A tailings pond phreatic line monitoring hole blocking treatment device and treatment method

By using a combination of drainage pipes, geotextiles, and airbags in the monitoring holes of the tailings dam's seepage line, a low-cost, safe, and reliable siltation control method was achieved. This solved the problems of high cost and poor safety in traditional methods, ensuring the authenticity of monitoring data and the stability of the tailings dam.

CN116272098BActive Publication Date: 2026-11-20KUNMING PROSPECTING DESIGN INSTITUTE OF CHINA NONFERROUS METALS INDUSTRY CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310167561.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-27
Publication Date
2026-11-20
Estimated Expiration
2043-02-27

AI Technical Summary

Technical Problem

Existing technologies for treating sludge blockage in tailings dam seepage line monitoring boreholes suffer from high costs, poor safety, and difficulty in effectively removing blockages. Traditional methods may lead to distorted monitoring data and potential safety hazards in tailings dams.

Method used

A combined device consisting of drainage pipes, geotextiles, airbags, and a pressurization system is used to remove silt through reverse seepage. The airbags are used to pressurize and form a reverse seepage channel, squeezing the silt against the borehole wall. The geotextiles prevent the silt from entering the drainage pipe, thus achieving multiple silt removal processes.

Benefits of technology

It achieves low-cost, safe and reliable siltation control, ensures the authenticity of monitoring data, avoids local hollowing of tailings around monitoring holes, and improves the stability and safety of tailings dams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116272098B_ABST
    Figure CN116272098B_ABST
Patent Text Reader

Abstract

The application discloses a tailing pond infiltration line monitoring hole clogging treatment device and treatment method. A plurality of water seepage holes are arranged on a seepage discharge pipe of the treatment device at intervals, airtight connection joints are detachably fixed at the top end of the seepage discharge pipe and have a diameter larger than that of the monitoring hole, a geotextile tightly wraps the seepage discharge pipe, an air bag is a hollow cylindrical structure with a closed bottom and is arranged in the seepage discharge pipe, the diameter of the air bag after expansion is not less than the inner diameter of the seepage discharge pipe, a gravity sinking device is fixed at the lower end of the air bag and has an outer circle diameter smaller than the inner diameter of the seepage discharge pipe, a gas supply pipe of a pressurizing system penetrates the airtight connection joint and is in airtight connection with an opening at the top end of the air bag. The test method comprises the steps of seepage discharge pipe installation, joint connection, air bag placement, airtight connection joint installation, pressure test and treatment. The application forms a reverse seepage flow channel for water in the monitoring hole through hole pressurization, so that the clogging is cleaned, and the application has the characteristics of simple structure, simple operation, good dredging effect, safety and reliability and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of environmental engineering technology, specifically relating to a device and method for treating clogging of tailings dam seepage line monitoring holes that is simple in structure, easy to operate, has good dredging effect, is safe and reliable, and has low cost. Background Technology

[0002] Tailings dams are constructed by damming valleys or enclosing land to store tailings discharged after the beneficiation of metal or non-metal mine ore, as well as other industrial waste such as coal slag from thermal power plants. Tailings dams are typically formed by the accumulation of water-rich tailings or other industrial waste. If not properly managed, the large amounts of heavy metals and sulfides they contain can cause serious pollution to the surrounding environment. Furthermore, tailings dams are also a high-potential source of man-made debris flows, posing a risk of dam failure and potentially causing major accidents.

[0003] Currently, my country generates over 1.5 billion tons of tailings annually from mineral processing. Aside from a small portion used for mine backfilling or comprehensive utilization, the vast majority is stockpiled in tailings dams. With continuous improvements in mineral processing technology, tailings particles are increasingly becoming more concentrated and finer. High-concentration fine-grained tailings are defined as tailings with a transport concentration exceeding 60%, an average particle size (dp) < 0.030 mm, and a dam-building particle size (+0.037 mm) of less than 30%. The wetting line monitoring boreholes in tailings dams are crucial monitoring facilities and essential for assessing the overall stability of the dam. Clogged monitoring boreholes distort the monitoring data, severely impacting the safe and stable operation of the tailings dam. Traditional methods for addressing clogged wetting line monitoring boreholes often involve re-drilling, which significantly increases engineering costs and fails to address the root cause of the clogging.

[0004] In existing technologies, a rigid filter pipe wrapped with a drainage membrane is installed inside the tailings seepage line monitoring hole, and multiple parallel cleaning pipes are arranged around the filter pipe. Cleaning holes facing the filter pipe are provided on the cleaning pipes, attempting to periodically or as needed flush the drainage membrane to remove clogging particles and cementitious materials. However, because flushing requires high water pressure to ensure effectiveness, the tailings around the monitoring hole can be locally hollowed out, affecting the normal monitoring of the tailings dam's seepage line and potentially causing rapid liquefaction in certain areas, threatening the safety of the tailings dam. Therefore, research on the treatment of clogging in tailings dam seepage line monitoring holes is particularly necessary. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this invention provides a tailings dam phreatic line monitoring hole clogging treatment device that is simple in structure, easy to operate, has good dredging effect, is safe and reliable, and has low cost. It also provides a method for treating the clogging of tailings dam phreatic line monitoring holes.

[0006] The tailings dam seepage line monitoring hole clogging control device of the present invention is implemented as follows: it includes a drainage pipe, geotextile, airbag, gravity sinking device, sealed connection joint, and pressurization system. The drainage pipe is provided with a number of seepage holes at intervals. The sealed connection joint is detachably fixed at the top of the drainage pipe and its diameter is larger than the diameter of the monitoring hole. The geotextile tightly wraps the drainage pipe. The airbag is a hollow cylindrical structure with a closed bottom and is arranged inside the drainage pipe. The diameter of the inflated airbag is not less than the inner diameter of the drainage pipe. The gravity sinking device is fixedly connected to the lower end of the airbag and its outer circle diameter is smaller than the inner diameter of the drainage pipe. The air supply pipe of the pressurization system passes through the sealed connection joint and is sealed to the opening at the top of the airbag.

[0007] The tailings dam phreatic line monitoring hole clogging treatment method of the present invention is implemented as follows, based on the aforementioned tailings dam phreatic line monitoring hole clogging treatment device, including the following steps: A. Drainage pipe installation: Wrap geotextile around the outer wall of the drainage pipe with several seepage holes and fix it in place; insert the wrapped drainage pipe into the pre-treated monitoring hole; B. Connector: Apply adhesive to the lower connector surface of the sealed connector and then insert it into the drainage pipe; at the same time, seal the opening of the airbag with adhesive to the air supply pipe and leave it for 2-3 days. C. Place the airbag: Insert the airbag with the gravity sinking device at the lower end through the lower connector into the drainage pipe. After the cone falls to the bottom of the monitoring hole, lift the airbag upwards by 25-35cm. D. Installation of sealed connection joint: Inject water into the drainage pipe. After the water level reaches the top of the monitoring hole that is close to the wetting line, install the upper joint and sealing ring to seal the opening of the monitoring hole, and make the air supply pipe pass through the upper joint and sealing ring. E. Pressure test: Adjust the pressurization system, slowly increase the pressure, and ensure that no water overflows from the sealed connection joints; F. Treatment: Gradually increase the gas supply pressure in the gas supply pipe until the preset maximum pressure is reached, and then slowly release the pressure. Repeat steps D to F of water injection-pressurization-depressurization multiple times to complete the treatment of siltation in the monitoring hole of the tailings dam seepage line.

[0008] The beneficial effects of this invention are: This invention involves placing a drainage pipe wrapped with geotextile inside a monitoring borehole, then placing an airbag inside the drainage pipe and installing a sealed connection joint at the top of the pipe, followed by water injection. This creates a sealed structure in the drainage pipe where the upper part can only connect to the airbag. The airbag is inflated and pressurized by an external pressurization system. The sealed connection joint prevents water from overflowing from the drainage pipe's opening during pressurization, while the water injected into the drainage pipe forms a reverse seepage channel through the geotextile. This forces the silt in the monitoring borehole into the borehole wall with the water flow, thereby clearing the silt. This invention solves the problem of distorted water level monitoring data caused by siltation in tailings dam seepage line monitoring boreholes. At the same time, the geotextile prevents silt from entering the drainage pipe and affecting the dredging effect. Compared with re-drilling monitoring boreholes, this method is less costly, has better dredging effect, and is safe and reliable.

[0009] 2. This invention, by setting a detachable sealed connection joint at the top of the drainage pipe, and connecting the airbag to the pressurization system air supply pipe passing through the sealed connection joint, allows for multiple water injections by disassembling the sealed connection joint, followed by reinstalling the sealed connection joint to perform reverse seepage dredging work by pressurizing and depressurizing the airbag. This enables multiple reverse seepage dredging operations to be easily achieved in the same monitoring hole to improve the dredging effect. Moreover, multiple reverse seepages from the hole can effectively remove particles and cementitious materials clogging the drainage membrane wrapped around the rigid filter pipe. Furthermore, the reverse seepage formed by the airbag compression in the hole is weakened by the two-stage depressurization of the geotextile on the drainage pipe and the drainage membrane on the rigid filter pipe, which can reduce the scouring of the tailings around the monitoring hole. This can prevent the tailings around the monitoring hole from becoming locally hollow, thus affecting the normal monitoring of the phreatic line of the tailings dam. In addition, the silt squeezed into the hole wall of the monitoring hole can also enhance the stability of the surrounding tailings and improve the safety of the tailings dam.

[0010] 3. The present invention has a gravity sinking device fixedly connected to the lower end of the airbag, and the airbag is a hollow cylindrical structure with a closed bottom. This allows the airbags to be evenly distributed in the drainage pipe, which can avoid blockage or even tearing caused by the airbags folding together when pressurized. Moreover, the evenly distributed airbags in the pipe can also make the reverse seepage pressure uniform along the axial direction, thereby improving the dredging effect of the monitoring hole and avoiding local pressure from excessive local pressure causing local hollowing of the surrounding tailings, thus ensuring the authenticity and reliability of the monitoring data.

[0011] In summary, this invention features simple structure, easy operation, good dredging effect, safety and reliability, and low cost. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the unpressurized application structure of the present invention; Figure 2 This is a schematic diagram of a partial structure during the pressurization process of the present invention; Figure 3 for Figure 2 A cross-sectional view of the sealing ring; Figure 4 for Figure 2 Enlarged view of the circumferentially unfolded drainage pipe; Figure 5 for Figure 1 A magnified view of a portion of the image; In the diagram: 1-drainage pipe, 11-seepage hole, 2-geotextile, 3-airbag, 4-gravity sinking device, 41-cone, 42-lead wire, 5-sealed connection joint, 51-upper joint, 52-sealing ring, 521-outer shell, 522-elastic colloid, 523-convex ring, 53-lower joint, 531-insertion pipe, 54-sealing ring, 6-pressurization system, 61-air supply pipe, 62-meter box, 63-high pressure air source, 7-monitoring hole, 8-pipe clamp. Detailed Implementation

[0013] The present invention will be further described below with reference to the accompanying drawings and embodiments, but this does not limit the present invention in any way. Any changes or improvements made based on the teachings of the present invention shall fall within the protection scope of the present invention.

[0014] like Figures 1 to 5 As shown, the tailings dam seepage line monitoring hole clogging treatment device of the present invention includes a drainage pipe 1, geotextile 2, airbag 3, gravity sinking device 4, sealed connection joint 5, and pressurization system 6. The drainage pipe 1 is provided with a plurality of seepage holes 11 at intervals. The sealed connection joint 5 is detachably fixed at the top of the drainage pipe 1 and its diameter is larger than the diameter of the monitoring hole 7. The geotextile 2 tightly wraps the drainage pipe 1. The airbag 3 is a hollow cylindrical structure with a closed bottom and is arranged inside the drainage pipe 1. The diameter of the inflated airbag 3 is not less than the inner diameter of the drainage pipe 1. The gravity sinking device 4 is fixedly connected to the lower end of the airbag 3 and its outer circle diameter is smaller than the inner diameter of the drainage pipe 1. The air supply pipe 61 of the pressurization system 6 passes through the sealed connection joint 5 and is sealed to the opening at the top of the airbag 3.

[0015] like Figure 2 and 3 As shown, the airbag 3 is fitted with inner and outer double-layered rubber membranes, and the opening at the top of the airbag 3 is sealed to the air supply pipe 61 with a colloid. The inner rubber membrane is used for pressurization, and the outer rubber membrane expands and contracts with the inner rubber membrane and is used for friction with the sidewall to protect the inner rubber membrane from damage.

[0016] The thickness of the double-layer rubber membrane of the airbag 3 is 2~3mm.

[0017] like Figure 4As shown, the seepage holes 11 are evenly spaced along the circumference of the drainage pipe 1. Adjacent seepage holes 11 arranged along the axial direction of the drainage pipe 1 are staggered. The distance between adjacent seepage holes 11 on the drainage pipe 1 is 15~20cm, and the opening rate of the seepage holes 11 on the drainage pipe 1 is 16~20%. Compared with regular drilling, the seepage holes arranged staggered along the axial direction (i.e., quincunx-shaped drilling) have the characteristics of high strength and less breakage, which can improve the service life of the drainage pipe.

[0018] like Figure 2 and 3 As shown, the sealed connection joint 5 includes an upper joint 51, a sealing ring 52, and a lower joint 53. The bottom of the lower joint 53 is detachably and fixedly connected to the drainage pipe 1. The upper joint 51 and the lower joint 53 are sealed together by the sealing ring 52 disposed between them. The air supply pipe 61 passes through the upper joint 51, the sealing ring 52, and the lower joint 53 in sequence and is sealed to the sealing ring 52 with a gel.

[0019] like Figure 3 As shown, the sealing ring 52 includes a cylindrical ring structure outer shell 521 and an elastic colloid 522 fixedly disposed inside the outer shell 521. The outer shell 521 is provided with external threads. The upper connector 51 and the lower connector 53 are both barrel-shaped structures and are provided with internal threads. The outer shell 521 is threadedly connected to the upper connector 51 and the lower connector 53 respectively.

[0020] The elastic colloid 522 has a convex ring 523 in the middle, and the outer shell 521 is fixedly disposed at both ends of the convex ring 523. The upper connector 51 and the lower connector 53 are threadedly connected to the outer shell 521 and their end faces are pressed against the two end faces of the convex ring 523.

[0021] The bottom of the lower connector 53 is fixedly provided with a downwardly extending insertion pipe 531 whose outer diameter is equivalent to the inner diameter of the drainage pipe 1. The insertion pipe 531 is inserted into the drainage pipe 1 and sealed with colloid.

[0022] like Figure 5 As shown, the gravity sinking device 4 includes a cone 41 and a lead wire 42. One end of the lead wire 42 is fixedly connected to the cone 41 and the other end is sealed to the lower end of the airbag 3 with a colloid.

[0023] The geotextile 2 is a water-filtering geotextile made of synthetic fibers through spinning or non-woven processes such as bonding and hot-pressing needle punching.

[0024] The method for treating clogging of tailings dam phreatic line monitoring holes according to the present invention, based on the aforementioned tailings dam phreatic line monitoring hole clogging treatment device, includes the following steps: A. Drainage pipe installation: Wrap the geotextile 2 around the outer wall of the drainage pipe 1 with several seepage holes 11 and fix it in place; insert the wrapped drainage pipe 1 into the pre-treated monitoring hole 7; B. Connector connection: Apply adhesive to the surface of the lower connector 53 of the sealed connector 5, and then insert it into the drainage pipe 1; at the same time, seal the opening of the airbag 3 with adhesive to the air supply pipe 61, and leave it for 2-3 days. C. Place the airbag: Insert the airbag 3, which is connected to the gravity sinking device 4 at the lower end, through the lower connector 53 into the drainage pipe 1. After the cone 41 falls to the bottom of the monitoring hole 7, lift the airbag 3 upwards by 25~35cm. D. Installation of sealed connection joint: Fill the drainage pipe 1 with water. After the water level reaches the top of the monitoring hole 7 which is close to the immersion line, install the upper joint 51 and sealing ring 52 to seal the opening of the monitoring hole 7, and make the air supply pipe 61 pass through the upper joint 51 and sealing ring 52. E. Pressure test: Adjust the pressurization system 6, slowly increase the pressure, and ensure that no water overflows at the sealed connection joint 5; F. Treatment: Gradually increase the gas supply pressure of the gas supply pipe 61 until the preset maximum pressure is reached, and then slowly release the pressure. Repeat steps D to F of water injection-pressurization-depressurization multiple times to complete the treatment of siltation in the tailings dam seepage line monitoring hole blockage.

[0025] In step A, the geotextile 2 wraps the drainage pipe 1 and is fixed at intervals of 3-7cm.

[0026] In step A, the geotextile 2 is fixed to the drainage pipe 1 by binding it with wire or straps at intervals of 3-7cm, or by fixing it to the plastic drainage pipe 1 with hot melt adhesive at intervals of 3-7cm.

[0027] The maximum pressure preset in step F shall not exceed 4 MPa; the siltation treatment of the monitoring hole of the tailings dam infiltration line can be completed by repeating water injection-pressurization-depressurization 3 to 5 times in step F.

[0028] Example 1

[0029] like Figures 1 to 5 As shown, the method for treating clogging of the monitoring wells in the tailings dam seepage line is as follows: 1. 400g / m 2Geotextile 2 is wrapped around the outer wall of a UPVC rigid polyvinyl chloride water supply pipe (i.e., drainage pipe 1) with a hole diameter of 50~90mm and a hole opening rate of 16~20% and a hole spacing of 15~20cm. The geotextile 2 is fixed to the UPVC rigid polyvinyl chloride water supply pipe at a spacing of 3~7cm using hot melt adhesive or binding tape. The wrapped UPVC rigid polyvinyl chloride water supply pipe is inserted into the pre-treated monitoring hole 7. According to the length, multiple UPVC rigid polyvinyl chloride water supply pipes wrapped and fixed with geotextile 2 are connected with pipe clamps 8.

[0030] 2. Apply adhesive to the outer wall of the insertion tube 531 at the bottom of the lower connector 53, and then insert it into the UPVC rigid polyvinyl chloride water supply pipe for about 10cm; at the same time, apply adhesive to the opening of the airbag 3 and seal it with the lower end of the air supply pipe 61, and then bond multiple layers of adhesive tape to the outside of it; and apply adhesive to the bottom of the airbag 3 and connect it with the lead wire 42 of the gravity sinking device 4, and leave it for 2-3 days.

[0031] 3. Insert the airbag 3 along with the gravity sinking device 4 through the lower connector 53 into the UPVC rigid polyvinyl chloride water supply pipe. After the cone 41 falls to the bottom of the monitoring hole 7, lift the airbag 3 upwards by 25~35cm.

[0032] 4. Fill the UPVC rigid polyvinyl chloride water supply pipe with water. After the water level reaches the top of the monitoring hole 7 which is close to the wetting line, install the upper connector 51 and sealing ring 52 to seal the opening of the monitoring hole 7, and make the air supply pipe 61 pass through the upper connector 51 and sealing ring 52. 5. Debug the pressurization system 6, slowly open the nitrogen cylinder (i.e., high-pressure gas source 63) to increase the pressure, and check the pressure gauge and pressure gauge on the gauge box 62 at any time to ensure that there is no water overflow at the sealed connection joint 5 and that personnel are safe. 6. Gradually increase the air supply pressure of the air supply pipe 61 until the preset maximum pressure (not exceeding 4MPa) is reached, and then slowly release the pressure. Repeat steps 4 to 5 of water injection-pressurization-depressurization 3 to 5 times to complete the siltation treatment of the monitoring hole of the tailings dam seepage line.

[0033] The above description is merely a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A device for treating clogging of monitoring holes in the seepage line of a tailings dam, characterized in that... The system includes a drainage pipe (1), geotextile (2), airbag (3), gravity sinking device (4), sealed connection joint (5), and pressurization system (6). The drainage pipe (1) has several perforation holes (11) spaced apart. The sealed connection joint (5) is detachably fixed at the top of the drainage pipe (1) and has a diameter larger than the monitoring hole (7). The geotextile (2) tightly wraps around the drainage pipe (1). The airbag (3) is a hollow cylindrical structure with a closed bottom and is placed inside the drainage pipe (1). 3) The expanded diameter is not less than the inner diameter of the drainage pipe (1). The gravity sinking device (4) includes a cone (41) and a lead wire (42). One end of the lead wire (42) is fixedly connected to the cone (41), and the other end is sealed to the lower end of the airbag (3) with a colloid. The gravity sinking device (4) is fixedly connected to the lower end of the airbag (3) and the outer diameter of the circumscribed circle is smaller than the inner diameter of the drainage pipe (1). The air supply pipe (61) of the pressurization system (6) passes through the sealed connection joint (5) and is sealed to the opening at the top of the airbag (3). The sealed connection joint (5) includes an upper joint (51), a sealing ring (52), and a lower joint (53). The bottom of the lower joint (53) is detachably fixed to the drainage pipe (1). The upper joint (51) and the lower joint (53) are sealed together by the sealing ring (52) between them. The air supply pipe (61) passes through the upper joint (51), the sealing ring (52), and the lower joint (53) in sequence and is sealed to the sealing ring (52) with a gel.

2. The tailings dam sludge monitoring hole clogging control device according to claim 1, characterized in that... The airbag (3) is covered with an inner and outer double-layer rubber membrane, and the opening at the top of the airbag (3) is sealed to the air supply pipe (61) with a colloid.

3. The tailings dam sludge monitoring hole clogging control device according to claim 1, characterized in that... The seepage holes (11) are evenly spaced along the circumference of the drainage pipe (1). Adjacent seepage holes (11) on the drainage pipe (1) are staggered along the axial direction. The distance between adjacent seepage holes (11) on the drainage pipe (1) is 15~20cm. The opening rate of the seepage holes (11) on the drainage pipe (1) is 16~20%.

4. The tailings dam sludge monitoring hole clogging control device according to claim 1, characterized in that... The sealing ring (52) includes a cylindrical ring structure outer shell (521) and an elastic colloid (522) fixedly disposed inside the outer shell (521). The outer shell (521) is provided with external threads. The upper connector (51) and the lower connector (53) are both barrel-shaped structures and are provided with internal threads. The outer shell (521) is threadedly connected to the upper connector (51) and the lower connector (53) respectively.

5. The tailings dam sludge monitoring hole clogging control device according to claim 4, characterized in that... The elastic colloid (522) has a convex ring (523) in the middle, and the outer shell (521) is fixedly disposed at both ends of the convex ring (523). The upper connector (51) and the lower connector (53) are threadedly connected to the outer shell (521) and their end faces are pressed against the two end faces of the convex ring (523).

6. The tailings dam sludge monitoring hole clogging control device according to claim 1, characterized in that... The bottom of the lower connector (53) is fixedly provided with a downwardly extending insertion pipe (531) with an outer diameter equivalent to the inner diameter of the drainage pipe (1). The insertion pipe (531) is inserted into the drainage pipe (1) and sealed with colloid.

7. A method for treating siltation in monitoring boreholes of tailings dam seepage lines, characterized in that... The tailings dam seepage line monitoring hole clogging control device according to any one of claims 1 to 6 includes the following steps: A. Drainage pipe installation: Wrap the geotextile (2) around the outer wall of the drainage pipe (1) with several seepage holes (11) and fix it in place; insert the wrapped drainage pipe (1) into the pre-treated monitoring hole (7); B. Connecting the connector: Apply colloid to the surface of the lower connector (53) of the sealed connector (5) and then insert it into the drainage pipe (1); at the same time, seal the opening of the airbag (3) with colloid to the air supply pipe (61) and leave it for 2-3 days. C. Place the airbag: Put the airbag (3) with the gravity sinking device (4) connected to the lower end through the lower connector (53) into the drainage pipe (1). After the cone (41) falls to the bottom of the monitoring hole (7), lift the airbag (3) upward by 25~35cm. D. Installation of sealed connection joint: Fill the drainage pipe (1) with water. After the water level reaches the top of the monitoring hole (7) which is close to the immersion line, install the upper joint (51) and sealing ring (52) to seal the opening of the monitoring hole (7) and make the air supply pipe (61) pass through the upper joint (51) and sealing ring (52). E. Pressure test: Debug the pressurization system (6), slowly increase the pressure, and make sure that no water overflows at the sealed connection joint (5); F. Treatment: Gradually increase the gas supply pressure of the gas supply pipe (61) until the preset maximum pressure is reached, and then slowly release the pressure. Repeat the water injection-pressurization-pressure reduction steps D to F multiple times to complete the treatment of the siltation of the tailings dam infiltration line monitoring hole.

8. The method for treating siltation of tailings dam seepage line monitoring holes according to claim 7, characterized in that... The maximum pressure preset in step F shall not exceed 4 MPa; the siltation treatment of the monitoring hole of the tailings dam infiltration line can be completed by repeating water injection-pressurization-depressurization 3 to 5 times in step F.

Citation Information

Patent Citations

  • Tailings drainage installation clogging clearing device and method

    CN108331127A

  • Efficient reverse osmosis membrane cleaning device

    CN217042097U