A method for precisely predicting water demand for water supply special planning
By dividing the land within the planning area into analysis units and combining machine learning and meter reading data to predict water demand, the problem of overestimating water demand in water supply special planning has been solved, and more accurate water demand prediction has been achieved.
Patent Information
- Application Number
- CN202310080898.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-01-31
AI Technical Summary
The existing methods for predicting water demand in water supply special plans have the problem of overestimating the predicted results, making it difficult to achieve accurate predictions.
The land within the planning area is divided into analysis units. The units are reconstructed using machine learning algorithms combined with administrative divisions, roads, and waterways. Spatial values are assigned using meter reading data. Land use maturity is evaluated and similarity analysis is performed. Water demand is predicted by combining economic development level and water use habits. Finally, the total water consumption is verified.
It improves the accuracy of water demand forecasting, reduces the deviation of forecast results, and brings them closer to actual water consumption.
Smart Images

Figure CN116050784B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of municipal planning technology, and in particular to a method for accurately predicting water demand in water supply planning. Background Technology
[0002] Water supply special planning is a specific arrangement for the city's water supply over the next 5-15 years. It is a plan to ensure the safe water use of urban residents. Water demand forecasting is one of the most important parts of water supply special planning. At present, the water demand forecasting method in water supply special planning is the conventional forecasting method. By analyzing the advantages and disadvantages of urban water demand forecasting methods, as well as water use patterns and water consumption, we can make the predicted urban water demand match the city's development.
[0003] In recent years, commonly used water demand forecasting methods in water supply planning include the urban comprehensive water consumption index method, the comprehensive domestic water consumption ratio correlation method, the sub-index method, and the classified land use water consumption index method. While conventional forecasting methods have their advantages and disadvantages, they all share a common drawback: they tend to overestimate water demand. Finding an accurate method for forecasting urban water demand remains a challenge for the water supply planning industry. Summary of the Invention
[0004] The purpose of this invention is to provide a method for accurately predicting water demand in water supply planning, so as to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention provides the following technical solution: A method for accurately predicting water demand in water supply planning includes the following steps: Step 1: Divide the land parcels within the planning area into analysis units; Step 2: Spatialize meter reading data; Step 3: Land use maturity assessment; Step 4: Land use structure similarity analysis; Step 5: Water consumption prediction for mature analysis units; Step 6: Predict water consumption in immature analysis units; Step 7: Forecast the total water consumption within the planning area; Step 8: Analyze and verify total water consumption.
[0006] As a further technical solution of the present invention: Step 1 specifically involves: taking the concept of spatial interpolation as the starting point and machine learning algorithms as the operating means, and through scale transition, combined with administrative division, road and river factors, reconstructing the plots within the planning scope into analysis units to improve the operability of the analysis.
[0007] As a further technical solution of the present invention: Step 2 specifically involves: using the meter reading data and the address of the user's water meter, based on the user's water consumption data and the water meter address, using geocoding technology, spatializing the meter reading data and assigning it to each analysis unit, assigning the water consumption to the analysis unit through the meter reading data, and obtaining the current water consumption distribution of the analysis unit.
[0008] As a further technical solution of the present invention: Step 3 specifically involves: evaluating the land development intensity within the analysis unit, analyzing the conformity between the current land use and the planned land use, and classifying the analysis units with more than 80% consistency between the current land use and the planned land use as immature units. These analysis units have relatively small development, basically maintain the current land use unchanged, have little change in development intensity, and have basically little change in water consumption; the analysis units with less than 80% consistency between the current land use and the planned land use are also immature units. These analysis units still have some development and construction, and there is a certain increase in water consumption.
[0009] As a further technical solution of the present invention: Step 4 specifically involves: performing statistical analysis on the land use categories within the analysis unit, statistically analyzing the area and proportion of each type of land use, and forming an analysis unit similarity matrix through a cosine similarity algorithm. If the composition of land use categories and the proportion of land area for each type of land use are basically the same, then such analysis units become similar units, thus providing a basis for water consumption prediction analysis.
[0010] As a further technical solution of the present invention: Step 5 specifically involves: expanding the water consumption of mature units, expanding the sample based on local economic development level, water use habits, and water resource conditions to obtain the water demand of mature units, expanding the current water consumption of mature units by 30% based on local economic development level, water use habits, and water resource conditions, while considering a 10% leakage rate to obtain the long-term water consumption of the analysis units, and selecting 5 mature analysis units as cases to predict the water consumption of mature units.
[0011] As a further technical solution of the present invention: Step 6 specifically involves: based on the composition and proportion of land use categories of immature units, finding the mature unit with the highest similarity to the immature unit by analyzing the unit similarity matrix, and then using the water consumption of the mature unit to predict the water consumption of the immature unit.
[0012] As a further technical solution of the present invention: In step 7, the sum of the predicted water consumption of mature units and immature units within the planning range is the total water consumption within the planning range.
[0013] As a further technical solution of the present invention: In step 8: Based on the total water consumption prediction results, the total water consumption is verified using the water consumption index method for different types of land use.
[0014] Compared with the prior art, the beneficial effects of the present invention are: This invention uses meter readings of actual user water usage as the basic data. By dividing the land within the planning area into analysis units and then analyzing and evaluating the land use maturity of these units, the water consumption of immature units is predicted using mature units, thereby increasing the accuracy of water demand prediction. Attached Figure Description
[0015] Figure 1 This is a diagram showing the distribution of the analysis units.
[0016] Figure 2 This is a distribution map of the current meter reading data for the analysis unit.
[0017] Figure 3 This is a framework diagram of a method for accurately predicting water demand in water supply planning.
[0018] Figure 4 This is a table showing the similarity matrix analysis of water demand analysis units. Detailed Implementation
[0019] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0020] like Figure 1-4 As shown, a method for accurately predicting water demand in water supply planning includes the following steps: Step 1: Divide the land parcels within the planning area into analysis units. Using spatial interpolation as a starting point and machine learning algorithms as the operational means, through scale transitions and combining factors such as administrative divisions, roads, and waterways, the land parcels within the planning area are reconstructed into analysis units, improving the operability of the analysis. Figure 1 As shown, the land within the planning area is divided into 341 analysis units.
[0021] Step 2: Spatialization of Meter Reading Data. Based on the user's water meter reading data and the water meter address, the meter reading data is spatialized using geocoding technology and assigned to each analysis unit.
[0022] like Figure 1As shown, water consumption data is assigned to the analysis units through meter readings to obtain the current water consumption distribution of the analysis units. The current water consumption of analysis units 136, 178, 240, 38, and 148 are 2756 m³ / d, 1818 m³ / d, 1485 m³ / d, 2845 m³ / d, and 3214 m³ / d, respectively. The current water consumption of analysis units 110, 95, 322, 294, and 220 are 535 m³ / d, 218 m³ / d, 697 m³ / d, 120 m³ / d, and 186 m³ / d, respectively.
[0023] Step 3: Evaluate the land development intensity within the analysis unit by analyzing the conformity between the current land use and the planned land use. Analyze the analysis units where the consistency between the current land use and the planned land use is more than 80% and they are considered immature units. These analysis units have relatively small development, basically maintain the current land use, and have little change in development intensity and water consumption. Analyze the analysis units where the consistency between the current land use and the planned land use is less than 80% and they are considered immature units. These analysis units still have some development and construction, and there is a certain increase in water consumption.
[0024] Mature analysis unit 136, mature analysis unit 178, mature analysis unit 240, mature analysis unit 38, mature analysis unit 148, immature analysis unit 110, immature analysis unit 95, immature analysis unit 322, immature analysis unit 294, immature analysis unit 220.
[0025] Step 4: Land Use Structure Similarity Analysis. Statistical analysis is performed on the land use types within the analysis unit, including the area and proportion of each type. A cosine similarity algorithm is used to generate a similarity matrix for the analysis unit. Analysis units with similar land use categories and proportions of land area for each category are considered similar units, thus aiding in water consumption prediction.
[0026] Five pairs of analysis units with high similarity were selected: mature analysis unit 136 is similar to immature analysis unit 110, mature analysis unit 178 is similar to immature analysis unit 95, mature analysis unit 240 is similar to immature analysis unit 322, mature analysis unit 38 is similar to immature analysis unit 294, and mature analysis unit 148 is similar to immature analysis unit 220.
[0027] Step 5: Water consumption prediction for mature analysis units. Expand the water consumption sample of mature units appropriately based on local economic development level, water use habits, and water resource conditions to obtain the water demand of mature units.
[0028] Based on local economic development levels, water usage habits, and water resource conditions, the current water consumption of mature units is expanded by 30%, while also considering a 10% leakage rate, to derive the long-term water consumption of the analysis units. Five mature analysis units are selected as case studies for water consumption prediction.
[0029] Mature analysis units 136, 178, 240, 38, and 148 have planned water consumption of 3941 m³ / d, 2599 m³ / d, 2123 m³ / d, 4068 m³ / d, and 4596 m³ / d, respectively.
[0030] Step 6: Water consumption prediction for immature analysis units. Based on the land use category composition and proportion of immature units, the mature units with the highest similarity to the immature units are found through the analysis unit similarity matrix. Then, the water consumption of the mature units is used to predict the water consumption of the immature units.
[0031] Through comparison and similarity matrix analysis, immature analysis unit 110 is similar to mature unit 136, immature analysis unit 95 is similar to mature unit 178, immature analysis unit 322 is similar to mature unit 240, immature analysis unit 294 is similar to mature unit 38, and immature analysis unit 220 is similar to mature unit 148.
[0032] The water consumption of mature units is used to predict the water consumption of similar immature units. Based on the water consumption of mature units, the water consumption per unit land area is calculated. Then, the water consumption of immature units is predicted using the water consumption per unit land area. Finally, the water consumption per unit land area is multiplied by the area of the immature unit to obtain the planned water consumption of the immature unit.
[0033] The planned water consumption for immature analysis units 110, 95, 322, 294, and 220 are 3251 m³ / d, 3245 m³ / d, 6967 m³ / d, 1832 m³ / d, and 3757 m³ / d, respectively.
[0034] Step 7: Total Water Consumption Forecast within the Planning Scope. The sum of the predicted water consumption of mature and immature units within the planning scope is the total water consumption within the planning scope. Based on the water consumption forecasting method for similar units, the total water consumption of the central urban area of Weifang City is predicted to be 656,600 m³ / d.
[0035] Step 8: Total Water Consumption Analysis and Verification. Based on the total water consumption forecast results, the total water consumption is verified using the water consumption index method for different land use categories.
[0036] A pair of analysis units were selected for water demand prediction verification. The prediction results were verified by comparing the water demand index methods for different land use categories in the "Urban Water Supply Engineering Planning Code" (GB50282-2016). Taking analysis unit 240 as an example, the daily unit inflow of analysis unit 240 was estimated to be 31.05 m³ / (ha·d) based on analysis unit 178. The daily water consumption was calculated based on the land use area of each land use category in analysis unit 240. The water demand index method for different land use categories yielded a result of 2758.26–7501.08 m³ / d, while the water demand prediction method for similar units yielded a result of 2008.32 m³ / d. The actual water consumption was 1485.45 m³ / d. The water demand prediction results for the different land use category water demand index method were 1.85–5.04 times the current water consumption, while the water demand prediction method for similar units yielded a result of 1.35 times the current water consumption. Based on the above analysis of water demand in mature analysis units, water consumption changes are relatively small, and water demand will not increase exponentially. According to the analysis results, the water consumption prediction method using similar units is closer to the actual residential water consumption.
[0037] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within the present invention.
[0038] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A method for accurately predicting water demand in water supply planning, characterized in that, The process includes the following steps: Step 1, dividing the land parcels within the planning area into analysis units; Step 2, spatializing meter reading data; Step 3, evaluating land use maturity; Step 4, analyzing land use structure similarity; Step 5, predicting water consumption for mature analysis units; Step 6, predicting water consumption for immature analysis units; Step 7, predicting total water consumption within the planning area; Step 8, analyzing and verifying total water consumption. Step 2 specifically involves: using the meter reading data and the address of the user's water meter, and based on the user's water consumption data and the water meter address, using geocoding technology, spatializing the meter reading data and assigning it to each analysis unit, and assigning the water consumption data to the analysis unit to obtain the current water consumption distribution of the analysis unit. Step 3 specifically involves: evaluating the land development intensity within the analysis unit, analyzing the conformity between the current land use and the planned land use, and classifying the analysis units with more than 80% consistency between the current land use and the planned land use as mature units. These analysis units have relatively small development, basically maintain the current land use, have little change in development intensity, and have basically little change in water consumption. The analysis units with less than 80% consistency between the current land use and the planned land use are considered immature units. These analysis units still have some development and construction, and there is a certain increase in water consumption. Step 4 specifically involves: performing statistical analysis on the land use categories within the analysis unit, statistically analyzing the area and proportion of each type of land use, and forming an analysis unit similarity matrix using the cosine similarity algorithm. If the composition of land use categories and the proportion of land area for each type of land use are basically the same, then such analysis units become similar units, thus providing a basis for water consumption prediction analysis. Step 6 specifically involves: based on the composition and proportion of land use categories in immature units, analyzing the unit similarity matrix to find the mature unit with the highest similarity to the immature unit, and then using the water consumption of the mature unit to predict the water consumption of the immature unit.
2. A method for accurately predicting water demand in a water supply planning project according to claim 1, characterized in that, Step 1 specifically involves: taking the concept of spatial interpolation as the starting point and machine learning algorithms as the operational means, and through scale transitions, combining administrative divisions, roads, and waterway factors, reconstructing the land parcels within the planning area into analysis units to improve the operability of the analysis.
3. A method for accurately predicting water demand in a water supply planning project according to claim 1, characterized in that, Step 5 specifically involves: expanding the water consumption of mature units based on local economic development level, water usage habits, and water resource conditions to obtain the water demand of mature units; expanding the current water consumption of mature units by 30% based on local economic development level, water usage habits, and water resource conditions, while considering a 10% leakage rate to obtain the long-term water consumption of the analysis units; and selecting 5 mature analysis units as cases for water consumption prediction of mature units.
4. A method for accurately predicting water demand in a water supply planning project according to claim 1, characterized in that, In step 7, the sum of the predicted water consumption of mature and immature units within the planning scope is the total water consumption within the planning scope.
5. A method for accurately predicting water demand in a water supply planning project according to claim 1, characterized in that, In step 8, the total water consumption is verified using the water consumption index method for different types of land use, based on the total water consumption prediction results.
Citation Information
Patent Citations
Urban-land height-limit determination method based on probability reference
CN106096296A
Grid partition-based method for estimating remaining capacity of electric energy-substituted matched power grid
CN109617057A