基于单元工程自识别的水利水电工程计量结算管理方法

By automatically identifying the metering units of water conservancy and hydropower projects through a three-dimensional spatial coordinate comparison algorithm, the problem of corresponding metering units with unit projects has been solved, achieving efficient metering and settlement management, reducing workload and improving data accuracy and settlement efficiency.

CN116258452BActive Publication Date: 2026-07-17CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
Filing Date
2023-01-05
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the measurement management of water conservancy and hydropower projects, it is difficult to correspond measurement units with unit projects one by one, which leads to frequent occurrences of double counting, omissions, and cross-counting, resulting in chaotic measurement data and affecting contract settlement and final acceptance.

Method used

A three-dimensional spatial coordinate comparison algorithm is established to automatically identify the sub-projects, elevations, and station numbers of the measurement unit, associate the quality evaluation information of the unit project, realize the measurement of multiple unit projects, reduce the measurement workload, and move the evaluation and acceptance control node from the measurement stage to the settlement stage.

Benefits of technology

Significantly reduce the workload of measurement and settlement, ensure data accuracy, promptly identify over-settlement issues, and improve measurement progress and settlement efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116258452B_ABST
    Figure CN116258452B_ABST
Patent Text Reader

Abstract

本发明涉及水利水电工程合同计量结算信息化管理技术领域,具体涉及一种基于单元工程自识别的水利水电工程计量结算管理方法。包括工程量清单、工程项目规划;承包商录入高程桩号计量范围信息;系统识别单元工程,分析处理计量数据并智能提醒,承包商填写工程量;监理审核;承包商选择结算月份;系统分析处理结算数据并智能提醒;承包商处理结算数据;监理审核;建设审批;计量 / 结算报表输出极查询统计。在防止预结、重结、超结的同时,摆脱了计量单元必须是单元工程或施工单元的限制,工程量清单中间计量模式同样适用,即可在一张中间计量单中对多个单元工程或施工单元计量,大幅减少计量工作量。