A BIM-based monitoring auxiliary method for construction sites

CN116228131BActive Publication Date: 2025-02-11GUANGZHOU XIHUA COMM EQUIP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211696595.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-28
Publication Date
2025-02-11
Estimated Expiration
2042-12-28

Smart Images

  • Figure CN116228131B_ABST
    Figure CN116228131B_ABST
Patent Text Reader

Abstract

The present application provides a construction site BIM-based monitoring auxiliary method, including: establishing a construction site slope BIM three-dimensional model; calculating slope terrain data according to the construction site slope BIM model, wherein the calculation of slope terrain data according to the construction site slope BIM model specifically includes: calculating the inclination angle of each irregular area by using Hough transform, analyzing the slope vegetation and road surface; grouping and clustering the slope terrain according to the analysis results; real-time monitoring of construction site driving; predicting the danger of vehicles passing through the slope according to the slope terrain category and the real-time monitoring data of the vehicle; determining the safe load and speed of the irregular area according to the danger of the vehicle passing through the slope; and automatically controlling the driving speed and the speed control timing according to the safe speed.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Monitoring point position selection method and system for slope risk monitoring

    CN112945136A

  • Slope deformation monitoring and early warning method and system and intelligent terminal

    CN113418496A