一种基于移动互联网的工程协同仿真系统

By using a mobile internet-based engineering collaborative simulation system, BIM models and 3D construction drawings were utilized to solve the problem of isolated quality and schedule during construction, enabling real-time monitoring and virtual drills, and improving construction efficiency and quality.

CN116432271BActive Publication Date: 2026-07-17BEIJING CCCC JINGWEI HIGHWAY COST TECH CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
BEIJING CCCC JINGWEI HIGHWAY COST TECH CO LTD
Filing Date
2023-01-16
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In traditional transportation construction projects, quality and progress are isolated during the construction process, making real-time comparison impossible. This leads to problems and rework during construction, resulting in low efficiency.

Method used

An engineering collaborative simulation system based on mobile internet is adopted, which uses BIM models and 3D construction drawings to conduct real-time monitoring and virtual drills of construction progress. Through the progress association, display and comparison modules, the system can automatically judge and display the construction status, reducing errors caused by misreading drawings.

Benefits of technology

It improved construction efficiency and quality, reduced time costs caused by rework, and achieved more efficient resource allocation and construction progress management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116432271B_ABST
    Figure CN116432271B_ABST
Patent Text Reader

Abstract

本发明提出一种基于移动互联网的工程协同仿真系统,包括:进度关联模块,用于在导入总体施工计划,通过将工序卡控数据和检验批记录进行关联,来自动判断现场施工进度和状态;进度展示模块,用于展示项目计划的BIM模型构件工序流程,以及现场施工进度虚拟仿真显示,根据现场实际情况自动动态显示各种不同颜色,灰色表示“未施工”,橙色表示“正在施工”,绿色表示“施工完未计价”,蓝色表示“完工且已计价”;进度对比模块,通过指定的时间段,查看当前实际进度与计划的对比情况,施工预演模块,用于从工程开工至竣工整个过程进行虚拟的施工演练,通过可视化的施工推演,施工图纸校验,辅助施工方案及施工计划合理调整。