Wind farm early warning method and apparatus

By using a fault risk probability identification model and machine learning technology, combined with wind turbine data and weather forecasts, the wind speed for wind farm warnings is calculated, which solves the problem of insufficient accuracy in wind farm warnings and achieves accurate warnings and reduced fault risks for wind farms.

CN116432364BActive Publication Date: 2026-11-20GOLDWIND SCI & TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202111650585.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-30
Publication Date
2026-11-20
Estimated Expiration
2041-12-30

AI Technical Summary

Technical Problem

Due to the complex terrain and insufficient observation data, the existing early warning methods for wind farms are not accurate enough and cannot effectively predict wind turbine failures, thus affecting power generation efficiency.

Method used

The fault risk probability identification model identifies the risk location, and combined with wind measurement data of wind turbines and weather forecasts, the warning wind speed is calculated and the warning is issued. Deep learning and machine learning models are used to improve the accuracy of the warning.

Benefits of technology

It enables precise early warning of wind farms, reduces the risk of wind turbine failures, improves power generation efficiency, and reduces economic losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116432364B_ABST
    Figure CN116432364B_ABST
Patent Text Reader

Abstract

A wind farm early warning method and device are provided. The wind farm early warning method includes determining a risk location, obtaining wind measurement data of a risk wind turbine at the risk location among wind turbines of a wind farm for a first predetermined period, and determining an early warning wind speed of the risk wind turbine based on the wind measurement data for the first predetermined period and a design safety wind speed of the risk wind turbine. A predicted wind speed for a second predetermined period after the first predetermined period is determined based on a weather forecast for the first predetermined period at the risk location and the wind measurement data for the first predetermined period. An early warning is issued when the predicted wind speed for the second predetermined period is greater than or equal to the early warning wind speed. The wind farm early warning method and device can provide accurate early warning services for a wind farm to reduce the occurrence of wind turbine failures, thereby improving the power generation efficiency of the wind farm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of wind power generation. More specifically, it relates to a wind farm early warning method and equipment. Background Technology

[0002] Wind energy, as an environmentally friendly and renewable energy source, has gained increasing attention. Wind is the primary factor affecting the power generation efficiency of wind turbines in wind farms and causing them damage; therefore, it is necessary to provide early warning services specifically for wind farms. Although there has been extensive research both domestically and internationally on disaster weather early warning methods, such as those related to wind, these warnings are primarily geared towards situations endangering public service safety, and early warning services specific to specialized areas like wind farms are still relatively lacking.

[0003] Wind farms are typically located in remote, sparsely populated areas with limited observational data, complex terrain, and poor weather forecast accuracy, all of which complicate early warning systems. Therefore, it is necessary to develop a more precise early warning system tailored to the specific characteristics of wind farms. Summary of the Invention

[0004] The purpose of this disclosure is to provide a wind farm early warning method and device, which can provide accurate early warning services for wind farms.

[0005] According to one aspect of this disclosure, a wind farm early warning method is provided, the method comprising: determining a risk location; acquiring wind measurement data for a first predetermined period of time for a risky wind turbine located at the risk location, and determining an early warning wind speed for the risky wind turbine based on the wind measurement data for the first predetermined period of time and the design safe wind speed of the risky wind turbine; determining a predicted wind speed for a second predetermined period of time following the first predetermined period of time based on a weather forecast for the first predetermined period of time at the risk location and the wind measurement data for the first predetermined period of time; and issuing an early warning when the predicted wind speed for the second predetermined period of time is greater than or equal to the early warning wind speed.

[0006] Optionally, the steps for determining the risk location include: acquiring target terrain information of the target area, where the target area is an area located within a preset distance range of the target location; inputting the target terrain information into a fault risk probability identification model to output a fault risk probability value; and determining the target location corresponding to the fault risk probability value as the risk location when the fault risk probability value is greater than or equal to a preset fault risk probability threshold. The target location may represent the location of the wind turbine generators where the wind farm is installed.

[0007] Optionally, the fault risk probability identification model is trained through the following steps: acquiring sample terrain information and historical wind measurement data for a sample area, where the sample area is a region located within a preset distance from the sample location; labeling the sample terrain information based on the historical wind measurement data to obtain risk terrain labels associated with the sample terrain information, wherein the risk terrain labels are used to indicate whether there is a fault risk at the sample location of the wind turbine; and training the fault risk probability identification model based on the sample terrain information and the risk terrain labels. Historical wind measurement data can be wind measurement data measured by a wind tower at the sample location within the sample area.

[0008] Optionally, the sample terrain information corresponds to a preset wind direction. Optionally, the step of obtaining risk terrain labeling includes: acquiring multiple wind shear data from historical wind measurement data, wherein the wind direction corresponding to each wind shear data matches the preset wind direction corresponding to the sample terrain information; when the proportion of negative wind shear data in the multiple wind shear data is greater than or equal to a preset threshold, the sample terrain information is labeled as a positive sample. Positive samples can indicate that there is a fault risk at the sample location of the wind turbine.

[0009] Optionally, the step of determining the warning wind speed includes: extracting the maximum instantaneous wind speed of the first predetermined period from the wind measurement data of the first predetermined period; calculating the average wind speed per predetermined minute and the average wind speed per hour of the first predetermined period based on the wind measurement data of the first predetermined period; calculating the first difference wind speed between the average wind speed per hour and the average wind speed per predetermined minute of the first predetermined period, and averaging the first difference wind speed to obtain the first average difference wind speed; calculating the second difference wind speed between the average wind speed per predetermined minute of the first predetermined period and the maximum instantaneous wind speed of the first predetermined period, and averaging the second difference wind speed to obtain the second average difference wind speed; and calculating the warning wind speed based on the instantaneous safe wind speed and the safe wind speed per predetermined minute of the design safe wind speed of the risky wind turbine, using the first average difference wind speed and the second average difference wind speed.

[0010] Optionally, the steps for calculating the warning wind speed include: summing the instantaneous safe wind speed, the second average difference wind speed, and the first average difference wind speed to obtain a first preliminary warning wind speed; summing the safe wind speed and the first average difference wind speed for each predetermined minute to obtain a second preliminary warning wind speed; and averaging the first preliminary warning wind speed and the second preliminary warning wind speed to obtain the warning wind speed.

[0011] Optionally, the early warning method further includes: acquiring wind measurement data for a second predetermined period of time for the risky wind turbine, and determining a corrected early warning wind speed for the risky wind turbine based on the wind measurement data for the second predetermined period, the predicted wind speed for the second predetermined period, and the design safe wind speed of the risky wind turbine; determining the predicted wind speed for a third predetermined period following the second predetermined period based on the weather forecast and wind measurement data for the second predetermined period at the risk location; and issuing an early warning when the predicted wind speed for the third predetermined period is greater than or equal to the corrected early warning wind speed.

[0012] Optionally, the step of determining the correction warning wind speed includes: extracting the maximum instantaneous wind speed of the second predetermined period from the wind measurement data of the second predetermined period; calculating the average wind speed per predetermined minute and the average wind speed per predetermined hour of the second predetermined period based on the wind measurement data of the second predetermined period; calculating the third difference wind speed between the average wind speed per predetermined hour and the average wind speed per predetermined minute of the second predetermined period, and averaging the third difference wind speed to obtain the third average difference wind speed; and calculating the average wind speed per predetermined minute of the second predetermined period. The fourth difference wind speed between the maximum instantaneous wind speed in the second predetermined period and the average of the fourth difference wind speed is obtained; the fifth difference wind speed between the predicted wind speed in the second predetermined period and the hourly average wind speed in the second predetermined period is calculated, and the average of the fifth difference wind speed is obtained; based on the instantaneous safe wind speed and the safe wind speed for each predetermined minute of the design safe wind speed of the risky wind turbine, the correction warning wind speed is calculated using the third, fourth, and fifth average difference wind speeds.

[0013] Optionally, the step of calculating the corrected warning wind speed includes: summing the instantaneous safe wind speed, the fourth average difference wind speed, the third average difference wind speed, and the fifth average difference wind speed to obtain the third preliminary corrected warning wind speed; summing the safe wind speed, the third average difference wind speed, and the fifth average difference wind speed for each predetermined minute to obtain the fourth preliminary corrected warning wind speed; and averaging the third preliminary corrected warning wind speed and the fourth preliminary corrected warning wind speed to obtain the corrected warning wind speed.

[0014] Optionally, the step of determining the predicted wind speed includes: extracting wind speeds from weather forecasts from multiple different data sources during a first predetermined time period; assigning different weighting coefficients to the wind speeds extracted from the weather forecasts from the multiple different data sources based on the accuracy of wind speed predictions at risk locations; performing a weighted average of the wind speeds extracted from the weather forecasts from the multiple different data sources based on the weighting coefficients to obtain a preliminary predicted wind speed for the first predetermined time period; and determining the predicted wind speed using a wind speed prediction correction model based on wind measurement data and the preliminary predicted wind speed for the first predetermined time period.

[0015] According to another aspect of this disclosure, a wind farm early warning device is provided, the device comprising: a risk location identification module for determining a risk location; an early warning wind speed determination module for acquiring wind measurement data of a risky wind turbine at a risk location within a first predetermined time period, and determining the early warning wind speed of the risky wind turbine based on the wind measurement data of the first predetermined time period and the design safe wind speed of the risky wind turbine; a predicted wind speed determination module for determining the predicted wind speed for a second predetermined time period following the first predetermined time period based on the weather forecast and wind measurement data of the first predetermined time period at the risk location; and an early warning issuance module for issuing an early warning when the predicted wind speed of the second predetermined time period is greater than or equal to the early warning wind speed.

[0016] According to another aspect of this disclosure, a wind farm early warning system is provided, the system including a processor and a memory storing a computer program. When the computer program is executed by the processor, the above-described wind farm early warning method is implemented.

[0017] According to another aspect of this disclosure, a computer-readable storage medium storing a computer program is provided. When the computer program is executed, the above-described wind farm early warning method is implemented.

[0018] The wind farm early warning method and equipment disclosed herein can provide accurate early warning for wind farms, thereby reducing the damage caused by strong winds to wind turbines and avoiding economic losses. Attached Figure Description

[0019] The above and other objects, features and advantages of this disclosure will become clearer from the following detailed description taken in conjunction with the accompanying drawings, in which:

[0020] Figure 1 A flowchart of a wind farm early warning method according to an embodiment of the present disclosure is shown;

[0021] Figure 2 A flowchart illustrating the determination of risk locations according to embodiments of the present disclosure is shown;

[0022] Figure 3 A flowchart illustrating the determination of warning wind speed according to an embodiment of the present disclosure is shown;

[0023] Figure 4 A flowchart illustrating the determination of predicted wind speed according to an embodiment of the present disclosure is shown;

[0024] Figure 5 A flowchart illustrating the issuance of a warning, including the step of determining the corrected warning wind speed, is shown according to an embodiment of the present disclosure;

[0025] Figure 6A flowchart illustrating the calculation of corrected warning wind speed according to embodiments of the present disclosure is shown; and

[0026] Figure 7 A block diagram of a wind farm early warning device according to an embodiment of the present disclosure is shown. Detailed Implementation

[0027] The features and exemplary embodiments of various aspects of this disclosure will now be described in detail. To make the objectives, technical solutions, and advantages of this disclosure clearer, the disclosure will be described in detail below with reference to the accompanying drawings and specific embodiments. It will be understood that the specific embodiments described herein are intended to explain this disclosure only and not to limit it. For those skilled in the art, this disclosure can be implemented without some of these specific details. The following description of the embodiments is only intended to provide a better understanding of this disclosure by illustrating exemplary embodiments of this disclosure.

[0028] It will be understood that although terms such as first, second, etc., may be used herein to describe various elements, components, and / or modules, these elements, components, and / or modules should not be limited by these terms. Rather, these terms are used only to distinguish one element, component, and / or module from another. Thus, without departing from the teachings of this disclosure, the first element, component, and / or module discussed below may be referred to as the second element, component, and / or module. As used herein, the singular forms “a,” “an,” and “the” are also intended to include the plural forms, unless the context clearly indicates otherwise.

[0029] Unless otherwise defined, all terms used herein (including technical and scientific terms) shall have the same meaning as commonly understood by one of ordinary skill in the art to which this disclosure pertains. It will be further understood that terms (such as those defined in a general dictionary) shall be interpreted as having a meaning consistent with their meaning in the context of the relevant field and shall not be interpreted in an idealized or overly formalized sense, unless expressly defined herein.

[0030] It will be further understood that, when used in this specification, the terms “comprising” and / or “including” indicate the presence of the stated steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other steps, operations, elements, components and / or combinations thereof.

[0031] In the following description, various exemplary embodiments of the present disclosure will be described more fully with reference to the accompanying drawings. The same reference numerals throughout denote the same elements, components, and / or modules.

[0032] Figure 1 A flowchart of a wind farm early warning method according to an embodiment of the present disclosure is shown.

[0033] Reference Figure 1 In step S110, the location of the risk can be determined.

[0034] exist Figure 1 In an example embodiment, a risk location can indicate a potential failure risk for the wind turbine at that location. For example, a failure risk could be a risk of tower sweeping, bearing damage, gearbox damage, or overload. Risk locations typically have specific terrain features; for example, a risk location could be situated on a mountaintop, hill, or valley. Such terrain-specific locations generally impact or damage the operation of wind turbines. Specifically, at such risk locations, negative wind shear (wind speed decreases with increasing altitude) is likely to occur, leading to a failure risk for the wind turbines located there, potentially causing damage and affecting the wind farm's power generation efficiency.

[0035] In step S120, wind measurement data for a first predetermined period of time can be obtained for the wind turbines in the wind farm located at risk locations, and the warning wind speed of the risky wind turbines can be determined based on the wind measurement data for the first predetermined period of time and the design safe wind speed of the risky wind turbines.

[0036] In embodiments of this disclosure, the first predetermined time period can be a pre-set time period for acquiring relevant data. For example, the first predetermined time period can be 24 hours, 48 ​​hours, or 72 hours, but this disclosure is not limited thereto. In one embodiment, wind measurement data can be wind-related data obtained from wind turbine operating status monitoring and health monitoring data (SCADA data) collected by the wind farm's Supervisory Control and Data Acquisition (SCADA) system. For example, wind measurement data can include wind speed data, wind direction data, etc., but is not limited thereto; for example, it can also include wind shear data. In one embodiment, wind measurement data can be used to determine the warning wind speed of the wind turbine and to combine it with weather forecasts at risk locations to determine the predicted wind speed of the wind farm.

[0037] In one embodiment, the design safe wind speed of the risky wind turbine can be obtained from a preset dataset. For example, the preset dataset includes the design safe wind speeds of all common types of wind turbines in the art. In one embodiment, the design safe wind speed of the wind turbine can include an instantaneous safe wind speed and a safe wind speed per predetermined minute. Optionally, the safe wind speed per predetermined minute of the wind turbine can typically be a safe wind speed per 10 minutes, but this disclosure is not limited thereto.

[0038] In step S130, the predicted wind speed for a second predetermined period following the first predetermined period can be determined based on the weather forecast and wind measurement data for the first predetermined period at the risk location.

[0039] In embodiments of this disclosure, weather forecasts may include numerical weather prediction, statistical forecasts, and graphical weather forecasts. Different types of weather forecasts have their own characteristics, advantages, and disadvantages for different meteorological scenarios. For example, numerical weather prediction, based on initial and boundary value problems of physical laws, assumes that the future state of the weather is a necessary result determined by the current state and the physical laws governing its changes, thus not fully utilizing existing historical data. Statistical forecasts utilize a large amount of real-time weather forecast data. They acknowledge the uncertainty of the future state of the weather and expect to make probabilistic inferences about the future based on the current state and recent evolution of the weather, but they do not utilize or fully utilize existing physical knowledge. Compared to the former two, graphical weather forecasts are significantly subjective and experience-based; however, weather forecasters can often use historical similar weather forecasts to make adjustments and extrapolations, thus achieving nonlinear weather forecasts. In the example embodiments of this disclosure, integrated weather forecasts that integrate the advantages of various weather forecasts can be achieved by assigning corresponding weighting coefficients to weather forecasts from different sources, thereby improving the accuracy or precision of forecasts for elements such as wind speed.

[0040] In step S140, a warning can be issued when the predicted wind speed during the second predetermined time period is greater than or equal to the warning wind speed. Optionally, the warning can be lifted when the predicted wind speed during the second predetermined time period is less than the warning wind speed.

[0041] In the example embodiments of this disclosure, through the above steps S110 to S140, accurate early warning for wind farms can be achieved, thereby preventing, reducing and / or minimizing the occurrence of faults in wind turbine units located at risk locations, so as to improve the power generation efficiency of wind farms.

[0042] Figure 2 A flowchart illustrating the determination of risk locations according to embodiments of the present disclosure is shown.

[0043] Reference Figure 2 In step S210, target terrain information of the target area can be obtained. In one embodiment, the target area can be an area located within a preset distance range from the target location.

[0044] exist Figure 2In an example embodiment, the target location may represent the location of the wind turbine generators where the wind farm is installed. In one embodiment, the target location may be a location corresponding to an actual geographical location, and it may have corresponding terrain features. Similarly, the target area may also be an actual geographical area. In addition, the target terrain information of the target area may reflect the terrain features of the target location. In one embodiment, for example, the aforementioned preset distance may be set as needed in actual operation, and this will not be described in detail in this disclosure.

[0045] In one embodiment, the target terrain information of the target area can be data corresponding to the target area extracted from a digital elevation model (DEM) or a map. Optionally, the target terrain information of the target area can also be obtained by on-site surveying. In one embodiment, the target area is typically a rectangular shape with the same length and width dimensions, but this disclosure is not limited thereto. Optionally, the target area can be a circular shape, an ellipse, a triangle, a square shape, and / or a hexagonal shape, etc.

[0046] In step S220, the acquired target terrain information can be input into the fault risk probability identification model to output the fault risk probability value.

[0047] In embodiments of this disclosure, the target terrain information can be data obtained by processing raw terrain information and having a format suitable for a specific model (e.g., the fault risk probability identification model of this disclosure). In one embodiment, the raw terrain information may include terrain information such as longitude, latitude, and contour lines, and the raw terrain information can be used to obtain elevation values ​​(DEM values) of various locations in the target area or to obtain the DEM values ​​of the desired area. The step of processing the raw terrain information to obtain the target terrain information can reduce the data processing requirements of the fault risk probability model, thereby improving the operational efficiency of the data processing process for determining risk locations.

[0048] In one embodiment, the fault risk probability identification model can be a deep learning model. For example, the fault risk probability identification model can be at least one model selected from neural network models, logistic regression models, and support vector machines.

[0049] In the embodiments of this disclosure, as long as the target terrain information is input into the fault risk probability identification model, a fault risk probability value indicating the probability of a fault occurring can be obtained.

[0050] In step S230, when the fault risk probability value is greater than or equal to the fault risk preset probability threshold, the target location corresponding to the fault risk probability value can be determined as the risk location.

[0051] In embodiments of this disclosure, the preset probability threshold can be a preset value. When the failure risk probability value is greater than or equal to the preset probability threshold, it indicates that there is a failure risk in the wind turbine at the target location. The target location can represent the location of the wind turbines where the wind farm is installed. In one embodiment, the preset probability threshold can be the mathematical statistical mean of the probability of a wind turbine failure event. Optionally, the preset risk probability threshold can be set to, for example, 50% or 60%, but this disclosure is not limited thereto.

[0052] Compared to existing methods that rely on manual identification of risky locations, Figure 2 The method of identifying risk locations through artificial intelligence (e.g., a fault risk probability identification model) in the embodiments can significantly improve identification efficiency and accuracy, and the method is suitable for processing such large amounts of data.

[0053] In embodiments of this disclosure, the fault risk probability identification model can be trained through the following steps: acquiring sample terrain information and historical wind measurement data of a sample area, wherein the sample area is an area located within a preset distance range of the sample location; labeling the sample terrain information according to the historical wind measurement data to obtain risk terrain labels associated with the sample terrain information, wherein the risk terrain labels are used to indicate whether there is a fault risk at the sample location of the wind turbine; and training the fault risk probability identification model based on the sample terrain information and the risk terrain labels. In one embodiment, the historical wind measurement data is the wind measurement data measured by a wind measuring device at the sample location in the sample area. Optionally, the wind measuring device can be a wind measuring tower or radar, etc.

[0054] In one embodiment, the sample area is typically an existing geographical region with specific geographical location and topography (topographical features). For example, the sample area can be mountains, valleys, hills, or plains, and its characteristics can be reflected by sample topographic information. This sample topographic information can be data corresponding to the sample area extracted from a digital elevation model or map. Alternatively, the sample topographic information can be obtained through on-site surveying. In embodiments of this disclosure, the sample topographic information can be a component of the training data for a fault risk probability identification model.

[0055] In addition, the sample terrain information may correspond to a preset wind direction. In one embodiment, historical wind measurement data may include data that could lead to wind turbine failure, such as wind direction, wind speed, or wind shear data. Based on the aforementioned historical wind measurement data, the sample terrain information can be labeled to obtain risk terrain labels associated with the sample terrain information. These risk terrain labels can be used to indicate whether the wind turbine has a failure risk.

[0056] Specifically, the steps for obtaining the aforementioned risk terrain labeling include: acquiring multiple wind shear data from historical wind measurement data, with the wind direction corresponding to each wind shear data matching the preset wind direction corresponding to the sample terrain information; when the proportion of negative wind shear data among the multiple wind shear data is greater than or equal to a preset threshold, the sample terrain information is labeled as a positive sample. Positive samples can indicate that there is a fault risk at the sample location of the wind turbine.

[0057] In one embodiment, the wind shear data is wind shear data that meets specific requirements, for example, wind shear data that meets specific requirements when the wind speed is greater than a specific wind speed threshold. Optionally, the specific wind speed threshold of this disclosure can be a wind speed of 6 m / s. Through data statistics and analysis, it has been found that when the wind speed is greater than 6 m / s, the wind turbine is prone to failure (e.g., tower sweeping). In addition, the wind speed compared with this specific wind speed threshold is the wind speed corresponding to the horizontal level of the wind turbine hub height.

[0058] In another example embodiment, for sample terrain information, when the proportion of negative wind shear data among the corresponding multiple wind shear data is greater than or equal to a preset threshold, the sample terrain information can be labeled as a positive sample to indicate that the sample terrain corresponding to the sample terrain information has a fault risk. Specifically, in practical applications, a label 1 can also be set for positive samples. Similarly, negative samples can exist, that is, sample terrain information whose corresponding proportion of negative wind shear data is less than a preset threshold can be labeled 0. In one embodiment, the preset thresholds used to determine positive and negative samples can be the same or different. For example, the preset threshold used to determine negative samples can be smaller than the preset threshold used to determine positive samples, thus distinguishing between positive and negative samples.

[0059] In one optional embodiment, if the ratio of negative wind shear data to total wind shear data in a sample region is greater than or equal to 33.3%, then the sample region can be labeled as a positive sample. In this case, 33.3% is the preset threshold for positive samples. Similarly, the preset threshold for negative samples can be 0.1%. Therefore, positive and negative samples can be clearly distinguished in this way. However, this disclosure is not limited thereto.

[0060] In the example embodiment, the fault risk probability identification model can be a convolutional neural network with 3 convolutional layers and 3 pooling layers. The convolutional kernels in the convolutional layers are 3x3 with a stride of 1, and the pooling layers are 2x2 max pooling with a rectified linear unit (ReLU) activation function. Specifically, the training of the convolutional neural network can use TensorFlow 2.0 as the computational framework, stochastic gradient descent as the optimization algorithm, and binary cross-entropy as the loss function. In addition, the fault risk probability identification model can be trained 100 times (i.e., the training is performed for 100 epochs) using a training set composed of sample terrain information and risk terrain labels.

[0061] Optionally, the fault risk probability identification model can be an 8-layer deep convolutional neural network. In one embodiment, layers 1, 3, and 5 are convolutional layers, layers 2, 4, and 6 are pooling layers, and layers 7 and 8 are fully connected layers. The convolutional kernels in the convolutional layers are 3x3 with a stride of 1, while the pooling layers use max pooling with a stride of 2. The convolutional layers and the first fully connected layer use the ReLU function as the activation function, and the last fully connected layer uses the sigmoid function as the activation function. Furthermore, to avoid overfitting on the test set, a process of randomly dropping 20% ​​of neurons is implemented in the 7th fully connected layer.

[0062] In one embodiment, the training set consisting of paired sample terrain information and risk terrain labels should have at least 10,000 data points to meet the minimum data volume requirement for training the model. Specifically, 20%, 25%, or 30% of the data in the training set is randomly selected as the test set, and the remaining data is used as the training set to train and test the fault risk probability identification model. Furthermore, training of the fault risk probability identification model is considered complete when the model's accuracy on the test set reaches a preset value. In one embodiment, this preset value can be a numerical value derived from mathematical statistics of a large amount of sample data. Optionally, the preset value can be, for example, 75% or 80%.

[0063] In another embodiment, the fault risk probability identification model can be obtained through a different training process. The difference lies in the following: the sample area can be divided into multiple sub-sample areas based on the wind direction closest to the wind turbine hub height level in the historical wind measurement data of the anemometer tower at the sample location. The fault risk probability identification model is then trained using the sub-sample terrain information of each sub-sample area and its sub-risk terrain annotations based on the historical wind measurement data. The specific training process is similar to the process described above and will not be described redundantly. The risk locations identified by this model are more accurate and can be used for subsequent wind turbine management strategies. Accordingly, when using the above model, the target area should also be divided into multiple sub-target areas in the same way. The identification process for specific risk locations (e.g., sub-risk locations) is similar to the aforementioned process and will not be described redundantly.

[0064] Figure 3 A flowchart illustrating the determination of warning wind speed according to an embodiment of the present disclosure is shown.

[0065] Because different wind turbine models have varying safety performance against extreme wind speeds, and because different risk locations have different geographical and meteorological environments, the extreme wind speeds during each weather event will also differ. Therefore, it is necessary to determine the warning wind speed for the risky wind turbines at the risk locations. In one embodiment, a period of strong winds can be defined as a period with wind speeds greater than or equal to 12 m / s or greater than or equal to 15 m / s.

[0066] Reference Figure 3 In step S310, the maximum instantaneous wind speed of the first predetermined period can be extracted from the wind measurement data of the first predetermined period.

[0067] In the embodiments of this disclosure, wind measurement data may be obtained from the SCADA data of the wind turbine and from remote timed transmission. Remote transmission can be achieved through wireless communication networks, wired communication networks, etc., but this disclosure is not limited thereto.

[0068] In step S320, the average wind speed per predetermined minute and the average wind speed per hour of the first predetermined period can be calculated based on the wind measurement data of the first predetermined period.

[0069] In one embodiment, the average wind speed over predetermined minutes can be an average wind speed over 10 minutes, while in another embodiment, the average wind speed over predetermined minutes can be an average wind speed over 5 minutes or an average wind speed over 15 minutes. Specifically, the duration of the predetermined minutes can be set according to actual needs to meet different accuracy requirements.

[0070] In step S330, a first difference wind speed can be calculated between the hourly average wind speed and the minute-by-minute average wind speed of the first predetermined time period, and the first difference wind speed can be averaged to obtain a first average difference wind speed; and a second difference wind speed can be calculated between the minute-by-minute average wind speed and the maximum instantaneous wind speed of the first predetermined time period, and the second difference wind speed can be averaged to obtain a second average difference wind speed.

[0071] In the embodiments of this disclosure, the first average difference wind speed and the second average difference wind speed are mathematical statistical averages. For example, the larger the number of sample data calculated, the more accurate the values ​​of the first average difference wind speed and the second average difference wind speed. Therefore, the number of sample data in the embodiments of this disclosure needs to meet the minimum requirements for achieving accurate first average difference wind speed and second average difference wind speed, which will not be described in detail in this disclosure.

[0072] In step S340, the warning wind speed can be calculated using the first average difference wind speed and the second average difference wind speed, based on the instantaneous safe wind speed and the safe wind speed for each predetermined minute of the design safe wind speed of the risky wind turbine.

[0073] In one embodiment, the design safe wind speed of the risky wind turbine can be obtained from a preset dataset of wind turbine design safe wind speeds, which may include design safe wind speeds for different types of wind turbines. Optionally, the design safe wind speed per predetermined minute may be a 5-minute safe wind speed, or a 10-minute safe wind speed, or a 15-minute safe wind speed; however, this disclosure is not limited thereto.

[0074] Specifically, the steps for calculating the warning wind speed may include: summing the instantaneous safe wind speed, the second average difference wind speed, and the first average difference wind speed to obtain a first preliminary warning wind speed; summing the safe wind speed and the first average difference wind speed over predetermined minutes to obtain a second preliminary warning wind speed; and averaging the first preliminary warning wind speed and the second preliminary warning wind speed to obtain the warning wind speed, but this disclosure is not limited thereto. For example, in another optional embodiment, the instantaneous safe wind speed and the second average difference wind speed may first be summed to obtain a first preliminary predetermined time period warning wind speed; then the first preliminary predetermined time period warning wind speed and the safe wind speed over predetermined minutes may be averaged to obtain a first preliminary warning wind speed; finally, the first preliminary warning wind speed and the first average difference wind speed may be summed to obtain a preliminary warning wind speed. Optionally, the warning wind speed may be calculated using various mathematical methods (or existing technologies), as long as the non-hourly level wind speed of the wind turbine can be linked to the hourly level wind speed of the weather forecast. The purpose of this is to provide a more accurate warning service for wind farms.

[0075] Figure 4A flowchart illustrating the determination of predicted wind speed according to an embodiment of the present disclosure is shown.

[0076] Reference Figure 4 In step S410, wind speed can be extracted from weather forecasts from multiple different data sources during the first predetermined time period.

[0077] exist Figure 4 In the embodiments, weather forecasts from various data sources can include numerical weather prediction, statistical forecasts, and synoptic forecasts. Specifically, numerical weather prediction can include objective forecasts using the model output statistics (MOS) method from the Weather Research and Forecasting (WRF) model, numerical forecast products from the National Meteorological Administration, and numerical forecast products from the European Centre for Medium-Range Weather Forecasts (ECMWF), etc. Synoptic forecasts can include weather maps at various altitudes, satellite cloud images, and radar images, etc., and statistical forecasts can include similar forecasts based on historical databases, etc.

[0078] In one embodiment, a precise objective forecast using the WRF model output statistics (MOS) method can be established for a specific location (e.g., a risk location). Specifically, based on historical forecast products for that specific location, a forecast factor library is established according to the correlation between wind speed forecast factors and other forecast elements, categorized by different locations, time series, and altitude levels. In addition to basic forecast quantities such as temperature, air pressure, wind, and relative humidity, the forecast factor library also includes vorticity, divergence, pseudo-equivalent potential temperature, dew point temperature difference, helicity, advection, vertical shear, gradient, humidification, elevation, total precipitation, relative humidity, 2-meter temperature, 10-meter wind field, and other physical quantities at all altitude levels. Then, for different locations, different forecast elements, and different time series, a certain number of forecast factors are selected from the forecast factor library by combining mathematical and meteorological methods. Finally, a regression equation is established to calculate the linear correlation between the forecast factors and the forecast elements. The forecast factor with the largest absolute value of the correlation coefficient is selected and then entered into the regression equation. Finally, a forecast equation for a predetermined time period (e.g., 24 hours, 48 ​​hours, or 72 hours) is established, thereby realizing the objective forecast of the WRF model output statistical (MOS) method.

[0079] In step S420, different weighting coefficients can be assigned to the wind speeds extracted from weather forecasts from multiple different data sources based on the accuracy of wind speed predictions at risk locations.

[0080] In one embodiment, wind speed forecast accuracy can be determined based on the mathematical statistics of weather forecasts and actual wind speed measurements at the risk location from various historical weather data sources. Specifically, the higher the accuracy of the wind speed prediction from a data source, the greater the weighting coefficient assigned to the wind speed extracted from that data source. In other words, the emphasis on different data source forecasts varies according to their wind speed forecast accuracy, thus enabling more accurate weather forecasts for risk locations.

[0081] Alternatively, weighting coefficients can be provided by experienced weather forecasters. Specifically, weather forecasters can consult historical weather maps in databases based on altimeter maps, satellite cloud images, radar images, etc., combined with key factors (such as the intensity, location, and pressure gradient of high and low pressure centers). They can then use the development, intensity, and movement paths of similar historical weather events to predict wind speed evolution at different locations. Based on this process, weather forecasters can assign different weighting coefficients to weather forecasts from different data sources. However, this method may be affected by subjective human factors; its accuracy depends on the forecaster's skill and experience, and may also be subject to human judgment errors.

[0082] In step S430, the wind speeds extracted from weather forecasts from multiple different data sources can be weighted and averaged based on weighting coefficients to obtain the preliminary predicted wind speed for the first predetermined time period.

[0083] In one embodiment, the preliminary predicted wind speed for the first predetermined time period can be determined by the following equation:

[0084]

[0085] In the equation, N represents the number of weather forecasts from different data sources, and W... i For the predicted wind speed in each weather forecast, ω i For W i The assigned weighting coefficient, W guess To make a preliminary prediction of wind speed, among which,

[0086] In step S440, the predicted wind speed can be determined using a wind speed prediction correction model based on wind measurement data and preliminary predicted wind speed for the first predetermined time period.

[0087] In one embodiment, a wind speed prediction correction model can be trained using wind measurement data and preliminary predicted wind speeds from a first plurality of historical periods of the risky wind turbine at the risky location as input samples and wind measurement data from a second plurality of historical periods of the risky wind turbine as output samples. Each period in the second plurality of historical periods can be a period following one of the periods in the first plurality of historical periods.

[0088] In one embodiment, the algorithm for the wind speed prediction correction model can be at least one algorithm selected from conventional machine learning algorithms. Conventional machine learning algorithms may include linear regression, support vector machine (SVM), nearest neighbor (KNN), random forest, optimized distributed gradient boosting library (XGboost), recurrent neural network (RNN), long short-term memory (LSTM), recurrent gate unit (GRU) algorithm, etc. In one embodiment, a suitable algorithm can be selected from the perspectives of time series data prediction adaptability, nonlinear regression performance, and operating efficiency. Optionally, the algorithm selected by the wind speed prediction correction model of this disclosure may include the GRU algorithm and the XGboost algorithm, and the wind speed prediction correction model is designed based on the XGboost algorithm and the GRU algorithm combined with a deep neural network (DNN) model.

[0089] During the training process of the wind speed prediction correction model, the output of the model needs to meet certain requirements. For example, it needs to simultaneously achieve a wind speed prediction accuracy of over 80% and a warning accuracy of over 60%. However, this disclosure is not limited to this. For example, the minimum accuracy of the wind speed prediction can be selected from a range of 60% to 100% or 80% to 100%, and the minimum accuracy of the warning can also be selected from a range of 60% to 100% or 80% to 100%. In one embodiment, the specific values ​​can be set according to actual accuracy requirements or mathematical statistical results.

[0090] Figure 5 A flowchart illustrating the issuance of a warning, including the step of determining the corrected warning wind speed, is shown according to an embodiment of the present disclosure.

[0091] Because there is often a certain deviation between the predicted wind speed and the actual wind speed during wind turbine operation, the warning wind speed determined solely from the wind turbine's design safe wind speed and the actual measured wind speed may have a small deviation, which can affect the accuracy of the warning. To reduce this deviation in the warning wind speed, or to enhance the contribution of the warning wind speed and predicted wind speed to the accuracy of the warning in actual operation, this disclosure also provides a method for issuing warnings that includes a step of calculating and correcting the warning wind speed. The method will be described in detail below.

[0092] Reference Figure 5 In step S510, wind measurement data for the second predetermined period of the risky wind turbine can be obtained, and the correction warning wind speed of the risky wind turbine can be determined based on the wind measurement data for the second predetermined period, the predicted wind speed for the second predetermined period, and the design safe wind speed of the risky wind turbine.

[0093] exist Figure 5 In one embodiment, the second predetermined time period can be the same as... Figure 1 The second predetermined time period in step S130 corresponds to the time period for which the wind measurement data is obtained. The wind measurement data for the second predetermined time period and the wind measurement data for the first predetermined time period can be obtained using the same method and include the same type of data information; therefore, a redundant description is not provided. Furthermore, the predicted wind speed for the second predetermined time period can be... Figure 1 The predicted wind speed in step S130 is the same as the predicted wind speed. Optionally, it can be assumed that... Figure 5 The second scheduled time period is Figure 1 The second scheduled time period, that is to say Figure 5 The steps can be in Figure 1 The step is performed after the previous step. Optionally, in one embodiment, it can be... Figure 5 Step S510 is executed once, or at least once.

[0094] In step S520, the predicted wind speed for a third predetermined period following the second predetermined period can be determined based on the weather forecast and wind measurement data for the second predetermined period at the risk location.

[0095] Figure 5 The description of the weather forecast for the second scheduled period can be compared with... Figure 1 The description of the first weather forecast is the same or similar, so it will not be described redundantly. Furthermore, the process of determining the predicted wind speed based on the weather forecast for the second predetermined time period and the wind measurement data for the second predetermined time period can be similar to that of the reference... Figure 4 The processes described are the same or similar, therefore, their descriptions have been omitted.

[0096] In step S530, an early warning can be issued when the predicted wind speed during the third predetermined time period is greater than or equal to the corrected warning wind speed. Optionally, the early warning can be lifted when the predicted wind speed during the third predetermined time period is less than the corrected warning wind speed.

[0097] pass Figure 5 The process described in the example embodiment can yield more accurate early warning wind speeds for wind turbines, thereby providing more precise early warning services. Therefore, it can improve the power generation efficiency of wind farms, thus preventing economic losses.

[0098] In another embodiment, the process of issuing the third-period warning may not include the process of calculating and correcting the warning wind speed. That is, step S510 can be omitted, and the wind speed can be directly utilized. Figure 3 The warning is issued for the third time period based on the predicted wind speed. In this case, a warning can be issued when the predicted wind speed for the third time period is greater than or equal to the warning wind speed. Optionally, the warning can be lifted when the predicted wind speed for the third time period is less than the warning wind speed.

[0099] Figure 6 A flowchart illustrating the calculation of corrected warning wind speed according to an embodiment of the present disclosure is shown.

[0100] and Figure 3 Compared to the calculation and warning wind speed process, Figure 6 The process of calculating and correcting the warning wind speed now includes an additional step of utilizing the predicted wind speed from the previous period. This will be described in detail below.

[0101] Reference Figure 6 In step S610, the maximum instantaneous wind speed of the second predetermined period can be extracted from the wind measurement data of the second predetermined period. Figure 6 Step S610 can be with Figure 3 The steps S310 are basically the same or similar, except that the time period for acquiring data is different. Therefore, we will not go into too much detail about this.

[0102] In step S620, the average wind speed per predetermined minute and the average wind speed per hour for the second predetermined time period can be calculated based on the wind measurement data for the second predetermined time period. Optionally, the predetermined minute interval can be 5 minutes, 10 minutes, and / or 15 minutes, etc. In one embodiment, the duration of the predetermined minute interval can be set according to the actual accuracy requirements.

[0103] In step S630, a third difference wind speed can be calculated between the hourly average wind speed and the minute-by-minute average wind speed of the second predetermined time period, and the third difference wind speed can be averaged to obtain a third average difference wind speed; a fourth difference wind speed can be calculated between the minute-by-minute average wind speed and the maximum instantaneous wind speed of the second predetermined time period, and the fourth difference wind speed can be averaged to obtain a fourth average difference wind speed; and a fifth difference wind speed can be calculated between the predicted wind speed of the second predetermined time period and the hourly average wind speed of the second predetermined time period, and the fifth difference wind speed can be averaged to obtain a fifth average difference wind speed.

[0104] Specifically, with Figure 3 Compared to step S330, Figure 6Step S630 adds a process of calculating the fifth average difference wind speed based on the predicted wind speed and hourly average wind speed of the second predetermined time period. The reason for doing this is to reduce the deviation between the predicted wind speed of the wind turbine and the actual measured wind speed during operation, so as to achieve more accurate early warning.

[0105] In step S640, the corrected warning wind speed can be calculated using the third average difference wind speed, the fourth average difference wind speed, and the fifth average difference wind speed, based on the instantaneous safe wind speed and the predetermined minute-by-minute safe wind speed of the design safe wind speed of the risky wind turbine at the risk location. In one embodiment, Figure 6 The instantaneous safe wind speed and the predetermined minute-by-minute safe wind speed of the design safety wind speed of the risk wind turbine at step S630 can be compared with... Figure 3 The steps in step S330 are the same or similar. Furthermore, adjusting the warning wind speed can improve the accuracy of the warning.

[0106] Specifically, the steps for calculating the corrected warning wind speed may include: summing the instantaneous safe wind speed, the fourth average difference wind speed, the third average difference wind speed, and the fifth average difference wind speed to obtain the third preliminary corrected warning wind speed; summing the safe wind speed, the third average difference wind speed, and the fifth average difference wind speed for each predetermined minute to obtain the fourth preliminary corrected warning wind speed; and averaging the third and fourth preliminary corrected warning wind speeds to obtain the corrected warning wind speed. Optionally, similar to the process of calculating the warning wind speed, the corrected warning wind speed can be calculated using various mathematical methods, as long as the non-hourly level wind speed of the wind turbine can be linked to the hourly level wind speed of the weather forecast and / or predicted wind speed. The purpose of this is to provide a more accurate warning service for wind farms.

[0107] Figure 7 A block diagram of a wind farm early warning device according to an embodiment of the present disclosure is shown.

[0108] like Figure 7 As shown, the wind farm early warning device 100 according to an embodiment of the present disclosure may include a risk location identification module 1001, an early warning wind speed determination module 1002, a predicted wind speed determination module 1003, and an early warning release module.

[0109] The risk location identification module 1001 can be used to determine the risk location, where the risk location refers to the wind turbine unit at the risk location is at risk of failure.

[0110] In one embodiment, the risk location identification module 1001 can, as shown in the example... Figure 2 The method shown is used to determine risk locations.

[0111] The warning wind speed determination module 1002 can be used to acquire wind measurement data of the risky wind turbine at the risk location in the wind farm during a first predetermined period, and determine the warning wind speed of the risky wind turbine based on the wind measurement data of the first predetermined period and the design safe wind speed of the risky wind turbine.

[0112] In one embodiment, the warning wind speed determination module 1002 can be configured as follows: Figure 3 The method shown is used to determine the warning wind speed for risky wind turbine units.

[0113] The predicted wind speed determination module 1003 can be used to determine the predicted wind speed for a second predetermined period after the first predetermined period based on weather forecasts and wind measurement data for a first predetermined period of time at the risk location.

[0114] In one embodiment, the predicted wind speed determination module 1003 can be configured as follows: Figure 4 The method shown is used to determine the predicted wind speed for the second predetermined period following the first predetermined period.

[0115] When the predicted wind speed during the second predetermined time period is greater than or equal to the warning wind speed, the warning issuing module 1004 may issue a warning. Optionally, when the predicted wind speed during the second predetermined time period is less than the warning wind speed, the warning issuing module 1004 may cancel the warning.

[0116] This disclosure also provides a wind farm early warning system. In one embodiment, the wind farm early warning system includes a processor and a memory (such as a computer-readable storage medium) storing a computer program. When the computer program is executed by the processor, the wind farm early warning method described above can be implemented.

[0117] The wind farm early warning method according to embodiments of this disclosure can be programmed into a computer program and stored on a computer-readable storage medium. When the computer program is executed by a processor, the wind farm early warning method described above can be implemented. Examples of computer-readable storage media include: read-only memory (ROM), random access programmable read-only memory (PROM), electrically erasable programmable read-only memory (EEPROM), random access memory (RAM), dynamic random access memory (DRAM), static random access memory (SRAM), flash memory, non-volatile memory, CD-ROM, CD-R, CD+R, CD-RW, CD+RW, DVD-ROM, DVD-R, DVD+R, DVD-RW, DVD+RW, DVD-RAM, BD-ROM, BD-R, BD-R LTH, BD-RE, Blu-ray or optical disc storage, hard disk drive (HDD), solid-state drive (SSD), card storage (such as multimedia cards, secure digital (SD) cards, or ultra-fast digital (XD) cards), magnetic tape, floppy disk, magneto-optical data storage device, optical data storage device, hard disk, solid-state drive, and any other device configured to store computer programs and any associated data, data files, and data structures in a non-transitory manner and to provide the computer programs and any associated data, data files, and data structures to a processor or computer so that the processor or computer can execute the computer programs. In one example, the computer programs and any associated data, data files, and data structures are distributed across a networked computer system, such that the computer programs and any associated data, data files, and data structures are stored, accessed, and executed in a distributed manner through one or more processors or computers.

[0118] The wind farm early warning method and equipment disclosed herein can provide accurate early warning based on the characteristics of the wind farm itself, thereby preventing, reducing and / or minimizing the occurrence of wind turbine failures, thus improving the power generation efficiency of the wind farm and maximizing the utilization of wind energy.

[0119] While some embodiments of this disclosure have been shown and described, those skilled in the art will understand that various modifications and changes may be made to these embodiments without departing from the principles and spirit of this disclosure, which are defined by the claims and their equivalents.

Claims

1. A wind farm early warning method, characterized in that, The method includes: Identify the location of the risk; Obtain wind measurement data for a first predetermined period of time for the wind turbine generator at the risk location in the wind farm, and determine the warning wind speed of the risk wind turbine generator based on the wind measurement data for the first predetermined period of time and the design safe wind speed of the risk wind turbine generator. Based on the weather forecast and wind measurement data for a first predetermined period of time at the risk location, determine the predicted wind speed for a second predetermined period following the first predetermined period; and A warning is issued when the predicted wind speed for the second predetermined time period is greater than or equal to the warning wind speed. The method further includes: Obtain wind measurement data for a second predetermined period of time for the risky wind turbine, and determine the correction warning wind speed for the risky wind turbine based on the wind measurement data for the second predetermined period, the predicted wind speed for the second predetermined period, and the design safe wind speed of the risky wind turbine. Based on the weather forecast and wind measurement data for the second predetermined period of the risk location, determine the predicted wind speed for the third predetermined period following the second predetermined period; and An early warning is issued when the predicted wind speed during the third predetermined time period is greater than or equal to the corrected warning wind speed.

2. The early warning method according to claim 1, characterized in that, The steps to determine the location of risk include: Acquire target terrain information of a target area, wherein the target area is an area located within a preset distance range from the target location; The target terrain information is input into the fault risk probability identification model to output a fault risk probability value; When the fault risk probability value is greater than or equal to the fault risk preset probability threshold, the target location corresponding to the fault risk probability value is determined as the risk location; The target location refers to the location where the wind turbines of the wind farm are installed.

3. The early warning method according to claim 2, characterized in that, The fault risk probability identification model is trained through the following steps: Acquire sample topographic information and historical wind measurement data for the sample area, which is an area located within a preset distance range from the sample location; The sample terrain information is labeled based on the historical wind measurement data to obtain risk terrain labels associated with the sample terrain information. These risk terrain labels indicate whether there is a risk of failure for the wind turbine at the sample location. The fault risk probability identification model is trained based on the sample terrain information and the risk terrain annotation. The historical wind measurement data refers to the wind measurement data obtained by the wind measurement tower at the sample location in the sample area.

4. The early warning method according to claim 3, characterized in that, The sample terrain information corresponds to a preset wind direction; and The steps for obtaining the risk terrain markings include: Multiple wind shear data are obtained from the historical wind measurement data, and the wind direction corresponding to each wind shear data is matched with the preset wind direction corresponding to the sample terrain information; When the proportion of negative wind shear data in the plurality of wind shear data is greater than or equal to a preset threshold, the sample terrain information is marked as a positive sample, and the positive sample indicates that there is a risk of failure of the wind turbine at the sample location.

5. The early warning method according to claim 1, characterized in that, The steps to determine the warning wind speed include: Extract the maximum instantaneous wind speed of the first predetermined period from the wind measurement data of the first predetermined period; Based on the wind measurement data of the first predetermined time period, calculate the average wind speed per predetermined minute and the average wind speed per hour of the first predetermined time period. Calculate the first difference wind speed between the hourly average wind speed and the minute-by-minute average wind speed during the first predetermined time period, and average the first difference wind speed to obtain the first average difference wind speed. Calculate the second difference wind speed between the average wind speed per predetermined minute during the first predetermined time period and the maximum instantaneous wind speed during the first predetermined time period, and average the second difference wind speed to obtain the second average difference wind speed. Based on the instantaneous safe wind speed and the safe wind speed every predetermined minute of the design safe wind speed of the risky wind turbine, the warning wind speed is calculated using the first average difference wind speed and the second average difference wind speed.

6. The early warning method according to claim 5, characterized in that, The steps for calculating the warning wind speed include: The instantaneous safe wind speed, the second average difference wind speed, and the first average difference wind speed are summed to obtain the first preliminary warning wind speed. The second preliminary warning wind speed is obtained by summing the predetermined safe wind speed every minute and the first average difference wind speed; and The first preliminary warning wind speed and the second preliminary warning wind speed are averaged to obtain the warning wind speed.

7. The early warning method according to claim 1, characterized in that, The steps for determining the corrected warning wind speed include: Extract the maximum instantaneous wind speed of the second predetermined period from the wind measurement data of the second predetermined period; Based on the wind measurement data of the second predetermined time period, calculate the average wind speed per predetermined minute of the second predetermined time period and the average wind speed per hour of the second predetermined time period. Calculate the third difference wind speed between the hourly average wind speed and the minute-by-minute average wind speed during the second predetermined time period, and average the third difference wind speed to obtain the third average difference wind speed. Calculate the fourth difference wind speed between the average wind speed per predetermined minute during the second predetermined time period and the maximum instantaneous wind speed during the second predetermined time period, and average the fourth difference wind speed to obtain the fourth average difference wind speed. Calculate the fifth difference wind speed between the predicted wind speed during the second predetermined time period and the hourly average wind speed during the second predetermined time period, and average the fifth difference wind speed to obtain the fifth average difference wind speed; and Based on the instantaneous safe wind speed and the safe wind speed every predetermined minute of the design safe wind speed of the risky wind turbine, the correction warning wind speed is calculated using the third average difference wind speed, the fourth average difference wind speed and the fifth average difference wind speed.

8. The early warning method according to claim 7, characterized in that, The steps for calculating the corrected warning wind speed include: The instantaneous safe wind speed, the fourth average difference wind speed, the third average difference wind speed, and the fifth average difference wind speed are summed to obtain the third preliminary correction warning wind speed. The fourth preliminary correction warning wind speed is obtained by summing the predetermined safe wind speed, the third average difference wind speed, and the fifth average difference wind speed; and The corrected warning wind speed is obtained by averaging the third preliminary correction warning wind speed and the fourth preliminary correction warning wind speed.

9. The early warning method according to claim 1, characterized in that, The steps for determining the predicted wind speed include: Wind speeds were extracted from weather forecasts from multiple different data sources during the first predetermined time period. Based on the accuracy of wind speed prediction at the risk location from the weather forecasts of the various data sources, different weighting coefficients are assigned to the wind speeds extracted from the weather forecasts of the various data sources. Based on weighted coefficients, a weighted average is applied to wind speeds extracted from weather forecasts from the various data sources to obtain preliminary predicted wind speeds for a first predetermined time period; and Based on the wind measurement data for the first predetermined time period and the preliminary predicted wind speed for the first predetermined time period, the predicted wind speed is determined using a wind speed prediction correction model.

10. A wind farm early warning device, characterized in that, The device includes: Risk location identification module, used to determine risk locations; The warning wind speed determination module acquires wind measurement data for a first predetermined period of time for the risky wind turbine at the risk location in the wind farm, and determines the warning wind speed of the risky wind turbine based on the wind measurement data for the first predetermined period of time and the design safe wind speed of the risky wind turbine. The predicted wind speed determination module, based on the weather forecast and wind measurement data for a first predetermined period at the risk location, determines the predicted wind speed for a second predetermined period following the first predetermined period; and The early warning issuing module issues an early warning when the predicted wind speed during the second predetermined time period is greater than or equal to the early warning wind speed. Among them, the wind farm early warning equipment is also configured as follows: Obtain wind measurement data for a second predetermined period of time for the risky wind turbine, and determine the correction warning wind speed for the risky wind turbine based on the wind measurement data for the second predetermined period, the predicted wind speed for the second predetermined period, and the design safe wind speed of the risky wind turbine. Based on the weather forecast and wind measurement data for the second predetermined period of the risk location, determine the predicted wind speed for the third predetermined period following the second predetermined period; and An early warning is issued when the predicted wind speed during the third predetermined time period is greater than or equal to the corrected warning wind speed.

11. A wind farm early warning system, characterized in that, The wind farm early warning system includes a processor and a memory storing a computer program, wherein when the computer program is executed by the processor, it implements the method as described in any one of claims 1 to 9.

12. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed, it implements the method of any one of claims 1 to 9.

Citation Information

Patent Citations

  • System and methods for determining a cut-out limit for a wind turbine

    CN102022265A

  • Method and device used for predicting output power of blower in wind field

    CN104021424A

  • Method and system for predicting short-time wind speed overrun probability

    CN112183866A

  • Method and device for correcting station wind speed forecast result

    CN113253364A