A complex steel structure high altitude construction structure and construction method thereof

CN116201370BActive Publication Date: 2025-04-04SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
-1 Cites -1 Cited by

Patent Information

Application Number
CN202310270839.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2025-04-04
Estimated Expiration
2043-03-17

Smart Images

  • Figure CN116201370B_ABST
    Figure CN116201370B_ABST
Patent Text Reader

Abstract

The invention relates to a complex steel structure high-altitude construction structure and a construction method thereof, comprising a traction mechanism arranged on the top of a roof frame, a steel structure and a connecting frame fixedly connected to the inner wall of the top of the roof frame, wherein a fixed plate in the traction mechanism is fixedly connected to the top of the roof frame, a winch and a fixed pulley are fixedly connected to the upper surface of the fixed plate, and an anti-slip component for preventing the winch output rope from breaking and sliding is also provided on the upper surface of the fixed plate; a connecting buckle is fixedly connected to the top of a first lifting ring on the top of the steel structure, an auxiliary lifting rope is fixedly connected to the top of the connecting buckle, a second lifting ring for fixing the steel structure is fixedly connected to the circumference of the top of the steel structure, a balancing steel wire is fixedly connected between the second lifting ring and the connecting buckle, and a first steel wire rope for lifting the steel structure is fixedly connected to the top of the second lifting ring; the problems in the prior art that the steel structure shakes during high-altitude lifting, which is prone to danger, and cannot be adjusted due to installation errors when it is lifted and connected.