一种水上无临设沉桩施工方法

CN116084407BActive Publication Date: 2026-07-17YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION
Filing Date
2023-03-06
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Traditional piling techniques require temporary trestle bridges or construction platforms when working on water or slopes, which occupy a lot of space, affect river flow and impact the ecological environment. Furthermore, they cannot be used in confined areas, affecting construction efficiency and cost.

Method used

The method of driving piles on water without temporary facilities is adopted. Using a static pressure pile driver and a reaction base, the steel pipe piles are accurately hoisted and driven in through a human-machine interactive remote control system. The power unit, the self-propelled crane for piles and the pile material handling device move on the completed steel pipe piles by themselves, replacing the ground crane for construction.

Benefits of technology

It enables construction without temporary facilities, reduces environmental impact, improves construction efficiency, lowers project costs, and allows construction to be completed in confined spaces, making it suitable for construction on water, slopes, and narrow sections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116084407B_ABST
    Figure CN116084407B_ABST
Patent Text Reader

Abstract

一种水上无临设沉桩施工方法,具体包括以下步骤:(一)、在施工现场放置反力基座;(二)、将静压植桩机固定在反力基座上;(三)、将钢管桩从作业基地运输到施工现场;(四)、静压植桩机将前三根钢管桩压入地基;(五)、静压植桩机在已完成的钢管桩桩顶上边自走边进行植桩施工;(六)、静压植桩机施工一段有限距离后,使动力单元、桩用自走式吊车和桩材搬运装置以已完成的钢管桩桩顶为作业轨道自走;(七)、施工距离较长时,桩材搬运装置沿着已完成的钢管桩桩顶往返供应桩材。本发明采用水上无临设沉桩施工方法,并开发出应用到该工程方法的整套设备,可以实现水上无临设沉桩施工,构筑压入桩连续墙,整个过程环保且作业效率高。