By optimizing the switching strategy of the wind-solar hybrid power supply system through the cloud platform and battery management module, the problems of inaccurate battery switching and low charging efficiency in the existing technology have been solved, achieving more efficient wind-solar hybrid power supply and stable communication.
Patent Information
- Application Number
- CN202310345333.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2043-04-03
AI Technical Summary
In existing wind-solar hybrid power supply systems, the switching of battery operating states is not accurate enough, and the charging efficiency is low, making it difficult to maintain stable and reliable power supply and communication, especially in complex environments.
The system employs a cloud platform, battery management module, data acquisition module, wireless transmission module, wind-solar switching module, and debugging module. Remote data processing and analysis are performed through the cloud platform. Combined with battery partition management and isolation, the wind-solar switching strategy is optimized to ensure the accuracy of battery selection and switching.
It improves the switching accuracy and battery charging efficiency of the wind-solar hybrid power supply system, reduces equipment costs, and ensures stable power supply in complex environments.
Smart Images

Figure CN116345655B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of electrical equipment testing technology, specifically to a wind-solar hybrid power supply wireless valve control system. Background Technology
[0002] Solar and wind energy are highly complementary in terms of time and location. A wind-solar hybrid power supply system mainly consists of wind turbine generators, solar photovoltaic cells, controllers, AC / DC loads, batteries, inverters, and other components. Electric valves are widely used, and in remote areas where power supply is unavailable, a wind-solar hybrid power supply system can be used to solve the power supply problem for electric valves.
[0003] Existing patent CN108331954A discloses a water diversion valve control system based on wind-solar hybrid power supply and dual communication technology, including a central control monitoring platform, an equipment control box equipped with an automatic control system, a power supply module, a wireless transmission module, sensors, and valves. The equipment control box is connected to the valves; the sensors and valves are connected to the central control monitoring platform via the wireless transmission module; the power supply module is connected to the central control monitoring platform, the equipment control box, and the sensors; the power supply module is a wind-solar hybrid power supply module; the wireless transmission module includes a 4G communication module and a LoRa communication module. This invention addresses the complex environment of long-distance water diversion pipelines, enabling stable and reliable power supply and communication.
[0004] In the aforementioned patents, the switching of wind-solar hybrid power mainly relies on changes in light intensity, wind speed, and load to switch and adjust the working state of the battery. However, the accuracy of wind-solar hybrid power switching is not good, and the battery charging efficiency is not high. Summary of the Invention
[0005] The purpose of this invention is to provide a wind-solar hybrid power supply wireless valve control system to solve the problems mentioned in the background art.
[0006] To address the aforementioned technical problems, this invention provides the following technical solution: a wind-solar hybrid power supply wireless valve control system, comprising a cloud platform, a battery management module, a data acquisition module, a wireless transmission module, a wind-solar switching module, and a debugging module. The battery management module, data acquisition module, wind-solar switching module, and debugging module are all connected to the cloud platform via the wireless transmission module. The cloud platform provides remote cloud-based data processing for the control system, with data centrally analyzed and processed on the cloud platform. The battery management module is used for partitioned battery management, facilitating subsequent battery selection. The data acquisition module is used to acquire and process battery data and valve data. The wind-solar switching module is used for wind-solar switching. The debugging module, located on the cloud platform, is used for data analysis and debugging.
[0007] Furthermore, the battery management module includes a battery partitioning unit and a battery isolation unit. The battery partitioning unit is used to partition the battery, and the battery isolation unit is used to isolate the battery.
[0008] Furthermore, the battery management module includes several energy storage batteries, the wind-solar switching module includes a wind power output terminal and a solar power output terminal, and the energy storage batteries are electrically connected to the wind power output terminal and the solar power output terminal respectively. The battery partitioning unit is used to partition different energy storage batteries; the battery isolation unit is used to isolate different energy storage batteries.
[0009] Furthermore, the data acquisition module includes a power acquisition unit, a valve action acquisition unit, and a valve opening degree acquisition unit; the power acquisition unit is used to acquire power data of different energy storage batteries; the valve action acquisition unit is used to acquire and process valve action data; and the valve opening degree acquisition unit is used to acquire and process valve opening degree data.
[0010] Furthermore, the battery management module includes five energy storage batteries, and the power data of the five energy storage batteries are as follows: , , , , The data acquisition module sends power data, valve action data, and valve opening data to the cloud platform. The cloud platform analyzes and compares the valve action data and opening data to determine whether the current valve action and opening meet the requirements.
[0011] Furthermore, the cloud platform analyzes and processes the data, automatically switching to debug mode every 30 minutes, where the debug module works; it analyzes and calculates the power data comparison, eliminates the energy storage batteries with the largest and smallest power, selects the other two energy storage batteries, and then connects the wind power output terminal and the solar power output terminal to the input terminals of the two energy storage batteries respectively to charge the two energy storage batteries. ; ; Two energy storage batteries were selected for commissioning, connected to the wind power output terminal and the solar power output terminal respectively. The energy storage battery connected to the wind power output terminal had a capacity of [missing information]. The energy storage battery connected to the output terminal of the solar power generation system has a capacity of [missing information]. ,and , , , .
[0012] Furthermore, when the debugging module is working, it enters the debugging mode every 30 minutes. Under normal circumstances, in the debugging mode, each debugging session lasts for 5 minutes, and data is checked once per minute. when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. ; when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. when At that time, the status of wind-solar hybrid dual-operation was pending confirmation; when At that time, the status was pending confirmation for wind-solar hybrid solar power generation alone. when At that time, the wind-solar hybrid wind power generation was in a state of pending determination.
[0013] Furthermore, when , , , , When all five conditions above are met simultaneously, the wind-solar hybrid dual-operation status is confirmed, and an instruction is sent to the wind-solar switching module to switch to the wind-solar hybrid dual-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending confirmation for wind-solar hybrid dual-operation, and the debugging time is extended for another 3 minutes. , , When any two conditions are met, the wind-solar hybrid dual-operation status is determined, and a command is sent to the wind-solar switching module to switch to the wind-solar hybrid dual-operation mode.
[0014] Furthermore, when , , , , When all five conditions above are met simultaneously, the wind-solar hybrid solar power generation is in a single-operation confirmed state, and a command is sent to the wind-solar switching module to switch to the wind-solar hybrid solar power generation single-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending determination for wind-solar hybrid solar power generation, and the commissioning time is extended for another 3 minutes. , , When any two conditions are met, the wind-solar hybrid solar power generation is in a single-operation state. A command is sent to the wind-solar switching module to switch to the wind-solar hybrid solar power generation single-operation mode.
[0015] Furthermore, when , , , , When all five conditions above are met simultaneously, the wind-solar hybrid wind power generation is in a single-operation confirmed state, and a command is sent to the wind-solar switching module to switch to the wind-solar hybrid wind power generation single-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the wind-solar hybrid wind power generation is in a pending-determining state, and the commissioning mode time is extended for another 3 minutes of commissioning; when , , When any two conditions are met, the wind-solar hybrid wind power generation is in a single-operation state, and a command is sent to the wind-solar switching module to switch to the wind-solar hybrid wind power generation single-operation mode.
[0016] Compared with the prior art, the beneficial effects achieved by the present invention are: This invention incorporates a cloud platform, a battery management module, a data acquisition module, a wireless transmission module, a wind-solar switching module, and a debugging module. The cloud platform provides remote cloud-based data processing for the control system, centralizing data analysis and processing within the cloud platform, effectively reducing the number of data acquisition devices and lowering equipment costs. The battery management module manages batteries in partitions and isolations, facilitating subsequent battery selection and ensuring the selection of suitable energy storage batteries for debugging, comparing the charging efficiency of wind and solar power generation. The data acquisition module collects and processes battery and valve data. The wind-solar switching module handles the switching between wind and solar power. The debugging module, located on the cloud platform, analyzes and processes the data. Multiple comparative analyses can be performed based on the charging efficiency of wind and solar power before switching between wind and solar power, effectively improving the accuracy of wind-solar switching and resulting in higher battery charging efficiency.
[0017] In this invention, two batteries are reserved for the debugging module. These two batteries can be analyzed by their charge levels to eliminate the batteries with the highest and lowest charge levels, selecting the other two to ensure accurate charging efficiency assessment. This avoids the battery charge levels being too low or too high, which could affect the accuracy of subsequent analysis and judgment during debugging. When the battery charging efficiency is zero or there is a significant anomaly, the corresponding wind and solar batteries are swapped. If the charging efficiency of the swapped battery is still zero or there is a significant anomaly, it is determined that the battery has an abnormal fault, and other batteries are switched for debugging. The debugging module jumps every 30 minutes, with each debugging session lasting 5 minutes and data being checked every minute. The mode is switched only when five data points fully meet the requirements. If only three or four data points meet the requirements, the debugging time is extended by 3 minutes. The mode is switched only when at least two of these three data points meet the requirements. This effectively ensures the accuracy of the charging efficiency comparison between wind and solar power generation, thereby improving the accuracy of wind-solar hybrid switching. Attached Figure Description
[0018] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of the module connections in this invention; In the diagram: 1. Cloud platform; 2. Data acquisition module; 3. Battery management module; 4. Wireless transmission module; 5. Wind-solar switching module; 6. Debugging module. Detailed Implementation
[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] Please see Figure 1This invention provides a technical solution: a wind-solar hybrid power supply wireless valve control system, comprising a cloud platform 1, a battery management module 3, a data acquisition module 2, a wireless transmission module 4, a wind-solar switching module 5, and a debugging module 6. The battery management module 3, data acquisition module 2, wind-solar switching module 5, and debugging module 6 are all connected to the cloud platform 1 via the wireless transmission module 4. The cloud platform 1 provides remote cloud-based data processing for the control system, with data centrally analyzed and processed on the cloud platform 1. The battery management module 3 is used for partitioned battery management, facilitating subsequent battery selection. The data acquisition module 2 is used for acquiring and processing battery data and valve data. The wind-solar switching module 5 is used for switching between wind and solar power. The debugging module 6, located on the cloud platform 1, is used for data analysis and debugging.
[0021] The battery management module 3 includes a battery partitioning unit and a battery isolation unit. The battery partitioning unit is used to partition the batteries; the battery isolation unit is used to isolate the batteries. The battery management module 3 includes several energy storage batteries. The wind-solar switching module 5 includes a wind power output terminal and a solar power output terminal. The energy storage batteries are electrically connected to the wind power output terminal and the solar power output terminal, respectively. The battery partitioning unit is used to partition different energy storage batteries; the battery isolation unit is used to isolate different energy storage batteries. The data acquisition module 2 includes a power acquisition unit, a valve action acquisition unit, and a valve opening acquisition unit. The power acquisition unit is used to acquire power data from different energy storage batteries; the valve action acquisition unit is used to acquire and process valve action data; the valve opening acquisition unit is used to acquire and process valve opening data. The battery management module 3 includes five energy storage batteries. This invention also provides a control method for a wind-solar hybrid power supply wireless valve control system, comprising the following steps: S1: Data acquisition module 2 collects the power data of the five energy storage batteries. The power data of the five energy storage batteries are as follows: , , , , The data acquisition module 2 sends the power data, valve action data, and valve opening data to the cloud platform 1. The cloud platform 1 analyzes and compares the valve action data and opening data to determine whether the current valve action and opening meet the requirements. S2: The cloud platform 1 analyzes and processes the data, and automatically switches to debugging mode every 30 minutes. The debugging module 6 works; it analyzes and calculates the power data comparison, eliminates the energy storage batteries with the largest and smallest power, selects the other two energy storage batteries, and then connects the wind power output terminal and the solar power output terminal to the input terminals of the above two energy storage batteries respectively to charge the above two energy storage batteries. ; ; Two energy storage batteries were selected for commissioning, connected to the wind power output terminal and the solar power output terminal respectively. The energy storage battery connected to the wind power output terminal had a capacity of [missing information]. The energy storage battery connected to the output terminal of the solar power generation system has a capacity of [missing information]. ,and , , , .
[0022] S3: When the debugging module 6 is working, it enters the debugging mode every 30 minutes. Under normal circumstances, in the debugging mode, each debugging session lasts 5 minutes, and data is checked once per minute. when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. ; when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. when At that time, the status of wind-solar hybrid dual-operation was pending confirmation; when At that time, the status was pending confirmation for wind-solar hybrid solar power generation alone. when At that time, the wind-solar hybrid wind power generation was in a state of pending determination.
[0023] S4: When , , , , When all five conditions above are met simultaneously, the wind-solar hybrid dual-operation status is confirmed, and an instruction is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid dual-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending confirmation for wind-solar hybrid dual-operation, and the debugging time is extended for another 3 minutes. , , When any two conditions are met, the wind-solar hybrid dual-operation state is determined, and a command is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid dual-operation mode.
[0024] S5: When , , , , When all five conditions above are met simultaneously, the wind-solar hybrid solar power generation is in a single-operation confirmed state, and an instruction is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid solar power generation single-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending determination for wind-solar hybrid solar power generation, and the commissioning time is extended for another 3 minutes. , , When any two conditions are met, the wind-solar hybrid solar power generation is in a single-operation state, and a command is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid solar power generation single-operation mode.
[0025] S6: When , , , , When all five conditions above are met simultaneously, the wind-solar hybrid wind power generation single-operation is determined, and an instruction is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid wind power generation single-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the wind-solar hybrid wind power generation is in a pending-determining state, and the commissioning mode time is extended for another 3 minutes of commissioning; when , , When any two conditions are met, the wind-solar hybrid wind power generation single-on mode is determined, and a command is sent to the wind-solar switching module 5 to switch to the wind-solar hybrid wind power generation single-on mode.
[0026] Working principle of the invention: Refer to the instruction manual appendix Figure 1 This invention comprises a cloud platform 1, a battery management module 3, a data acquisition module 2, a wireless transmission module 4, a wind-solar switching module 5, and a debugging module 6. The cloud platform 1 provides remote cloud-based data processing for the control system. Data is centrally analyzed and processed on the cloud platform 1, effectively reducing the number of data acquisition devices and lowering equipment costs. The battery management module 3 manages batteries in partitions and isolations, facilitating subsequent battery selection and ensuring the selection of suitable energy storage batteries for debugging, comparing the charging efficiency of wind and solar power generation. The data acquisition module 2 collects and processes battery and valve data. The wind-solar switching module 5 handles wind-solar switching. The debugging module 6, located on the cloud platform 1, analyzes and processes the data. Multiple comparative analyses can be performed based on the charging efficiency of wind power and solar power before switching to wind-solar hybrid power, effectively improving the accuracy of wind-solar hybrid switching and resulting in higher battery charging efficiency. Adjustments are made to the switching of wind and solar power, the current wind power generation efficiency and solar power generation efficiency are analyzed and compared, and then the switching of wind and solar power is carried out. Two batteries are reserved for the debugging module: These two batteries can be analyzed by their charge levels to eliminate the batteries with the highest and lowest charge levels, and select the other two batteries to ensure the accuracy of charging efficiency judgment; to avoid the battery charge levels being too low or too high, which would affect the accuracy of the analysis and judgment during subsequent debugging. When the battery charging efficiency is zero or there is an obvious abnormality, the corresponding batteries for wind and solar power are swapped. If the charging efficiency of the swapped battery is still zero or there is an obvious abnormality, it is determined that the battery has an abnormal fault, and other batteries are switched for debugging. The debugging module jumps every 30 minutes, with each debugging session lasting 5 minutes. Data is checked every minute, and the mode is switched only when all five data points meet the requirements. If only three or four data points meet the requirements, the debugging module is extended by 3 minutes. The mode is switched only when at least two of these three data points meet the requirements. This effectively ensures the accuracy of the charging efficiency comparison between wind power generation and solar power generation, thereby improving the accuracy of wind-solar hybrid switching.
[0027] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A wind-solar hybrid power supply wireless valve control system, comprising a cloud platform (1), a battery management module (3), a data acquisition module (2), a wireless transmission module (4), a wind-solar switching module (5), and a debugging module (6), characterized in that: The battery management module (3), data acquisition module (2), and wind-solar switching module (5) are all connected to the cloud platform (1) via wireless transmission module (4). The cloud platform (1) is used to provide remote cloud data processing for the control system. The data is centrally analyzed and processed in the cloud platform (1). The battery management module (3) is used to manage the batteries by partition, which facilitates the selection and processing of batteries in the future. The data acquisition module (2) is used to collect and process battery data and valve data. The wind-solar switching module (5) is used to switch between wind and solar power. The debugging module (6) is located on the cloud platform (1) and is used to analyze and debug the data. The cloud platform (1) analyzes and processes the data and automatically jumps to the debugging mode every 30 minutes. The debugging module (6) works. The power data is analyzed and compared. The energy storage batteries with the largest and smallest power are excluded. The other two energy storage batteries are selected. Then the wind power output terminal and the solar power output terminal are connected to the input terminals of the two energy storage batteries respectively to charge the two energy storage batteries. ; ; Two energy storage batteries were selected for commissioning, connected to the wind power output terminal and the solar power output terminal respectively. The energy storage battery connected to the wind power output terminal had a capacity of [missing information]. The energy storage battery connected to the output terminal of the solar power generation system has a capacity of [missing information]. ,and , , , ; When the debugging module (6) is working, it enters the debugging mode every 30 minutes. Under normal circumstances, in the debugging mode, each debugging session lasts 5 minutes and the data is checked once per minute. when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. ; when , If any one of the conditions is met, the energy storage batteries corresponding to the wind and solar power are swapped. If the energy storage battery's capacity still meets the above criteria after the swap, it is determined that the energy storage battery has an abnormal fault, and other energy storage batteries are switched for debugging. when At that time, the status of wind-solar hybrid dual-operation was pending confirmation; when At that time, the status was pending confirmation for wind-solar hybrid solar power generation alone. when At that time, the status was pending confirmation for wind-solar hybrid wind power generation alone; when , , , , When all five conditions are met simultaneously, the wind-solar hybrid dual-operation status is determined, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid dual-operation mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending confirmation for wind-solar hybrid dual-operation, and the debugging time is extended for another 3 minutes. , , When any two of the conditions are met, the wind-solar hybrid dual-open state is determined, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid dual-open mode; when , , , , When all five conditions are met simultaneously, the wind-solar hybrid solar power generation single-on mode is determined, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid solar power generation single-on mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the system is in a state of pending determination for wind-solar hybrid solar power generation, and the commissioning time is extended for another 3 minutes. , , When any two of the conditions are met, the wind-solar hybrid solar power generation single-on determination state is established, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid solar power generation single-on mode; when , , , , When all five conditions are met simultaneously, the wind-solar hybrid wind power generation single-on mode is determined, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid wind power generation single-on mode. when , , , , If at least three of the above five conditions are met simultaneously but less than five, the wind-solar hybrid wind power generation is in a pending-determining state, and the commissioning mode time is extended for another 3 minutes of commissioning; when , , When any two conditions are met, the wind-solar hybrid wind power generation single-on mode is determined, and an instruction is sent to the wind-solar switching module (5) to switch to the wind-solar hybrid wind power generation single-on mode.
2. The wind-solar hybrid power supply wireless valve control system according to claim 1, characterized in that: The battery management module (3) includes a battery partitioning unit and a battery isolation unit. The battery partitioning unit is used to partition the battery; the battery isolation unit is used to isolate the battery.
3. The wind-solar hybrid power supply wireless valve control system according to claim 2, characterized in that: The battery management module (3) includes several energy storage batteries, the wind-solar switching module (5) includes a wind power output terminal and a solar power output terminal, the energy storage batteries are electrically connected to the wind power output terminal and the solar power output terminal respectively, the battery partitioning unit is used to partition different energy storage batteries; the battery isolation unit is used to isolate different energy storage batteries.
4. The wind-solar hybrid power supply wireless valve control system according to claim 3, characterized in that: The data acquisition module (2) includes a power acquisition unit, a valve action acquisition unit, and a valve opening acquisition unit; the power acquisition unit is used to acquire power data of different energy storage batteries; the valve action acquisition unit is used to acquire and process valve action data; and the valve opening acquisition unit is used to acquire and process valve opening data.
5. The wind-solar hybrid power supply wireless valve control system according to claim 4, characterized in that: The battery management module (3) includes five energy storage batteries, and the power data of the five energy storage batteries are as follows: , , , , The data acquisition module (2) sends the power data, valve action data and valve opening data to the cloud platform (1). The cloud platform (1) analyzes and compares the valve action data and opening data to determine whether the current action and opening of the valve meet the requirements.
Citation Information
Patent Citations
Water diversion valve control system based on wind-solar complementary power supply and duplex communication technology
CN108331954A
Direct-current valve electric actuator intelligent measurement and control system based on wind-solar complementation
CN209149355U