A complex steel structure high altitude construction structure and construction method thereof
CN116201370BActive Publication Date: 2025-04-04SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
-1 Cites -1 Cited by
Patent Information
- Application Number
- CN202310270839.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-17
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2043-03-17
Smart Images

Figure CN116201370B_ABST
Abstract
The invention relates to a complex steel structure high-altitude construction structure and a construction method thereof, comprising a traction mechanism arranged on the top of a roof frame, a steel structure and a connecting frame fixedly connected to the inner wall of the top of the roof frame, wherein a fixed plate in the traction mechanism is fixedly connected to the top of the roof frame, a winch and a fixed pulley are fixedly connected to the upper surface of the fixed plate, and an anti-slip component for preventing the winch output rope from breaking and sliding is also provided on the upper surface of the fixed plate; a connecting buckle is fixedly connected to the top of a first lifting ring on the top of the steel structure, an auxiliary lifting rope is fixedly connected to the top of the connecting buckle, a second lifting ring for fixing the steel structure is fixedly connected to the circumference of the top of the steel structure, a balancing steel wire is fixedly connected between the second lifting ring and the connecting buckle, and a first steel wire rope for lifting the steel structure is fixedly connected to the top of the second lifting ring; the problems in the prior art that the steel structure shakes during high-altitude lifting, which is prone to danger, and cannot be adjusted due to installation errors when it is lifted and connected.
Need to check novelty before this filing date? Find Prior Art