Mingmanliu simulation model construction, simulation method and system

By correcting wave velocity calculations and adding numerical viscosity, a full-flow simulation model was constructed, which solved the numerical oscillation problem in the simulation of full-flow in long-distance water transfer projects, achieving high-precision and efficient simulation of canal and tunnel systems, and improving scheduling safety and efficiency.

CN116451611BActive Publication Date: 2026-11-24WUHAN UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310427387.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2026-11-24
Estimated Expiration
2043-04-20

AI Technical Summary

Technical Problem

Existing technologies are insufficient for effectively simulating open-flow simulation under high pressure wave velocity in long-distance water transfer projects, resulting in severe numerical oscillations that affect the safety and efficiency of canal and tunnel systems. Furthermore, existing methods are complex and difficult to apply, or the simulation results differ significantly from reality.

Method used

By employing a modified wave velocity calculation method and adding numerical viscosity, combined with a suitable numerical format and physical model, a full-flow simulation model is constructed. Numerical oscillations are suppressed through the full-flow transition simulation model, and a simulation system suitable for complex canal and tunnel systems is established.

Benefits of technology

It significantly suppresses numerical oscillations, improves simulation accuracy and computational efficiency, can adapt to various flow regimes, enhances the simulation accuracy and operation management level of canal and tunnel systems, and reduces safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116451611B_ABST
    Figure CN116451611B_ABST
Patent Text Reader

Abstract

This invention provides a simulation model, simulation method, and system for open-water flow, applicable to the simulation of open-water flow under actual high pressure wave velocities in long-distance water transfer projects. It significantly suppresses numerical oscillations and possesses high simulation accuracy and computational efficiency. The open-water flow simulation model construction method includes: for the transitional numerical simulation of open-water flow, correcting the wave velocity calculation method and modifying the HLLS scheme by adding numerical viscosity, while also modifying the source terms. Based on a suitable numerical scheme, a transitional simulation model for open-water flow is constructed that effectively suppresses numerical oscillations without affecting the accuracy of open-water flow calculations. The open-water flow simulation method includes: Step I, constructing the aforementioned open-water flow simulation model; Step II, simulating using the open-water flow simulation model based on the hydraulic conditions to be simulated and measured data. The open-water flow simulation system can automatically implement the aforementioned simulation model construction method and simulation method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of automated scheduling technology of water conservancy systems, specifically involving the construction of a full-flow simulation model, simulation method and system. Background Technology

[0002] Long-distance water transfer projects provide a means to resolve the contradiction between water supply and demand, but only by combining them with automated canal system control can the project benefits be maximized and water allocation optimized. In water transfer projects, open channels are typically used as the main water conveyance structures. However, in recent years, due to restrictions on arable land, large-scale inter-basin water transfer projects have increasingly favored the use of tunnels and inverted siphons. For example, one water diversion project used a 63-kilometer-long tunnel, and another project used a 72-kilometer-long inverted siphon. These hydraulic structures inevitably bring about the problem of alternating open and full flow. Traditional long-distance open channel systems generally treat inverted siphons as node head losses, ignoring the influence of internal pressurized flow and the safety issues of inverted siphons during scheduling. Since inverted siphons are generally made of PCCP pipes, their pressure wave velocity can reach 1000 m / s. If the canal-tunnel system is not properly scheduled, the pressure peak generated in the inverted siphon may exceed the maximum pressure that the pipeline can withstand, leading to serious accidents such as pipe bursts. Therefore, considering the open and full flow problem in the operation and scheduling of canal-tunnel systems is a necessary requirement and guarantee for safe and efficient operation.

[0003] Open channel flow simulation models are a prerequisite for studying the hydraulic response characteristics and automated operation scheduling of canal-tunnel systems. However, the different governing equations of open channel flow and pressurized flow pose a significant challenge to establishing simulation models for complex open channel flow and pressurized flow canal-tunnel systems. Adding an infinitely long narrow slit above the flow cross-section can unify the governing equations of open channel flow and pressurized flow, but the difference of two orders of magnitude between the pressure wave velocity and the gravity wave velocity in open channel flow leads to non-conservation of flux on both sides of the open channel-pressurized flow interface, causing severe numerical oscillations. These spurious numerical oscillations often cause program crashes and result in calculations that deviate significantly from actual conditions. Therefore, some scholars have proposed various methods to suppress spurious numerical oscillations in open channel-pressurized flow simulations, such as using smaller pressure wave velocities, high-precision complex calculation schemes, or artificial viscosity. However, these simulation methods are often too complex to apply, have undetermined parameters, or produce simulation results that differ significantly from experimental results. Therefore, when applied to long-distance complex open-flow canal and tunnel systems, it may produce large deviations, making it difficult to simulate complex engineering realities or resulting in low simulation efficiency, which in turn affects the safety and efficiency of canal and tunnel system operation and scheduling.

[0004] In summary, regarding the safety of pressure pipelines during the automated scheduling process of inter-basin water transfer projects involving alternating open and full flow, a pressing technical problem that needs to be addressed by those skilled in the art is to propose a simulation model for open and full flow suitable for larger pressure wave velocities (e.g., reaching 1000 m / s, at the same level as the actual pressure wave velocity). This model should meet the following requirements: 1) At the level of open and full flow simulation, it should be able to simultaneously simulate open channel flow and pressurized flow, and significantly suppress numerical oscillations caused by the alternation of open and full flow, thus possessing high simulation accuracy; 2) At the level of flow regime simulation, it should be able to take into account various flow regimes such as slow flow, rapid flow, pressurized flow, and open and full flow; 3) The simulation model should have a simple structure, fewer parameters that are easy to determine, and high computational efficiency, thereby facilitating practical applications. Summary of the Invention

[0005] To address the aforementioned problems, this invention provides a simulation model, simulation method, and system for open-water flow, applicable to the simulation of open-water flow under actual high pressure wave velocities in long-distance water transfer projects. It significantly suppresses numerical oscillations and possesses high simulation accuracy and computational efficiency. The invention employs the following scheme:

[0006] <Model Construction Methods>

[0007] This invention provides a method for constructing a full-flow simulation model, comprising the following steps:

[0008] Step 1: For the numerical simulation of the transition of the bright full flow, based on a suitable numerical format, construct a simulation model of the transition of the bright full flow that can effectively suppress numerical oscillations of the bright full flow without affecting the accuracy of the bright flow calculation.

[0009] The corrected wave velocity calculation method is as follows:

[0010]

[0011]

[0012] In the formula, λ represents wave velocity, u represents cross-sectional average flow velocity, c represents gravity wave velocity, A represents cross-sectional flow area, subscript i represents the i-th control volume, i+1 / 2 represents the center of the i-th control volume, and i-1 / 2 represents the center of the (i-1)-th control volume.

[0013] Furthermore, the HLLS format was modified by adding numerical viscosity:

[0014]

[0015] The corrected source item processing method is as follows:

[0016]

[0017]

[0018] In the formula, Represents the cross-sectional average source term. The effect of the standing wave generated by the source term on the flux is represented by g, g represents the acceleration due to gravity, h represents the water depth, and P represents the water depth. a H max H represents the water depth at the center cross-section after adding numerical viscosity. max P is the maximum water depth of the closed section. b Indicates the starting point for adding numerical viscosity, I1 represents the effect of hydrostatic pressure, and the subscript... S represents the hydrostatic pressure corresponding to the average water level. f Let δ represent the friction source term, δ represent the derivative, and Δx represent the grid size.

[0019] Preferably, the method for constructing a full-flow simulation model provided by the present invention further includes: step 2, based on step 1, establishing a physical model for the cross-sectional shape, bottom slope, roughness, and pressure wave velocity of a complex full-flow system, determining a suitable mesh size and time step, and establishing a realistic physical model.

[0020] Preferably, in the method for constructing the full-flow simulation model provided by the present invention, step 2 includes the following sub-steps:

[0021] Step 2-1: Divide the Mingman flow system into multiple cross-sections with equal spacing, and apply the corresponding flow rate, water depth initial conditions, bottom slope, and roughness physical parameters at the cross-sections.

[0022] Step 2-2: Determine the magnitude of the corresponding pressure wave velocity by using the physical properties of the pressure pipe material, such as the elastic modulus. Calculate the time step under the corresponding grid according to the Courant condition, and take the minimum time step as the globally unified time step.

[0023] Steps 2-3: Based on the boundary conditions of the real-world Mingman flow system, set the corresponding boundary condition change process to establish a realistic physical model.

[0024] <Simulation Methods>

[0025] Preferably, the full-flow simulation method provided by the present invention includes:

[0026] Step I: Construct the full-flow simulation model as described in any one of claims 1 to 3;

[0027] Step II: Based on the hydraulic conditions to be simulated and the measured data, a full-flow simulation model is used for simulation.

[0028] Preferably, in step II of the open-flow simulation method provided by the present invention, based on the hydraulic conditions to be simulated and the measured data, the fluxes entering and leaving each control volume are calculated using the open-flow simulation model. The specific sequence is as follows: ① Solve for the average hydraulic elements based on the information of adjacent cross sections; ② Determine whether to add numerical viscosity by using numerical viscosity parameters; ③ Calculate the wave velocity and source term; ④ Determine the grid flow regime and calculate the flux; ⑤ Solve for the cross section information at the next moment based on the flux of the control volume; ⑥ Determine whether the calculation end time has been reached. If yes, output the result and end the process; otherwise, repeat steps ① to ⑤.

[0029] Preferably, in the full-flow simulation method provided by the present invention, after calculating the flux entering and leaving each control body based on the numerical format of steps ① to ④ in step II, the average water level and flow rate of the control body at the next moment are obtained by using the following formula, and are used as the initial conditions of the cross section at the next moment for further calculation.

[0030]

[0031] In the formula, the superscripts L and R represent the left and right sides of the central section, respectively; Δt represents the time step; Δx represents the grid size; and U is the conserved variable of the section [A,Q]. T F is the flux of the cross section [Q, Q] 2 / A+gI1] T Q represents the flow rate;

[0032] Determine if the calculation time has reached the specified calculation end time. If it has, output the corresponding water level and flow rate results based on the required cross-sectional information. If the end time has not been reached, repeat steps ① to ⑤ until the calculation end time is reached.

[0033] <System>

[0034] Furthermore, the present invention also provides a full-flow simulation system capable of automatically implementing the above-mentioned <method>, including:

[0035] The numerical model construction department, for numerical simulation of the transition of the bright and full flow, constructs a simulation model of the transition of the bright and full flow based on a suitable numerical format, which can effectively suppress numerical oscillations of the bright and full flow without affecting the accuracy of the bright flow calculation.

[0036] The corrected wave velocity calculation method is as follows:

[0037]

[0038]

[0039] In the formula, λ represents wave velocity, u represents cross-sectional average flow velocity, c represents gravity wave velocity, A represents cross-sectional flow area, subscript i represents the i-th control volume, i+1 / 2 represents the center of the i-th control volume, and i-1 / 2 represents the center of the (i-1)-th control volume.

[0040] Furthermore, the HLLS format was modified by adding numerical viscosity:

[0041]

[0042] The corrected source item processing method is as follows:

[0043]

[0044]

[0045] In the formula, Represents the cross-sectional average source term. The effect of the standing wave generated by the source term on the flux is represented by g, g represents the acceleration due to gravity, h represents the water depth, and P represents the force of gravity. a H max H represents the water depth at the center cross-section after adding numerical viscosity. max P is the maximum water depth of the closed section. b Indicates the starting point for adding numerical viscosity, I1 represents the effect of hydrostatic pressure, and the subscript... S represents the hydrostatic pressure corresponding to the average water level. f Let δ represent the friction source term, δ represent the derivative, and Δx represent the grid size.

[0046] The physical model construction department, based on the open-flow transition simulation model, establishes a physical model for the cross-sectional shape, bottom slope, roughness, and pressure wave velocity of the complex open-flow system, determines the appropriate mesh size and time step, and establishes a realistic physical model.

[0047] The simulation department, based on the Mingman flow transition simulation model and the actual physical model, obtained the Mingman flow simulation model, and used this Mingman flow simulation model to conduct simulation based on the hydraulic conditions to be simulated and the measured data.

[0048] The control unit communicates with the numerical model construction unit, the physical model construction unit, and the simulation unit, and controls their operation.

[0049] Preferably, the full-flow simulation system provided by the present invention may further include: a scheduling unit, which is connected in communication with the control unit, and generates a water conveyance system or canal and tunnel system operation scheduling scheme based on the simulation results.

[0050] Preferably, the full-flow simulation system provided by the present invention may further include: an input display unit, which is communicatively connected to the control unit, for allowing the user to input operation commands and displaying them accordingly.

[0051] Preferably, the Mingman flow simulation system provided by the present invention has a control unit that, based on the hydraulic conditions to be simulated and measured data input or imported by the user, uses the Mingman flow simulation model to: ① solve for the average hydraulic elements based on the information of adjacent cross sections; ② determine whether to add numerical viscosity through numerical viscosity parameters; ③ calculate wave velocity and source term; ④ determine the grid flow regime and calculate flux; ⑤ solve for the cross section information at the next moment based on the flux of the control volume; ⑥ determine whether the calculation end time has been reached, and if so, output the result and end the process, otherwise repeat steps ① to ⑤.

[0052] The role and effect of invention

[0053] (1) This invention corrects the original method of calculating wave velocity, changes the calculation method of star region to add numerical viscosity, and corrects the calculation method of its source term. The resulting full flow simulation model (PHLLS) can effectively suppress numerical oscillation problem and avoid the amplification of numerical error by narrow gap and large pressure wave velocity. It is of great significance for the safe and efficient operation of long-distance complex canal tunnel water diversion project and ensuring the safety of project operation.

[0054] (2) The PHLLS simulation model has a simple structure, fewer parameters that are easy to determine, convenient calculation, and high computational efficiency, making it suitable for practical applications. Furthermore, the simulation model can handle terrain changes and cross-sectional changes along the tunnel well, and can effectively cope with the frequent changes in bottom slope and cross-sectional shape of long-distance complex canal and tunnel systems.

[0055] (3) The established PHLLS simulation model is robust and can adapt to simulations under various flow conditions. It exhibits high accuracy in open channel flow, pressurized flow, and open-full flow transitions. It is particularly beneficial for improving the simulation accuracy of long-distance, high-pressure wave velocity canal-tunnel water transfer projects, thereby improving the level of operation management and automated scheduling, and reducing safety risks. It provides a new approach for exploring the hydraulic response characteristics and automated operation scheduling of canal-tunnel systems. Attached Figure Description

[0056] Figure 1 This is a longitudinal cross-sectional view of the glass channel open-flow transition experimental device according to Embodiment 1 of the present invention;

[0057] Figure 2 The diagram shows the experimental boundary conditions and the simulation results of the water head in the piezometers A, B, C, and D involved in Embodiment 1 of the present invention.

[0058] Figure 3 This is a diagram of the experimental apparatus for alternating open and full flow in a pipeline according to Embodiment 1 of the present invention;

[0059] Figure 4 This is a comparison chart of the experimental results G1, G2, G3, G4, G5, and G6 and the simulation results involved in Embodiment 1 of the present invention;

[0060] Figure 5 This is a schematic diagram of the experimental device for open full-flow transition in a steep-slope pipeline according to Embodiment 1 of the present invention.

[0061] Figure 6 This is a comparison chart of the measured values ​​(hollow points) of the pressure head at P5 and P7 in Embodiment 1 of the present invention with the simulation results (PHLLS). Detailed Implementation

[0062] The following detailed description, in conjunction with the accompanying drawings, provides a detailed explanation of the specific implementation schemes for the Mingman flow simulation model construction, simulation method, and system involved in this invention.

[0063] <Example 1>

[0064] The specific construction and simulation method of the full-flow simulation model provided in this embodiment are as follows:

[0065] I. Numerical format establishment process:

[0066] ① Governing equation

[0067]

[0068]

[0069] In the formula, A is the cross-sectional area of ​​the flow, Q is the flow rate, g is the gravitational acceleration, S0 is the riverbed slope, and Z0 is the riverbed bottom elevation (thoroughfare line elevation).

[0070]

[0071]

[0072]

[0073] In the formula, integral gI1 represents the hydrostatic pressure, while integral gI2 represents the lateral pressure caused by the change in longitudinal width. h and b represent the water depth and the width of the free surface, respectively. The governing equations can be written in the following vector form:

[0074]

[0075] In the formula, U is a conserved variable represented as [A, Q]. T F is the flux, represented as [Q, Q' ... 2 / A+gI1] T S is the source term, represented as [0, gA(S0-S)]. f)+gI2] T .

[0076] ② Discrete method

[0077]

[0078]

[0079] In the formula, Let Δt be the source term and Δt be the time step. This is the integral average of the fastest and slowest signals over a time interval Δt;

[0080] ③ Method for adding viscosity to full flow values

[0081] In simulations of the Mingman flow, severe numerical oscillations are frequently encountered because the velocity at the Mingman interface is much lower than the pressure wave velocity. This causes the interface to remain in the mesh for multiple time steps, resulting in a discrepancy between the pressure wave flux at the interface and the analytical solution, leading to erroneous numerical oscillations. We have found that adjusting the wave velocity can increase numerical viscosity, thereby suppressing numerical oscillations. The wave velocity calculation method is shown below:

[0082]

[0083]

[0084] Furthermore, the method for calculating the area of ​​the Riemann region was altered by adding the following approach. This method increases the wave velocity at the open-water interface to approach the pressure wave velocity, thereby adding sufficient numerical viscosity.

[0085] A i+1 / 2 =A(P a H max ),h i >P b H max or h i+1 >P b H max (Equation 11)

[0086] However, the numerical scheme considering the source term in flux calculations leads to abrupt changes in cross-sectional shape due to the presence of narrow gaps during open-full flow alternation simulations. The original source term calculation method fails during open-full flow transitions; therefore, we have improved it as follows:

[0087]

[0088]

[0089] II. How to use numerical models

[0090] Numerical schemes alone are insufficient to simulate the transition process of the Mingman flow. In order to better use the above numerical model to simulate the real Mingman flow transition process, the following steps should be followed:

[0091] ① Establish a physical model for a real open-circuit system, determine an appropriate mesh size and time step, and build a realistic physical model. Based on the real physical system, give the corresponding boundary conditions.

[0092] The specific implementation steps are as follows: 1) Divide the Mingman flow system into several cross-sections with equal spacing, and apply the corresponding flow rate, initial water depth conditions, bottom slope, roughness and other physical parameters at the cross-sections; 2) Determine the magnitude of the corresponding pressure wave velocity through the physical properties of the pressure pipe material such as the elastic modulus, and calculate the time step under the corresponding grid according to the Courant condition, and take the minimum time step as the globally unified time step; 3) Set the corresponding boundary condition change process according to the actual Mingman flow system boundary.

[0093] ② Based on the change process of the set boundary conditions over time, set the corresponding boundary conditions at each moment.

[0094] Specific boundary conditions can generally be divided into fixed flow boundary, fixed water level boundary, connected boundary, and solid wall boundary. The specific setting methods are as follows:

[0095] Fixed flow boundary: Water enters or exits the simulation region at a constant flow rate, which does not change with the flow regime. The setting method is as follows: (Import border) (Export boundary).

[0096] Fixed water level boundary: The water flow at the inlet or outlet of the simulation area is affected by control structures such as overflow weirs, maintaining a constant water level. Therefore, it can be assumed that the water level is fixed at the boundary, which can be translated into the assumption that the flow area is fixed at the boundary. The setting method is as follows: (Import border) (Export boundary).

[0097] Connectivity Boundary: Since the water flow is unobstructed at the inlet or outlet of the simulation region, it can be assumed that the flow state changes continuously at the boundary. The state variables within the virtual mesh can be considered to have the same values ​​as those of adjacent meshes at the previous time step. This is achieved by setting the following method: (Import border) (Export boundary).

[0098] Solid wall boundary; under this condition, the water flow at the inlet or outlet of the simulation area is obstructed by the wall, forming a water wave that propagates against the direction of the water flow. Therefore, it can be assumed that the water flow state is opposite in direction at the boundary. The state variables within the virtual mesh can be considered to be opposite to the values ​​of adjacent meshes at the previous time step. The setting method is as follows: (Import border) (Export boundary).

[0099] The subscript represents the spatial grid number, and the superscript represents the time count number.

[0100] ③ Apply the proposed numerical scheme to solve for the flux at the cross section in each control volume.

[0101] The cross-sectional area of ​​the flow path at the center of each control volume is calculated by adding a numerical viscosity parameter. When the water depth at the center cross-section exceeds the numerical viscosity addition threshold, the area calculation method is modified, thereby altering the wave velocity calculation result to incorporate numerical viscosity. The wave velocity calculation method is shown below:

[0102]

[0103]

[0104] The flow regime within the control volume is determined based on wave velocity, and then the flux calculation method is selected. When the flow within the control volume is rapid (0≤λ),... i or 0≥λ i+1 When the water flow is only affected by the direction of the incoming flow, the flux is equal to the flux in the direction of the incoming flow; when the flow within the control volume is slow (λ i ≤0≤λ i+1 The flux within the control volume can be calculated by following the given numerical format. Repeating this step yields the flux at the center cross-section of all control volumes.

[0105]

[0106]

[0107] ④ Calculate the mean value of the conservation variables of the control volume at the next moment based on the flux obtained in step ③, update the physical variables of the cross section, and choose whether to output the physical quantities at the current moment.

[0108] This embodiment is based on the first-order precision finite volume method. It assumes that the computational domain is distributed along the x-axis, and the simulation computational domain is divided into N+1 uniform computational grids with a grid size of Δx, where the center point of the i-th control volume grid is located at x. i The control volume boundary is located at x i-1 / 2 and x i+1 / 2 The computational domain contained in the grid is [x i -0.5△x,xi +0.5Δx]. The simulation duration is also divided into several steps, with a time step size of Δt. Integrating the control equations in the i-th computational grid within one time step yields the following computational steps. By performing calculations within each control volume, the centrally conserved variables of the control volume at the next time step can be obtained.

[0109]

[0110] ⑤ Determine if the calculation end time has been reached. If yes, output the result and end the process; otherwise, repeat steps ② to ④.

[0111] The simulation model constructed above simplifies the actual physical model into a one-dimensional model, establishing a numerical model consistent with the real system. By assigning appropriate boundary conditions, this simulation model can simulate the real process of open-channel and full-flow transition and output the system pressure response process, thereby determining whether the pressure in the pressure pipeline exceeds the limit and further judging pipeline safety issues caused by operational scheduling during the open-channel and full-flow transition. Furthermore, this simulation model can handle various flow regimes in long-distance complex canal and tunnel systems, including common situations such as slow flow, rapid flow, and hydraulic jumps, as well as open channel flow, pressurized flow, and open-channel and full-flow transitions, achieving more accurate simulations. Simultaneously, this simulation model has high computational efficiency and can be used for simulating canal and tunnel systems in long-distance water transfer projects.

[0112] III. Demonstrating the Simulation Accuracy and Performance of the Simulation Model with Examples

[0113] (1) Instructions for setting numerical viscosity parameters

[0114] For the numerical viscosity parameters that need to be added, their physical meaning is clear; it is only necessary to ensure that P... a H max Greater than the maximum pressure head during the alternation of open and full flow, H max P is the top elevation of the closed cross-section (i.e., the maximum water depth that can be reached, determined by the cross-sectional shape). b Typically, a value of 0.7 to 0.8 is used. By adding numerical viscosity, a smooth transition of state variables within the grid from open flow to pressurized flow can be achieved, reducing the generation of numerical oscillations and accelerating their dissipation once they occur. Furthermore, this method allows for convenient adjustment of the starting point for adding numerical viscosity by changing the water depth threshold; when the water depth is below the threshold, the numerical viscosity parameter does not affect the simulation calculation.

[0115]

[0116] (2) Simulation accuracy description

[0117] The simulation accuracy of the simulation model is tested and explained here. Three tests were used to test the simulation model's ability to cope with different open flow transition conditions, with pressure wave velocities of 20 m / s, 1000 m / s, and 6 m / s, respectively.

[0118] Test 1: For example Figure 1 As shown, the simulation system consists of a 30m long horizontal channel with a 10m long wooden roof forming a pipe section at the top. The pipe has a rectangular cross-section, with a width of 0.51m and a height of 0.148m. The Manning coefficient of the pipe was determined to be 0.012 through experiments. Initially, the water depth in the pipe is 0.128m, and the water is still. As the water depth in the upstream channel increases, a rising water wave propagates downstream at the pipe inlet. When the water depth in the upstream channel reaches a certain height, a clear full-flow interface appears at the pipe inlet.

[0119] Simulation results are as follows Figure 2 As shown, the simulation model can effectively simulate the transition from open channel to pressurized flow and from pressurized flow to open channel, exhibiting a smooth transition between open and full channel flows while capturing the steep interface between them. Furthermore, the pressure head obtained from the simulation model is consistent with the experimentally measured pressure head, demonstrating high simulation accuracy.

[0120] Test 2: This test involves a V-shaped pipe, 12.12m in length, with a circular cross-section of 19.2cm in diameter and a wall thickness of 4mm. The upper section has a slope of 0.084, while the lower section has a reverse slope of 0.277. The axial distance from the pipe inlet to the turning point is 7m. Six pressure sensors are installed along the pipe, with axial distances from the inlet of 1m, 3m, 4.5m, 6.8m, 7.06m, and 8.52m, respectively. The pipe installation is as follows: Figure 3 As shown, the inlet is closed and the outlet is open. A gate is installed 5m axially from the inlet. Initially, the gate is completely closed, and it opens instantaneously at the start of the experiment.

[0121] The comparison between the results of experiments G1, G2, G3, G4, G5, and G6 and the simulation results is as follows: Figure 4 As shown, the simulation model agrees well with the experimental data and effectively suppresses numerical oscillations. The test results reflect the simulation model's ability to handle wet-dry boundaries and open-circuit flow.

[0122] Test 3: This test case involves a 10m long, 0.1m cross-sectional radius, and 0.27 slope steep pipeline. Due to the steep slope, the initial flow within the pipeline is rapid when the downstream gate is opened. Figure 5 As shown, the initial flow rate in this experiment was 0.0013 m³ / s. 3The upstream gate opening is 0.014m, and the downstream gate is fully open. At the start of the test, the downstream gate is momentarily closed, and after 30 seconds, it is reopened to 0.008m, 0.015m, and 0.028m. This simulates the transition from rapid flow to pressurized flow and then back to open flow in the pipeline.

[0123] like Figure 6 As shown, the simulation results agree well with the experimental data, and the simulation model effectively suppresses numerical oscillations.

[0124] The test results above show that the open channel full flow simulation model proposed in this invention can effectively suppress the numerical oscillation problem of open channel full flow, significantly improve the simulation accuracy of open channel full flow transition, and help enhance the safety and efficiency of open channel water conveyance system operation.

[0125] <Example 2>

[0126] Furthermore, this embodiment two provides a full-flow simulation system capable of automatically implementing the above-mentioned method of the present invention. The system includes a single-pixel model construction unit, an event response model construction unit, a time-domain distribution model construction unit, a probability estimation unit, an evaluation and determination unit, an input display unit, and a control unit.

[0127] The numerical model construction unit is used to perform the content described in step 1 above. For the numerical simulation of the transition of the bright and full flow, based on a suitable numerical format, it constructs a simulation model of the transition of the bright and full flow that can effectively suppress the numerical oscillation of the bright and full flow without affecting the accuracy of the bright flow calculation.

[0128] The physical model construction unit is used to perform the content described in step 2 above, to establish a physical model for the cross-sectional shape, bottom slope, roughness, and pressure wave velocity of the complex open flow system, to determine the appropriate mesh size and time step, and to establish a realistic physical model.

[0129] The simulation department is used to obtain the Mingman flow simulation model based on the Mingman flow transition simulation model and the actual physical model, and to conduct simulation based on the hydraulic conditions to be simulated and the measured data.

[0130] The scheduling department is used to generate operation scheduling plans for water conveyance systems or canal and tunnel systems based on simulation results.

[0131] The input display unit is used to allow users to input operation commands and to display the input, output, and intermediate processing data of the corresponding unit in the form of numerical values, tables, graphs, etc., according to the operation commands. It can also display the corresponding data statically or dynamically on a two-dimensional or three-dimensional model.

[0132] The control unit is connected in communication with the numerical model construction unit, physical model construction unit, simulation unit, scheduling unit, and input display unit, and controls their operation.

[0133] The above embodiments are merely illustrative examples of the technical solutions of the present invention. The construction of the full-flow simulation model, simulation method, and system involved in the present invention are not limited to the content described in the above embodiments, but are subject to the scope defined by the claims. Any modifications, additions, or equivalent substitutions made by those skilled in the art based on these embodiments are within the scope of protection claimed by the claims of the present invention.

Claims

1. A method for constructing a full-flow simulation model, characterized in that, include: Step 1: For the numerical simulation of the transition of the bright full flow, based on a suitable numerical format, construct a simulation model of the transition of the bright full flow that can effectively suppress numerical oscillations of the bright full flow without affecting the accuracy of the bright flow calculation. The corrected wave velocity calculation method is as follows: In the formula, λ represents wave velocity, u represents cross-sectional average flow velocity, c represents gravity wave velocity, A represents cross-sectional flow area, subscript i represents the i-th control volume, i+1 / 2 represents the center of the i-th control volume, and i-1 / 2 represents the center of the (i-1)-th control volume. Furthermore, the HLLS format was modified by adding numerical viscosity: The corrected source item processing method is as follows: In the formula, Represents the cross-sectional average source term. The effect of the standing wave generated by the source term on the flux is represented by g, g represents the acceleration due to gravity, h represents the water depth, and P represents the water depth. a H max H represents the water depth at the center cross-section after adding numerical viscosity. max P is the maximum water depth of the closed section. b Indicates the starting point for adding numerical viscosity, I1 represents the effect of hydrostatic pressure, and the subscript... S represents the hydrostatic pressure corresponding to the average water level. f Let δ represent the friction source term, δ represent the derivative, and Δx represent the grid size.

2. The method for constructing a full-flow simulation model according to claim 1, characterized in that, Also includes: Step 2: Based on Step 1, establish a physical model for the cross-sectional shape, bottom slope, roughness, and pressure wave velocity of the complex open flow system, determine the appropriate mesh size and time step, and establish a realistic physical model.

3. The method for constructing a full-flow simulation model according to claim 2, characterized in that: in, Step 2 includes the following sub-steps: Step 2-1: Divide the Mingman flow system into multiple cross-sections with equal spacing, and apply the corresponding flow rate, water depth initial conditions, bottom slope, and roughness physical parameters at the cross-sections. Step 2-1: Determine the magnitude of the corresponding pressure wave velocity by using the physical properties of the pressure pipe material, such as the elastic modulus. Calculate the time step under the corresponding grid according to the Courant condition, and take the minimum time step as the globally unified time step. Steps 2-3: Based on the boundary conditions of the real-world Mingman flow system, set the corresponding boundary condition change process to establish a realistic physical model.

4. A full-flow simulation method, characterized in that, include: Step I: Construct the full-flow simulation model as described in any one of claims 1 to 3; Step II: Based on the hydraulic conditions to be simulated and the measured data, a full-flow simulation model is used for simulation.

5. The full-flow simulation method according to claim 4, characterized in that: in, In step II, based on the hydraulic conditions to be simulated and the measured data, the fluxes entering and leaving each control volume are calculated using the open-flow simulation model. The specific sequence is as follows: ① Solve for the average hydraulic elements based on the information of adjacent cross sections; ② Determine whether to add numerical viscosity by using numerical viscosity parameters; ③ Calculate the wave velocity and source term; ④ Determine the grid flow regime and calculate the flux; ⑤ Solve for the cross section information at the next time step based on the flux of the control volume; ⑥ Determine whether the calculation end time has been reached. If yes, output the results and end the calculation. Otherwise, repeat steps ① to ⑤.

6. The full-flow simulation method according to claim 5, characterized in that: in, In step II, after calculating the fluxes entering and leaving each control volume based on the numerical format of steps ① to ④, the average water level and flow rate of the control volume at the next moment are obtained using the following formulas, and these are used as the initial conditions of the cross section at the next moment for further calculation. In the formula, the superscripts L and R represent the left and right cross-sections, respectively; Δt represents the time step; Δx represents the grid size; and U is the conserved variable of the cross-section [A,Q]. T F is the flux of the cross section [Q, Q] 2 / A+gI1] T Q represents the flow rate; Determine if the calculation time has reached the specified calculation end time. If it has, output the corresponding water level and flow rate results based on the required cross-sectional information. If the end time has not been reached, repeat steps ① to ⑤ until the calculation end time is reached.

7. A full-flow simulation system, characterized in that, include: The numerical model construction department, for numerical simulation of the transition of the bright and full flow, constructs a simulation model of the transition of the bright and full flow based on a suitable numerical format, which can effectively suppress numerical oscillations of the bright and full flow without affecting the accuracy of the bright flow calculation. The corrected wave velocity calculation method is as follows: In the formula, λ represents wave velocity, u represents cross-sectional average flow velocity, c represents gravity wave velocity, A represents cross-sectional flow area, subscript i represents the i-th control volume, i+1 / 2 represents the center of the i-th control volume, and i-1 / 2 represents the center of the (i-1)-th control volume. Furthermore, the HLLS format was modified by adding numerical viscosity: The corrected source item processing method is as follows: In the formula, Represents the cross-sectional average source term. The effect of the standing wave generated by the source term on the flux is represented by g, g represents the acceleration due to gravity, h represents the water depth, and P represents the water depth. a H max H represents the water depth at the center cross-section after adding numerical viscosity. max P is the maximum water depth of the closed section. b Indicates the starting point for adding numerical viscosity, I1 represents the effect of hydrostatic pressure, and the subscript... S represents the hydrostatic pressure corresponding to the average water level. f Let δ represent the friction source term, δ represent the derivative, and Δx represent the grid size. The physical model construction department, based on the open-flow transition simulation model, establishes a physical model for the cross-sectional shape, bottom slope, roughness, and pressure wave velocity of the complex open-flow system, determines the appropriate mesh size and time step, and establishes a realistic physical model. The simulation department, based on the Mingman flow transition simulation model and the actual physical model, obtained the Mingman flow simulation model, and used this Mingman flow simulation model to conduct simulation based on the hydraulic conditions to be simulated and the measured data. The control unit communicates with the numerical model construction unit, the physical model construction unit, and the simulation unit, and controls their operation.

8. The full-flow simulation system according to claim 7, characterized in that, Also includes: The dispatching department, which is connected to the control department, generates operation and dispatching plans for the water conveyance system or canal and tunnel system based on the simulation results.

9. The full-flow simulation system according to claim 7, characterized in that, Also includes: The input display unit is connected in communication with the control unit and is used to allow users to input operation commands and display the corresponding commands.

10. The full-flow simulation system according to claim 7, characterized in that: in, Based on the hydraulic conditions to be simulated and measured data input or imported by the user, the control unit adopts the open-flow simulation model. ① It solves the average hydraulic elements based on the information of adjacent cross sections; ② It determines whether to add numerical viscosity by using numerical viscosity parameters; ③ It calculates wave velocity and source term; ④ It determines the grid flow regime and calculates flux; ⑤ It solves the cross section information at the next moment based on the flux of the control volume; ⑥ It determines whether the calculation end time has been reached. If yes, it outputs the results and ends; otherwise, it repeats ① to ⑤.

Citation Information

Patent Citations

  • Urban surface water flow numerical simulation method based on simplified shallow water equation set