一种水上无临设沉桩施工方法
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION
- Filing Date
- 2023-03-06
- Publication Date
- 2026-07-17
AI Technical Summary
Traditional piling techniques require temporary trestle bridges or construction platforms when working on water or slopes, which occupy a lot of space, affect river flow and impact the ecological environment. Furthermore, they cannot be used in confined areas, affecting construction efficiency and cost.
The method of driving piles on water without temporary facilities is adopted. Using a static pressure pile driver and a reaction base, the steel pipe piles are accurately hoisted and driven in through a human-machine interactive remote control system. The power unit, the self-propelled crane for piles and the pile material handling device move on the completed steel pipe piles by themselves, replacing the ground crane for construction.
It enables construction without temporary facilities, reduces environmental impact, improves construction efficiency, lowers project costs, and allows construction to be completed in confined spaces, making it suitable for construction on water, slopes, and narrow sections.
Smart Images

Figure CN116084407B_ABST