电网拓扑生成方法、装置、计算机设备和存储介质
By constructing an objective function and power grid operation constraints, a power grid topology is generated, which solves the problem of long computation time in traditional algorithms and improves the efficiency of power grid topology generation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHENZHEN POWER SUPPLY BUREAU
- Filing Date
- 2022-12-19
- Publication Date
- 2026-07-17
AI Technical Summary
Traditional artificial intelligence algorithms are computationally time-consuming and complex in power grid topology optimization and reconstruction, making it difficult to effectively improve the efficiency of power grid topology generation.
By obtaining the power grid topology corresponding to each target event, a reference target event is determined. Based on the line transmission loss and power loss of the reference power grid topology, an objective function is constructed and solved in combination with power grid operation constraints to generate the target power grid topology.
Even after the occurrence of the maximum risk event, the power grid topology can still maintain normal operation. The algorithm rules are simple and improve the efficiency of power grid topology generation.