Method, device and computer equipment for determining tailings disposal void volume
By determining the relationship between tailings volume and ore body, and combining it with the formula for pile density to calculate the volume of empty areas, the problem of incomplete tailings disposal was solved, and efficient utilization of tailings and accurate determination of empty areas were achieved.
Patent Information
- Application Number
- CN202211632277.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-19
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-12-19
AI Technical Summary
Existing tailings disposal methods cannot effectively utilize the voids created by mining small ore bodies, resulting in an inability to accommodate all tailings. Therefore, it is necessary to accurately determine the volume of voids required for tailings disposal.
By determining the amount of tailings to be disposed of, a relationship between the volume of the ore body to be mined and the amount of tailings that can be disposed of is established. Combined with the stockpile density formula, the required void volume is calculated. The density determination is optimized using multiple regression analysis, and the shrinkage coefficient is considered to improve the calculation accuracy.
Accurately calculate the volume of open area required to dispose of all tailings, guide actual mining operations, and ensure the effective disposal of tailings.
Smart Images

Figure CN116187662B_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of mining technology, and in particular relates to a method, apparatus and computer equipment for determining the volume of tailings disposal voids. Background Technology
[0002] During the mining of some ores, a large amount of tailings is also produced. Some of this tailings is used for backfilling the mining area, while the rest is discharged into surface tailings ponds. For environmental protection reasons, surface tailings ponds will be gradually phased out as they can no longer accommodate the tailings produced during mining.
[0003] Currently, it is possible to create voids by mining small ore bodies, which can then be used to accommodate some of the tailings. However, based on existing tailings disposal methods, the voids created by mining small ore bodies cannot handle all the tailings. Therefore, it is necessary to accurately determine the volume of voids required for tailings disposal. Summary of the Invention
[0004] In view of this, embodiments of this application provide a method, apparatus and computer equipment for determining the volume of the empty space required for tailings disposal, so as to accurately determine the volume of the empty space required for tailings disposal.
[0005] The first aspect of this application provides a method for determining the volume of a tailings disposal empty zone, including:
[0006] The amount of tailings to be disposed of is determined, wherein the amount of tailings to be disposed of is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of.
[0007] Based on the amount of tailings to be disposed of, determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of.
[0008] Formula for determining the density of a stockpile;
[0009] Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, the required empty space volume for the amount of tailings to be disposed of is calculated.
[0010] Optionally, determining the amount of tailings to be disposed of includes:
[0011] Determine the amount of the first tailings produced during the mining of the first ore body;
[0012] Determine the amount of second tailings required for filling the first void generated by the first ore body during mining;
[0013] The amount of tailings to be disposed of is determined based on the first tailings amount and the second tailings amount.
[0014] Optionally, determining the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of, includes:
[0015] Determine the volume of the second void generated from the mining of the second ore body;
[0016] Determine the tailings yield of the second ore body;
[0017] Based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, determine the relationship between the volume of the second void and the amount of tailings that can be disposed of.
[0018] Optionally, determining the relationship between the volume of the second void and the amount of tailings that can be disposed of, based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, includes:
[0019] Determine the waste rock density of the second ore body;
[0020] Based on the volume of the second void, the tailings yield of the second ore body, the amount of tailings to be disposed of, and the waste rock density of the second ore body, the relationship between the volume of the second void and the amount of tailings that can be disposed of is determined.
[0021] Optionally, the formula for determining the density of the stockpile includes:
[0022] Acquire triaxial test data for downhole mining sites, including test density data of filling bodies under different mix proportions;
[0023] Based on the test density data of the filling body under different proportions, the formula for the density of the packing body was determined by multiple regression analysis.
[0024] Optionally, calculating the required empty space volume for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of disposable tailings and the stockpile density formula includes:
[0025] Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, the actual amount of tailings that can be disposed of per cubic meter of empty area is calculated.
[0026] The volume of the empty space required to dispose of the tailings is calculated based on the actual amount of tailings that can be disposed of per cubic meter of the empty space.
[0027] Optionally, the step of calculating the required volume of open space based on the actual amount of tailings that can be disposed of per cubic meter of open space includes:
[0028] Determine the shrinkage coefficient of the stockpile;
[0029] The required volume of empty space for the amount of tailings to be disposed of is calculated based on the shrinkage coefficient and the actual amount of tailings that can be disposed of per cubic meter of empty space.
[0030] A second aspect of this application provides an apparatus for determining the volume of a tailings disposal empty zone, comprising:
[0031] The tailings quantity determination module is used to determine the tailings quantity to be disposed of, which is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of.
[0032] The relationship determination module is used to determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of.
[0033] The module for determining the stock density formula is used to determine the stock density formula.
[0034] The empty zone volume calculation module is used to calculate the empty zone volume required for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of and the stockpile density formula.
[0035] A third aspect of this application provides a computer device including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for determining the volume of a tailings disposal void as described in any of the first aspects above.
[0036] A fourth aspect of this application provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the method for determining the volume of a tailings disposal void as described in any of the first aspects above.
[0037] A fifth aspect of this application provides a computer program product that, when run on a computer, causes the computer to execute the method for determining the volume of a tailings disposal void as described in any of the first aspects above.
[0038] Compared with the prior art, the embodiments of this application have the following advantages:
[0039] In this embodiment, by determining the amount of tailings to be disposed of, which can be equal to the amount of tailings remaining after the first void created by the first ore body, a relationship can be determined between the volume of the second ore body to be mined and the amount of tailings that can be disposed of. Based on this, by determining the stockpile density formula, the required void volume for the amount of tailings to be disposed of can be calculated by combining the relationship between the volume of the second ore body and the amount of tailings that can be disposed of with the stockpile density formula. Applying the method provided in this embodiment allows for the accurate calculation of the void volume required to dispose of all tailings, which helps guide actual mining operations, enabling targeted mining of the second ore body. Attached Figure Description
[0040] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0041] Figure 1 This is a schematic diagram of a method for determining the volume of a tailings disposal empty area provided in an embodiment of this application;
[0042] Figure 2 This is a schematic diagram of one implementation of S101 in a method for determining the volume of a tailings disposal empty area provided in an embodiment of this application;
[0043] Figure 3 This is a schematic diagram of one implementation of S102 in a method for determining the volume of a tailings disposal empty area provided in an embodiment of this application;
[0044] Figure 4 This is a schematic diagram of one implementation of S104 in a method for determining the volume of a tailings disposal empty area provided in an embodiment of this application;
[0045] Figure 5 This is a schematic diagram of a device for determining the volume of a tailings disposal empty area provided in an embodiment of this application;
[0046] Figure 6 This is a schematic diagram of a computer device provided in an embodiment of this application. Detailed Implementation
[0047] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of this application. However, those skilled in the art will understand that this application may also be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods have been omitted so as not to obscure the description of this application with unnecessary detail.
[0048] The technical solution of this application will be described below through specific embodiments.
[0049] Reference Figure 1 The diagram illustrates a method for determining the volume of a tailings disposal empty area according to an embodiment of this application, which may specifically include the following steps:
[0050] S101. Determine the amount of tailings to be disposed of, wherein the amount of tailings to be disposed of is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of.
[0051] This method can be applied to computer equipment; that is, the execution subject of this application embodiment is a computer device. By executing the various steps of this application embodiment, the computer device can accurately determine the volume of empty space required to dispose of all tailings.
[0052] In this embodiment of the application, in order to determine the volume of the void required for tailings disposal, it is first necessary to determine the amount of tailings to be disposed of. The amount of tailings to be disposed of can be the amount of tailings remaining after the first void generated by mining the first ore body is disposed of.
[0053] In the embodiments of this application, such as Figure 2 As shown, determining the amount of tailings to be disposed of in S101 may specifically include the following steps S1011-S1013:
[0054] S1011. Determine the amount of the first tailings produced by mining the first ore body.
[0055] S1012. Determine the amount of second tailings required for filling the first void generated by the first ore body.
[0056] S1013. Determine the amount of tailings to be disposed of based on the first amount of tailings and the second amount of tailings.
[0057] The first ore body can be a conventional ore body. For example, during the mining of a conventional ore body, a large amount of tailings will be generated; this amount of tailings is the first tailings quantity. A portion of this large amount of tailings can be disposed of using the first void created after mining the conventional ore body, while the remaining portion can be considered as tailings to be disposed of. Therefore, after determining the first tailings quantity generated from mining the first ore body, and determining the second tailings quantity required to fill the first void created by mining the first ore body, the amount of tailings to be disposed of can be obtained by calculating the difference between the first and second tailings quantities.
[0058] For example, if the tailings production during the mining of the first ore body is 2159.1 t / d (tons per day), of which 1795 t / d is consumed by normal backfilling, then the amount of tailings to be disposed of is 2159.1 - 1795 = 364.1 t / d.
[0059] S102. Based on the amount of tailings to be disposed of, determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of.
[0060] In this embodiment, the second ore body can be a series of small ore bodies. Typically, small ore bodies are located in areas that are difficult to mine, or where mining them yields relatively low economic benefits.
[0061] For the amount of tailings to be disposed of, it can be done by mining small ore bodies to create open areas. Therefore, the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of can be determined.
[0062] In one possible implementation of the embodiments of this application, such as Figure 3 As shown, the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, as determined in S102, can specifically include the following steps S1021-S1023:
[0063] S1021. Determine the volume of the second void area generated by mining the second ore body.
[0064] The volume of the second void generated from the mining of the second ore body can refer to the volume of the additional void that needs to be mined in order to utilize the mining of the small ore body to dispose of the tailings. This volume can be temporarily represented by x.
[0065] S1022. Determine the tailings yield of the second ore body.
[0066] The tailings yield of the second ore body is the ratio between the ore that can enter the beneficiation stage and the small ore body that is actually mined during the mining of the small ore body.
[0067] For example, for a small ore body, if the actual mining volume is 674 t / d (tons per day), of which 357.8 t / d of ore can enter the beneficiation stage, and the amount of tailings produced during the mining process is 137.71 t / d, then the tailings yield is equal to 137.71 / 674 = 20.43%.
[0068] S1023. Based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, determine the relationship between the volume of the second void and the amount of tailings that can be disposed of.
[0069] In the embodiments of this application, the waste rock density of the second ore body can be determined. The waste rock density can be determined by the amount of waste rock generated and the volume of the small ore body.
[0070] For example, if the volume of the empty space generated from mining a small ore body is 246 cubic meters, and the corresponding waste rock produced is 674 tons, then the density of the waste rock is equal to 674 / 246 = 2.74 t / m³. 3 .
[0071] Based on this, the relationship between the volume of the second void and the amount of tailings that can be disposed of can be determined according to the volume of the second void, the tailings yield of the second ore body, the amount of tailings to be disposed of, and the waste rock density of the second ore body.
[0072] Specifically, in the aforementioned example, the relationship between the volume of the second empty zone and the amount of tailings that can be disposed of can be expressed as:
[0073] 364.1+2.74*0.2043*(x-246)=x*ρ……(1)
[0074] Where x is the volume of the second ore body to be mined, i.e., the volume of the second void, and represents the amount of tailings that can be disposed of per cubic meter of void. The above formula represents the volume of the void required to dispose of the remaining tailings of the conventional ore body (364.1 t / d) and the amount of tailings to be disposed of after mining the small ore body (2.74 * 0.2043 * (x - 246)).
[0075] S103, Formula for determining the density of a stockpile.
[0076] In this embodiment of the application, the bulk density formula can be determined based on the sample density measured in a static triaxial test or a vibration triaxial test.
[0077] Specifically, triaxial test data for underground stopes can be obtained, including density data of backfill samples at different mix proportions. For example, during triaxial testing, the density of the backfill samples can be measured, along with the concentration of the backfill slurry and the cement-sand ratio in each test scheme. Each test serves as a mix proportion, and based on the density data of the backfill tests at different mix proportions, a formula for determining the bulk density can be determined using multiple regression analysis.
[0078] As an example of an embodiment of this application, the formula for bulk density can be expressed as:
[0079] ρ1=x1*(1-x2)*2.3+x1x2*3.1+(1-x1)……(2)
[0080] Where ρ1 is the density of the tailings pile, x1 is the concentration of the filling slurry, and x2 is the ash-sand ratio.
[0081] When preparing the filling slurry, by substituting parameters such as the concentration of the filling slurry and the ash-sand ratio into the above formulas (1) and (2), the density of the stockpile corresponding to different proportions can be obtained. This density can be used as the amount of tailings that can be disposed of per cubic meter of empty space.
[0082] It should be noted that the above formula was determined using multiple regression analysis based on specific triaxial test data. The formula for tailings density will differ for different triaxial test data, but all can be expressed as the relationship between tailings density and the concentration of the filling slurry and the cement-sand ratio.
[0083] S104. Calculate the required empty space volume for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the stockpile density formula.
[0084] In one possible implementation of the embodiments of this application, such as Figure 4 As shown, in S104, the calculation of the required empty space volume for the amount of tailings to be disposed of, based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, may specifically include the following steps S1041-S1042:
[0085] S1041. Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, calculate the actual amount of tailings that can be disposed of per cubic meter of empty space.
[0086] S1042. Calculate the volume of the empty area required to dispose of the amount of tailings based on the actual amount of tailings that can be disposed of per cubic meter of empty area.
[0087] In this embodiment, the actual amount of tailings that can be disposed of per cubic meter in the void generated from mining a small ore body can be calculated based on formulas (1) and (2). This amount is related to the concentration and ash-sand ratio of the backfill slurry used when disposing of tailings in the void.
[0088] Generally, as the concentration of the backfill slurry increases, the density of the stockpile also increases, and consequently, the amount of tailings that can be disposed of per cubic meter of void also increases. Therefore, by using a relatively higher energy level when preparing the backfill slurry, the amount of tailings that can be disposed of can be increased, reducing the volume of void that needs to be excavated.
[0089] In one possible implementation of this application, when determining the required empty space volume, the shrinkage coefficient of the stockpile can also be considered. This coefficient represents the reduction in the volume of the stockpile under the influence of factors such as bleeding and settling. For example, the shrinkage coefficient is typically 1.10 to 1.26, meaning that a stockpile of 1.10 to 1.26 cubic meters may shrink to 1.00 cubic meters. Therefore, the required empty space volume for the amount of tailings to be disposed of can be calculated based on the shrinkage coefficient and the actual amount of tailings that can be disposed of per cubic meter of empty space, further correcting the actual required empty space volume and ensuring the accuracy of the volume calculation.
[0090] In this embodiment, by determining the amount of tailings to be disposed of, which can be equal to the amount of tailings remaining after the first void generated by the first ore body, the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of can be determined. Based on this, by determining the stockpile density formula, the required void volume for the amount of tailings to be disposed of can be calculated by combining the relationship between the volume of the second ore body and the amount of tailings that can be disposed of with the stockpile density formula. Applying the method provided in this embodiment, the required void volume for disposing of all tailings can be accurately calculated, which helps guide actual mining operations so that the second ore body can be mined in a targeted manner.
[0091] It should be noted that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.
[0092] Reference Figure 5 The diagram illustrates a device for determining the volume of a tailings disposal void area according to an embodiment of this application. Specifically, it may include a tailings quantity determination module 501, a relationship determination module 502, a stockpile density formula determination module 503, and a void area volume calculation module 504, wherein:
[0093] The tailings quantity determination module 501 is used to determine the tailings quantity to be disposed of, which is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of.
[0094] The relationship determination module 502 is used to determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of.
[0095] The 503 module for determining the stock density formula is used to determine the stock density formula.
[0096] The empty zone volume calculation module 504 is used to calculate the empty zone volume required for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of and the stockpile density formula.
[0097] In one possible implementation of this application embodiment, the tailings quantity determination module 501 can be used for:
[0098] Determine the amount of the first tailings produced during the mining of the first ore body;
[0099] Determine the amount of second tailings required for filling the first void generated by the first ore body during mining;
[0100] The amount of tailings to be disposed of is determined based on the first tailings amount and the second tailings amount.
[0101] In one possible implementation of this application embodiment, the relation determination module 502 can be used to:
[0102] Determine the volume of the second void generated from the mining of the second ore body;
[0103] Determine the tailings yield of the second ore body;
[0104] Based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, determine the relationship between the volume of the second void and the amount of tailings that can be disposed of.
[0105] In this embodiment of the application, the relation determination module 502 can be specifically used for:
[0106] Determine the waste rock density of the second ore body;
[0107] Based on the volume of the second void, the tailings yield of the second ore body, the amount of tailings to be disposed of, and the waste rock density of the second ore body, the relationship between the volume of the second void and the amount of tailings that can be disposed of is determined.
[0108] In one possible implementation of this application embodiment, the bulk density formula determination module 503 can be used for:
[0109] Acquire triaxial test data for downhole mining sites, including test density data of filling bodies under different mix proportions;
[0110] Based on the test density data of the filling body under different proportions, the formula for the density of the packing body was determined by multiple regression analysis.
[0111] In one possible implementation of this application embodiment, the empty space volume calculation module 504 can be used for:
[0112] Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, the actual amount of tailings that can be disposed of per cubic meter of empty area is calculated.
[0113] The volume of the empty space required to dispose of the tailings is calculated based on the actual amount of tailings that can be disposed of per cubic meter of the empty space.
[0114] In this embodiment of the application, the empty area volume calculation module 504 can be specifically used for:
[0115] Determine the shrinkage coefficient of the stockpile;
[0116] The required volume of empty space for the amount of tailings to be disposed of is calculated based on the shrinkage coefficient and the actual amount of tailings that can be disposed of per cubic meter of empty space.
[0117] This application also provides an apparatus for determining the volume of a tailings disposal empty area, which can be used to implement the steps in the aforementioned method embodiments.
[0118] As the apparatus embodiments are basically similar to the method embodiments, they are described in a relatively simple manner. For relevant details, please refer to the description in the method embodiment section.
[0119] Reference Figure 6 The diagram illustrates a computer device provided in an embodiment of this application. Figure 6 As shown, the computer device 600 in this embodiment includes: a processor 610, a memory 620, and a computer program 621 stored in the memory 620 and executable on the processor 610. When the processor 610 executes the computer program 621, it implements the steps in the various embodiments of the method for determining the volume of the tailings disposal empty area described above, for example... Figure 1 Steps S101 to S104 are shown. Alternatively, when the processor 610 executes the computer program 621, it implements the functions of each module / unit in the above-described device embodiments, for example... Figure 5 The functions of modules 501 to 504 are shown.
[0120] For example, the computer program 621 can be divided into one or more modules / units, which are stored in the memory 620 and executed by the processor 610 to complete this application. The one or more modules / units can be a series of computer program instruction segments capable of performing specific functions, which can be used to describe the execution process of the computer program 621 in the computer device 600. For example, the computer program 621 can be divided into a tailings quantity determination module, a relationship determination module, a stockpile density formula determination module, and a void volume calculation module, with the specific functions of each module as follows:
[0121] The tailings quantity determination module is used to determine the tailings quantity to be disposed of, which is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of.
[0122] The relationship determination module is used to determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of.
[0123] The module for determining the stock density formula is used to determine the stock density formula.
[0124] The empty zone volume calculation module is used to calculate the empty zone volume required for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of and the stockpile density formula.
[0125] The computer device 600 can be a device for implementing the steps in the foregoing method embodiments, and can be a desktop computer, cloud server, or other computing device. The computer device 600 may include, but is not limited to, a processor 610 and a memory 620. Those skilled in the art will understand that... Figure 6 This is merely one example of computer device 600 and does not constitute a limitation on computer device 600. It may include more or fewer components than shown, or combine certain components, or different components. For example, computer device 600 may also include input / output devices, network access devices, buses, etc.
[0126] The processor 610 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor.
[0127] The memory 620 can be an internal storage unit of the computer device 600, such as a hard disk or RAM of the computer device 600. The memory 620 can also be an external storage device of the computer device 600, such as a plug-in hard disk, Smart Media Card (SMC), Secure Digital (SD) card, Flash Card, etc., equipped on the computer device 600. Furthermore, the memory 620 can include both internal and external storage units of the computer device 600. The memory 620 is used to store the computer program 621 and other programs and data required by the computer device 600. The memory 620 can also be used to temporarily store data that has been output or will be output.
[0128] This application also discloses a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the method for determining the volume of the tailings disposal void as described in the foregoing embodiments.
[0129] This application also discloses a computer-readable storage medium storing a computer program that, when executed by a processor, implements the method for determining the volume of the tailings disposal void as described in the foregoing embodiments.
[0130] This application also discloses a computer program product that, when run on a computer, causes the computer to execute the method for determining the volume of the tailings disposal void as described in the foregoing embodiments.
[0131] The embodiments described above are only used to illustrate the technical solutions of this application, and are not intended to limit it. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.
Claims
1. A method for determining the volume of a tailings disposal empty area, characterized in that, include: The amount of tailings to be disposed of is determined, wherein the amount of tailings to be disposed of is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of. Based on the amount of tailings to be disposed of, determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of. Formula for determining the density of a stockpile; Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, calculate the volume of the empty space required for the amount of tailings to be disposed of. The formula for determining the density of the stockpile includes: Acquire triaxial test data for downhole mining sites, including test density data of filling bodies under different mix proportions; Based on the test density data of the filling body under different proportions, the formula for the density of the pile body was determined by multiple regression analysis. The step of calculating the required empty space volume for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the stockpile density formula, includes: Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, the actual amount of tailings that can be disposed of per cubic meter of empty area is calculated. The volume of the empty space required to dispose of the tailings is calculated based on the actual amount of tailings that can be disposed of per cubic meter of the empty space.
2. The method according to claim 1, characterized in that, The determination of the amount of tailings to be disposed of includes: Determine the amount of the first tailings produced during the mining of the first ore body; Determine the amount of second tailings required for filling the first void generated by the first ore body during mining; The amount of tailings to be disposed of is determined based on the first tailings amount and the second tailings amount.
3. The method according to claim 1, characterized in that, The formula for determining the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of, includes: Determine the volume of the second void generated from the mining of the second ore body; Determine the tailings yield of the second ore body; Based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, determine the relationship between the volume of the second void and the amount of tailings that can be disposed of.
4. The method according to claim 3, characterized in that, The step of determining the relationship between the volume of the second void and the amount of tailings that can be disposed of, based on the volume of the second void, the tailings yield of the second ore body, and the amount of tailings to be disposed of, includes: Determine the waste rock density of the second ore body; Based on the volume of the second void, the tailings yield of the second ore body, the amount of tailings to be disposed of, and the waste rock density of the second ore body, the relationship between the volume of the second void and the amount of tailings that can be disposed of is determined.
5. The method according to claim 1, characterized in that, The step of calculating the required open space volume for the amount of tailings to be disposed of based on the actual disposable tailings mass per cubic meter of open space includes: Determine the shrinkage coefficient of the stockpile; The required volume of empty space for the amount of tailings to be disposed of is calculated based on the shrinkage coefficient and the actual amount of tailings that can be disposed of per cubic meter of empty space.
6. An apparatus for determining the volume of a tailings disposal empty zone, characterized in that, include: The tailings quantity determination module is used to determine the tailings quantity to be disposed of, which is equal to the amount of tailings remaining after the first void generated by the first ore body is disposed of. The relationship determination module is used to determine the relationship between the volume of the second ore body to be mined and the amount of tailings that can be disposed of, based on the amount of tailings to be disposed of. The module for determining the stock density formula is used to determine the stock density formula. The empty zone volume calculation module is used to calculate the empty zone volume required for the amount of tailings to be disposed of based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of and the stockpile density formula. The bulk density formula determination module is used for: Acquire triaxial test data for downhole mining sites, including test density data of filling bodies under different mix proportions; Based on the test density data of the filling body under different proportions, the formula for the density of the pile body was determined by multiple regression analysis. The empty space volume calculation module is used for: Based on the relationship between the volume of the second ore body and the amount of tailings that can be disposed of, and the formula for the density of the stockpile, the actual amount of tailings that can be disposed of per cubic meter of empty area is calculated. The volume of the empty space required to dispose of the tailings is calculated based on the actual amount of tailings that can be disposed of per cubic meter of the empty space.
7. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the method for determining the volume of the tailings disposal void as described in any one of claims 1-5.
8. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by the processor, it implements the method for determining the volume of the tailings disposal void as described in any one of claims 1-5.