Double-layer plate truss combined rigid frame bridge upper layer combined structure and construction method

By optimizing the connection layout and prestressing measures of the double-layer plate girder combined rigid frame bridge, the problem of high stress and easy cracking of the upper edge concrete of block 0 was solved, and the uniformity of stress distribution and the durability of the bridge structure were improved.

CN116377836BActive Publication Date: 2026-11-24CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310292253.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-23
Publication Date
2026-11-24
Estimated Expiration
2043-03-23

AI Technical Summary

Technical Problem

The existing double-layer plate girder combined rigid frame bridge has problems such as high stress level, easy cracking and poor durability of the concrete at the upper edge of block 0. In particular, the large negative bending moment under load leads to excessive tensile stress in the concrete, and the improper stiffness of the steel-concrete connection leads to uneven local stress.

Method used

An optimized connection arrangement was adopted, consisting of web members of block 0, upper chord members of steel truss, shear studs, lower concrete of block 0, and upper post-cast concrete. Combined with the bridge deck and prestressed steel strands of block 0, prestressing measures were used to improve stress distribution and reduce local stress levels.

Benefits of technology

It effectively reduced the local stress level in the area where the upper steel structure and concrete of block 0# are combined, improved stress distribution, controlled crack width, and improved the durability of the bridge structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116377836B_ABST
    Figure CN116377836B_ABST
Patent Text Reader

Abstract

This invention relates to a composite structure and construction method for the upper layer of a double-layer plate truss combined rigid frame bridge. The structure includes a web member of block 0#, which is connected to the upper chord of the steel truss girder. Shear studs are installed on the upper chord of the steel truss girder and the web member of block 0# within the block area. The web member of block 0# is connected to the lower concrete of block 0# via shear studs. Several concrete bridge decks are symmetrically arranged on both sides of block 0# along the bridge direction, spaced apart. Symmetrical concrete bridge decks are connected by several prestressed steel strands. Adjacent concrete bridge decks on each side are connected by wet joints. The upper chord of the steel truss girder is connected to the upper post-cast concrete of block 0# via shear studs. Several prestressed steel strands of block 0# are installed in the upper post-cast concrete of block 0# along the bridge direction. The upper post-cast concrete of block 0# is connected to the adjacent concrete bridge decks by wet joints. This invention improves the stress distribution in the upper part of the steel-concrete composite section of block 0# through force transmission anchoring and external prestressing, reduces the stress level, and improves the durability of the bridge structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of bridge technology, and in particular to a combined upper structure and construction method for a double-layer plate girder combined rigid frame bridge. Background Technology

[0002] To address the issues of poor tensile strength of concrete and the heavy self-weight of concrete beams, steel-concrete composite structures fully utilize the tensile strength of steel and the compressive strength of concrete, while also reducing the structural self-weight, which is beneficial for seismic resistance in areas near fault zones prone to strong earthquakes. However, existing steel-concrete composite structures have the following drawbacks when used in double-layer plate-truss combined rigid frame bridges:

[0003] 1. Under load, the large negative bending moment at the top of the rigid frame pier (block 0) leads to a large tensile stress in the concrete at its upper edge, making the concrete prone to cracking and reducing the durability of the bridge. 2. Steel-concrete connections typically use shear studs. While ensuring a reliable and effective connection, it is necessary to consider the balance between connection stiffness and concrete stress. Excessive connection stiffness leads to greater tensile stress on the concrete, while insufficient connection stiffness results in insufficient connection strength. 3. The complex structure of the bridge pier-beam joint, with high stress levels in the localized areas where concrete and steel beams meet, leads to localized cracking of the concrete and reduces its durability.

[0004] Therefore, a double-layer plate girder combined rigid frame bridge upper layer composite structure is needed to solve the above problems. Summary of the Invention

[0005] The purpose of this invention is to address the problems of high concrete stress levels, easy cracking, and poor durability at the upper edge of the 0# block of a double-layer plate girder combined rigid frame bridge in existing technologies. This invention provides a composite structure and construction method for the upper layer of a double-layer plate girder combined rigid frame bridge to effectively improve the high concrete stress levels and uneven stress distribution at the pier-beam joint of the double-layer plate girder combined rigid frame bridge, thereby enhancing the structure's durability.

[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows: In a first aspect, the present invention provides a composite upper structure for a double-layer plate truss combined rigid frame bridge, comprising a web member of block 0#, the web member of block 0# being connected to the upper chord of a steel truss beam, a plurality of shear studs being provided on the upper chord of the steel truss beam and the web member of block 0# within the area of ​​block 0#, the web member of block 0# being connected to the lower concrete of block 0# via the shear studs, a plurality of concrete bridge deck panels being symmetrically arranged on both sides of block 0# along the bridge direction, the concrete bridge deck panels on each side being spaced apart, two symmetrical concrete bridge deck panels being connected by a plurality of bridge deck prestressed steel strands, adjacent concrete bridge deck panels on each side being connected by wet joints, the upper chord of the steel truss beam being connected to the upper post-cast concrete of block 0# via the shear studs, a plurality of block prestressed steel strands being provided in the upper post-cast concrete of block 0# along the bridge direction, the upper post-cast concrete of block 0# being connected to the adjacent concrete bridge deck panels by wet joints.

[0007] The present invention employs a double-layer plate truss combined rigid frame bridge upper layer composite structure. This structure optimizes the steel-concrete connection arrangement through the web members of block 0#, the upper chord of the steel truss, the shear studs, the lower concrete of block 0#, and the upper post-cast concrete of block 0#. It also optimizes prestressing measures through the prestressed steel strands of the bridge deck and block 0#, improving the stress distribution and stress level in the upper part of the steel-concrete composite section of block 0# from aspects such as force transmission anchorage and external prestressing. Specifically, it effectively reduces the local stress level in the joint area between the upper steel structure and concrete of block 0#, improving its stress distribution; effectively reduces the tensile stress level of the concrete bridge deck of block 0#, improving its stress distribution; and by reducing the tensile stress level in key parts of the upper part of block 0#, it controls crack width and improves the durability of the bridge structure.

[0008] As a preferred technical solution of the present invention, the anchoring points of the prestressed steel strands of the 0# block are located at both ends of the post-cast concrete on the upper part of the 0# block.

[0009] As a preferred technical solution of the present invention, the anchoring point of the prestressed steel strand of the bridge deck is located at the end of the concrete bridge deck away from block #0.

[0010] As a preferred technical solution of the present invention, the transverse bridge direction of the 0# block area includes two upper chords of the steel truss beams, and the two upper chords of the steel truss beams are connected by an upper horizontal connector.

[0011] As a preferred technical solution of the present invention, the post-cast concrete on the upper part of the 0# block wraps the node plate and web of the upper chord of the steel truss beam.

[0012] As a preferred embodiment of the present invention, all the shear studs are arranged in an array.

[0013] As a further preferred technical solution of the present invention, the spacing of the shear studs is 200mm-300mm.

[0014] Secondly, the present invention also provides a construction method for a double-layer plate girder combined rigid frame bridge superstructure, used to form a double-layer plate girder combined rigid frame bridge superstructure as described in any of the above claims. The construction method includes the following steps: S1. Construct the web members of the 0# block and the upper chord of the steel truss beam, and pour the lower part of the 0# block concrete; S2. Starting from the mid-span and proceeding symmetrically towards block 0, pour concrete bridge deck panels on both sides of block 0, tension the corresponding prestressed steel strands of the bridge deck panels, seal the anchor points of the prestressed steel strands of the bridge deck panels with the wet joints and connect the adjacent concrete bridge deck panels until all concrete bridge deck panels are constructed. S3. Pour the post-cast concrete on the upper part of the 0# block, tension the prestressed steel strands of the 0# block, seal the anchorage points of the prestressed steel strands of the 0# block with the wet joint, and connect the post-cast concrete on the upper part of the 0# block to the concrete bridge deck.

[0015] The construction method of the double-layer plate girder combined rigid frame bridge superstructure described in this invention involves first constructing the concrete bridge deck symmetrically from mid-span and tensioning prestress, gradually completing the entire concrete bridge deck, and finally constructing the post-cast concrete on the upper part of the 0# block and tensioning prestress. The post-cast concrete on the upper part of the 0# block and the concrete bridge deck are connected through the wet joint. The stress in most areas of the top is basically compressive stress, which comprehensively improves the stress state of the upper part of the 0# block, effectively reduces the problem of structural cracking, and improves the durability of the bridge structure.

[0016] Thirdly, the present invention also provides a bridge, including the upper layer composite structure of a double-layer plate girder combined rigid frame bridge as described in any of the above claims.

[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. The present invention discloses a double-layer plate truss combined rigid frame bridge upper layer composite structure. This structure optimizes the steel-concrete connection arrangement through the web members of the 0# block, the upper chord of the steel truss, the shear studs, the lower concrete of the 0# block, and the upper post-cast concrete of the 0# block. It also optimizes prestressing measures through the prestressed steel strands of the bridge deck and the 0# block, improving the stress distribution and stress level of the upper part of the steel-concrete composite section of the 0# block in terms of force transmission anchorage and external prestressing. Specifically, it effectively reduces the local stress level in the joint area between the upper steel structure and concrete of the 0# block, improving its stress distribution; effectively reduces the tensile stress level of the concrete bridge deck of the 0# block, improving its stress distribution; and controls crack width and improves the durability of the bridge structure by reducing the tensile stress level in key parts of the upper part of the 0# block. 2. The construction method of the upper layer composite structure of a double-layer plate girder combined rigid frame bridge described in this invention involves first constructing the concrete bridge deck symmetrically from the mid-span and tensioning prestress, gradually completing the entire concrete bridge deck, and finally constructing the post-cast concrete on the upper part of the 0# block and tensioning prestress. The post-cast concrete on the upper part of the 0# block and the concrete bridge deck are connected through the wet joint. The stress in most areas of the top is basically compressive stress, which comprehensively improves the stress state of the upper part of the 0# block, effectively reduces the problem of structural cracking, and improves the durability of the bridge structure. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the facade layout of the upper-level composite structure; Figure 2 A schematic diagram of the plan layout of the upper-level composite structure; Figure 3 A schematic diagram of the cross-sectional layout of the centerline of the bridge piers in the upper composite structure; Figure 4 A schematic diagram of the longitudinal section layout of the pier centerline for the upper composite structure; Figure 5 This is a schematic diagram of the construction process for the concrete bridge deck and the post-cast concrete on the upper part of block #0 in this application. Figure 6 This is a schematic diagram illustrating the construction process of the concrete bridge deck and the post-cast concrete on top of block #0, used for comparison. Figure 7 This is a schematic diagram showing the spacing of the shear studs in this application; Figure 8 A diagram showing the spacing of shear studs for comparison. Figure 1 ; Figure 9 A diagram showing the spacing of shear studs for comparison. Figure 2 ; Figure 10 This is a stress diagram of the bridge deck of block 0# in this application; Figure 11 This is a stress diagram of the 0# bridge deck as a comparison. Figure 12 This is a schematic diagram of the local stress in the upper chord of block 0# of this application; Figure 13 This is a schematic diagram of the local stress in the upper chord of block #0 for comparison.

[0019] Markings in the diagram: 1-Post-cast concrete on top of block 0#, 2-Concrete bridge deck, 3-Wet joint, 4-Prestressed steel strands in bridge deck, 5-Prestressed steel strands in block 0#, 6-Anchorage point, 7-Lower concrete of block 0#, 8-Upper chord of steel truss, 9-Web member of block 0#, 10-Upper horizontal bracing, 11-Shear stud. Detailed Implementation

[0020] The present invention will now be described in detail with reference to the accompanying drawings.

[0021] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0022] Example 1 like Figures 1 to 4 As shown, the upper layer composite structure of a double-layer plate girder combined rigid frame bridge according to the present invention includes a 0# block web member 9, which is connected to the upper chord member 8 of the steel truss beam.

[0023] like Figure 3 and Figure 4 As shown, the transverse direction of the 0# block area includes two upper chord members 8 of the steel truss beams. The two upper chord members 8 of the steel truss beams are connected by an upper horizontal bracing 10. Several shear studs 11 are provided on the upper chord members 8 of the steel truss beams and the web members 9 of the 0# block area. All the shear studs 11 are arranged in an array. In this embodiment, a rectangular array is used. The spacing of the shear studs 11 is 200mm-300mm.

[0024] like Figure 1 , Figure 3 and Figure 4 As shown, the web member 9 of block #0 is connected to the lower concrete 7 of block #0 via the shear stud 11.

[0025] like Figure 1 and Figure 2 As shown, several concrete bridge deck panels 2 are symmetrically arranged on both sides of block 0# along the bridge direction. The concrete bridge deck panels 2 on each side are spaced apart. Two symmetrical concrete bridge deck panels 2 are connected by several bridge deck prestressed steel strands 4. The anchorage point 6 of the bridge deck prestressed steel strands 4 is located at the end of the concrete bridge deck panel 2 away from block 0#. Adjacent concrete bridge deck panels 2 on each side are connected by a wet joint 3, and the wet joint 3 seals the anchorage point 6.

[0026] like Figures 1 to 4 As shown, the upper chord 8 of the steel truss girder is connected to the upper post-cast concrete 1 of block #0 via shear studs 11. The upper post-cast concrete 1 of block #0 encloses the node plate and web of the upper chord 8 of the steel truss girder and the upper horizontal bracing 10. Several prestressed steel strands 5 of block #0 are arranged longitudinally within the upper post-cast concrete 1 of block #0. The anchorage points 6 of the prestressed steel strands 5 of block #0 are located at both ends of the upper post-cast concrete 1 of block #0. The upper post-cast concrete 1 of block #0 is connected to the adjacent concrete bridge deck 2 via wet joints 3, and the wet joints 3 seal the anchorage points 6. Figure 3As shown, several prestressed steel strands 5 of the 0# block are respectively arranged on both sides of the web of the upper chord 8 of the steel truss, and several prestressed steel strands 5 of the 0# block are also arranged on both sides of the top of the web member 9 of the 0# block.

[0027] Among them, a refined finite element model of the structure was established to conduct stress analysis on the upper composite structure of the double-layer plate girder combined rigid frame bridge. The construction scheme of the post-cast concrete 1 on the upper part of the 0# block, the spacing of the shear studs 11, the setting of the prestressed steel strands 4 on the bridge deck, and the setting of the prestressed steel strands 5 on the 0# block were compared and selected, as follows: like Figure 5 As shown in the figure, the construction scheme of the concrete bridge deck 2 and the post-cast concrete 1 on the upper part of the 0# block in this embodiment is as follows: First, the concrete bridge deck 2 on both sides of the 0# block is poured symmetrically from the mid-span towards the 0# block. After each two symmetrical concrete bridge decks 2 are poured, the corresponding prestressed steel strands 4 of the bridge deck are tensioned, and the adjacent concrete bridge decks 2 are connected by the wet joint 3. Then, the post-cast concrete 1 on the upper part of the 0# block is poured, the prestressed steel strands 5 of the 0# block are tensioned, and the post-cast concrete 1 on the upper part of the 0# block is connected to the concrete bridge deck 2 by the wet joint 3.

[0028] like Figure 6 As shown, in comparison with the construction scheme of the concrete bridge deck 2 and the post-cast concrete 1 on the upper part of the 0# block, the post-cast concrete 1 on the upper part of the 0# block is poured first, and the prestressed steel strands 5 of the 0# block are tensioned. Then, the concrete bridge deck 2 on both sides of the 0# block is poured symmetrically from the mid-span towards the 0# block. After each two symmetrical concrete bridge decks 2 are poured, the corresponding prestressed steel strands 4 of the bridge deck are tensioned. The adjacent concrete bridge decks 2 are connected by the wet joint 3. Finally, the post-cast concrete 1 on the upper part of the 0# block is connected to the concrete bridge deck 2 by the wet joint 3.

[0029] Adopting such Figure 5 The construction plan shown is compared to, for example Figure 6 The construction scheme shown can optimize the tensile stress in the main parts of the pier centerline section by 2.0 MPa to 8.9 MPa.

[0030] like Figures 7 to 9 The diagram shows the arrangement spacing of the three types of shear studs 11. Figure 7 The spacing between the center elements is 250mm. Figure 8 The spacing between the center elements is 125mm. Figure 9 The spacing between the shear studs is 375mm. The analysis results show that the shear studs 11 have little impact on the overall stress. However, the larger the spacing between the shear studs 11, the greater the stress fluctuation in the coupling area. Based on comprehensive comparison, the spacing between the shear studs 11 is selected as 250mm.

[0031] Analysis showed that after setting the prestressed steel strand 5 of the 0# block, the longitudinal stress level near the upper chord 8 of the steel truss was significantly reduced.

[0032] like Figure 10 As shown, after analyzing and setting the prestressed steel strands 4 in the bridge deck, the maximum longitudinal stress of the No. 0 block bridge deck is 8.3 MPa, and the average stress of the section is 4.5 MPa, which meets the tensile strength requirements of reinforced concrete. Figure 11 As shown, without taking any measures, the longitudinal stress of the bridge deck of block 0 is 18.7 MPa, which does not meet the tensile strength requirements of reinforced concrete.

[0033] pass Figure 12 and Figure 13 In comparison, the stress level in the concrete area near the upper chord 8 of the steel truss at block 0# was significantly reduced, with the maximum tensile stress at the top decreasing from 6.5 MPa to 5.2 MPa. Furthermore, after adopting the construction plan of prestressed steel strands 5 and post-cast concrete 1 at the top of block 0#, the stress in most areas at the top was basically compressive stress, with only the tensile stress at the local geometric corner of the concrete reaching 5.2 MPa. However, this comprehensively improved the stress state of the upper part of block 0#.

[0034] In summary, the above comparative analysis shows that the above scheme can significantly reduce the stress level of the upper part of block 0 and the bridge deck, while improving the stress distribution at the interface between the upper chord of the steel truss and the concrete.

[0035] Based on the above analysis, the design of this structure requires measures such as post-casting of the upper concrete of block 0#, 250mm spacing of the shear studs 11, prestressing of the upper concrete of block 0#, and prestressing of the bridge deck. The specific methods are as follows: First, based on the internal force analysis of the entire bridge, the maximum reinforcement ratio of the concrete bridge deck 2 is adopted to determine the tensile stress control value corresponding to the maximum crack width. The strength grades of concrete, steel, reinforcing bars, and prestressed reinforcing bars are initially determined, and the 250mm spacing of the shear studs 11 is adopted. Based on the stress level and distribution of the concrete near the upper chord 8 of the steel truss, and the allowable tensile stress value of plain concrete... The arrangement of the reinforcing bars on the upper part of block 0# is determined, and the maximum stress level that meets the requirements of tensile strength and crack width of reinforced concrete is calculated. Finally, the arrangement and quantity of prestressed steel strands near the upper chord 8 of the steel truss are determined. Based on the stress level and distribution of the concrete bridge deck 2 and the tensile stress control value corresponding to the maximum crack width, the arrangement of the reinforcing bars of the bridge deck is determined, and the maximum stress level that meets the requirements of tensile strength and crack width of reinforced concrete is calculated. Finally, the distribution and quantity of the prestressed steel strands 4 of the bridge deck are determined. Based on the number of prestressed steel strands in the bridge deck, the number of joints in the bridge deck is determined, so that the prestressed steel strands are evenly distributed in each joint for anchorage.

[0036] This embodiment describes a double-layer plate truss combined rigid frame bridge upper layer composite structure. By optimizing the steel-concrete connection arrangement through the web members 9 of block 0#, the upper chord members 8 of the steel truss, the shear studs 11, the lower concrete 7 of block 0#, and the upper post-cast concrete 1 of block 0#, and by optimizing prestressing measures through the prestressed steel strands 4 and 5 of the bridge deck, the stress distribution and stress level of the upper part of the steel-concrete composite section of block 0# are improved in terms of force transmission anchorage and external prestressing. Specifically, it effectively reduces the local stress level in the joint area between the upper steel structure and concrete of block 0#, improving its stress distribution; effectively reduces the tensile stress level of the concrete bridge deck of block 0#, improving its stress distribution; and by reducing the tensile stress level in key parts of the upper part of block 0#, it controls crack width and improves the durability of the bridge structure.

[0037] Example 2 like Figures 1 to 4 As shown, the present invention discloses a construction method for the upper layer composite structure of a double-layer plate girder combined rigid frame bridge, used to form the upper layer composite structure of the double-layer plate girder combined rigid frame bridge as described in Example 1. The construction method includes the following steps: S1. Construct the web member 9 of the 0# block and the upper chord member 8 of the steel truss beam, and pour the lower concrete 7 of the 0# block; S2. Pour the concrete bridge deck 2 on both sides of the 0# block symmetrically from the mid-span to the 0# block, tension the corresponding prestressed steel strands 4 of the bridge deck, seal the anchor points 6 of the prestressed steel strands 4 of the bridge deck with the wet joint 3 and connect the adjacent concrete bridge deck 2 until the construction of all the concrete bridge deck 2 is completed. S3. Pour the post-cast concrete 1 on the upper part of the 0# block, tension the prestressed steel strands 5 of the 0# block, seal the anchorage points 6 of the prestressed steel strands 5 of the 0# block with the wet joint 3, and connect the post-cast concrete 1 on the upper part of the 0# block to the concrete bridge deck 2.

[0038] This embodiment describes a construction method for the upper layer composite structure of a double-layer plate girder combined rigid frame bridge. First, the concrete bridge deck 2 is symmetrically constructed from mid-span and prestressed. The entire concrete bridge deck 2 is constructed step by step. Finally, the upper post-cast concrete 1 of the 0# block is constructed and prestressed. The upper post-cast concrete 1 of the 0# block and the concrete bridge deck 2 are connected through the wet joint 3. The stress in most areas of the top is primarily compressive stress, comprehensively improving the stress state of the upper part of the 0# block, effectively reducing structural cracking and improving the durability of the bridge structure.

[0039] Example 3 The bridge described in this invention includes the upper layer composite structure of a double-layer plate girder combined rigid frame bridge as described in Example 1.

[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A composite structure for the upper layer of a double-layer plate girder combined rigid frame bridge, characterized in that, The structure includes a web member (9) for block #0, which is connected to the upper chord (8) of the steel truss. Several shear studs (11) are provided on the upper chord (8) and web member (9) of the steel truss within the block #0 area. The web member (9) of block #0 is connected to the lower concrete (7) of block #0 via the shear studs (11). Several concrete bridge deck panels (2) are symmetrically arranged on both sides of block #0 along the bridge direction. The concrete bridge deck panels (2) on each side are spaced apart. Two symmetrical concrete bridge deck panels (2) are connected by several bridge deck prestressed steel strands (4). Adjacent concrete bridge deck panels (2) on each side are connected by wet joints (3). The steel truss... The upper chord (8) is connected to the upper post-cast concrete (1) of block 0 through the shear studs (11). Several prestressed steel strands (5) of block 0 are arranged in the longitudinal direction of the upper post-cast concrete (1) of block 0. The upper post-cast concrete (1) of block 0 is connected to the adjacent concrete bridge deck (2) through a wet joint (3). Several prestressed steel strands (5) of block 0 are respectively arranged on both sides of the web of the upper chord (8) of the steel truss. Several prestressed steel strands (5) of block 0 are also arranged on both sides of the top of the web member (9) of block 0. The upper post-cast concrete (1) of block 0 wraps the node plate and web of the upper chord (8) of the steel truss and the upper horizontal bracing (10).

2. The upper-level composite structure of the double-layer plate girder combined rigid frame bridge according to claim 1, characterized in that, The anchorage points (6) of the prestressed steel strands (5) of the 0# block are located at both ends of the post-cast concrete (1) on the upper part of the 0# block.

3. The upper-level composite structure of the double-layer plate girder combined rigid frame bridge according to claim 1, characterized in that, The anchorage point (6) of the prestressed steel strand (4) of the bridge deck is located at the end of the concrete bridge deck (2) away from block #0.

4. The upper-level composite structure of the double-layer plate girder combined rigid frame bridge according to claim 1, characterized in that, The transverse direction of the 0# block area includes two upper chord members (8) of the steel truss beams, which are connected by an upper horizontal bracing (10).

5. The upper-level composite structure of a double-layer plate girder combined rigid frame bridge according to any one of claims 1-4, characterized in that, All the shear studs (11) are arranged in an array.

6. The upper-level composite structure of the double-layer plate girder combined rigid frame bridge according to claim 5, characterized in that, The spacing of the shear studs (11) is 200mm-300mm.

7. A construction method for the upper layer composite structure of a double-layer plate girder combined rigid frame bridge, characterized in that, The construction method for forming the superstructure of a double-layer plate girder combined rigid frame bridge as described in any one of claims 1-6 includes the following steps: S1. Construct the web members (9) of the 0# block and the upper chord members (8) of the steel truss beam, and pour the lower concrete (7) of the 0# block; S2. Pour the concrete bridge deck (2) on both sides of the 0# block symmetrically from the middle of the span to the 0# block, tension the corresponding bridge deck prestressed steel strands (4), seal the anchor points (6) of the bridge deck prestressed steel strands (4) with the wet joint (3) and connect the adjacent concrete bridge deck (2) until all the concrete bridge deck (2) construction is completed. S3. Pour the post-cast concrete (1) on the upper part of the 0# block, tension the prestressed steel strand (5) of the 0# block, seal the anchor point (6) of the prestressed steel strand (5) of the 0# block with the wet joint (3), and connect the post-cast concrete (1) on the upper part of the 0# block to the concrete bridge deck (2).

8. A bridge, characterized in that, Including the upper layer composite structure of a double-layer plate girder combined rigid frame bridge as described in any one of claims 1-6.

Citation Information

Patent Citations

  • Continuous rigid frame bridge based on steel truss-concrete slab composite beam

    CN103669194A

  • Modular steel composite small box girder simply supported continuous bridge and construction method thereof

    CN109958049A

  • Non-upper parallel connection steel truss girder composite beam and construction method

    CN112942050A

  • Novel corrugated web steel-concrete continuous beam bridge

    CN213507992U