AI Technical Summary

Technical Problem

[0004]本公开实施例的目的在于提供一种供电方法、装置、电子设备及可读存储介质,用于解决现有的基站运营成本较高的技术问题

Benefits of technology

[0030]在本公开实施例中,通过连接基站供电子系统和换电柜子系统,并在基站供电子系统的供电设备停止运行的情况下,基于基站供电子系统的第一蓄电设备和换电柜子系统的多个第二蓄电设备对所述基站用电设备供电,以在保障基站供电安全的前提下,减少基站内配置的第一蓄电设备的数量,进而降低基站运营成本。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116111712B_ABST
    Figure CN116111712B_ABST
Patent Text Reader

Abstract

The present disclosure provides a power supply method and device, electronic equipment and readable storage medium, and relates to the technical field of Internet of Things. The method is applied to a joint system, the joint system comprises a power supply device, a first power storage device, a base station power consumption device and a plurality of second power storage devices, and the method comprises: in the case that the power supply device stops running, obtaining the total standby power time of the base station power consumption device, the first power supply time of the first power storage device, and the second power supply time of the plurality of second power storage devices; in the case that the sum of the first power supply time and the second power supply time is greater than or equal to the total standby power time, supplying power to the base station power consumption device based on the first power storage device and the plurality of second power storage devices. In the case that the power supply device stops running, the base station power consumption device is supplied with power based on the first power storage device and the plurality of second power storage devices, so as to reduce the operation cost of the base station under the premise of ensuring the safety of the base station power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of Internet of Things (IoT) technology, and more specifically to a power supply method, apparatus, electronic device, and readable storage medium. Background Technology

[0002] Currently, base station power supply systems typically include energy storage devices (such as batteries) to ensure the base station's power supply security in the event of a mains power outage.

[0003] The application revealed that with the advancement of power grid transformation and optimization projects, the actual interruption time of mains power in base stations is significantly less than the preset theoretical interruption time. However, in order to ensure the power supply security of base stations, a certain number of energy storage devices still need to be configured in the base stations. This results in a large number of redundant energy storage devices remaining in the base stations, which means that the operating cost of existing base stations is relatively high. Summary of the Invention

[0004] The purpose of this disclosure is to provide a power supply method, apparatus, electronic device, and readable storage medium to solve the technical problem of high operating costs of existing base stations.

[0005] In a first aspect, embodiments of this disclosure provide a power supply method applied to a combined system, the combined system including a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes a power supply device, a first energy storage device, and base station electrical equipment. The power supply device and the first energy storage device are respectively used to supply power to the base station electrical equipment, and the power supply device is used to charge the first energy storage device. The battery swapping cabinet subsystem includes a plurality of second energy storage devices, the plurality of second energy storage devices being used to supply power to the base station electrical equipment. The method includes:

[0006] When the power supply equipment stops operating, the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices are obtained.

[0007] When the first power supply duration is less than the total backup power duration, and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration, the base station power equipment is powered based on the first energy storage device and the plurality of second energy storage devices.

[0008] In one embodiment, supplying power to the base station equipment based on a first energy storage device and the plurality of second energy storage devices includes:

[0009] The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system.

[0010] When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

[0011] In one embodiment, obtaining the second power supply duration of the plurality of second energy storage devices includes:

[0012] Obtain the battery demand of the battery swapping cabinet subsystem during a power outage period, wherein the power outage period is the period during which the power supply equipment stops operating;

[0013] The difference between the total number of the plurality of second energy storage devices and the required number of batteries is determined as the number of available batteries in the battery swapping cabinet subsystem;

[0014] The second power supply duration is calculated based on the number of available batteries and the power supply duration of a single second energy storage device.

[0015] In one embodiment, obtaining the battery demand of the battery swapping cabinet subsystem during a power outage includes:

[0016] The battery swapping cabinet subsystem acquires multiple battery replacement data during power outages, with each of the multiple battery replacement data corresponding to a different historical date.

[0017] The average of multiple battery replacement data is determined as the number of batteries required by the battery swapping cabinet subsystem during power outages.

[0018] In one embodiment, the method further includes:

[0019] If the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, the base station power supply equipment is powered based on the first energy storage device and the plurality of second energy storage devices, and an alarm message indicating that the backup power time of the base station power supply equipment is insufficient is output.

[0020] In one embodiment, after supplying power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices, the method further includes:

[0021] When the power supply equipment resumes operation, the base station equipment is supplied with power based on the power supply equipment, and the first energy storage device is charged based on the power supply equipment.

[0022] Secondly, this disclosure also provides a power supply device applied to a combined system, the combined system including a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes a power supply device, a first energy storage device, and base station electrical equipment. The power supply device and the first energy storage device are respectively used to supply power to the base station electrical equipment, and the power supply device is used to charge the first energy storage device. The battery swapping cabinet subsystem includes a plurality of second energy storage devices, the plurality of second energy storage devices being used to supply power to the base station electrical equipment. The device includes:

[0023] The duration acquisition module is used to acquire, when the power supply equipment stops operating, the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices;

[0024] The power supply module is used to supply power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices when the first power supply duration is less than the total backup power duration and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration.

[0025] In one embodiment, the power supply module is specifically used for:

[0026] The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system.

[0027] When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

[0028] Thirdly, embodiments of this disclosure also provide an electronic device, including a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the power supply method described above.

[0029] Fourthly, embodiments of this disclosure also provide a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of the power supply method described above.

[0030] In this embodiment of the disclosure, by connecting the base station power supply system and the battery swapping cabinet subsystem, and when the power supply equipment of the base station power supply system stops operating, the base station power supply equipment is powered by the first energy storage device of the base station power supply system and multiple second energy storage devices of the battery swapping cabinet subsystem, so as to reduce the number of first energy storage devices configured in the base station while ensuring the power supply safety of the base station, thereby reducing the base station operating cost. Attached Figure Description

[0031] To more clearly illustrate the technical solutions of the embodiments of this disclosure, the accompanying drawings used in the description of the embodiments of this disclosure will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this disclosure. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0032] Figure 1 This is a flowchart of a power supply method provided in an embodiment of this disclosure;

[0033] Figure 2 This is a schematic diagram of the structure of a combined system provided in an embodiment of this disclosure;

[0034] Figure 3 This is a schematic diagram of the structure of a power supply management system provided in an embodiment of this disclosure;

[0035] Figure 4 This is a schematic diagram of the structure of a power supply device provided in an embodiment of this disclosure;

[0036] Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this disclosure. Detailed Implementation

[0037] The technical solutions of the embodiments of this disclosure will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this disclosure. Based on the embodiments of this disclosure, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this disclosure.

[0038] This disclosure provides a power supply method, see [link to relevant documentation] Figure 1 , Figure 1 This is a flowchart of a power supply method provided in an embodiment of this disclosure, which is applied to a combined system, such as... Figure 2 As shown, the integrated system includes a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes power supply equipment, a first energy storage device, and base station electrical equipment. The power supply equipment and the first energy storage device are respectively used to supply power to the base station electrical equipment. The power supply equipment is used to charge the first energy storage device. The battery swapping cabinet subsystem includes multiple second energy storage devices, which are used to supply power to the base station electrical equipment, such as... Figure 1 As shown, the power supply method includes the following steps:

[0039] Step 101: When the power supply equipment stops operating, obtain the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices.

[0040] In this disclosure, the aforementioned base station power supply system can be a power supply system installed within the base station, and the aforementioned battery swapping cabinet subsystem can be a power supply system installed within the battery swapping cabinet; the aforementioned power supply equipment can stop operating when the mains power source within the base station is interrupted, i.e., when the mains power is cut off.

[0041] It should be noted that in the event of a mains power outage, the base station can receive backup power information transmitted from a remote server. By parsing the backup power information, the total backup power duration of the base station's electrical equipment can be obtained. The total backup power duration can be defined as the total duration during which the base station's electrical equipment needs to operate with the support of the energy storage device in the event of a mains power outage.

[0042] The first power supply duration of the first energy storage device can be: the duration during which the base station equipment can operate with the power supply support of the first energy storage device. The first energy storage device will stop supplying power to the base station equipment when it discharges to the first capacity threshold, so as to avoid the problem of shortening the service life due to over-discharge of the first energy storage device.

[0043] The second power supply duration of the plurality of second energy storage devices can be: the duration during which the base station equipment can operate with the power support of the plurality of second energy storage devices, wherein the power supply support to the base station equipment will be stopped when the second energy storage device discharges to the second capacity threshold, so as to avoid the problem of shortening the service life due to over-discharge of the second energy storage device.

[0044] Step 102: When the first power supply duration is less than the total backup power duration, and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration, power is supplied to the base station equipment based on the first energy storage device and the plurality of second energy storage devices.

[0045] In this embodiment of the disclosure, by connecting the base station power supply system and the battery swapping cabinet subsystem, and when the power supply equipment of the base station power supply system stops operating, the base station power supply equipment is powered by the first energy storage device of the base station power supply system and multiple second energy storage devices of the battery swapping cabinet subsystem, so as to reduce the number of first energy storage devices configured in the base station while ensuring the power supply safety of the base station, thereby reducing the base station operating cost.

[0046] In this disclosure, power can be supplied to the base station equipment based on the first energy storage device first, and after the first energy storage device discharges to the first capacity threshold, power can be supplied to the base station equipment based on multiple second energy storage devices; or power can be supplied to the base station equipment based on the first energy storage device and multiple second energy storage devices simultaneously.

[0047] It is important to emphasize that with the rapid development of delivery services such as food delivery and express delivery, the number of battery swapping cabinets is also gradually increasing. Moreover, many of the secondary energy storage devices in the battery swapping cabinets are idle during the early morning hours (e.g., from 0:00 to 6:00), while the mains power outage time of the base station is usually also during the early morning hours. Therefore, by connecting the discharge circuit of the battery swapping cabinet to the power supply circuit of the base station, the multiple idle secondary energy storage devices in the battery swapping cabinet can be utilized, thereby reducing the operating cost of the base station.

[0048] For example, the number of target battery swapping cabinets connected to the power supply circuit of the base station can be one. In this case, it is preferable to set the battery swapping cabinet closest to the base station as the target battery swapping cabinet. The number of target battery swapping cabinets connected to the power supply circuit of the base station can also be N (N is an integer greater than 1). In this case, it is preferable to set the N battery swapping cabinets closest to the base station as the target battery swapping cabinets.

[0049] In one embodiment, when the supply voltage of the first energy storage device is greater than the supply voltage of the second energy storage device, an inverter can be used to adjust the supply voltage of the second energy storage device so that the actual voltage of the base station power supply device output by the second energy storage device is consistent with the supply voltage of the first energy storage device.

[0050] In one embodiment, supplying power to the base station equipment based on a first energy storage device and the plurality of second energy storage devices includes:

[0051] The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system.

[0052] When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

[0053] In this embodiment, by monitoring the operating voltage of the base station's power supply system in real time, and determining that the remaining power of the first energy storage device is insufficient when the operating voltage is less than or equal to the voltage threshold, the power supply to the base station's electrical equipment is switched to the second energy storage device to avoid the base station's electrical equipment from losing power due to unstable power supply, thus enabling the base station's electrical equipment to maintain a stable operating state.

[0054] In one embodiment, obtaining the second power supply duration of the plurality of second energy storage devices includes:

[0055] Obtain the battery demand of the battery swapping cabinet subsystem during a power outage period, wherein the power outage period is the period during which the power supply equipment stops operating;

[0056] The difference between the total number of the plurality of second energy storage devices and the required number of batteries is determined as the number of available batteries in the battery swapping cabinet subsystem;

[0057] The second power supply duration is calculated based on the number of available batteries and the power supply duration of a single second energy storage device.

[0058] In this embodiment, the number of available batteries in the battery swapping cabinet subsystem is determined by the difference between the total number of the plurality of second energy storage devices and the number of batteries required. The second power supply duration is calculated based on the number of available batteries and the power supply duration of a single second energy storage device, so as to ensure the normal use of the battery swapping cabinet while utilizing the idle energy storage devices of the battery swapping cabinet to ensure the power supply security of the base station.

[0059] For example, if the battery swapping cabinet subsystem requires 2 batteries during a power outage and the total number of secondary energy storage devices is 10, then the available number of batteries in the battery swapping cabinet subsystem is 8.

[0060] The process of obtaining the power supply duration of a single second energy storage device can be as follows: obtaining the power supply capacity of a single second energy storage device from a fully charged state to a second capacity threshold, and determining the ratio of the power supply capacity to the instantaneous load of the base station power equipment as the power supply duration of a single second energy storage device.

[0061] In one embodiment, obtaining the battery demand of the battery swapping cabinet subsystem during a power outage includes:

[0062] The battery swapping cabinet subsystem acquires multiple battery replacement data during power outages, with each of the multiple battery replacement data corresponding to a different historical date.

[0063] The average of multiple battery replacement data is determined as the number of batteries required by the battery swapping cabinet subsystem during power outages.

[0064] In this embodiment, the battery demand quantity is determined by calculating the average of multiple battery replacement data during power outage periods on different historical dates for the battery swapping cabinet subsystem, making the obtained battery demand data more reliable, which can further ensure the normal use of the battery swapping cabinet.

[0065] For example, if the battery swapping cabinet subsystem has multiple battery replacement data of 5, 6, 7, 8, and 9 during the power outage period, then the battery demand of the battery swapping cabinet subsystem during the power outage period is 7.

[0066] In one embodiment, the method further includes:

[0067] If the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, the base station power supply equipment is powered based on the first energy storage device and the plurality of second energy storage devices, and an alarm message indicating that the backup power time of the base station power supply equipment is insufficient is output.

[0068] In this embodiment, when the power supply duration of the first energy storage device and the multiple second energy storage devices cannot meet the total backup power duration, the power supply of the base station equipment is based on the first energy storage device and the multiple second energy storage devices. This can ensure the power supply stability of the base station equipment in the early and middle stages of the total backup power duration. The output of alarm information indicating that the backup power time of the base station equipment is insufficient can remind the backup power personnel of the base station to go to the base station to manually generate electricity, so as to ensure the power supply stability of the base station equipment in the later stages of the total backup power duration.

[0069] It should be noted that if the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, a backup power assistance request can be sent to the cloud server. If the cloud server provides backup power assistance information based on the backup power assistance request, the undischarged second energy storage device in the battery swapping cabinet subsystem can be controlled to supply power to the base station equipment based on the backup power assistance information. At this time, the number of second energy storage devices in the battery swapping cabinet subsystem used to supply power to the base station equipment is greater than the number of available batteries in the battery swapping cabinet subsystem.

[0070] In one embodiment, after supplying power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices, the method further includes:

[0071] When the power supply equipment resumes operation, the base station equipment is supplied with power based on the power supply equipment, and the first energy storage device is charged based on the power supply equipment.

[0072] In this embodiment, when the power supply equipment resumes operation, that is, when the mains power is restored, the power supply equipment is restored to the base station equipment, and the first energy storage device is charged based on the power supply equipment to replenish the energy consumed by the first energy storage device during the backup power process.

[0073] For ease of understanding, the following example is provided:

[0074] This disclosure also provides a power supply management system, such as... Figure 3 As shown, the power supply management system includes: a cloud platform, an edge computing box, a power system for the battery swapping cabinet, an environmental monitoring system for the base station, a power control matrix, n 24V batteries, a switching power supply, a base station load, and m 48V batteries.

[0075] The cloud platform and the edge computing box are connected in communication. One end of the edge computing box is electrically connected to the power system of the battery swapping cabinet, and the other end of the edge computing box is electrically connected to the environmental monitoring system of the base station. The power system of the battery swapping cabinet controls the charging and discharging of n 24V batteries through a power control matrix. The environmental monitoring system of the base station controls the connection between the base station load and m 48V batteries through a switching power supply. The discharge circuit of the n 24V batteries is connected to the switching power supply through an inverter.

[0076] The above power supply management system can operate as follows: When the edge computing box detects that the base station is currently experiencing a mains power outage, it reports the mains power outage to the cloud platform. Subsequently, the edge computing box receives the total backup power duration from the cloud platform and calculates the first power supply duration of m 48V batteries and the second power supply duration of n 24V batteries. If the first power supply duration is less than the total backup power duration, and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration, the base station load is powered based on the m 48V batteries and n 24V batteries. Specifically, the base station load can be powered by the m 48V batteries first. When the operating voltage of the base station is less than or equal to 47.1V, it is determined that the remaining power of the 48V batteries is insufficient, and then the power supply is switched to the n 24V batteries to power the base station load.

[0077] See Figure 4 , Figure 4 This is a structural diagram of a power supply device 400 provided in an embodiment of the present disclosure, which is applied to a combined system. The combined system includes a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes a power supply device, a first energy storage device, and base station electrical equipment. The power supply device and the first energy storage device are respectively used to supply power to the base station electrical equipment. The power supply device is used to charge the first energy storage device. The battery swapping cabinet subsystem includes multiple second energy storage devices, which are used to supply power to the base station electrical equipment. Figure 4 As shown, the power supply device 400 includes:

[0078] The duration acquisition module 401 is used to acquire the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices when the power supply equipment stops operating.

[0079] The power supply module 402 is used to supply power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices when the first power supply duration is less than the total backup power duration and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration.

[0080] In one embodiment, the power supply module 402 is specifically used for:

[0081] The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system.

[0082] When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

[0083] In one embodiment, the duration acquisition module 401 includes:

[0084] The first quantity acquisition module is used to acquire the battery demand quantity of the battery swapping cabinet subsystem during the power outage period, wherein the power outage period is the period during which the power supply equipment stops operating;

[0085] The second quantity acquisition module is used to determine the difference between the total number of the plurality of second energy storage devices and the required number of batteries as the number of available batteries in the battery swapping cabinet subsystem;

[0086] The second power supply duration calculation module is used to calculate the second power supply duration based on the number of available batteries and the power supply duration of a single second energy storage device.

[0087] In one embodiment, the first quantity acquisition module is specifically used for:

[0088] The battery swapping cabinet subsystem acquires multiple battery replacement data during power outages, with each of the multiple battery replacement data corresponding to a different historical date.

[0089] The average of multiple battery replacement data is determined as the number of batteries required by the battery swapping cabinet subsystem during power outages.

[0090] In one embodiment, the device 400 further includes:

[0091] The alarm module is used to supply power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices when the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, and to output alarm information indicating that the backup power time of the base station equipment is insufficient.

[0092] In one embodiment, the device 400 further includes:

[0093] The charging module is used to supply power to the base station's electrical equipment based on the power supply equipment when the power supply equipment resumes operation, and to charge the first energy storage device based on the power supply equipment.

[0094] The power supply device 400 provided in this embodiment can implement the various processes in the above method embodiments, and will not be described again here to avoid repetition.

[0095] Please see Figure 5 , Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this disclosure, such as... Figure 5 As shown, the electronic device includes: a processor 501, a memory 502, and a program 5021 stored in the memory 502 and executable on the processor 501.

[0096] When program 5021 is executed by processor 501, it can achieve the following: Figure 1 Any steps in the corresponding method embodiments and the achievement of the same beneficial effects will not be repeated here.

[0097] Those skilled in the art will understand that all or part of the steps of the methods described in the above embodiments can be implemented by hardware related to program instructions, and the program can be stored in a readable medium.

[0098] This disclosure also provides a readable storage medium storing a computer program, which, when executed by a processor, can perform the above-described functions. Figure 1 Any step in the corresponding method embodiment can achieve the same technical effect, and will not be repeated here to avoid repetition.

[0099] The computer-readable storage medium of this disclosure can be any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. For example, a computer-readable storage medium can be an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium can be any tangible medium that contains or stores a program that can be used by or in conjunction with an instruction execution system, apparatus, or device.

[0100] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, carrying computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, capable of sending, propagating, or transmitting programs for use by or in connection with an instruction execution system, apparatus, or device.

[0101] The program code contained on the storage medium can be transmitted using any suitable medium, including but not limited to wireless, wire, optical fiber, RF, etc., or any suitable combination thereof.

[0102] Computer program code for performing the operations of this disclosure can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, and C++, and conventional procedural programming languages ​​such as the "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or terminal. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0103] The above description represents the preferred embodiments of this disclosure. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles described herein, and these improvements and modifications should also be considered within the scope of protection of this disclosure.

Claims

1. A power supply method, characterized in that, The method is applied to a combined system, which includes a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes a power supply device, a first energy storage device, and base station electrical equipment. The power supply device and the first energy storage device are respectively used to supply power to the base station electrical equipment. The power supply device is used to charge the first energy storage device. The battery swapping cabinet subsystem includes multiple second energy storage devices, which are used to supply power to the base station electrical equipment. The method includes: When the power supply equipment stops operating, the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices are obtained. When the first power supply duration is less than the total backup power duration, and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration, the base station power equipment is powered based on the first energy storage device and the plurality of second energy storage devices. The method further includes: If the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, the base station power supply equipment is powered based on the first energy storage device and the plurality of second energy storage devices, and an alarm message indicating that the backup power time of the base station power supply equipment is insufficient is output.

2. The method according to claim 1, characterized in that, The method of supplying power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices includes: The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system. When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

3. The method according to claim 1, characterized in that, Obtaining the second power supply duration of the plurality of second energy storage devices includes: Obtain the battery demand of the battery swapping cabinet subsystem during a power outage period, wherein the power outage period is the period during which the power supply equipment stops operating; The difference between the total number of the plurality of second energy storage devices and the required number of batteries is determined as the number of available batteries in the battery swapping cabinet subsystem; The second power supply duration is calculated based on the number of available batteries and the power supply duration of a single second energy storage device.

4. The method according to claim 3, characterized in that, The step of obtaining the battery demand of the battery swapping cabinet subsystem during the power outage period includes: The battery swapping cabinet subsystem acquires multiple battery replacement data during power outages, with each of the multiple battery replacement data corresponding to a different historical date. The average of multiple battery replacement data is determined as the number of batteries required by the battery swapping cabinet subsystem during power outages.

5. The method according to claim 1, characterized in that, After supplying power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices, the method further includes: When the power supply equipment resumes operation, the base station equipment is supplied with power based on the power supply equipment, and the first energy storage device is charged based on the power supply equipment.

6. A power supply device, characterized in that, The device is applied to a combined system, which includes a base station power supply system and a battery swapping cabinet subsystem. The base station power supply system includes a power supply device, a first energy storage device, and base station electrical equipment. The power supply device and the first energy storage device are respectively used to supply power to the base station electrical equipment. The power supply device is used to charge the first energy storage device. The battery swapping cabinet subsystem includes multiple second energy storage devices, which are used to supply power to the base station electrical equipment. The device includes: The duration acquisition module is used to acquire, when the power supply equipment stops operating, the total backup power duration of the base station power equipment, the first power supply duration of the first energy storage device, and the second power supply duration of the plurality of second energy storage devices; The power supply module is used to supply power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices when the first power supply duration is less than the total backup power duration and the sum of the first power supply duration and the second power supply duration is greater than or equal to the total backup power duration. The device further includes: The alarm module is used to supply power to the base station equipment based on the first energy storage device and the plurality of second energy storage devices when the sum of the first power supply duration and the second power supply duration is less than or equal to the total backup power duration, and to output alarm information indicating that the backup power time of the base station equipment is insufficient.

7. The apparatus according to claim 6, characterized in that, The power supply module is specifically used for: The first energy storage device supplies power to the base station's electrical equipment and obtains the operating voltage of the base station's electronic system. When the operating voltage is less than or equal to a preset voltage threshold, the base station equipment is powered by the second energy storage device.

8. An electronic device, characterized in that, It includes a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program, when executed by the processor, implements the steps of the power supply method as described in any one of claims 1 to 5.

9. A readable storage medium, characterized in that, The readable storage medium stores a computer program that, when executed by a processor, implements the steps of the power supply method as described in any one of claims 1 to 5.

Citation Information

Patent Citations

  • Intelligent power distribution device and intelligent power distribution system

    CN112072658A

  • Standby power system and control method of standby power system

    CN114759658A