A UHPC bridge deck panel rubber mat strip installation device

CN116497704BActive Publication Date: 2026-09-15CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310326070.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2026-09-15
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

[0004]本发明的目的在于提供一种UHPC桥面板橡胶垫条安装装置,解决现有UHPC桥面板安装过程中垫条容易发生移动,不密贴和顺直,安装时间较长的技术问题

Benefits of technology

[0014] The gasket holder of this invention can fix the gasket in a fixed position, realizing the locking of the gasket at a specific position. At the same time, when installing the polypropylene gasket, the gasket does not move, ensuring a tight fit and straightness. While ensuring a tight fit and straightness, it can improve installation efficiency and shorten the installation time by half.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116497704B_ABST
    Figure CN116497704B_ABST
Patent Text Reader

Abstract

The application provides a UHPC bridge deck slab rubber pad strip mounting device, and belongs to the field, which comprises a connecting plate and two clamping seats, the two clamping seats are arranged at two ends of the connecting plate, the two clamping seats are respectively clamped on two sides of a beam segment, the pad strip is transversely clamped into the clamping seats of the same straight line of a plurality of mounting devices, and the clamping seats limit and fix the pad strip. The pad strip clamping seat can fix the pad strip at a fixed position, realize clamping of a specific position of the pad strip, and when the polypropylene pad strip is installed, the pad strip does not move, the close adhesion and straightness are ensured, the installation efficiency can be improved under the condition of ensuring the close adhesion and straightness, and the installation time is shortened by half.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of engineering, and more particularly to a UHPC bridge deck rubber pad installation device. Background Technology

[0002] During the installation of UHPC bridge decks, according to the design documents, polypropylene spacers are generally required to be installed between the upper flanges of the steel beams and the bridge deck. Reliable measures must be taken to fix them to the edge of the flanges to ensure that the spacers do not move during the hoisting of the precast bridge decks and the pouring of concrete. The installation should also be tight and straight.

[0003] During the installation of UHPC bridge decks, the PVC gaskets are prone to shifting, misalignment, and unevenness, leading to prolonged installation time and low efficiency. Therefore, it is necessary to design a UHPC bridge deck rubber gasket installation device to further improve the accuracy of the UHPC bridge deck installation process. Summary of the Invention

[0004] The purpose of this invention is to provide a UHPC bridge deck rubber pad installation device, which solves the technical problems of easy movement, non-close fit and straightness of the pads during the existing UHPC bridge deck installation process, and long installation time.

[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows:

[0006] A UHPC bridge deck rubber pad installation device includes a connecting plate and two clamps. The two clamps are located at both ends of the connecting plate and are respectively clamped on both sides of the beam segment. The pad is laterally clamped into the clamps of several installation devices in the same straight line, and the clamps limit and fix the pad.

[0007] Furthermore, the two brackets are a right bracket and a left bracket, with the right bracket located at the right end of the connecting plate and the left bracket located at the left end of the connecting plate. The bottoms of the connecting plate, the right bracket, and the left bracket are all attached to the upper end of the beam segment.

[0008] Furthermore, the left-side card holder includes a left-side pad first card plate, a left-side pad second card plate, and a left-side pad card holder. The left-side pad first card plate and the left-side pad second card plate are disposed on both sides of the left-side pad card holder, and the pad is disposed inside the left-side pad card holder.

[0009] Furthermore, the right-side bracket includes a right-side pad first plate, a right-side pad second plate, and a right-side pad bracket. The right-side pad first plate and the right-side pad second plate are respectively disposed on both sides of the right-side pad bracket, and the pad is disposed inside the right-side pad bracket.

[0010] Furthermore, the left bridge plate is set on the side of the left bracket, and the bending direction of the left bridge plate is opposite to the bending direction of the first left pad plate. The left bridge plate and the first left pad plate are set on the same plane.

[0011] Furthermore, the right bridge plate is set on the side of the right bracket, and the bending direction of the right bridge plate is opposite to the bending direction of the second plate of the right pad.

[0012] Furthermore, the manufacturing process of the installation device is as follows: First, select a 1mm thick steel plate, and select a steel plate of appropriate length according to the width of the beam segment. Draw areas A, B, and C on both ends of the steel plate. Areas A and C are set at the ends of the steel plate. Cut from the connection line between areas A and C. Area A is bent upwards by 90°, and area C is bent downwards by 90°. Area B is set in the inner area of ​​the end of the steel plate. Area B is separated from area A by a fixed distance. After being bent upwards, area B is positioned opposite to the bent area A. The interval between the bent area B and the bent area A is a spacer groove.

[0013] The present invention, by adopting the above-described technical solution, has the following beneficial effects:

[0014] The gasket holder of this invention can fix the gasket in a fixed position, realizing the locking of the gasket at a specific position. At the same time, when installing the polypropylene gasket, the gasket does not move, ensuring a tight fit and straightness. While ensuring a tight fit and straightness, it can improve installation efficiency and shorten the installation time by half. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the UHPC bridge deck rubber pad installation device of the present invention;

[0016] Figure 2 This is a schematic diagram of the installation structure of the UHPC bridge deck rubber pad installation device of the present invention;

[0017] Figure 3 This is a schematic diagram of the preparation process of the UHPC bridge deck rubber pad installation device of the present invention.

[0018] In the attached diagram, 1-first clamping plate of left side pad, 2-second clamping plate of left side pad, 3-left side pad mounting seat, 4-left side bridge mounting plate, 5-connecting plate, 6-first clamping plate of right side pad, 7-second clamping plate of right side pad, 8-right side bridge mounting plate, 9-right side pad mounting seat, 10-beam segment, 11-pad, 12-mounting seat. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are merely to provide the reader with a thorough understanding of one or more aspects of the present invention, and these aspects of the invention can be implemented even without these specific details.

[0020] like Figure 1-2 As shown, a UHPC bridge deck rubber pad installation device includes a connecting plate 5 and two retaining seats 12. The two retaining seats 12 are located at both ends of the connecting plate 5 and are respectively engaged on both sides of the beam segment 10. The pad 11 is laterally engaged into the retaining seats 12 in a straight line of several installation devices, and the retaining seats 12 limit and fix the pad 11. This invention solves the problems of pad movement, non-close fit, and straightness of the polypropylene pads during the installation of UHPC bridge decks. At the same time, it can improve installation efficiency and shorten the installation time by half while ensuring close fit and straightness.

[0021] In this embodiment of the invention, the two mounting brackets 12 are a right mounting bracket and a left mounting bracket, respectively. The right mounting bracket is located at the right end of the connecting plate 5, and the left mounting bracket is located at the left end of the connecting plate 5. The bottoms of the connecting plate 5, the right mounting bracket, and the left mounting bracket are all attached to the upper end of the beam segment 10. A device that can hold the pad strip and install it to the bridge deck beam is made by bending a 1mm thick steel plate.

[0022] In this embodiment of the invention, the left card holder includes a left pad first card plate 1, a left pad second card plate 2 and a left pad card holder 3. The left pad first card plate 1 and the left pad second card plate 2 are disposed on both sides of the left pad card holder 3, and the pad 11 is disposed inside the left pad card holder 3.

[0023] In this embodiment of the invention, the right-side card holder includes a right-side pad first card plate 6, a right-side pad second card plate 7, and a right-side pad card holder 9. The right-side pad first card plate 6 and the right-side pad second card plate 7 are respectively disposed on both sides of the right-side pad card holder 9, and the pad 11 is disposed inside the right-side pad card holder 9.

[0024] In this embodiment of the invention, the left bridge plate 4 is disposed on the side of the left bracket, and the bending direction of the left bridge plate 4 is opposite to the bending direction of the left pad first plate 1. The left bridge plate 4 and the left pad first plate 1 are disposed on the same plane.

[0025] In this embodiment of the invention, the right-side bridge clamping plate 8 is disposed on the side of the right-side clamping seat, and the bending direction of the right-side bridge clamping plate 8 is opposite to the bending direction of the right-side pad second clamping plate 7. This solves the problems of unevenness, poor adhesion, and movement during the pasting of the pad; the structural principle is simple, and the processing and manufacturing are easy; it can significantly improve construction efficiency.

[0026] In embodiments of the present invention, such as Figure 3 As shown, the fabrication process of the installation device is as follows: First, select a 1mm thick steel plate. Choose a steel plate of appropriate length according to the width of beam segment 10. Draw areas A, B, and C on both ends of the steel plate. Areas A and C are located at the ends of the steel plate. Cut from the connection line between areas A and C. Bending area A upwards by 90° and area C downwards by 90°. Area B is located on the inner side of the end of the steel plate, separated from area A by a fixed distance. After bending upwards, area B is positioned opposite the bent area A. The gap between the bent area B and the bent area A is a spacer groove. Structural description: A - upward bend; B - upward bend; C - downward bend. The lower part of the mounting device is inserted into the beam segment, and the upper part is fitted with a spacer strip.

[0027] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A UHPC bridge deck rubber pad installation device, characterized in that: It includes a connecting plate (5) and two card holders (12). The two card holders (12) are set at both ends of the connecting plate (5). The two card holders (12) are respectively clamped on both sides of the beam segment (10). The pad strip (11) is inserted laterally into the card holders (12) of several installation devices in the same straight line. The card holders (12) play a limiting and fixing role for the pad strip (11). The two card holders (12) are the right card holder and the left card holder respectively. The right card holder is set at the right end of the connecting plate (5), and the left card holder is set at the left end of the connecting plate (5). The bottom of the connecting plate (5), the right card holder and the left card holder are all attached to the upper end of the beam segment (10). The right-side bracket includes a right-side pad first bracket (6), a right-side pad second bracket (7), and a right-side pad bracket (9). The right-side pad first bracket (6) and the right-side pad second bracket (7) are respectively located on both sides of the right-side pad bracket (9), and the pad (11) is located inside the right-side pad bracket (9). It also includes a left bridge plate (4), which is set on the side of the left seat. The bending direction of the left bridge plate (4) is opposite to the bending direction of the left pad first plate (1). The left bridge plate (4) and the left pad first plate (1) are set on the same plane. It also includes a right bridge plate (8), which is set on the side of the right bracket. The bending direction of the right bridge plate (8) is opposite to the bending direction of the right pad second plate (7).

2. The UHPC bridge deck rubber pad installation device according to claim 1, characterized in that: The left side bracket includes a left side pad first bracket (1), a left side pad second bracket (2) and a left side pad bracket (3). The left side pad first bracket (1) and the left side pad second bracket (2) are set on both sides of the left side pad bracket (3), and the pad (11) is set inside the left side pad bracket (3).

3. The UHPC bridge deck rubber pad installation device according to claim 1, characterized in that: The manufacturing process of the installation device is as follows: First, select a 1mm thick steel plate. Select a steel plate of appropriate length according to the width of the beam segment (10). Draw A, B, and C regions at both ends of the steel plate. Set A and C regions at the ends of the steel plate. Cut from the connection line between A and C regions. Bend A region upwards by 90° and bend C region downwards by 90°. Set B region in the inner area of ​​the end of the steel plate. B region is separated from A region by a fixed distance. After B region is bent upwards, it is set opposite to the bent A region. The interval between the bent B region and the bent A region is a pad groove.

Citation Information

Patent Citations

  • Bearing filler strip and production method thereof

    CN111022646A