value is calculated and displayed by the theoretical line loss calculation module and the display module, and the influence value Δx and influence rate y of the modified factor on the theoretical line loss are automatically calculated, where Δx = x' - x, y = Δx / x, x is the theoretical line loss value before modification, and x' is the theoretical line loss value after modification, so as to intuitively demonstrate the quantitative influence of a single factor change on the theoretical line loss. The theoretical line loss calculation module reads the electricity consumption data of the simulated transformer area, including the voltage and current data of the first and last ends of the load module and each branch node in the middle. According to the line loss calculation formula x = (W total meter - ∑W users) / W total meter, the theoretical line loss value of the simulated transformer area is calculated, where W total meter is the total meter consumption of the simulated transformer area, and ∑W users is the sum of the electricity consumption of each user in the simulated transformer area. The display module is used to display the theoretical line loss value calculated by the theoretical line loss calculation module, as well as the influence value Δx and influence rate y of a single factor on the theoretical line loss.
2. The low-voltage transformer area theoretical line loss simulation device according to claim 1, characterized in that, The nine factors input to the main control module include: percentage of electricity used in the grid, percentage of electricity used by end users, voltage drop between the first and last terminals, power factor, three-phase imbalance, load characteristics, load rate, grid structure, and power supply radius.
3. The low-voltage transformer area theoretical line loss simulation device according to claim 1, characterized in that, The main control module calculates and sets the line modules to the specified level based on the input grid structure and power supply radius; calculates and sets the load modules to the specified level based on the input load rate, three-phase imbalance, load characteristics, end-user power percentage, and first- and last-end voltage drop; calculates and sets the photovoltaic modules to the specified level based on the input on-grid power percentage; and calculates and sets the reactive power modules to the specified level based on the input power factor.
Citation Information
Patent Citations
Transformer region low-voltage cause analysis method and system
CN108075466A
Program-controlled load simulation system for low-voltage transformer area
CN111146781A
One-transformer-area-one-index line loss management method and system based on big data
CN113159339A