AI Technical Summary

Technical Problem

[0002]在现有的技术中,新冠检测试盒设有连接桥,参照图18、图19以及图20,连接桥包括桥体910、桥盖920以及O型圈930,桥体910的顶侧面设有第一插头911和第二插头912,其中,生产人员需要人为地将桥盖920焊装于桥体910的底侧面,且将O型圈930套设于第一插头911,但是,上述人为的组装工作所需的人力成本较高,因此,会导致连接桥的生产成本增加

Benefits of technology

[0005]根据本发明实施例的一种连接桥组装生产线,至少具有如下有益效果:通过上述结构,机架上设置的输料装置、焊接装置以及装圈装置相互配合,以能够实现将桥盖和O型圈装于桥体,其中,上述组装工作无人工的参与,因此,能够降低人力的成本,从而能够降低连接桥的生产成本。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116329941B_ABST
    Figure CN116329941B_ABST
Patent Text Reader

Abstract

The application discloses a connecting bridge assembling production line, which comprises a rack, a material conveying device, a welding device and a ring mounting device. The material conveying device is arranged on the rack and is used for outputting a bridge cover, an O-shaped ring and a bridge body arranged downward. The welding device is arranged on the rack and is used for moving and receiving the bridge body output by the material conveying device and moving and welding the bridge cover output by the material conveying device to the bottom side of the received bridge body. The ring mounting device is arranged on the rack and is used for overturning, moving and receiving the bridge body with the welded bridge cover on the welding device. The overturned bridge body is arranged upward, and the ring mounting device is used for moving and sleeving the O-shaped ring output by the material conveying device to the first plug of the bridge body. Through the above structure, the labor cost can be reduced, and the production cost of the connecting bridge can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of bridge manufacturing technology, and in particular to a bridge assembly line. Background Technology

[0002] In existing technologies, COVID-19 test kits are equipped with connecting bridges, as referenced. Figure 18 , Figure 19 as well as Figure 20 The connecting bridge includes a bridge body 910, a bridge cover 920, and an O-ring 930. The top side of the bridge body 910 is provided with a first plug 911 and a second plug 912. Production personnel need to manually weld the bridge cover 920 to the bottom side of the bridge body 910 and fit the O-ring 930 onto the first plug 911. However, the labor cost required for the above-mentioned manual assembly work is high, which will lead to an increase in the production cost of the connecting bridge. Summary of the Invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a connecting bridge assembly line that can reduce the production cost of connecting bridges.

[0004] According to an embodiment of the present invention, a bridge assembly production line includes a frame, a conveying device, a welding device, and a ring-fitting device. The conveying device is disposed on the frame and is used to output a bridge cover, an O-ring, and a bridge body facing downwards. The welding device is disposed on the frame and is used to pick up and receive the bridge body output by the conveying device, and to transfer and weld the bridge cover output by the conveying device to the bottom side of the received bridge body. The ring-fitting device is disposed on the frame and is used to flip, pick up, and receive the bridge body with the bridge cover welded on it from the welding device. The flipped and picked-up bridge body faces upwards, and the ring-fitting device is used to transfer and fit the O-ring output by the conveying device onto the first plug of the bridge body.

[0005] According to an embodiment of the present invention, a connecting bridge assembly production line has at least the following beneficial effects: through the above structure, the material conveying device, welding device and ring mounting device provided on the frame cooperate with each other to realize the mounting of the bridge cover and O-ring onto the bridge body. The above assembly work is done without manual intervention, thus reducing labor costs and thereby reducing the production cost of the connecting bridge.

[0006] According to some embodiments of the present invention, the material conveying device includes a bridge conveying mechanism, a bridge conveying cover mechanism, and an O-ring conveying mechanism. The bridge conveying mechanism is disposed on the frame and is used to output the bridge body facing downward. The bridge conveying cover mechanism is disposed on the frame and is used to output the bridge cover. The O-ring conveying mechanism is disposed on the frame and is used to output the O-ring.

[0007] According to some embodiments of the present invention, the welding apparatus includes a first platform mechanism, a first transfer assembly, a second transfer assembly, and a welding mechanism. The first platform mechanism is disposed on the frame and has a first platform. The first platform mechanism is capable of sequentially transferring the first platform to a first position, a second position, and a third position. The first platform is used to support the bridge body disposed downwards. The first transfer assembly is disposed on the frame and is used to transfer the bridge body output by the material conveying device to the first platform located at the first position. The second transfer assembly is disposed on the frame and is used to transfer the bridge cover output by the material conveying device to the bottom side of the bridge body located at the second position. The welding mechanism is disposed on the frame and is used to weld the bridge body and the bridge cover located at the third position.

[0008] According to some embodiments of the present invention, the frame is provided with a first cleaning component, the first platform mechanism is capable of sequentially and cyclically moving the first platform to the first position, the second position, the third position, the fourth position and the fifth position, the ring loading device is used to flip and transfer the bridge body located at the fourth position, and the first cleaning component is capable of blowing and cleaning the first platform located at the fifth position.

[0009] According to some embodiments of the present invention, the O-ring mounting device includes a second platform mechanism, a first flipping and transferring mechanism, and a transfer mechanism. The second platform mechanism is disposed on the frame and has a second platform. The second platform mechanism is capable of sequentially transferring the second platform to a sixth position and a seventh position. The second platform is used to support the bridge body facing upward. The first flipping and transferring mechanism is disposed on the frame and is used to flip and transfer the bridge body with the bridge cover welded on the welding device, and to transfer the flipped, upward-facing bridge body to the second platform located at the sixth position. The transfer mechanism is disposed on the frame and is used to transfer the O-ring output by the material conveying device and fit it into the first plug located at the seventh position.

[0010] According to some embodiments of the present invention, the frame is provided with a material transfer device, a storage and conveying device, a sticker applicator, a box conveying mechanism, and a second flipping and transferring mechanism. The storage and conveying device is used to store the mounting plate and to sequentially convey the mounting plate to the eighth, ninth, and tenth positions. The sticker applicator is used to apply adhesive tape to the mounting plate located at the eighth position. The material transfer device is used to remove the bridge body with the O-ring sleeve on the ring applicator and to transfer a predetermined number of the bridge bodies to the adhesive tape on the mounting plate located at the ninth position. The box conveying mechanism is used to convey a first receiving box and to convey it to the eleventh position. The first receiving box is provided with a first mounting groove for inserting a vertical mounting plate with the bridge body attached. The second flipping and transferring mechanism is used to flip and remove the mounting plate with the bridge body attached located at the tenth position and to insert the flipped vertical mounting plate into the first mounting groove located at the eleventh position.

[0011] According to some embodiments of the present invention, the frame is provided with a third transfer assembly, and the storage and conveying device is used to sequentially transport the mounting plate to the eighth position, the ninth position, the tenth position and the fourteenth position, and the third transfer assembly is used to transfer the mounting plate located at the fourteenth position with only adhesive tape attached.

[0012] According to some embodiments of the present invention, the frame is provided with a pressing mechanism, the storage and conveying device is used to sequentially convey the mounting plate to the eighth position, the ninth position, the fifteenth position and the tenth position, and the pressing mechanism is used to press the bridge body attached to the mounting plate at the fifteenth position.

[0013] According to some embodiments of the present invention, the frame is provided with a loading mechanism for conveying at least two of the first receiving boxes stacked together, and for transferring the first receiving boxes one by one to the conveying mechanism.

[0014] According to some embodiments of the present invention, the frame is provided with a material transfer device, a box conveying mechanism, and a third flipping and transferring mechanism. The material transfer device is used to remove the bridge body with the O-ring sleeve on the ring mounting device and to transfer the bridge body to the twelfth position. The box conveying mechanism is used to convey a second receiving box and to convey it to the thirteenth position. The second receiving box is provided with a second mounting slot for a predetermined number of bridge bodies with the first plug horizontally arranged to be inserted. The third flipping and transferring mechanism is used to flip and remove a predetermined number of bridge bodies located at the twelfth position and to insert the predetermined number of bridge bodies with the first plug horizontally arranged after flipping into the second mounting slot located at the thirteenth position. Attached Figure Description

[0015] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which:

[0016] Figure 1 This is a structural diagram of an embodiment of the bridge body mechanism of the present invention;

[0017] Figure 2 for Figure 1 The diagram shows the structure of the bridge body mechanism after some components have been removed.

[0018] Figure 3 This is a structural diagram of an embodiment of the welding apparatus of the present invention;

[0019] Figure 4 for Figure 3 The structural diagram of the conveyor cover mechanism and the second transfer assembly shown in the figure;

[0020] Figure 5 for Figure 3 The diagram shows the structure of the first transfer mechanism shown in the figure.

[0021] Figure 6 for Figure 3 The diagram shows the structure of the first removal component.

[0022] Figure 7 for Figure 3 The structural diagram of the welding mechanism shown in the figure;

[0023] Figure 8 This is a structural diagram of an embodiment of the ring-fitting device of the present invention;

[0024] Figure 9 for Figure 8 The diagram shows the structure of the ring-fitting device after removing some components.

[0025] Figure 10 for Figure 8 The diagram shows the structure of the fifth transfer component.

[0026] Figure 11 for Figure 8 The structural diagram of the transfer mechanism shown in the figure;

[0027] Figure 12 for Figure 11 A cross-sectional view of the transfer mechanism shown in the diagram when the O-ring is fitted;

[0028] Figure 13 This is a structural diagram of an embodiment of the sticker-making device, box-carrying mechanism, box-loading mechanism, and second flipping and transferring mechanism of the present invention.

[0029] Figure 14 for Figure 13The diagram shown is of the structure after removing some components;

[0030] Figure 15 for Figure 13 Another structural diagram showing the removal of some components;

[0031] Figure 16 for Figure 13 Another structural diagram showing the removal of some components;

[0032] Figure 17 for Figure 13 The structural diagram of the box conveying mechanism and the box loading mechanism shown in the figure;

[0033] Figure 18 This is a structural diagram of the bridge body of the present invention;

[0034] Figure 19 This is a structural diagram of the bridge body equipped with a bridge cover according to the present invention;

[0035] Figure 20 This is a structural diagram of the bridge body (i.e., connecting bridge) of the present invention, which is equipped with a bridge cover and an O-ring;

[0036] Figure 21 This is a simplified structural diagram of the connecting bridge assembly production line of the present invention. Detailed Implementation

[0037] This section will describe in detail specific embodiments of the present invention. Preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the drawings is to supplement the textual description with graphics, so that people can intuitively and vividly understand each technical feature and overall technical solution of the present invention, but they should not be construed as limiting the scope of protection of the present invention.

[0038] In the description of this invention, the use of terms such as first, second, third, fourth, fifth, etc., is only for the purpose of distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the number of technical features indicated, or implicitly indicating the order of the technical features indicated.

[0039] In the description of this invention, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., are based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting this invention.

[0040] In this invention, unless otherwise explicitly defined, the terms "setting," "installing," and "connecting" should be interpreted broadly. For example, they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to a fixed connection, a detachable connection, or an integrally formed connection; they can refer to a mechanical connection; they can refer to the internal connection of two components or the interaction between two components. Those skilled in the art can reasonably determine the specific meaning of the above terms in this invention in conjunction with the specific content of the technical solution.

[0041] Reference Figures 1 to 21 This invention discloses a bridge assembly production line, comprising a frame 100, a conveying device, a welding device, and a ring-fitting device. The conveying device is located on the frame 100 and is used to output a bridge cover 920, an O-ring 930, and a bridge body 910 facing downwards. The welding device is located on the frame 100 and is used to pick up and receive the bridge body 910 output by the conveying device, and to transfer and weld the bridge cover 920 output by the conveying device to the bottom side of the received bridge body 910. The ring-fitting device is located on the frame 100 and is used to flip, pick up, and receive the bridge body 910 with the bridge cover 920 welded on it from the welding device. The flipped and picked-up bridge body 910 faces upwards, and the ring-fitting device is used to transfer and fit the O-ring 930 output by the conveying device onto the first plug 911 of the bridge body 910.

[0042] It is understandable that the bridge body 910 facing downwards means that the first plug 911 and the second plug 912 are facing downwards.

[0043] With the above structure, the material conveying device, welding device and ring mounting device provided on the frame 100 cooperate with each other to enable the bridge cover 920 and O-ring 930 to be mounted on the bridge body 910. The above assembly work is done without manual intervention, thus reducing labor costs and thereby reducing the production cost of the connecting bridge.

[0044] The material conveying device includes a conveyor bridge body mechanism 210, a conveyor bridge cover mechanism 220, and an O-ring conveying mechanism 230.

[0045] Reference Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 8 as well as Figure 11 The bridge body conveying mechanism 210 is located on the frame 100 and is used to output the bridge body 910 facing downward. The bridge cover conveying mechanism 220 is located on the frame 100 and is used to output the bridge cover 920. The O-ring conveying mechanism 230 is located on the frame 100 and is used to output the O-ring 930.

[0046] The conveyor bridge mechanism 210 includes a first storage plate frame group 211, a second storage plate frame group 212, a plate shifting assembly 213, and a conveyor bridge frame group 214.

[0047] Reference Figure 1 and Figure 2 The first storage rack assembly 211, the second storage rack assembly 212, the pallet shifting assembly 213, and the conveyor bridge assembly 214 are all mounted on the frame 100. The pallet shifting assembly 213 is provided with a support plate 213A, which is used to receive and support the pallets. The pallet shifting assembly 213 can drive the support plate 213A to move sequentially to the sixteenth position s16, the seventeenth position s17, and the eighteenth position s18. The first storage rack assembly 211 is used to store at least two stacked pallets equipped with bridge bodies 910 (facing downwards), and is used to move the pallets located at... The lowest single receiving plate is transferred to the support plate 213A located at the sixteenth position s16. The bridge conveyor assembly 214 is provided with a bridge conveyor channel for the downward-facing bridge body 910 to pass through. The bridge conveyor channel has a nineteenth position s19 and a twentieth position s20. The bridge conveyor assembly 214 is used to transfer the bridge body 910 on the receiving plate located at the seventeenth position s17 to the twentieth position s20, and to drive the bridge body 910 on the twentieth position s20 to the nineteenth position s19, so as to output the bridge body 910. The second storage plate assembly 212 is used to receive the empty receiving plate on the support plate 213A located at the eighteenth position s18.

[0048] Understandably, when the second storage rack group 212 receives an empty storage plate, the plate transfer assembly 213 can drive the support plate 213A back to the sixteenth position s16, and drive it to move sequentially to the seventeenth position s17 and the eighteenth position s18.

[0049] The plate shifting assembly 213 includes the aforementioned support plate 213A and a first conveyor belt assembly. The first conveyor belt assembly includes two first rollers 213B, a first conveyor belt 213C, and a first drive member 213D. (Refer to...) Figure 2 A support plate 213A is slidably mounted on the frame 100. A first rotating wheel 213B is rotatably connected to the frame 100. A first conveyor belt 213C is fitted onto two first rotating wheels 213B and connected to the support plate 213A. A first driving member 213D is mounted on the frame 100 and connected to one of the first rotating wheels 213B. The first driving member 213D can drive the first conveyor belt 213C to rotate through one of the first rotating wheels 213B, causing the support plate 213A to move sequentially to position 16, position 17, and position 18. The first driving member 213D is a motor.

[0050] The first storage rack assembly 211 includes a first storage rack 211A, a first lifting rack 211B, a second drive unit 211C, and four third drive units 211D. (Refer to...) Figure 2 A first storage plate rack 211A is mounted on the frame 100, and the first storage plate rack 211A has a first storage plate cavity 211A1. A first lifting frame 211B is slidably mounted on the frame 100, and the first lifting frame 211B is located below the first storage plate cavity 211A1. A second driving member 211C is mounted on the frame 100, and the output end of the second driving member 211C is connected to the first lifting frame 211B. The second driving member 211C can drive the first lifting frame 211B to rise and fall. Four third driving members 211D are arranged in a rectangular four-point distribution on the first lifting frame 211B. The output end of the third driving member 211D has an insert plate. The four insert plates are used to jointly support at least two stacked receiving plates equipped with bridge bodies 910 (facing downwards), so that at least two receiving plates are placed in the first storage plate cavity 211A1. Among them, the second driving member 211C and the third driving member 211D are both cylinders, etc.

[0051] The process by which the first storage plate assembly 211 moves the single container plate located at the bottom to the support plate 213A located at the sixteenth position s16 is as follows: When the support plate 213A is located at the sixteenth position s16, the support plate 213A is located in the first storage plate cavity 211A1 and below the insert plate. The second drive member 211C drives the first lifting frame 211B to descend, and at least two container plates on the insert plate move to the support plate 213A. The four third drive members 211D drive the four insert plates to move and release the support of the container plate located at the bottom. The second drive member 211C drives the first lifting frame 211B to rise. The four third drive members 211D drive the four insert plates to move and support the container plate adjacent to the container plate located at the bottom. The second drive member 211C drives the first lifting frame 211B to rise, and the two container plates at the bottom separate, leaving the container plate located at the bottom on the support plate 213A located at the sixteenth position s16.

[0052] The conveyor bridge frame assembly 214 includes a fourth drive member 214A, a fifth drive member 214B, a first clamp 214C, a conveyor bridge 214D, a second conveyor belt assembly 214E, two sixth drive members 214F, and two seventh drive members 214G, as shown in the reference. Figure 1A conveyor bridge 214D is mounted on the frame 100 and has the aforementioned conveyor bridge channel. A fourth drive member 214A is mounted on the frame 100, and a fifth drive member 214B is mounted at the output end of the fourth drive member 214A. The fourth drive member 214A can drive the fifth drive member 214B to move laterally. A first clamp 214C is mounted at the output end of the fifth drive member 214B and is used to clamp the downward-facing bridge body 910. The fifth drive member 214B can drive the first clamp 214C to move up and down. The conveyor bridge 214D is equipped with an anti-detachment block. A second conveyor belt assembly 214E is mounted on... The conveyor bridge 214D and the second conveyor belt assembly 214E are capable of conveying the bridge body 910 of the bridge body channel from the twentieth position s20 to the nineteenth position s19, so that the bridge body 910 abuts against the anti-detachment block. The sixth drive member 214F is provided on the conveyor bridge 214D, and the output ends of the two sixth drive members 214F can be moved to above the two ends of the bridge body 910 at the nineteenth position s19, respectively. The seventh drive member 214G is provided on the conveyor bridge 214D, and the output ends of the two seventh drive members 214G can be moved to above the two ends of the bridge body 910 at the twentieth position s20, respectively. Among them, the fourth drive member 214A is configured as a linear module, etc.; the first clamp 214C is configured as a pneumatic gripper, etc.; the fifth drive member 214B, the sixth drive member 214F, and the seventh drive member 214G are all configured as cylinders, etc.; the structure and working principle of the second conveyor belt assembly 214E are the same as those of the first conveyor belt assembly, so they will not be described again here.

[0053] The working process of the bridge frame assembly 214 is as follows: the first clamp 214C clamps the bridge body 910 on the receiving plate at the seventeenth position s17; the fifth drive member 214B drives the clamped bridge body 910 to rise and fall; the fourth drive member 214A drives the clamped bridge body 910 to move laterally, so that the clamped bridge body 910 moves to the twentieth position s20; the output ends of the two seventh drive members 214G are respectively moved above the two ends of the bridge body 910 at the twentieth position s20; and the second conveyor belt assembly 214E transports the bridge body 910 at the twentieth position s20 to the nineteenth position s19.

[0054] When the bridge body 210 is placed at the nineteenth position s19, the output ends of the two sixth drive members 214F are respectively positioned above the two ends of the bridge body 910. If the first removal component 320 removes the bridge body 910 at the nineteenth position s19, the output ends of the two sixth drive members 214F are respectively moved away from the two ends of the bridge body 910.

[0055] The second storage rack assembly 212 includes a second storage rack 212A, a second lifting frame 212B, an eighth drive component 212C, and four hinge plates 212D. (Refer to...) Figure 2A second storage tray frame 212A is mounted on the frame 100, and the second storage tray frame 212A has a second storage tray cavity 212A1. A second lifting frame 212B is slidably mounted on the frame 100, and the second lifting frame 212B is located below the second storage tray cavity 212A1. An eighth driving member 212C is mounted on the frame 100, and the output end of the eighth driving member 212C is connected to the second lifting frame 212B. The eighth driving member 212C can drive the second lifting frame 212B to rise and fall. Four hinge plates 212D are rotatably connected to the frame 100 in a rectangular four-point distribution. Among them, the hinge plates 212D have a vertical state and a horizontal state. The horizontal hinge plate 212D can support the receiving plate. The eighth driving member 212C is configured as a cylinder, etc.

[0056] The working process of the second storage plate frame group 212 is as follows: When the support plate 213A is in the eighteenth position s18, the support plate 213A is located in the second storage plate cavity 212A1 and below the hinge plate 212D. The eighth driving member 212C drives the second lifting frame 212B to rise. The second lifting frame 212B supports and lifts the receiving plate on the support plate 213A. The lifted receiving plate drives the hinge plate 212D to rotate to a vertical state. When the receiving plate moves to a preset height above the hinge plate 212D, the hinge plate 212D returns to a horizontal state under the action of gravity. The eighth driving member 212C drives the second lifting frame 212B to fall, so that the receiving plate on the second lifting frame 212B is supported by the four hinge plates 212D in a horizontal state. At this time, the receiving work of the receiving plate on the support plate 213A in the eighteenth position s18 can be completed.

[0057] The bridge conveyor cover mechanism 220 includes a first vibratory feeder 221, a bridge conveyor cover frame 222, a bridge pick-up cover plate 223, and a ninth driving component 224, as shown in the figure. Figure 3 and Figure 4 The first vibratory plate 221, the bridge conveyor cover 222, and the ninth drive unit 224 are all located on the frame 100. The bridge pick-up cover 223 is connected to the output end of the ninth drive unit 224. The bridge pick-up cover 223 is provided with a bridge pick-up cover channel 223A. The bridge conveyor cover 222 is provided with a bridge conveyor cover channel. The inlet of the bridge conveyor cover channel is connected to the outlet of the first vibratory plate 221. The ninth drive unit 224 can drive the bridge pick-up cover 223 to move laterally, so that the bridge pick-up cover channel 223A connects to the outlet of the bridge conveyor cover channel, or so that the bridge pick-up cover 223 closes the outlet of the bridge conveyor cover channel.

[0058] The process of the bridge cover conveying mechanism 220 outputting the bridge cover 920 is as follows: the bridge cover 920 on the first vibrating plate 221 moves to the bridge cover taking channel 223A through the bridge cover conveying channel. The ninth driving member 224 drives the bridge cover taking plate 223 to move laterally. The bridge cover taking plate 223 closes the outlet of the bridge cover conveying channel. The single bridge cover 920 located in the bridge cover taking channel 223A is misaligned with the outlet of the bridge cover conveying channel to realize the operation of outputting the bridge cover 920.

[0059] The O-ring feeding mechanism 230 includes a second vibratory plate 231, an O-ring feeding frame 232, an O-ring strip taking mechanism 233, and a tenth driving member 234, as shown in the figure. Figure 8 , Figure 9 as well as Figure 11 The second vibratory plate 231, the O-ring conveyor 232, and the tenth drive unit 234 are all located on the frame 100. The O-ring strip 233 is connected to the output end of the tenth drive unit 234. The O-ring strip 233 is provided with a ring-taking groove 233A. The O-ring conveyor 232 is provided with an O-ring conveying channel. The inlet of the O-ring conveying channel is connected to the outlet of the second vibratory plate 231. The tenth drive unit 224 can drive the O-ring strip 233 to move laterally, so that the ring-taking groove 233A connects to the outlet of the O-ring conveying channel, or so that the O-ring strip 233 closes the outlet of the O-ring conveying channel.

[0060] It is understandable that the output working principle of the O-ring conveying mechanism 230 is the same as that of the bridge cover conveying mechanism 220, so it will not be described again here.

[0061] In this embodiment, refer to Figure 11 The O-ring feeder 232 is equipped with an eleventh driving member 235. The output end of the eleventh driving member 235 is equipped with an insertion block 235A. The eleventh driving member 235 can drive the insertion block 235A to rise and fall. When a single O-ring 930 enters the ring-taking slot 233A, the eleventh driving member 235 drives the insertion block 235A to move down and insert the O-ring 930 at the outlet of the O-ring feeder channel, thereby restricting the O-rings 930 from entering the ring-taking slot 233A.

[0062] The welding apparatus includes a first stage mechanism 310, a first transfer component 320, a second transfer component 330, and a welding mechanism 340.

[0063] Reference Figure 3 The first platform mechanism 310 is provided on the frame 100. The first platform mechanism 310 is provided with a first platform 311. The first platform mechanism 310 can sequentially move the first platform 311 to the first position s1, the second position s2 and the third position s3. The first platform 311 is used to support the bridge body 910 facing downward. The first transfer component 320 is provided on the frame 100. The first transfer component 320 is used to transfer the bridge body 910 at the nineteenth position s19 to the first platform 311 at the first position s1. The second transfer component 330 is provided on the frame 100. The second transfer component 330 is used to transfer the bridge cover 920 on the misaligned bridge cover channel 223A to the bottom side of the bridge body 910 at the second position s2. The welding mechanism 340 is provided on the frame 100. The welding mechanism 340 is used to weld the bridge body 910 and the bridge cover 920 at the third position s3.

[0064] The first platform mechanism 310 includes a first chain 312, a twelfth drive component 313, and two third wheels, as shown in the reference. Figure 3 and Figure 7 The third rotating wheel is rotatably connected to the frame 100. The first chain 312 is sleeved on the two third rotating wheels. The first chain 312 is provided with the aforementioned first platform 311. The twelfth driving member 313 is provided on the frame 100. The twelfth driving member 313 is connected to one of the third rotating wheels. The twelfth driving member 313 can rotate through one of the third rotating wheels to drive the first chain 312 to move the first platform 311 sequentially to the first position s1, the second position s2 and the third position s3.

[0065] The first transfer assembly 320 includes a thirteenth drive member 321, a fourteenth drive member 322, and a second clamp 323, as shown in the reference. Figure 6 The thirteenth drive unit 321 is located on the frame 100, and the fourteenth drive unit 322 is located at the output end of the thirteenth drive unit 321. The thirteenth drive unit 321 can drive the fourteenth drive unit 322 to move laterally. The second clamp 323 is located on the fourteenth drive unit 322, and the fourteenth drive unit 322 can drive the second clamp 323 to rise and fall.

[0066] In this embodiment, four second clamps 323 are provided, and the first platform 311 is used to support the four bridge bodies 910. In order to adjust the spacing between two adjacent bridge bodies 910 during the removal process, so that the four bridge bodies 910 clamped from the nineteenth position s19 can be adaptively moved onto the first platform 311, refer to Figure 6 The output end of the fourteenth drive unit 322 is provided with a lifting plate 322A. The lifting plate 322A is provided with a fifteenth drive unit 322A1. The lifting plate 322A is slidably connected to a guide plate 322A2. The guide plate 322A2 and the fifteenth drive unit 322A1 are connected. The guide plate 322A2 is provided with four guide holes. The second clamps 323 are slidably arranged side by side on the lifting plate 322A. The second clamps 323 are provided with guide blocks. The four guide blocks are arranged one-to-one in the four guide holes. The fifteenth drive unit 322A1 can drive the guide plate 322A2 to rise and fall, so as to adjust the distance between two adjacent second clamps 323 through the guide holes.

[0067] The second transfer assembly 330 includes a sixteenth drive member 331, a first connecting plate 332, a seventeenth drive member 333, a first suction member 335, and a nineteenth drive member 336, as shown in the reference. Figure 4The sixteenth driving member 331 is located on the frame 100, and the first connecting plate 332 is located at the output end of the sixteenth driving member 331. The sixteenth driving member 331 can drive the first connecting plate 332 to move laterally. The seventeenth driving member 333 is located on the first connecting plate 332, and the first suction member 335 is located on the seventeenth driving member 333. The first suction member 335 is used for adsorption, and the seventeenth driving member 333 can drive the first suction member 335 to rise and fall. The nineteenth driving member 336 is located on the frame 100, and the nineteenth driving member 336 is provided with an adjustment frame. The nineteenth driving member 336 can drive the adjustment frame 336A to rotate.

[0068] Through the coordinated operation of the sixteenth drive member 331 and the seventeenth drive member 333, the bridge cover 920 picked up from the misaligned bridge cover picking channel 223A can sequentially pass through the adjusting frame 336A and the second position s2. Among them, the nineteenth drive member 336 can drive the adjusting frame 336A to rotate, thereby adjusting the position of the bridge cover 920 on the adjusting frame 336A, and thus directly and adaptively mounting the bridge cover 920 onto the bottom side of the bridge body 910 located at the second position s2.

[0069] In this embodiment, refer to Figure 4 The first connecting plate 332 is slidably connected to the eighteenth driving member 334, which is connected to the seventeenth driving member 333. The seventeenth driving member 333 can drive the eighteenth driving member 334 to rise and fall. The eighteenth driving member 334 is provided with two first suction members 335, which can drive the two first suction members 335 to move towards or away from each other to adjust the distance between the two first suction members 335, thereby adjusting the distance between the two bridge covers 920 being suctioned. With the above structure, the two bridge covers 920 being suctioned after the distance is adjusted can be directly mounted on the bottom side of the two bridge bodies 910 located at the second position s2.

[0070] The welding mechanism 340 includes a welding head 341 and a twentieth drive component, as shown in the reference. Figure 1 The twentieth drive unit is located on the frame 100. The output end of the twentieth drive unit is connected to the welding head 341. The twentieth drive unit can drive the welding head to rise and fall in order to weld the bridge body 910 and the bridge cover 920 located in the third position s3.

[0071] In this embodiment, refer to Figure 3The first platform mechanism 310 can sequentially and cyclically transfer the first platform 311 to the first position s1, the second position s2, the third position s3, the twenty-first position s21, the fourth position s4, and the fifth position s5. The ring loading device is used to flip and transfer the bridge body 910 located at the fourth position s4. The frame 100 is provided with a first cleaning component 510 and a first detection component 520. The first cleaning component 510 can blow clean the first platform 311 located at the fifth position s5, and the first detection component 520 can detect the degree of welding between the bridge body 910 and the bridge cover 920 located at the twenty-first position s21.

[0072] The first cleaning component 510 includes two blow heads, see reference... Figure 3 The purge head is located on the frame 100 and is capable of purging the first platform 311 located at the fifth position s5.

[0073] The first detection component 520 includes a twenty-first driving element 521 and a detection probe 522, as shown in the reference. Figure 5 The 21st drive unit 521 is located on the frame 100, and the detection probe 522 is located at the output end of the 21st drive unit 521. The 21st drive unit 521 can drive the detection probe 522 to rise and fall. Specifically, by lowering the detection probe 522 to the distance required to abut against the bridge cover 920, the degree of welding between the bridge body 910 and the bridge cover 920 can be determined.

[0074] In this embodiment, in order to fix the first stage 311 in the corresponding position, refer to Figure 7 The first platform 311 is provided with a fixed notch 311A, and the frame 100 is provided with a first fixing mechanism 810. The first fixing mechanism 810 includes a rotating roller 811, a fixed rod 812, a twenty-second driving member 813, and a connecting rod 814. The rotating roller 811 is rotatably connected to the frame 100, the fixed rod 812 is provided on the rotating roller 811, and the twenty-second driving member 813 is rotatably connected to the frame 100. The output end of the twenty-second driving member 813 is rotatably connected to one end of the connecting rod 814, and the other end of the connecting rod 814 is connected to the rotating roller 811. The twenty-second driving member 813 can drive the rotating roller 811 to rotate through the connecting rod 814. The rotating roller 811 can drive the fixed rod 812 to swing until it is engaged in the fixed notch 311A.

[0075] The ring loading device includes a second platform mechanism 410, a first flipping and transfer mechanism 420, and a loading mechanism 430.

[0076] Reference Figure 3 , Figure 5 as well as Figure 8The second platform mechanism 410 is provided on the frame 100. The second platform mechanism 410 is provided with a second platform 411. The second platform mechanism 410 can sequentially move the second platform 411 to the sixth position s6 and the seventh position s7. The second platform 411 is used to support the bridge body 910 facing upward. The first flipping and transferring mechanism 420 is provided on the frame 100. The first flipping and transferring mechanism 420 is used to flip and transfer the bridge body 910 with the bridge cover 920 welded on at the fourth position s4, and to transfer the flipped and upward-facing bridge body 910 to the second platform 411 at the sixth position s6. The transfer mechanism 430 is provided on the frame 100. The transfer mechanism 430 is used to transfer the O-ring 930 on the ring groove 233A and fit it onto the first plug 911 at the seventh position s7.

[0077] It is understood that the second platform mechanism 410 includes a second chain, a twenty-third driving component, and two fourth rotating wheels. The second chain is equipped with the aforementioned second platform 411. The connection structure and working principle of the second platform mechanism 410 are the same as those of the first platform mechanism 310, so they will not be described again here.

[0078] The first transfer mechanism 420 includes a twenty-fourth drive member 421, a twenty-fifth drive member 422, a second suction member 423, a twenty-sixth drive member 424, a twenty-seventh drive member 425, and a third clamp 426, as shown in the reference. Figure 5 The twenty-fourth drive member 421 is located on the frame 100, the twenty-fifth drive member 422 is located at the output end of the twenty-fourth drive member 421, the twenty-fourth drive member 421 can drive the twenty-fifth drive member 422 to rise and fall, the second suction member 423 is located at the output end of the twenty-fifth drive member 422, the twenty-fifth drive member 422 can drive the second suction member 423 to flip, the second suction member 423 is used to pick up the bridge cover 920 welded to the bridge body 910, the twenty-sixth drive member 424 is located on the frame 100, the twenty-seventh drive member 425 is connected to the output end of the sixteenth drive member 424, the twenty-sixth drive member 424 can drive the twenty-seventh drive member 425 to move laterally, the third clamp 426 is located on the twenty-seventh drive member 425, the twenty-seventh drive member 425 can drive the third clamp 426 to rise and fall.

[0079] The working process of the first transfer mechanism 420 is as follows: the second suction member 423 picks up the bridge cover 920 welded to the bridge body 910 located at the fourth position s4; the twenty-fourth driving member 421 drives the picked-up bridge body 910 to rise; the twenty-fifth driving member 422 drives the picked-up bridge body 910 to rotate so that the bridge body 910 is set facing upward; the twenty-seventh driving member 425 drives the third clamp 426 to move downward; the third clamp 426 clamps the upward-set bridge body 910; the second suction member 423 stops suctioning the bridge body 910; the twenty-seventh driving member 425 drives the clamped bridge body 910 to move upward; the twenty-sixth driving member 424 drives the clamped bridge body 910 to move laterally to above the second platform 411 located at the sixth position s6; the twenty-seventh driving member 425 drives the clamped bridge body 910 to move downward to the second platform 411 located at the sixth position s6; and the third clamp 426 releases the clamp.

[0080] The transfer mechanism 430 includes a twenty-eighth driving member 431, a twenty-ninth driving member 432, a second connecting plate 433, a thirtieth driving member 434, a sleeve member 435, and a insertion shaft 436.

[0081] Reference Figure 11 and Figure 12 The twenty-eighth driving component 431 is located on the frame 100, and the twenty-ninth driving component 432 is located at the output end of the twenty-eighth driving component 431. The twenty-eighth driving component 431 can drive the twenty-ninth driving component 432 to move laterally. The second connecting plate 433 is located at the output end of the twenty-ninth driving component 432. The twenty-ninth driving component 432 can drive the second connecting plate 433 to rise and fall. The thirtieth driving component 434 and the sleeve component 435 are both located on the second connecting plate 433. The insertion shaft 436 is connected to the thirtieth driving component 434 and passes through the sleeve component 435. The thirtieth driving component 434 can drive the insertion shaft 436 to move up or down along the axis of the sleeve component 435.

[0082] The working process of the transfer mechanism 430 is as follows: the twenty-ninth driving member 432 drives the insertion shaft 436 to move downward, and the insertion shaft 436 inserts the O-ring 930 into the ring-taking groove 233A. The twenty-ninth driving member 432 drives the inserted O-ring 930 to move upward and away from the ring-taking groove 233A. The twenty-eighth driving member 431 drives the inserted O-ring 930 to move laterally to above the first plug 911 located at the seventh position s7. The twenty-ninth driving member 432 drives the inserted O-ring 930 to move laterally to above the first plug 911 located at the seventh position s7. The O-ring 930 moves downward, causing the insertion shaft 436 to be fitted onto the first plug 911. The thirtieth drive member 434 drives the insertion shaft 436 upward, and the twenty-ninth drive member 432 drives the sleeve member 435 downward. At this time, the sleeve member 435 and the insertion shaft 436 move up and down relative to each other. The insertion shaft 436 moves and retracts into the sleeve member 435. The sleeve member 435 presses against the O-ring 930 and disengages it from the insertion shaft 436, and drives the O-ring to be fitted onto the first plug 911.

[0083] In this embodiment, to improve the stability when installing the O-ring 930, refer to Figure 11 and Figure 12 The frame 100 is provided with a thirty-first drive unit 437. The output end of the thirty-first drive unit 437 is connected to a fourth clamp 438. The thirty-first drive unit 437 can drive the fourth clamp 438 to move down so that the fourth clamp 438 can clamp the bridge body 910 located at the seventh position s7.

[0084] In this embodiment, refer to Figure 8 The second stage mechanism 410 can sequentially and cyclically transfer the second stage 411 to the sixth position s6, the seventh position s7, the twenty-second position s22, the twenty-third position s23, and the twenty-fourth position s24. The material transfer device is used to transfer the bridge body 910 located at the twenty-third position s23. The frame 100 is provided with a second detection component 440 and a second cleaning component 450. The second detection component 440 is used to detect the bridge body 910 located at the twenty-second position s22 to determine whether the bridge body 910 is fitted with an O-ring 930. The second cleaning component 450 can blow clean the second stage 411 located at the twenty-fourth position s27. The second detection component 440 is set as a CCD camera detection component; the connection structure of the second cleaning component 450 is the same as that of the first cleaning component 510, so it will not be described again here.

[0085] To attach a predetermined number of bridge bodies 910, each equipped with a bridge cover 920 and an O-ring 930, to the mounting plate 600, and to install the mounting plate 600, which contains the bridge bodies 910, into the first receiving box, refer to... Figure 8 and Figure 13The frame 100 is equipped with a material transfer device, a storage and conveying device, a sticker-applying device 130, a box conveying mechanism 140, and a second flipping and transferring mechanism 150. The storage and conveying device is used to store the mounting plate 600 and to sequentially convey the mounting plate 600 to the eighth position s8, the ninth position s9, and the tenth position s10. The sticker-applying device is used to apply adhesive tape to the mounting plate 600 located at the eighth position s8. The material transfer device is used to remove the bridge body 910 located at the twenty-third position s23 and to transfer a preset number of bridge bodies 910. The first receiving box is conveyed to the adhesive tape on the mounting plate 600 at the ninth position s9. The first receiving box has a first mounting slot for inserting the vertical mounting plate 600 with the bridge body 910 attached. The second flipping and transferring mechanism 150 flips and transfers the mounting plate 600 with the bridge body 910 attached at the tenth position s10, and inserts the flipped vertical mounting plate 600 into the first mounting slot at the eleventh position s11. The sticker-applying device 130 is a conventional sticker-cutting device. The second flipping and transferring mechanism 150 has the same structure and working principle as the first flipping and transferring mechanism 420, and therefore will not be described again here.

[0086] The storage and conveying device includes a storage rack 121, a fourth transfer assembly 122, a first conveying rack 123, and an interval conveying assembly 124, all mounted on the frame 100. (Refer to...) Figure 8 , Figure 13 as well as Figure 21 ,

[0087] The storage rack 121 is used to store at least two stacked mounting plates 600. The first conveying rack 123 is provided with a first conveying channel for the mounting plates 600 to move. The first conveying channel is provided with the aforementioned eighth position s8, ninth position s9 and tenth position s10. The fourth transfer component 122 is provided on the frame 100. The fourth transfer component 122 is used to transfer the bridge body 910 located at the twenty-third position s23 to the first conveying channel one by one. The interval conveying component 124 is used to drive the mounting plates 600 on the first conveying channel to move sequentially to the eighth position s8, the ninth position s9 and the tenth position s10.

[0088] The fourth transfer assembly 122 includes a thirty-second drive member 122A, a thirty-third drive member 122B, and a third suction member 122C, as shown in the figure. Figure 13The thirty-second drive unit 122A is located on the frame 100. The thirty-third drive unit 122B is connected to the output end of the thirty-second drive unit 122A. The thirty-second drive unit 122A can drive the thirty-third drive unit 122B to move laterally. The third suction unit 122C is located on the output end of the thirty-third drive unit 122B. The third suction unit 122C is used to suction the bridge body 910. The thirty-third drive unit 122B can drive the third suction unit 122C to move up and down.

[0089] The interval conveying assembly 124 includes a thirty-fourth drive member 124A, three thirty-fifth drive members 124B, three sliding blocks 124C, and a crossbar member 124D, as shown in the figure. Figure 21 The sliding block 124C is slidably mounted on the frame 100. The crossbar 124D is slidably mounted on the sliding block 124C. The crossbar 124D has at least three spaced protrusions 124D1. The crossbar 124D is rotatably connected to the fifth rotating wheel 124D2. The thirty-fifth driving member 124B is mounted on the frame 100. The thirty-fifth driving member 124B is connected to the corresponding sliding block 124C. The thirty-fifth driving member 124B can drive the corresponding sliding block 124C to rise and fall. The thirty-fourth driving member 124A is mounted on the frame 100. The output end of the thirty-fourth driving member 124A has a third mounting groove 124A1 with an open top. The fifth rotating wheel 124D2 is located in the third mounting groove 124A1. The thirty-fourth driving member 124A can drive the crossbar 124D to move laterally.

[0090] The material transfer device includes a fifth transfer assembly 111, a second conveyor frame 112, a sixth transfer assembly 113, and a third conveyor belt assembly 114, all mounted on the frame 100, as shown in the figure. Figure 8 , Figure 10 as well as Figure 13 The second conveyor frame 112 is provided with a second conveying channel for moving the bridge body 910, which is equipped with O-rings 930 and bridge covers 920. The second conveying channel has a 25th position s25 and a 26th position s26. The third conveyor belt assembly 114 can drive the bridge body 910 at the 25th position s25 to the 26th position s26. The fifth transfer assembly 111 is used to transfer the bridge body 910 located at the 23rd position s23 to the 25th position s25. The sixth transfer assembly 113 is used to transfer a preset number of bridge bodies 910 at the 26th position s26 to the adhesive tape on the mounting plate 600 at the 9th position s9. The structure and working principle of the sixth transfer assembly 113 are the same as those of the fourth transfer assembly 122, so they will not be described again here. The structure and working principle of the third conveyor belt assembly 114 are the same as those of the second conveyor belt assembly 214E, so they will not be described again here.

[0091] The fifth transfer assembly 111 includes the thirty-seventh drive unit 111A, the thirty-eighth drive unit 111B, and the fifth clamp 111C, as shown in the figure. Figure 10 The thirty-seventh drive unit 111A is located on the frame 100. The thirty-seventh drive unit 111A is connected to the thirty-eighth drive unit 111B. The thirty-seventh drive unit 111A can drive the thirty-eighth drive unit 111B to move laterally. The fifth clamp 111C is located on the thirty-eighth drive unit 111B. The thirty-eighth drive unit 111B can drive the fifth clamp 111C to move up and down. The fifth clamp 111C is used to clamp the bridge body 910.

[0092] In this embodiment, refer to Figure 15 and Figure 16 The frame 100 is provided with a pressing mechanism 170, and the storage and conveying device 120 is used to sequentially convey the mounting plate 600 to the eighth position s8, the ninth position s9, the fifteenth position s15 and the tenth position s10. The pressing mechanism 170 is used to press the bridge body 910 attached to the mounting plate 600 at the fifteenth position s15.

[0093] In this embodiment, refer to Figure 14 , Figure 15 as well as Figure 16 The frame 100 is provided with a third transfer component 160, and the storage and conveying device 120 is used to sequentially transport the mounting plate 600 to the eighth position s8, the ninth position s9, the tenth position s10 and the fourteenth position s14. The third transfer component 160 is used to transfer the mounting plate 600 located at the fourteenth position s14 with only adhesive tape attached.

[0094] Reference Figure 17 The frame 100 is provided with a loading mechanism 180, which is used to transport at least two first containment boxes stacked together, and to transfer the first containment boxes one by one to the box conveying mechanism 140.

[0095] In some embodiments, refer to Figure 14 and 15 The frame 100 is equipped with a material transfer device, a box conveying mechanism 140, and a third flipping and transfer mechanism 190. The material transfer device is used to transfer the bridge body 910 with O-rings 930 on the ring mounting device and to transfer the bridge body 910 to the twelfth position s12. The box conveying mechanism 140 is used to convey the second accommodating box and to convey it to the thirteenth position. The second accommodating box is equipped with a second mounting slot for inserting a preset number of first plugs 911 horizontally arranged bridge bodies 910. The third flipping and transfer mechanism 190 is used to flip and transfer the preset number of bridge bodies 910 located at the twelfth position s12 and to insert the preset number of bridge bodies 910 with the flipped first plugs 911 horizontally arranged into the second mounting slot located at the thirteenth position.

[0096] In this embodiment, Figure 21 The packaging apparatus includes the aforementioned material transfer device, storage and conveying device, sticker labeling device 130, box conveying mechanism 140, second flipping and transferring mechanism 150, third transfer component 160, pressing mechanism 170, box loading mechanism 180, and third flipping and transferring mechanism 190.

[0097] Of course, the present invention is not limited to the above-described embodiments. Those skilled in the art can make equivalent modifications or substitutions without departing from the spirit of the present invention. All such equivalent modifications and substitutions are included within the scope defined by the claims of this application.

Claims

1. A bridge assembly production line, characterized in that: include Rack (100); A conveying device is provided on the frame (100) for outputting the bridge cover (920), the O-ring (930) and the downward-facing bridge body (910). A welding device is provided on the frame (100), the welding device being used to pick up and receive the bridge body (910) output by the conveying device, and to transfer and weld the bridge cover (920) output by the conveying device to the bottom side of the received bridge body (910). An O-ring mounting device is provided on the frame (100). The O-ring mounting device is used to flip, transfer and receive the bridge body (910) on the welding device with the bridge cover (920) welded on it. The bridge body (910) after flipping and transfer is arranged facing upward. The O-ring mounting device is used to transfer the O-ring (930) output by the material conveying device and fit it into the first plug (911) of the bridge body (910). The welding apparatus includes: A first platform mechanism (310) is provided on the frame (100). The first platform mechanism (310) is provided with a first platform (311). The first platform mechanism (310) can sequentially move the first platform (311) to a first position (s1), a second position (s2) and a third position (s3). The first platform (311) is used to support the bridge body (910) facing downward. A first transfer assembly (320) is provided on the frame (100) and is used to transfer the bridge body (910) output by the conveying device to the first platform (311) located at the first position (s1). A second transfer assembly (330) is provided on the frame (100) for transferring the bridge cover (920) output by the conveying device to the bottom side of the bridge body (910) located at the second position (s2); A welding mechanism (340) is provided on the frame (100) for welding the bridge body (910) and the bridge cover (920) located at the third position (s3).

2. The connecting bridge assembly production line according to claim 1, characterized in that: The frame (100) is provided with a first cleaning component (510), the first platform mechanism (310) is able to sequentially and cyclically transfer the first platform (311) to the first position (s1), the second position (s2), the third position (s3), the fourth position (s4) and the fifth position (s5), the ring mounting device is used to flip and transfer the bridge body (910) located at the fourth position (s4), and the first cleaning component (510) is able to blow clean the first platform (311) located at the fifth position (s5).

3. A bridge assembly production line, characterized in that: include Rack (100); A conveying device is provided on the frame (100) for outputting the bridge cover (920), the O-ring (930) and the downward-facing bridge body (910). A welding device is provided on the frame (100), the welding device being used to pick up and receive the bridge body (910) output by the conveying device, and to transfer and weld the bridge cover (920) output by the conveying device to the bottom side of the received bridge body (910). An O-ring mounting device is provided on the frame (100). The O-ring mounting device is used to flip, transfer and receive the bridge body (910) on the welding device with the bridge cover (920) welded on it. The bridge body (910) after flipping and transfer is arranged facing upward. The O-ring mounting device is used to transfer the O-ring (930) output by the material conveying device and fit it into the first plug (911) of the bridge body (910). The ring-loading device includes: The second platform mechanism (410) is provided on the frame (100). The second platform mechanism (410) is provided with a second platform (411). The second platform mechanism (410) can sequentially move the second platform (411) to the sixth position (s6) and the seventh position (s7). The second platform (411) is used to support the bridge body (910) facing upward. A first flipping and transfer mechanism (420) is provided on the frame (100). The first flipping and transfer mechanism (420) is used to flip and transfer the bridge body (910) with the bridge cover (920) welded on the welding device, and to transfer the flipped and upward-facing bridge body (910) to the second platform (411) located at the sixth position (s6). A transfer mechanism (430) is provided on the frame (100) for transferring the O-ring (930) output by the feeding device and fitting it onto the first plug (911) located at the seventh position (s7).

4. A bridge assembly production line, characterized in that: include Rack (100); A conveying device is provided on the frame (100) for outputting the bridge cover (920), the O-ring (930) and the downward-facing bridge body (910). A welding device is provided on the frame (100), the welding device being used to pick up and receive the bridge body (910) output by the conveying device, and to transfer and weld the bridge cover (920) output by the conveying device to the bottom side of the received bridge body (910). An O-ring mounting device is provided on the frame (100). The O-ring mounting device is used to flip, transfer and receive the bridge body (910) on the welding device with the bridge cover (920) welded on it. The bridge body (910) after flipping and transfer is arranged facing upward. The O-ring mounting device is used to transfer the O-ring (930) output by the material conveying device and fit it into the first plug (911) of the bridge body (910). The frame (100) is equipped with a material transfer device, a storage and conveying device, a sticker-applying device (130), a box conveying mechanism (140), and a second flipping and conveying mechanism (150). The storage and conveying device is used to store the mounting plate (600) and to sequentially convey the mounting plate (600) to the eighth position (s8), the ninth position (s9) and the tenth position (s10). The sticker applicator (130) is used to apply adhesive tape to the mounting plate (600) located at the eighth position (s8). The material transfer device is used to remove the bridge body (910) with the O-ring (930) sleeved on the ring mounting device, and to transfer a preset number of the bridge bodies (910) to the adhesive tape of the mounting plate (600) located at the ninth position (s9). The box conveying mechanism (140) is used to convey the first container box and to convey it to the eleventh position. The first container box is provided with a first mounting groove for inserting the vertical mounting plate (600) on which the bridge body (910) is attached. The second flipping and transferring mechanism (150) is used to flip and transfer the mounting plate (600) with the bridge body (910) attached at the tenth position (s10), and to insert the flipped vertical mounting plate (600) into the first mounting slot at the eleventh position.

5. The connecting bridge assembly production line according to claim 4, characterized in that: The frame (100) is provided with a third transfer assembly (160), and the storage and conveying device is used to sequentially transport the mounting plate (600) to the eighth position (s8), the ninth position (s9), the tenth position (s10) and the fourteenth position (s14). The third transfer assembly (160) is used to transfer the mounting plate (600) located at the fourteenth position (s14) with only adhesive tape attached.

6. The connecting bridge assembly production line according to claim 4, characterized in that: The frame (100) is provided with a pressing mechanism (170), and the storage and conveying device is used to sequentially convey the mounting plate (600) to the eighth position (s8), the ninth position (s9), the fifteenth position (s15) and the tenth position (s10). The pressing mechanism (170) is used to press the bridge body (910) attached to the mounting plate (600) located at the fifteenth position (s15).

7. The connecting bridge assembly production line according to claim 4, characterized in that: The frame (100) is provided with a loading mechanism (180), which is used to transport at least two of the first containment boxes stacked together, and to transfer the first containment boxes one by one to the box conveying mechanism (140).

8. A bridge assembly production line, characterized in that: include Rack (100); A conveying device is provided on the frame (100) for outputting the bridge cover (920), the O-ring (930) and the downward-facing bridge body (910). A welding device is provided on the frame (100), the welding device being used to pick up and receive the bridge body (910) output by the conveying device, and to transfer and weld the bridge cover (920) output by the conveying device to the bottom side of the received bridge body (910). An O-ring mounting device is provided on the frame (100). The O-ring mounting device is used to flip, transfer and receive the bridge body (910) on the welding device with the bridge cover (920) welded on it. The bridge body (910) after flipping and transfer is arranged facing upward. The O-ring mounting device is used to transfer the O-ring (930) output by the material conveying device and fit it into the first plug (911) of the bridge body (910). The frame (100) is equipped with a material transfer device, a box conveying mechanism (140), and a third flipping and transfer mechanism (190). The material transfer device is used to remove the bridge body (910) with the O-ring (930) sleeved on the ring mounting device, and to transfer the bridge body (910) to the twelfth position (s12). The conveying mechanism (140) is used to convey the second container and to convey it to the thirteenth position. The second container is provided with a second mounting slot, which is used for the bridge body (910) with a preset number of first plugs (911) horizontally arranged to be inserted. The third flipping and transferring mechanism (190) is used to flip and transfer a preset number of the bridge bodies (910) located at the twelfth position (s12), and to insert a preset number of the bridge bodies (910) with the flipped first plug (911) horizontally set into the second mounting slot located at the thirteenth position.

9. A connecting bridge assembly production line according to claim 1, 3, 4, or 8, characterized in that: The material conveying device includes: A bridge conveying mechanism (210) is provided on the frame (100), and the bridge conveying mechanism (210) is used to output the bridge body (910) facing downward. A bridge cover conveying mechanism (220) is provided on the frame (100) and is used to output the bridge cover (920). An O-ring feeding mechanism (230) is provided on the frame (100) and is used to feed out the O-rings (930).

Citation Information

Patent Citations

  • Automatic assembly welding device of lithium battery cap

    CN207447610U