Task information processing method and device, equipment, storage medium and program product

By receiving and presenting task notification messages in real time through the conversation interface between the project management platform and the service account, the problem that task lists in multi-user collaborative work are only for the creator is solved, and the real-time acquisition of task change details and the efficiency of collaborative processing are improved.

CN116501419BActive Publication Date: 2026-11-20TENCENT TECHNOLOGY (SHENZHEN) CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210056520.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-18
Publication Date
2026-11-20
Estimated Expiration
2042-01-18

AI Technical Summary

Technical Problem

In existing technologies, when multiple users collaborate in the office, the task list is only for the creator, and the notification message is only sent to the creator. This is not suitable for scenarios where multiple people are working together to process tasks, and there is a lack of an effective task change notification mechanism.

Method used

Through the conversation interface between the project management platform and the service account, task notification messages can be received and presented in real time. The associated objects of the task include the creation object and the execution object, enabling real-time acquisition and rapid notification of task change details.

Benefits of technology

It enables collaborative task processing by multiple users, and the associated objects of the task can quickly obtain task change details in real time, thus improving task processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116501419B_ABST
    Figure CN116501419B_ABST
Patent Text Reader

Abstract

The application provides a task information processing method, device and equipment, a storage medium and a computer program product; the method comprises the following steps: presenting a conversation interface for conversing with a service number of a project management platform; when a target project associated task in the project management platform is changed, and a current object is an associated object of the changed task, receiving a task notification message sent by the project management platform through the service number, the task notification message being used for notifying that the target project associated task is changed; wherein the task has a corresponding creation object and an execution object, and the associated object of the task comprises at least one of the creation object and the execution object; presenting the received task notification message in the conversation interface; through the application, the task associated object can acquire task change details in real time and quickly through the conversation message, and the task processing efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of Internet technology, and in particular to a method, apparatus, device, storage medium, and computer program product for processing task information. Background Technology

[0002] In related technologies, multiple users can create task lists in a task management client by sending session messages during collaborative work, and receive notifications about the list creation via session messages after creation. However, the created task list is only for the creator, and the notification messages are only sent to the creator. This is a method of recording personal task lists and is not suitable for scenarios where multiple people are collaboratively handling tasks. There is currently no solution in related technologies. Summary of the Invention

[0003] This application provides a method, apparatus, device, storage medium, and computer program product for processing task information, which enables task-related objects to obtain task change details in real time and quickly through session messages, thereby improving task processing efficiency.

[0004] The technical solution of this application embodiment is implemented as follows: This application provides a method for processing task information, including: Presents a conversational interface for communicating with the service account of the project management platform; When the task associated with the target project in the project management platform changes, and the current object is the associated object of the task that has changed, Receive a task notification message sent by the project management platform through the service number. The task notification message is used to notify that the task associated with the target project has changed. The task has a corresponding creation object and execution object, and the associated object of the task includes at least one of the creation object and the execution object; The received task notification message is displayed in the session interface.

[0005] This application also provides a method for processing task information, including: Present the project management interface corresponding to the target project, and present the tasks associated with the target project in the project management interface; Based on the project management interface, when a change instruction for the task is received, the task change operation indicated by the change instruction is executed on the task; Send a notification message to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the notification message to the associated object of the task through the service number of the project management platform; The task is associated with at least two objects, including the task creation object and the task execution object.

[0006] This application embodiment also provides a task information processing apparatus, including: The first presentation module is used to present the conversation interface for communicating with the service account of the project management platform; The receiving module is used to receive a task notification message sent by the project management platform through the service number when the task associated with the target project in the project management platform changes and the current object is the associated object of the changed task. The task notification message is used to notify that the task associated with the target project has changed. The task has a corresponding creation object and execution object, and the associated object of the task includes at least one of the creation object and the execution object; The second presentation module is used to present the received task notification message in the session interface.

[0007] In the above scheme, the second presentation module is further configured to present the received task notification message in the session interface through a notification message template; wherein the notification message template includes at least two task dimensions for the task.

[0008] In the above scheme, the second presentation module is further configured to receive a first task notification message sent by the project management platform through the service number; correspondingly, the second presentation module is further configured to extract information of the corresponding task dimensions from the first task notification message based on the at least two task dimensions to obtain task information of each task dimension; obtain the notification message template, and fill the notification message template with the task information of each task dimension to obtain a second task notification message, and present the second task notification message.

[0009] In the above scheme, when the changed task is a new task created for the target project, the second presentation module is further configured to receive an input task creation message for the target project based on the session interface, the task creation message being used to instruct the creation of the new task for the target project; in response to the sending instruction for the task creation message, send the task creation message to the project management platform corresponding to the service number, and present the task creation message in the session interface; wherein, the task creation message is used for the project management platform to create the new task based on the task creation message.

[0010] In the above scheme, the second presentation module is further configured to receive an input interaction instruction message for the task based on the session interface, the interaction instruction message being used to instruct the corresponding interaction operation for the task; in response to a sending instruction for the interaction instruction message, send the interaction instruction message to the project management platform corresponding to the service number, and present the interaction instruction message in the session interface; wherein, the interaction instruction message is used for the project management platform to perform the corresponding interaction operation based on the interaction instruction message.

[0011] In the above scheme, the second presentation module is further configured to receive an interactive notification message sent by the project management platform through the service number, the interactive notification message being used to notify that the interactive operation has been performed; and to present the received interactive notification message in the session interface.

[0012] In the above scheme, the second presentation module is further configured to receive, based on the session interface, an input task change message for the task, the task change message being used to instruct the changed task to be changed again; in response to the sending instruction for the task change message, send the task change message to the project management platform corresponding to the service number, and present the task change message in the session interface; wherein, the task change message is used for the project management platform to perform corresponding change operations on the task based on the task change message.

[0013] In the above scheme, the second presentation module is further configured to present a change message template in response to a viewing instruction for a task change template; and to receive a task change message for the task input based on the change message template.

[0014] In the above scheme, the second presentation module is further configured to receive a session message based on the input of the session interface; when the session message does not include a task identifier and the session message has an associated historical task change message or historical task notification message corresponding to the task, determine the degree of association between the session message and the historical task change message or historical task notification message; when the degree of association reaches a threshold, determine the session message as a task change message for the task.

[0015] In the above scheme, the second presentation module is further configured to present a task change function entry in the session interface; present a task change interface in response to a trigger operation on the task change function entry; receive task change content set for the task based on the task change interface; and send the task change content to the project management platform in response to a confirmation operation on the task change content; wherein the task change content is used by the project management platform to perform corresponding change operations on the task based on the task change content.

[0016] In the above scheme, the second presentation module is further configured to receive a task notification message corresponding to the task change content sent by the project management platform through the service number; and to present the task notification message corresponding to the task change content in the session interface.

[0017] In the above scheme, the second presentation module is further configured to present a file upload function item for the task in the session interface; receive a target file selected based on the file upload function item; and, in response to a confirmation operation for the target file, send the target file to the project management platform corresponding to the service number; wherein the target file is used by the project management platform to send a notification message carrying the target file to the terminal of the associated object.

[0018] In the above scheme, the second presentation module is further configured to respond to a trigger operation on the task notification message and present a details page corresponding to the task notification message; in the details page, task information of at least one task dimension in the task notification message is presented.

[0019] This application embodiment also provides a task information processing apparatus, including: The third presentation module is used to present the project management interface corresponding to the target project, and to present the tasks associated with the target project in the project management interface; The execution module is used to perform the task change operation indicated by the change instruction when a change instruction for the task is received, based on the project management interface. The sending module is used to send a notification message to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the notification message to the associated object of the task through the service number of the project management platform; The task is associated with at least two objects, including the task creation object and the task execution object.

[0020] In the above scheme, the third presentation module is also used to present the tasks associated with the target project and the task information of the tasks in the project management interface according to at least two task dimensions.

[0021] In the above scheme, the third presentation module is further configured to present the filtering function items corresponding to the tasks when there are multiple tasks; in response to the trigger operation of the filtering function items, present the filtering conditions corresponding to each of the task dimensions; and in response to the confirmation operation of the target filtering conditions, present the target tasks that meet the target filtering conditions.

[0022] In the above scheme, the third presentation module is further configured to present filtering function items corresponding to each of the task dimensions when there are multiple tasks; and to present target tasks that meet the filtering conditions corresponding to the target task dimension in response to the triggering operation of the filtering function item for the target task dimension.

[0023] In the above scheme, the task is associated with a target task document, and the third presentation module is also used to present the document viewing function of the task; in response to a trigger operation for the document viewing function, the document content of the target task document and the application function entry corresponding to the target task document are presented; when a trigger operation for the application function entry is received, the target task document is presented through the document application associated with the application function entry; wherein, the document application is used for the associated objects of the task to collaboratively edit the target task document.

[0024] In the above scheme, the third presentation module is further configured to receive editing information corresponding to the editing operation when there is an editing operation on the target task document in the document application; based on the editing information, perform a corresponding update operation on the target task document in the project management interface, and send a document notification message to the project management platform corresponding to the project management interface, so that the project management platform sends the document notification message to the associated object of the task through the service number of the project management platform; wherein, the document notification message is used to notify that the target task document has been updated.

[0025] This application also provides an electronic device, including: Memory, used to store executable instructions; The processor, when executing executable instructions stored in the memory, implements the task information processing method provided in the embodiments of this application.

[0026] This application also provides a computer-readable storage medium storing executable instructions, which, when executed by a processor, implement the task information processing method provided in this application.

[0027] This application also provides a computer program product, including a computer program or instructions, which, when executed by a processor, implement the task information processing method provided in this application.

[0028] The embodiments of this application have the following beneficial effects: A conversation interface is presented for communicating with the service account of the project management platform. When the task associated with the target project in the project management platform changes and the current object is the associated object of the changed task, the task notification message sent by the project management platform through the service account is received and presented in the conversation interface. Based on the task notification message, the associated object is notified that the task associated with the target project has changed. Here, the task has a corresponding creation object and execution object. The associated object corresponding to the task notification message includes at least one of the creation object and execution object. In this way, multiple people can collaboratively process project tasks, and the associated object of the task can obtain the task change details in real time and quickly through the conversation message, thereby improving the task processing efficiency. Attached Figure Description

[0029] Figure 1 This is a schematic diagram of the architecture of the task information processing system 100 provided in this application embodiment; Figure 2 This is a schematic diagram of the structure of an electronic device 500 for implementing the task information processing method provided in this application embodiment; Figure 3 This is a flowchart illustrating the task information processing method provided in an embodiment of this application; Figure 4 This is a schematic diagram showing the task notification message provided in an embodiment of this application; Figure 5 This is a schematic diagram showing the task creation message and interactive notification message provided in an embodiment of this application; Figure 6 This is a schematic diagram showing the task change template provided in the embodiments of this application; Figure 7 This is a schematic diagram showing the task change interface provided in an embodiment of this application; Figure 8 This is a flowchart illustrating the task information processing method provided in an embodiment of this application; Figure 9 This is a schematic diagram of the project management interface provided in an embodiment of this application; Figure 10 This is a schematic diagram of the filtering function items provided in the embodiments of this application; Figure 11 This is a schematic diagram of the editing process of the target task document provided in the embodiments of this application; Figure 12 This is a schematic diagram of the permission management linkage provided in the embodiments of this application; Figure 13 This is a flowchart illustrating the task information processing method provided in an embodiment of this application; Figure 14 This is a schematic diagram of the architecture of the task information processing system provided in the embodiments of this application; Figure 15 This is an interactive schematic diagram of the task information processing system provided in the embodiments of this application. Detailed Implementation

[0030] To make the objectives, technical solutions, and advantages of this application clearer, the application will be further described in detail below with reference to the accompanying drawings. The described embodiments should not be regarded as limitations on this application. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0031] In the following description, references are made to “some embodiments,” which describe a subset of all possible embodiments. However, it is understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.

[0032] In the following description, the terms "first, second, third" are used merely to distinguish similar objects and do not represent a specific ordering of objects. It is understood that "first, second, third" may be interchanged in a specific order or sequence where permitted, so that the embodiments of this application described herein can be implemented in an order other than that illustrated or described herein.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein is for the purpose of describing embodiments of this application only and is not intended to limit this application.

[0034] Before providing a further detailed description of the embodiments of this application, the nouns and terms involved in the embodiments of this application will be explained, and the nouns and terms involved in the embodiments of this application shall be interpreted as follows.

[0035] 1) Client: An application that runs on a terminal and provides various services, such as an instant messaging client or a video playback client.

[0036] 2) In response, used to indicate the conditions or states on which the operation performed depends. When the conditions or states on which it depends are met, one or more operations performed may be performed in real time or with a set delay. Unless otherwise specified, there is no restriction on the order in which the multiple operations are performed.

[0037] 3) Service account is a type of account on the public platform. It serves as a contact in the user's social network client, used to push information to the user and provide services such as consultation and purchase.

[0038] This application provides a method, apparatus, device, storage medium, and computer program product for processing task information, which enables task-related objects to obtain task change details in real time and quickly through session messages, thereby improving task processing efficiency.

[0039] The following describes the implementation scenario of the task information processing method provided in the embodiments of this application. See also Figure 1 , Figure 1 This is a schematic diagram of the architecture of the task information processing system 100 provided in the embodiments of this application. In order to support an exemplary application, the terminal 400 connects to the project management platform 200 through the network 300. The network 300 can be a wide area network or a local area network, or a combination of the two, and data transmission is achieved using wireless or wired links.

[0040] Terminal 400 (which may be equipped with an instant messaging client) is used to send a service account follow request to the project management platform 200 in order to follow the service account of the project management platform. The project management platform 200 is used to determine whether the tasks associated with the target project have changed. When the tasks associated with the target project change, a task notification message is sent to the terminal 400 of the associated object of the changed task. This task notification message is used to notify that the tasks associated with the target project have changed. Each task has a corresponding creation object and execution object, and the associated objects of the task include at least one of the creation object and the execution object. Terminal 400 is used to present a session interface for communicating with the service number of the project management platform; receive task notification messages sent by the project management platform 200 through the service number; and present the received task notification messages in the session interface.

[0041] In some embodiments, the task information processing method provided in this application can be implemented by various electronic devices. For example, it can be implemented by a terminal alone, by a server alone, or by a terminal and a server working together. For example, a terminal and a server can work together to execute the task information processing method provided in this application. This application can be applied to various scenarios, including but not limited to cloud technology, artificial intelligence, smart transportation, and assisted driving.

[0042] In some embodiments, the electronic device for processing the implementation task information provided in this application can be various types of terminal devices or servers. The server (e.g., project management platform 200) can be an independent physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server providing basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communication, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms. The terminal (e.g., terminal 400) can be a smartphone, tablet, laptop, desktop computer, intelligent voice interaction device (e.g., smart speaker), smart home appliance (e.g., smart TV), smartwatch, vehicle terminal, etc., but is not limited to these. The terminal and server can be directly or indirectly connected via wired or wireless communication, and this application does not impose any limitations on this.

[0043] In some embodiments, the terminal or server can implement the task information processing method provided in this application embodiment by running a computer program. For example, the computer program can be a native program or software module in an operating system; it can be a native application (APP), that is, a program that needs to be installed in the operating system to run; it can also be a mini-program, that is, a program that only needs to be downloaded to the browser environment to run; or it can be a mini-program that can be embedded in any APP. In short, the above-mentioned computer program can be any form of application, module or plugin.

[0044] In some embodiments, multiple servers can form a blockchain, with each server being a node on the blockchain. Information connections can exist between each node in the blockchain, allowing for information transmission between nodes. Furthermore, data related to the task information processing method provided in this application (e.g., tasks, task information, and task notification messages) can be stored on the blockchain.

[0045] The following describes an electronic device for processing task information according to embodiments of this application. See also: Figure 2 , Figure 2This is a schematic diagram of the structure of an electronic device 500 that implements the task information processing method provided in this application embodiment. The electronic device 500 is used as an example. Figure 1 Taking the terminal shown as an example, the electronic device 500 for implementing the task information processing method provided in this application embodiment includes: at least one processor 510, a memory 550, at least one network interface 520, and a user interface 530. The various components in the electronic device 500 are coupled together through a bus system 540. It is understood that the bus system 540 is used to realize the connection and communication between these components. In addition to a data bus, the bus system 540 also includes a power bus, a control bus, and a status signal bus. However, for clarity, in... Figure 2 The general labeled all buses as Bus System 540.

[0046] The processor 510 can be an integrated circuit chip with signal processing capabilities, such as a general-purpose processor, a digital signal processor (DSP), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor, etc.

[0047] The memory 550 may be removable, non-removable, or a combination thereof. Exemplary hardware devices include solid-state storage, hard disk drives, optical disk drives, etc. The memory 550 may optionally include one or more storage devices physically located away from the processor 510.

[0048] The memory 550 may include volatile memory or non-volatile memory, or both. The non-volatile memory may be read-only memory (ROM), and the volatile memory may be random access memory (RAM). The memory 550 described in this application embodiment is intended to include any suitable type of memory.

[0049] In some embodiments, memory 550 is capable of storing data to support various operations, examples of which include programs, modules, and data structures or subsets or supersets thereof, as illustrated below.

[0050] Operating system 551 includes system programs for handling various basic system services and performing hardware-related tasks, such as the framework layer, core library layer, driver layer, etc., for implementing various basic business functions and handling hardware-based tasks; The network communication module 552 is used to reach other computing devices via one or more (wired or wireless) network interfaces 520, exemplary network interfaces 520 including: Bluetooth, WiFi, and Universal Serial Bus (USB), etc. In some embodiments, the task information processing apparatus provided in this application can be implemented in software. Figure 2 A processing device 553 for task information stored in memory 550 is shown. It may be software in the form of programs and plug-ins, and includes the following software modules: a first presentation module 5531, a receiving module 5532, and a second presentation module 5533. These modules are logically related and can therefore be arbitrarily combined or further divided according to the functions they implement. The functions of each module will be described below.

[0051] In other embodiments, the task information processing device provided in this application can be implemented in a combination of hardware and software. As an example, the task information processing device provided in this application can be a processor in the form of a hardware decoding processor, which is programmed to execute the task information processing method provided in this application. For example, the processor in the form of a hardware decoding processor can be one or more application-specific integrated circuits (ASICs), DSPs, programmable logic devices (PLDs), complex programmable logic devices (CPLDs), field-programmable gate arrays (FPGAs), or other electronic components.

[0052] The following describes the task information processing method provided in the embodiments of this application. In some embodiments, the task information processing method provided in the embodiments of this application can be implemented by various electronic devices. For example, it can be implemented by a terminal alone, by a server alone, or by a terminal and a server working together. Taking a terminal implementation as an example, see [link to documentation]. Figure 3 , Figure 3 This is a flowchart illustrating a task information processing method provided in an embodiment of this application. The task information processing method provided in an embodiment of this application includes: Step 101: The terminal displays a session interface for communicating with the service account of the project management platform.

[0053] Here, the terminal can be equipped with an instant messaging client. By running this client, the terminal presents a session interface for communicating with the project management platform's service account. This project management platform manages target projects and their associated tasks. For example, the target project could be application development, and the associated tasks could include application interface planning, application interface design, application testing, etc. The project management platform's service account can push notification messages to users. When the terminal runs the instant messaging client, it can follow the project management platform's service account to receive notification messages pushed by the platform.

[0054] In practical applications, the terminal can display at least one session function entry point, including the session function entry point of the project management platform's service account. When the project management platform pushes a new notification message through the service account, the terminal can display a corresponding prompt icon at the session function entry point of the project management platform's service account to indicate that the service account has pushed a new notification message. When a trigger operation is received for the session function entry point of the service account, a session interface for communicating with the project management platform's service account is displayed.

[0055] Step 102: When the task associated with the target project in the project management platform changes, and the current object is the associated object of the changed task, receive the task notification message sent by the project management platform through the service number.

[0056] The task notification message is used to notify the target project of a change in the associated task; the task has a corresponding creation object and execution object, and the associated objects of the task include at least one of the creation object and execution object.

[0057] Here, the tasks associated with a target project in the project management platform can be changed. Users can modify the tasks associated with the target project as needed. In practical applications, task changes include the following two situations: 1) Changes in the number of tasks, i.e., increasing or decreasing the number of tasks, corresponding to the creation and deletion of tasks; 2) Changes in task information, corresponding to changes in the task information of existing tasks, such as changes in task status, task content, task priority, task time, changes in the objects associated with the task, etc.

[0058] In this embodiment, when a task associated with a target project in the project management platform changes, the project management platform sends a task notification message to the associated object of the changed task, thereby notifying the associated object of the change that the task associated with the target project has changed. At this time, if the current object (i.e., the object corresponding to the terminal) is the associated object of the changed task, then the task notification message sent by the project management platform via the service number is received.

[0059] Here, the task associated with the target project has corresponding creation objects and execution objects. The creation object is the creator of the task, and the execution object is the executor of the task. For example, if Li X posts a task asking Zhang X and Wang X to buy groceries, the creation object is Li X, and the execution objects are Zhang X and Wang X. In practical applications, when there are multiple execution objects, the creation object can also be one of them. The associated objects of the above task can include at least one of the creation object and the execution object; that is, the associated objects of the task can include only the creation object, only the execution object, or both.

[0060] Step 103: In the conversation interface, the received task notification message is displayed.

[0061] Here, after receiving a task notification message from the project management platform via its service number, the terminal displays the received task notification message in the conversation interface that is communicating with the project management platform's service number. In some embodiments, the type of the task notification message can include various types, such as task creation type, task deletion type, existing task status change type, and interactive message type. The task notification message can be displayed according to a preset notification message template; in practical applications, different types of task notification messages can correspond to different notification message templates.

[0062] In some embodiments, the terminal may present the received task notification message in the session interface in the following manner: in the session interface, the received task notification message is presented through a notification message template; wherein, the notification message template includes at least two task dimensions for the task.

[0063] Here, the terminal presents the received task notification message in the session interface through a notification message template. This notification message template includes at least two task dimensions. In some embodiments, the at least two task dimensions include: task status, task content, task priority, task time, and at least two of the following: associated objects of the task.

[0064] In some embodiments, the terminal may present task information in the following manner: in response to a triggering operation on a task notification message, a details page corresponding to the task notification message is presented; in the details page, task information of at least one task dimension from the task notification message is presented.

[0065] Here, after the terminal displays the received task notification message in the session interface, the user can trigger an action related to the task notification message to view its details page. When the terminal receives an action related to the task notification message, it displays the details page corresponding to the task notification message, and the details page displays task information from at least one task dimension of the task notification message.

[0066] In some embodiments, the terminal may receive a task notification message sent by the project management platform via a service number in the following manner: receiving a first task notification message sent by the project management platform via a service number. Accordingly, the terminal can present the received task notification message through the notification message template in the following way: based on at least two task dimensions, extract the information of the corresponding task dimensions from the first task notification message to obtain the task information of each task dimension; obtain the notification message template, fill the notification message template with the task information of each task dimension to obtain the second task notification message, and present the second task notification message.

[0067] Here, the terminal receives the first task notification message sent by the project management platform via a service number. When presenting the received task notification message through the notification message template, information for each of the at least two task dimensions can be extracted from the first task notification message to obtain task information for each task dimension. Then, the notification message template is obtained, and the task information for each task dimension is filled into the notification message template to obtain and present the second task notification message.

[0068] As an example, see Figure 4 , Figure 4 This is a schematic diagram showing the task notification message provided in an embodiment of this application. Here, as... Figure 4 As shown in (1), the notification message template is the notification message template for task completion notification, including: completion time, expected task time, task name, task related person, and task publisher. The task notification message is displayed based on this notification message template, namely "Task completion notification; completion time: 22:08 on October 9, 2021; expected task time: 22:00 on October 9, 2021 to 22:00 on October 10, 2021; task name: XX Express Order Summary; task related person: Wang Y; task publisher: Li Z".

[0069] like Figure 4As shown in (2), the notification message template is a notification message template for task status change, including: expected task time, change time, task name, relevant person in charge, and task change. The task notification message is displayed based on this notification message template, namely, "Task status change; expected task time: 22:00 on October 9, 2021 to 22:00 on October 10, 2021; change time: 22:11 on October 9, 2021; task name: XX project backend division of labor; task related person: Wang Y; task change: task status changed from "in progress" to "risk exists".

[0070] In this embodiment, the methods for changing the tasks associated with the target project include: 1) performing task change operations on the front end (e.g., a project management application) of the project management platform; 2) performing task change operations through the session interface displayed on the terminal, such as by sending a task change message through the session interface. The following describes the task change operations performed through the session interface displayed on the terminal.

[0071] In some embodiments, when the changed task is a new task created for the target project, the terminal can create a new task for the target project in the following way: based on the session interface, it receives an input task creation message for the target project, the task creation message being used to instruct the creation of a new task for the target project; in response to the sending instruction for the task creation message, it sends the task creation message to the project management platform corresponding to the service number, and presents the task creation message in the session interface; wherein, the task creation message is used for the project management platform to create a new task based on the task creation message.

[0072] Here, when the changed task is a new task created for the target project, that is, a new task is created for the target project through the session interface. The terminal receives the task creation message for the target project input through the session interface. This task creation message instructs the creation of a new task for the target project. In practice, this task creation message can be entered through the message input function in the session interface. When a send instruction for the task creation message is received, the task creation message is sent to the project management platform corresponding to the service number, and the task creation message is presented in the session interface. After receiving the task creation message, the project management platform creates a new task for the target project based on the task creation message.

[0073] When the project management platform creates a new task for the target project, it determines that the task associated with the target project in the project management platform has changed. At this time, the terminal also receives a task notification message sent by the project management platform through the service number to notify that the new task indicated by the task creation message has been created.

[0074] In some embodiments, the terminal may send interactive instruction information for a task in the following manner: receiving an input interactive instruction message for a task based on a session interface, the interactive instruction message being used to instruct the corresponding interactive operation for the task; responding to the sending instruction for the interactive instruction message, sending the interactive instruction message to the project management platform corresponding to the service number, and presenting the interactive instruction message in the session interface; wherein, the interactive instruction message is used for the project management platform to perform the corresponding interactive operation based on the interactive instruction message.

[0075] Here, users can input interactive instructions for a task through the session interface displayed on the terminal. This task must be an existing task, meaning one that has already been created. The terminal receives the input interactive instruction message for the task through the session interface. This instruction message directs the user to perform a corresponding interactive operation on the task, such as liking or commenting. In practice, this instruction message can be entered through the message input function in the session interface. When a send command for the interactive instruction message is received, the message is sent to the project management platform corresponding to the service number and displayed in the session interface. After receiving the interactive instruction message, the project management platform performs the interactive operation for the corresponding task based on the instruction message.

[0076] In some embodiments, after an interaction instruction message is presented in the session interface, the terminal may receive an interaction notification message sent by the project management platform via a service number. This interaction notification message is used to notify that an interaction operation has been performed; the received interaction notification message is then presented in the session interface.

[0077] Once the project management platform executes an interactive operation on the corresponding task based on the interactive instruction information, it can also send an interactive notification message to the terminal via a service number. This notification message informs the user that the interactive operation indicated by the interactive information has been executed for the corresponding task. Upon receiving the interactive notification message sent by the project management platform via the service number, the terminal displays the notification message in the session interface.

[0078] As an example, see Figure 5 , Figure 5 This is a schematic diagram showing the task creation message and interactive notification message provided in an embodiment of this application. Here, the terminal receives an input task creation message for a target project based on a session interface; in response to the sending instruction for the task creation message, it sends the task creation message to the project management platform corresponding to the service number, and presents the task creation message "Have Wang X and Li X go to the vegetable market to buy vegetables tomorrow and the day after tomorrow" in the session interface, such as... Figure 5 As shown in (1). The terminal also receives a task notification message sent by the project management platform via a service number to notify that the new task indicated by the task creation message has been created, such as Figure 5 As shown in (2).

[0079] The terminal receives the task-related interactive instruction message from the conversation interface, responds to the sending command for the interactive instruction message, sends the interactive instruction message to the project management platform corresponding to the service number, and displays the interactive instruction message "Comment, remember to sell meat" in the conversation interface, such as... Figure 5 As shown in (3). The terminal receives the interactive notification message sent through the service number and displays the interactive notification message in the session interface, as shown in (3). Figure 5 As shown in (4).

[0080] When the changed task is to delete the target task associated with the target project, the system receives an input task deletion message for the target project based on the session interface. The task deletion message is used to indicate the deletion of the target task associated with the target project. In response to the sending instruction for the task deletion message, the system sends the task deletion message to the project management platform corresponding to the service number and displays the task deletion message in the session interface. The task deletion message is used by the project management platform to delete the target task based on the task deletion message.

[0081] In some embodiments, the terminal can implement task changes in the following manner: based on the session interface, it receives an input task change message for a task, which is used to indicate that the task that has been changed should be changed again; in response to the sending instruction for the task change message, it sends the task change message to the project management platform corresponding to the service number and presents the task change message in the session interface; wherein, the task change message is used for the project management platform to perform corresponding change operations on the task based on the task change message.

[0082] Here, existing tasks can be modified. Users can enter task modification messages in the session interface. The terminal receives the entered task modification messages through the session interface, which instruct the modified tasks to be modified again. In practice, these task modification messages can be entered through the message input function in the session interface. When a send instruction for a task modification message is received, the task modification message is sent to the project management platform corresponding to the service number and displayed in the session interface. After receiving the task modification message, the project management platform performs the corresponding modification operations on the existing tasks of the target project based on the task modification message.

[0083] When the project management platform performs the corresponding change operation on the existing tasks of the target project, it determines that the tasks associated with the target project in the project management platform have changed again. At this time, the terminal also receives a task notification message sent by the project management platform through the service number to notify that the existing tasks indicated by the task change message have changed again.

[0084] In some embodiments, a terminal may receive a task change message for a task input in the following ways: in response to a viewing instruction for a task change template, presenting a change message template; and receiving a task change message for a task input based on the change message template.

[0085] Here, the aforementioned task change message can have a corresponding task change template. This template can be displayed in the session interface, for example, as a floating window, or it can display templates for different session interfaces. The terminal can display a view function for the task change template in the session interface. In response to a trigger operation on this view function, the terminal receives a view command for the task change template, thus presenting the change message template. The aforementioned task change template can contain multiple different templates; that is, different types of task change messages correspond to different task change templates. The types of task change messages can include task creation, task deletion, existing task change, and interactive message types.

[0086] In practice, users can select the desired task change template. The terminal responds to this selection by displaying the chosen template, allowing users to add relevant content. Based on this content, a task change message is generated for the task. The terminal then receives the task change message based on the input template.

[0087] As an example, see Figure 6 , Figure 6 This is a schematic diagram showing the task change template provided in an embodiment of this application. Here, the terminal can display the "Template" viewing function item for the task change template in the session interface, such as... Figure 6 As shown in (1); in response to a trigger operation on the "template" function item, a viewing instruction for the task change template is received, thereby presenting the change message template, as shown in (1). Figure 6 As shown in (2).

[0088] In some embodiments, the terminal may receive a task change message for a task as input in the following manner: receiving a session message based on the session interface; when the session message does not contain a task identifier and the session message has a corresponding historical task change message or historical task notification message associated with the task, determining the degree of association between the session message and the historical task change message or historical task notification message; when the degree of association reaches a threshold, determining the session message as a task change message for a task.

[0089] Here, the terminal receives the input session message based on the session interface, parses the session message, and determines whether it includes a task identifier. This task identifier can be at least one of the task's name, ID, or summary. If the session message does not include a task identifier, it further retrieves historical task change messages or historical task notification messages associated with the session message and corresponding to that task. Then, it determines the degree of association between the session message and the historical task change message or historical task notification message. When the degree of association reaches a threshold, the session message is identified as a task change message for that task.

[0090] In some embodiments, the terminal can implement task changes in the following ways: presenting a task change function entry in the session interface; presenting a task change interface in response to a trigger operation on the task change function entry; receiving task change content set for the task based on the task change interface; and sending the task change content to the project management platform in response to a confirmation operation on the task change content; wherein, the task change content is used by the project management platform to perform corresponding change operations on the task based on the task change content.

[0091] In some embodiments, after the terminal sends the task change content to the project management platform, it can also receive a task notification message with the corresponding task change content sent by the project management platform through a service number; the task notification message with the corresponding task change content is displayed in the session interface.

[0092] Here, the terminal can also provide a task change function entry point. When a trigger operation is received for this function entry point, the task change interface is displayed. In actual implementation, this task change interface can include function items for setting change content for each task dimension. Based on this task change interface, the task change content set for each task dimension can be received based on the change content setting function items for each task dimension. When a confirmation operation for the task change content is received, the task change content is sent to the project management platform corresponding to the service account. After receiving the task change content, the project management platform performs the corresponding change operation on the existing tasks of the target project based on the task change content.

[0093] When the project management platform performs the corresponding change operation on the existing tasks of the target project, it is determined that the tasks associated with the target project in the project management platform have changed. At this time, the terminal also receives a task notification message sent by the project management platform through the service number to notify that the existing tasks indicated by the task change content have changed.

[0094] As an example, see Figure 7 , Figure 7 This is a schematic diagram showing the task change interface provided in an embodiment of this application. Here, the terminal presents the task change function entry "Task Change" in the session interface, as shown below. Figure 7 As shown in (1); in response to the trigger operation of the "Task Change" function entry, the task change interface is presented, and the corresponding task change content setting function items are displayed in the task change interface, such as the task time change function item, the task status change function item, and the task priority change function item. At the same time, the task information corresponding to each dimension of the task is also displayed, such as "task status in progress". Figure 7 As shown in (2); based on the task change interface, the task change content set for the task is received, that is, the task status changes from "in progress" to "completed", and the corresponding confirmation function item "confirm" is presented, such as Figure 7 As shown in (3). When a confirmation operation for the task change content is received based on the confirmation function item "Confirm", the task change content is sent to the project management platform.

[0095] In some embodiments, the terminal may present a file upload function for a task in the session interface; receive the target file selected based on the file upload function; and, in response to a confirmation operation for the target file, send the target file to the project management platform corresponding to the service number; wherein, the target file is used by the project management platform to send a notification message carrying the target file to the terminal of the associated object.

[0096] Here, the terminal can also provide a file upload function for the task; when the target file selected based on the file upload function is received, in response to the confirmation operation for the target file, the target file is sent to the project management platform corresponding to the service number; after receiving the target file, the project management platform sends a notification message carrying the target file to the terminal of the associated object to notify the associated object that the target file has been uploaded for the task.

[0097] Applying the above embodiments of this application, a session interface for communicating with the service account of the project management platform is presented. When the task associated with the target project in the project management platform changes, and the current object is the associated object of the changed task, a task notification message sent by the project management platform through the service account is received and presented in the session interface. Based on the task notification message, the associated object is notified that the task associated with the target project has changed. Here, the task has a corresponding creation object and execution object. The associated object corresponding to the task notification message includes at least one of the creation object and the execution object. In this way, multiple people can collaboratively process project tasks, and the associated object of the task can obtain the task change details in real time and quickly through the session message, thereby improving the task processing efficiency.

[0098] The following continues to describe the task information processing method provided in the embodiments of this application. In some embodiments, the task information processing method provided in the embodiments of this application can be implemented by various electronic devices. For example, it can be implemented by a terminal alone, by a server alone, or by a terminal and a server working together. Taking a terminal implementation as an example, see [link to documentation]. Figure 8 , Figure 8 This is a flowchart illustrating a task information processing method provided in an embodiment of this application. The task information processing method provided in an embodiment of this application includes: Step 201: The terminal displays the project management interface corresponding to the target project, and presents the tasks associated with the target project in the project management interface.

[0099] Here, the terminal displays the project management interface corresponding to the target project by running the project management application corresponding to the project management platform. This project management application can be a standalone client or a web-based application software operated via a web browser on the internet or corporate intranet. The project management interface allows users to manage the target project and its associated tasks. For example, the target project could be application development, and associated tasks could include application interface planning, application interface design, application testing, etc. When tasks are created for the target project, the tasks associated with the target project are displayed in the project management interface.

[0100] In some embodiments, the terminal may present the tasks associated with the target project in the project management interface in the following manner: In the project management interface, the tasks associated with the target project and the task information of the tasks are presented according to at least two task dimensions.

[0101] Here, the at least two task dimensions include: task status, task content, task priority, task time, and at least two of the following: task status, task content, task priority, task time, and the objects associated with the task. Task information refers to the specific details of the corresponding task, such as whether it is completed, in progress, or postponed. This can be the task information corresponding to the task status when the task dimension is task status.

[0102] As an example, see Figure 9 , Figure 9 This is a schematic diagram of the project management interface provided in the embodiments of this application. Here, in the project management interface, the tasks associated with the target project and the task information of the tasks are presented according to at least two task dimensions. The task dimensions include: task content, associated object, task start date, task end date, status, and priority. Each task dimension corresponds to the task information, such as the status being "in progress" and the priority being "high".

[0103] In some embodiments, the terminal can perform task filtering in the following ways: when there are multiple tasks, the terminal presents the filtering function items corresponding to the tasks; in response to the trigger operation for the filtering function items, the terminal presents the filtering conditions corresponding to each task dimension; in response to the confirmation operation for the target filtering conditions, the terminal presents the target tasks that meet the target filtering conditions.

[0104] Here, different filtering conditions are available for different task dimensions. For example, if the task dimension is the task status, the corresponding filtering conditions may include: completed, in progress, postponed, etc.; if the task dimension is the task priority, the corresponding filtering conditions may include: high, medium, low.

[0105] In some embodiments, the terminal can implement task filtering in the following ways: when there are multiple tasks, filter function items corresponding to each task dimension are presented; in response to the triggering operation of the filter function item for the target task dimension, the target task that meets the filter conditions corresponding to the target task dimension is presented.

[0106] Here, the terminal can present corresponding filtering options for each task dimension, such as filtering options for task status and filtering options for task priority. In response to the triggering of a filtering option for a target task dimension, the terminal presents the target tasks that meet the filtering conditions corresponding to that target task dimension.

[0107] As an example, see Figure 10 , Figure 10 This is a schematic diagram of the filtering function items provided in an embodiment of this application. Here, the terminal presents the filtering function item "Filter" corresponding to the task, such as... Figure 10 As shown in (1); in response to the trigger operation of the filter function item, the filter conditions corresponding to each task dimension are presented. For example, if the task dimension is the task status, the corresponding filter conditions may include: completed, in progress, postponed, etc.; if the task dimension is the task priority, the corresponding filter conditions may include: high, medium, low, etc. Figure 10As shown in (2); in response to the confirmation operation for the target filter condition, that is, the confirmation operation for the filter condition "high" for task priority, the target tasks that meet the target filter condition, that is, the target tasks with "high" priority, are presented, including task 1 and task 3, as shown in (2). Figure 10 As shown in (3).

[0108] Step 202: Based on the project management interface, when a change instruction for a task is received, perform the task change operation indicated by the change instruction.

[0109] Here, task changes are implemented through the project management interface. When a task change instruction is received through the project management interface, the task executes the task change operation indicated by the instruction. In practice, users can change the tasks associated with the target project as needed. In practice, task changes include the following two situations: 1) Changes in the number of tasks, i.e., increasing or decreasing the number of tasks, corresponding to task creation and deletion; 2) Changes in task information, corresponding to changes in the task information of existing tasks, such as changes in task status, task content, task priority, task time, and the objects associated with the task, etc.

[0110] Step 203: Send a notification message to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the notification message to the associated object of the task through the service number of the project management platform.

[0111] The task has at least two associated objects, including the task creation object and the task execution object.

[0112] Here, after a task change operation is performed as instructed by a change command based on the project management interface, a notification message is sent to the project management platform corresponding to the project management interface to notify that the task has changed. This allows the project management platform to send the notification message to the associated objects of the task through its service number, thus informing the associated objects that the task has been changed. This enables interoperability between the project management application and the instant messaging application where the service number resides.

[0113] In this context, the tasks associated with the target project have corresponding creation objects and execution objects. The creation object is the creator of the task, and the execution object is the executor of the task. For example, if Li X posts a task asking Zhang X and Wang X to buy groceries, the creation object is Li X, and the execution objects are Zhang X and Wang X. In practical applications, when there are multiple execution objects, the creation object can also be one of them. The associated objects of the above task can include at least one of the creation object and the execution object; that is, the associated objects of the task can include only the creation object, only the execution object, or both.

[0114] In some embodiments, a task is associated with a target task document, and the terminal can present the target task document in the following ways: presenting the document viewing function item of the task; responding to a trigger operation for the document viewing function item, presenting the document content of the target task document and the application function entry corresponding to the target task document; when a trigger operation for the application function entry is received, presenting the target task document through the document application associated with the application function entry; wherein, the document application is used for the associated objects of the task to collaboratively edit the target task document.

[0115] Here, when the task is associated with a target task document, such as a target document added for the task or a target document created for the task, the terminal can provide editing functions for the target task document. In actual implementation, since each task corresponds to multiple associated objects, the corresponding target task document also needs to be edited by multiple associated objects. Based on this, this application embodiment provides collaborative editing of the target task document, which allows multiple associated objects of the corresponding task to collaboratively edit the target task document, enabling synchronization when multiple users edit together.

[0116] In practical applications, the terminal can provide a document viewing function for viewing task documents, allowing users to view task-related documents. In response to a trigger operation on the document viewing function, the content of the target task document is presented for the user to view. Simultaneously, the application function entry point corresponding to the target task document is also presented. This entry point allows the user to access the associated document application, view the target task document, and collaboratively edit the document using the document application.

[0117] In some embodiments, the terminal can synchronize the editing of the target task document in the following ways: when there is an editing operation on the target task document in the document application, it receives the editing information corresponding to the editing operation; based on the editing information, it performs the corresponding update operation on the target task document in the project management interface, and sends a document notification message to the project management platform corresponding to the project management interface, so that the project management platform sends the document notification message to the associated object of the task through the service number of the project management platform; wherein, the document notification message is used to notify that the target task document has been updated.

[0118] Here, when the terminal presents the target task document through a document application, the user can edit the target task document within the document application. In practice, this editing operation can include editing the target task document itself (i.e., the document content of the target task document), as well as editing the information associated with the target task document (such as the target task document's editing permissions, viewing permissions, etc.). When an editing operation for the target task document exists in the document application, the terminal receives the editing information corresponding to the editing operation and then performs the corresponding update operation on the target task document in the project management interface based on the editing information. As an example, this editing information can be the edited content of the target task document itself (i.e., the document content of the target task document), or it can be the editing information associated with the target task document (such as the target task document's editing permissions, viewing permissions, etc.), such as modifying the target task document's editing permissions, adding or deleting users with editing permissions, etc.

[0119] In practical applications, when a user performs editing operations on a target task document within a document application, the document application sends the corresponding editing information to its backend server to update the target task document. Simultaneously, the document application's backend server also sends the editing information to the project management platform (i.e., the project management server) corresponding to the project management interface, causing the project management platform to update the target task document there. Once the target task document on the project management platform is updated, the project management platform sends the editing information corresponding to the editing operation to the project management application, causing the project management application to update the target task document in the project management interface. Upon receiving the editing information, the project management application performs corresponding update operations on the target task document in the project management interface, updating the target task document within the project management application (i.e., the project management interface).

[0120] Simultaneously, after the project management application performs the corresponding update operation on the target task document in the project management interface based on the editing information, the terminal (running the project management application) also sends a document notification message to the project management platform corresponding to the project management interface. This document notification message is used to notify that the target task document has been updated. After receiving the document notification message, the project management platform sends the document notification message to at least two task objects associated with the task through the service number of the project management platform, so as to notify at least two task objects associated with the task that the target task document has been updated. The terminals of at least two task objects can view the document notification message through the service number (which can be understood as a contact in a user's instant messaging application). In this way, the editing operation of the target task document realizes the three-terminal linkage between the project management application, the document application, and the instant messaging application. That is, the target task document in the project management application is edited through the document application, and the edited target task document is synchronized to the project management application. After editing, the corresponding task objects are notified of the update of the target task document through the service number of the instant messaging application.

[0121] As an example, see Figure 11 , Figure 11 This is a schematic diagram of the editing process of the target task document provided in an embodiment of this application. Here, the terminal presents the task document viewing function items, including "Task 1 Document" and "Task 2 Document", as shown below. Figure 11 As shown in Figure (1); in response to the document viewing function "Task 1 Document" triggered for "Task 1", the document content of the target task document of "Task 1" is displayed, as well as the application function entry "Open in XX Document Application" corresponding to the target task document, such as Figure 11 As shown in Figure (2); in response to the trigger operation of "Open in XX Document Application" for the application function entry, the XX Document Application is invoked to display the target task document, such as Figure 11 As shown in Figure (3).

[0122] By applying the above embodiments of this application, a project management interface corresponding to the target project is presented, and the tasks associated with the target project are presented in the project management interface. Based on the project management interface, when a change instruction for a task is received, the task change operation indicated by the change instruction is executed on the task, and a notification message for notifying the task of the change is sent to the project management platform corresponding to the project management interface. This allows the project management platform to send the notification message to the associated object of the task through the service number of the project management platform. Here, the task has corresponding creation objects and execution objects, and the associated object corresponding to the task notification message includes at least one of the creation object and the execution object. In this way, multiple people can collaboratively process project tasks, and the associated object of the task can obtain task change details in real time and quickly through conversation messages, thereby improving task processing efficiency.

[0123] The following describes an exemplary application of the embodiments of this application in a real-world application scenario. First, the terms involved in the embodiments of this application will be explained, including: 1) PM sheet: Project Management sheet, referring to the aforementioned project management platform; 2) Word segmentation: the process of dividing a Chinese sentence into individual words; 3) Semantic finite automaton: a finite number of states are assigned to the possible types of words, each state can transition to zero or more states, and the received word determines which state transition is executed; 4) Semantic analysis: the segmented words are analyzed to provide structure and process for semantic reasoning.

[0124] In related technologies, a service account for a manifest creation application can create a task list within the application by sending a session message. The service account then returns a notification of successful creation. However, this created manifest is only for the creator, and the notification message is only sent to the creator, essentially functioning as a creator's memo. Furthermore, the returned notification message only provides simple content and time information, offering a single dimension. Historical messages are simply displayed directly, resulting in a disorganized and disorganized presentation.

[0125] Based on this, embodiments of this application provide a method for processing task information to address at least the aforementioned problems. In embodiments of this application, based on an online collaborative team project management scenario, a linkage method between a web-based online collaborative product and a mobile social office product is provided. This enables a closer and more subtle correlation between user operations and message pushes, forming a two-way channel where user operations can generate message pushes, and message pushes can generate user operations. This achieves multi-terminal linkage, improves user work efficiency, reduces communication costs, and better meets user needs for collaborative products. In project management scenarios, the security and privacy of project tasks, timely synchronization of rich-dimensional messages, and the efficiency of task-related responsible persons are all crucial. Furthermore, embodiments of this application can flexibly achieve the understanding and management of key tasks in project management through multi-terminal linkage message synchronization and category aggregation.

[0126] In practical applications, 1) the project management platform (PM sheet) can push all status changes, permission notifications, time adjustments, and status adjustments related to tasks and responsible persons to the terminals of multiple relevant responsible persons in a unified format, achieving rich-dimensional message notifications. 2) In this embodiment, the dimensions of tasks associated with the project application include not only time and content, but also task status, task executor, task publisher, and task priority. Through the recognition of multiple semantics, task change messages are sent to the terminals of task-related personnel in a fixed, multi-task-dimensional manner. 3) By adopting a multi-dimensional filtering method for task notification messages and viewing them by category, one can gain a directional and logical understanding of task changes in the project, which is of great significance.

[0127] The following section first describes the task information processing method provided in this application embodiment from the product side. In practical applications, the task information processing method provided in this application embodiment can be used in team online collaborative project management scenarios. Task management for projects is based on an online collaborative project management application (PM sheet), and conversational communication is achieved using an instant messaging application, effectively improving communication efficiency. In this application embodiment, the account of the project management application (i.e., the PM sheet account) is bound to the account of the instant messaging application, allowing members to interact and link through the service accounts of the instant messaging application and the project management application.

[0128] 1) Here, PM SHEET has two types of permissions associated with the instant messaging application: document application permissions and project management permissions. The document application permissions are linked to the instant messaging application; that is, when a user changes document permissions in the instant messaging application, the document application, or PM SHEET, the changes are synchronized across all three. When a team member in PM SHEET creates or adds a task-related document, the document application's API is called to grant document permissions to the task-related members and the project owner, making document use more secure and convenient. PM SHEET can establish a project-task-level permission system on top of the document application permissions. When a member with document permissions has left the target project, access can be denied through project-level permissions to ensure document security; alternatively, permissions can be set only in PM SHEET, without needing to set permissions for the document itself, making the document accessible only within PM SHEET. See the example below. Figure 12 , Figure 12 This is a schematic diagram illustrating the permission management linkage provided in an embodiment of this application. Here, as... Figure 12 As shown in (1), the PM Sheet administrator can receive notifications from members regarding their project permission requests, such as... Figure 12 As shown in (2), the instant messaging application can also receive project permission request notifications sent by users; such as Figure 12 As shown in (3), the PM Sheet allows modification of member permission status.

[0129] 2) Task notification messages offer rich dimensions. Here, the PM SHEET service account of the instant messaging application is linked to the PMSHEET system platform. PM SHEET can send task notification messages to the instant messaging application through the service account. For example, when a task in a target project changes—such as changes to task status, task time, task content, or when task annotations are received or files are added—PM SHEET can send a corresponding task notification message to the instant messaging application through the service account. In practical applications, this task notification message can be configured with a corresponding notification message template. For instance, if a member modifies a task, PM SHEET will notify all users and the project owner related to that task via a task notification message. The task notification message pushed by the service account will show which member changed the task status from what to what, and when. The project owner and other task-related personnel can reply to the task notification message, add comments, etc., through the service account. See the example of the task notification message. Figure 4 .

[0130] 3) Flexible and Multi-Scenario Recognition and Synchronization: Through the semantic transformation and recognition described above, project managers and project members can easily create tasks and change task statuses using instant messaging applications (PC and mobile). For example, see... Figure 5 After member Du X sends the task creation message "Have Wang X and Li X go to the market to buy groceries tomorrow and the day after tomorrow" to the service account, PM SHEET's backend service will retrieve this task creation message, perform Chinese word segmentation and semantic analysis, and confirm that a task has been published, the participants are Wang X and Li X, the time is tomorrow and the day after tomorrow (and convert it to the target time zone), and the task content is to go to the market to buy groceries. Then, PM SHEET will send a task notification message to Du X through the service account, informing Du X that the task has been successfully generated; at the same time, PM SHEET will send the task to other relevant personnel, namely Wang X and Li X, through the service account, the task is to go to the market to buy groceries, the creator is Du X, the relevant personnel are Wang X and Li X, and the time is tomorrow and the day after tomorrow (here will be the specific dates). Sending messages in the service account has context association, and will judge the previous task scenario. For example, if you want to add a comment in the previous scenario, you don't need to repeat the scenario, you only need to directly describe the behavior, such as Figure 5 As shown in (3).

[0131] 4) Task notification messages can be clustered in multiple dimensions to make the information clearer: Messages received and sent between PM SHEET and instant messaging applications are stored in PM SHEET's backend system, which has an internal messaging system that allows for filtering task notification messages from multiple dimensions. See also Figure 9 and Figure 10 Filtering dimensions can include: people (initiators and handlers); actions (creation, status update, notification, completion, etc.); and time (task time filtering). In PMSHEET, task messages and instant messaging application messages behave the same as internal messages; therefore, message filtering can help to better understand the task status.

[0132] The following section continues to describe the task information processing method provided in the embodiments of this application from a technical perspective. See [link to documentation]. Figure 13 , Figure 13 This is a flowchart illustrating the task information processing method provided in this application embodiment, including: 1. A user logs in to an instant messaging application by scanning a QR code; 2. The system automatically generates a PM SHEET account using the instant messaging application information; 3. The user performs an operation, such as sending an application to join a project; 4. The user's operation is parsed to obtain the time, location, and person involved in the action, which is then converted into a message corresponding to the action and sent to the relevant person; 5. The background receives the action and uses the instant messaging application's API to push the message to the corresponding member through the service account; 6. Members can reply to the message or send a message to perform an operation through the service account; 7. The background uses the instant messaging application's API to obtain the message, and after receiving the message, uses an automaton to parse the operation corresponding to the message, executes the operation, and records the action; 8. After the background executes the operation, the task change message of the corresponding task is synchronously notified to all task-related persons through the service account.

[0133] In practical applications, after logging into an instant messaging application, a user account is registered in the system, associated with the instant messaging application's identity, generating a unique user login credential and recording the instant messaging application ID, which is linked to the document application's permissions. Users can request to join a project; the system parses the user's request and converts it into a corresponding message, which is then pushed to the project administrator via the instant messaging application. The project administrator can then perform operations through the instant messaging application or the PM SHEET. Specifically, the instant messaging application replies to the service account message, which the system then receives and consumes, parses the text, executes actions, records the actions, and notifies relevant parties.

[0134] In PM SHEET, when a member creates or adds associated files for a task, the document application's API is called to grant document permissions to task stakeholders and project managers, forming a document application permission management system that simplifies document use and enhances information security. The system also has a separate permission system that binds file permissions to project tasks. Permissions are only effective within PM SHEET, document links are encrypted, and the document URL is not disclosed. Accessing file content is done by transmitting a file stream, generating a temporary file for display, and updating a file involves transmitting the file stream and updating the corresponding remote file. Thus, the document address cannot be directly obtained; the file can only be used within the PM SHEET system, ensuring information security at the system level.

[0135] Furthermore, for content security reasons, document synchronization performance can be reduced, and real-time saving is not possible. However, this raises a new issue: users might forget to save before exiting. Therefore, the front-end can implement forced exit recovery, ensuring that even if the page is accidentally closed, the edited content is promptly stored in the cache, preventing loss of changes and mitigating the risk of forgetting to save before exiting.

[0136] See Figure 14 , Figure 14 This is a schematic diagram of the architecture of the task information processing system provided in this application embodiment. Here, the system includes: a runtime environment, a storage layer, a data layer, a business layer, a presentation layer, and a front-end UI layer; wherein, the runtime environment is an independent server; the storage layer is used to store relevant information and files related to the tasks associated with the project; the data layer is used to transmit data generated by the business layer to the storage layer for storage; the business layer is used to process messages, established tasks, and associated files involved in PM SHEETH and instant messaging applications; the presentation layer is used to render and display the screen data of the front-end UI based on a rendering engine; the front-end UI is implemented based on HTML, CSS, JavaScript, and Vue.

[0137] like Figure 14 As shown in the system architecture diagram, the storage layer includes a temporary file storage mechanism. This serves as a buffer for loading document content and temporarily stores unsaved file copies. The frontend periodically stores user-edited content locally. When the user leaves the page, the edited content is automatically sent to the business layer's file processing service and stored in a local file on the server. If a browser crash causes the PM SHEET to crash and fail to send updated file content to the backend in time, the frontend caching ensures that user data is not lost.

[0138] Interacting with PM SHEET's service account involves generating messages directly through content mapping. Transforming messages into actions is achieved by creating a semantic finite automaton. The backend receives messages from the service account, performs Chinese word segmentation, analyzes lexical and semantic information, identifies the person, time, action, and current operator, converts it into the corresponding action, and then calls the backend interface corresponding to the action to perform a series of operations. The context of interaction with the service account is analyzed to create a scenario, such as a project, task, or other people's comments. For example, to add a comment within a previous scenario, there's no need to repeat the scenario; simply describe the action. Missing scenarios can be automatically suggested and filled in by the previous scenario.

[0139] This application features richer scene recognition, more diverse interactions with user messages, and the ability to link contextual scenarios. After member Du X sends a task creation message to the service account stating "Have Wang X and Li X go to the vegetable market to buy groceries tomorrow and the day after," the PMSHEET backend service retrieves this task creation message, performs Chinese word segmentation and semantic analysis, and determines that a task has been published, the participants are Wang X and Li X, the time is tomorrow and the day after (converted to specific Beijing time), and the task content is going to the vegetable market to buy groceries. Then, PM SHEET will send a task notification message to Du X via the service account, informing Du X that the task has been successfully generated. Simultaneously, PM SHEET will send the task to other relevant personnel, namely Wang X and Li X, via the service account, specifying that the task is to go to the vegetable market to buy groceries, the creator is Du X, the relevant participants are Wang X and Li X, and the time is tomorrow and the day after (these will be the specific dates). By binding messages with corresponding tasks, task rollback can be performed using message backtracking. Each message corresponds to a user operation, and every change is stored in the message. This is the basis for the linkage between PM SHEET and instant messaging applications.

[0140] This is thanks to the design of the data table, see [link / reference] Figure 15 , Figure 15 This is an interactive diagram of the task information processing system provided in this application embodiment. Here, tasks and messages appear to be two completely unrelated external manifestations, but in reality, they are carried by the same carrier. Tasks are stored in the data table according to several filtering dimensions, such as project, time, person, task, and event, and then bound to the corresponding creation or generation messages in the message table. This allows the system to filter not only tasks by dimensions but also the bound messages. Task rollback can be performed through message rollback. This design, through the linkage between data tables, makes the interaction between the PM SHEET and the instant messaging application closer, making the system more integrated and enabling interaction and association between modules. Project executors can cluster and display messages across multiple dimensions, targeting different projects, tasks, times, and events.

[0141] When a user registers as a member of the project management platform, the platform's registration process calls the instant messaging application to retrieve the user's information. When a user makes changes to a task, the system first determines if the user has the necessary permissions. If permissions are granted, the system saves the impact of the action and generates a message that is sent to the message queue. The messaging system retrieves and consumes messages from the message queue, calls the instant messaging application's API to push the task change message to the instant messaging application's service account, and stores the task change message in the database. If the change affects document permissions, the system calls the corresponding API for the document application to change permissions. When a user sends a message in the instant messaging application, the system retrieves the message through the instant messaging application's API, stores the message in the database, parses the user's action in the messaging system, determines if the user has the necessary permissions, and if so, sends the action to the user action processing service for execution.

[0142] The aforementioned instant messaging applications can be task-oriented applications, clients, mini-programs, etc., and are highly scalable. In addition to the integration of project management platforms and social office software, it can also achieve integration between collaborative office software from various industries, broadening the application scenarios.

[0143] Applying the above embodiments of this application, 1) based on the online collaborative team project management scenario, a linkage method between web-based online collaborative products and mobile social office products is proposed, making the correlation between user operations and message pushes closer and more ingenious, forming a two-way channel. User operations (i.e., task changes) can generate message pushes, and message pushes can generate user operations. This achieves multi-terminal linkage, improves user work efficiency, reduces communication costs, and better meets users' needs for collaborative products. In project management scenarios, the security and privacy of project tasks, timely synchronization of rich-dimensional messages, and the efficiency of task-related responsible persons are all crucial. The embodiments of this application can flexibly realize the above-mentioned key tasks in team management through message synchronization and category aggregation in multi-terminal linkage. 2) The linkage permission management is more user-friendly. In terms of linkage permission management, document permissions can be managed based on document applications or based on the PM SHEET independent permission management system. The two permission systems more fully protect customer data security, and the linkage permission management is more user-friendly. 3) In this embodiment, because the usage direction is clearer and more explicit, the semantic parsing of Chinese characters uses a finite automaton with optimized state numbers, thus greatly improving the system response speed. 4) The message clustering dimensions are richer, improving the user experience and allowing for quick filtering of desired task notification messages.

[0144] It is understood that in the embodiments of this application, data related to user information, tasks, task information, task notification messages, etc. are involved. When the embodiments of this application are applied to specific products or technologies, user permission or consent is required, and the collection, use and processing of related data must comply with the relevant laws, regulations and standards of the relevant countries and regions.

[0145] The following description continues to illustrate the exemplary structure of the task information processing device 553 provided in the embodiments of this application as a software module. In some embodiments, such as Figure 2 As shown, the software module in the task information processing device 553 stored in the memory 550 may include: The first presentation module 5531 is used to present the session interface for communicating with the service account of the project management platform; The receiving module 5532 is used to receive a task notification message sent by the project management platform through the service number when the task associated with the target project in the project management platform changes and the current object is the associated object of the changed task. The task notification message is used to notify that the task associated with the target project has changed. The task has a corresponding creation object and execution object, and the associated object of the task includes at least one of the creation object and the execution object; The second presentation module 5533 is used to present the received task notification message in the session interface.

[0146] In some embodiments, the second presentation module 5533 is further configured to present the received task notification message in the session interface through a notification message template; wherein the notification message template includes at least two task dimensions for the task.

[0147] In some embodiments, the second presentation module 5533 is further configured to receive a first task notification message sent by the project management platform through the service number; correspondingly, the second presentation module 5533 is further configured to extract information of the corresponding task dimensions from the first task notification message based on the at least two task dimensions to obtain task information of each task dimension; obtain the notification message template, and fill the notification message template with the task information of each task dimension to obtain a second task notification message, and present the second task notification message.

[0148] In some embodiments, when the changed task is a new task created for the target project, the second presentation module 5533 is further configured to receive an input task creation message for the target project based on the session interface, the task creation message being used to instruct the creation of the new task for the target project; in response to a sending instruction for the task creation message, send the task creation message to the project management platform corresponding to the service number, and present the task creation message in the session interface; wherein, the task creation message is used for the project management platform to create the new task based on the task creation message.

[0149] In some embodiments, the second presentation module 5533 is further configured to receive an input interaction instruction message for the task based on the session interface, the interaction instruction message being used to instruct the execution of a corresponding interaction operation for the task; in response to a sending instruction for the interaction instruction message, send the interaction instruction message to the project management platform corresponding to the service number, and present the interaction instruction message in the session interface; wherein, the interaction instruction message is used for the project management platform to execute a corresponding interaction operation based on the interaction instruction message.

[0150] In some embodiments, the second presentation module 5533 is further configured to receive an interactive notification message sent by the project management platform through the service number, the interactive notification message being used to notify that the interactive operation has been performed; and to present the received interactive notification message in the session interface.

[0151] In some embodiments, the second presentation module 5533 is further configured to receive, based on the session interface, an input task change message for the task, the task change message being used to instruct the task that has been changed to be changed again; in response to a sending instruction for the task change message, send the task change message to the project management platform corresponding to the service number, and present the task change message in the session interface; wherein, the task change message is used for the project management platform to perform corresponding change operations on the task based on the task change message.

[0152] In some embodiments, the second presentation module 5533 is further configured to present a change message template in response to a viewing instruction for a task change template; and receive a task change message for the task input based on the change message template.

[0153] In some embodiments, the second presentation module 5533 is further configured to receive a session message based on the input of the session interface; when the session message does not include a task identifier and the session message has an associated historical task change message or historical task notification message corresponding to the task, determine the degree of association between the session message and the historical task change message or historical task notification message; when the degree of association reaches a threshold, determine the session message as a task change message for the task.

[0154] In some embodiments, the second presentation module 5533 is further configured to present a task change function entry in the session interface; present a task change interface in response to a trigger operation on the task change function entry; receive task change content set for the task based on the task change interface; and send the task change content to the project management platform in response to a confirmation operation on the task change content; wherein the task change content is used for the project management platform to perform corresponding change operations on the task based on the task change content.

[0155] In some embodiments, the second presentation module 5533 is further configured to receive a task notification message corresponding to the task change content sent by the project management platform through the service number; and to present the task notification message corresponding to the task change content in the session interface.

[0156] In some embodiments, the second presentation module 5533 is further configured to present a file upload function item for the task in the session interface; receive a target file selected based on the file upload function item; and, in response to a confirmation operation for the target file, send the target file to the project management platform corresponding to the service number; wherein the target file is used by the project management platform to send a notification message carrying the target file to the terminal of the associated object.

[0157] In some embodiments, the second presentation module 5533 is further configured to present a details page corresponding to the task notification message in response to a triggering operation on the task notification message; in the details page, task information of at least one task dimension in the task notification message is presented.

[0158] Applying the above embodiments of this application, a session interface for communicating with the service account of the project management platform is presented. When the task associated with the target project in the project management platform changes, and the current object is the associated object of the changed task, a task notification message sent by the project management platform through the service account is received and presented in the session interface. Based on the task notification message, the associated object is notified that the task associated with the target project has changed. Here, the task has a corresponding creation object and execution object. The associated object corresponding to the task notification message includes at least one of the creation object and the execution object. In this way, multiple people can collaboratively process project tasks, and the associated object of the task can obtain the task change details in real time and quickly through the session message, thereby improving the task processing efficiency.

[0159] The following continues to describe the task information processing apparatus provided in the embodiments of this application. Embodiments of this application also provide a task information processing apparatus, including: The third presentation module is used to present the project management interface corresponding to the target project, and to present the tasks associated with the target project in the project management interface; The execution module is used to perform the task change operation indicated by the change instruction when a change instruction for the task is received based on the project management interface. The sending module is used to send a notification message to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the notification message to the associated object of the task through the service number of the project management platform; The task has at least two associated objects, including the task creation object and the task execution object.

[0160] In some embodiments, the third presentation module is further configured to present, in the project management interface, the tasks associated with the target project and the task information of the tasks according to at least two task dimensions.

[0161] In some embodiments, the third presentation module is further configured to present the filtering function items corresponding to the tasks when there are multiple tasks; in response to a trigger operation for the filtering function items, present the filtering conditions corresponding to each of the task dimensions; and in response to a confirmation operation for the target filtering conditions, present the target tasks that meet the target filtering conditions.

[0162] In some embodiments, the third presentation module is further configured to present filtering function items corresponding to each of the task dimensions when there are multiple tasks; and to present target tasks that meet the filtering conditions corresponding to the target task dimension in response to the triggering operation of the filtering function item for the target task dimension.

[0163] In some embodiments, the task is associated with a target task document, and the third presentation module is further configured to present a document viewing function item for the task; in response to a trigger operation for the document viewing function item, present the document content of the target task document and the application function entry corresponding to the target task document; when a trigger operation for the application function entry is received, present the target task document through the document application associated with the application function entry; wherein, the document application is used for the associated objects of the task to collaboratively edit the target task document.

[0164] In some embodiments, the third presentation module is further configured to receive editing information corresponding to the editing operation when there is an editing operation for the target task document in the document application; based on the editing information, perform a corresponding update operation on the target task document in the project management interface, and send a document notification message to the project management platform corresponding to the project management interface, so that the project management platform sends the document notification message to the associated object of the task through the service number of the project management platform; wherein, the document notification message is used to notify that the target task document has been updated.

[0165] By applying the above embodiments of this application, a project management interface corresponding to the target project is presented, and the tasks associated with the target project are presented in the project management interface. Based on the project management interface, when a change instruction for a task is received, the task change operation indicated by the change instruction is executed on the task, and a notification message for notifying the task of the change is sent to the project management platform corresponding to the project management interface. This allows the project management platform to send the notification message to the associated object of the task through the service number of the project management platform. Here, the task has corresponding creation objects and execution objects, and the associated object corresponding to the task notification message includes at least one of the creation object and the execution object. In this way, multiple people can collaboratively process project tasks, and the associated object of the task can obtain task change details in real time and quickly through conversation messages, thereby improving task processing efficiency.

[0166] This application also provides a computer program product or computer program, which includes computer instructions stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium and executes the computer instructions, causing the computer device to perform the task information processing method provided in this application.

[0167] This application also provides a computer-readable storage medium storing executable instructions, which, when executed by a processor, will cause the processor to execute the task information processing method provided in this application.

[0168] In some embodiments, the computer-readable storage medium may be a memory such as FRAM, ROM, PROM, EPROM, EEPROM, flash memory, magnetic surface memory, optical disk, or CD-ROM; or it may be a variety of devices including one or any combination of the above-mentioned memories.

[0169] In some embodiments, executable instructions may take the form of a program, software, software module, script, or code, written in any form of programming language (including compiled or interpreted languages, or declarative or procedural languages), and may be deployed in any form, including as a standalone program or as a module, component, subroutine, or other unit suitable for use in a computing environment.

[0170] As an example, executable instructions may, but do not necessarily, correspond to files in a file system. They may be stored as part of a file that holds other programs or data, for example, in one or more scripts in a Hyper Text Markup Language (HTML) document, in a single file dedicated to the program in question, or in multiple collaborating files (e.g., a file that stores one or more modules, subroutines, or code sections).

[0171] As an example, executable instructions can be deployed to execute on a single computing device, or on multiple computing devices located in one location, or on multiple computing devices distributed across multiple locations and interconnected via a communication network.

[0172] The above description is merely an embodiment of this application and is not intended to limit the scope of protection of this application. Any modifications, equivalent substitutions, and improvements made within the spirit and scope of this application are included within the scope of protection of this application.

Claims

1. A method for processing task information, characterized in that, The method includes: Presents a conversational interface for communicating with the service account of the project management platform; When the task associated with the target project in the project management platform changes, and the current object is the associated object of the task that has changed, Receive a task notification message sent by the project management platform through the service number. The task notification message is used to notify that the task associated with the target project has changed. The task has a corresponding creation object and execution object, and the associated object of the task includes at least one of the creation object and the execution object; The received task notification message is displayed in the session interface; After the received task notification message is presented in the conversation interface, a target message for the task is received based on the conversation interface. The target message is an interaction instruction message or a task change message. The interaction instruction message is used to instruct the corresponding interaction operation for the task, and the task change message is used to instruct the task that has been changed to be changed again. In response to the sending instruction of the target message, the target message is sent to the project management platform corresponding to the service number, and the target message is presented in the session interface; After sending the target message, receive a notification message corresponding to the target message sent by the project management platform through the service number; Wherein, when the target message is the interaction instruction message, the notification message is an interaction notification message, used to notify that the interaction operation has been performed; when the target message is the task change message, the notification message is a task notification message, used to notify that the task that has been changed has been changed again. The received notification message is displayed in the session interface.

2. The method as described in claim 1, characterized in that, The presentation of the received task notification message in the session interface includes: In the conversation interface, the received task notification message is presented through a notification message template; The notification message template includes at least two task dimensions for the task.

3. The method as described in claim 2, characterized in that, Receiving the task notification message sent by the project management platform through the service number includes: Receive the first task notification message sent by the project management platform through the service number; The step of presenting the received task notification message through a notification message template includes: Based on the at least two task dimensions, information of the corresponding task dimensions is extracted from the first task notification message to obtain task information for each task dimension. Obtain the notification message template, fill the notification message template with the task information of each task dimension, obtain the second task notification message, and present the second task notification message.

4. The method as described in claim 1, characterized in that, When the changed task is a new task created for the target project, before presenting the received task notification message, the method further includes: Based on the session interface, an input task creation message for the target project is received, the task creation message being used to instruct the creation of the new task for the target project; In response to the sending instruction for the task creation message, the task creation message is sent to the project management platform corresponding to the service number, and the task creation message is presented in the session interface; The task creation message is used by the project management platform to create the new task based on the task creation message.

5. The method as described in claim 1, characterized in that, When the target message is the task change message, receiving the input target message for the task includes: In response to a command to view a task change template, display the change message template; Receive a task change message for the task based on the change message template input.

6. The method as described in claim 1, characterized in that, When the target message is the task change message, receiving the input target message for the task includes: Receive a session message based on input from the session interface; When the session message does not include a task identifier, and the session message has an associated historical task change message or historical task notification message corresponding to the task, determine the degree of association between the session message and the historical task change message or historical task notification message. When the degree of association reaches a threshold, the session message is identified as a task change message for the task.

7. The method as described in claim 1, characterized in that, After presenting the received task notification message, the method further includes: The task change function entry is presented in the chat interface; In response to a trigger operation on the task change function entry point, the task change interface is displayed; Based on the task change interface, the task change content set for the task is received; In response to the confirmation operation regarding the task change, the task change content is sent to the project management platform; The task change content is used by the project management platform to perform corresponding change operations on the task based on the task change content.

8. The method as described in claim 7, characterized in that, After sending the task change information to the project management platform, the method further includes: Receive a task notification message from the project management platform via the service number, corresponding to the task change content; The session interface displays a task notification message corresponding to the task change content.

9. The method as described in claim 1, characterized in that, The method further includes: The chat interface presents a file upload function for the task. Receive the target file selected based on the file upload function item; In response to the confirmation operation for the target file, the target file is sent to the project management platform corresponding to the service number; The target file is used by the project management platform to send a notification message carrying the target file to the terminal of the associated object.

10. The method as described in claim 1, characterized in that, The method further includes: In response to a triggered operation on the task notification message, the details page corresponding to the task notification message is displayed; The details page displays task information for at least one task dimension from the task notification message.

11. A method for processing task information, characterized in that, The method includes: The project management application presents the project management interface corresponding to the target project, and the tasks associated with the target project are displayed in the project management interface; Through the project management application, based on the project management interface, when a change instruction for the task is received, the task change operation indicated by the change instruction is executed on the task; Through the project management application, a task notification message is sent to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the task notification message to the associated object of the task through the service number of the project management platform; The task has at least two associated objects, including the task creation object and the task execution object. A conversational interface for communicating with the service account of the project management platform is presented through an instant messaging application. When the task associated with the target project in the project management platform changes and the current object is the associated object of the changed task, the instant messaging application receives a task notification message sent by the project management platform through the service number. The task notification message is used to notify that the task associated with the target project has changed. The received task notification message is displayed in the conversation interface through the instant messaging application. After the received task notification message is presented in the conversation interface, the instant messaging application receives an input target message for the task based on the conversation interface. The target message is an interaction instruction message or a task change message. The interaction instruction message is used to instruct the corresponding interaction operation for the task, and the task change message is used to instruct the task that has been changed to be changed again. In response to the sending instruction of the target message, the instant messaging application sends the target message to the project management platform corresponding to the service number and presents the target message in the conversation interface. After sending the target message, the instant messaging application receives a notification message corresponding to the target message sent by the project management platform through the service number. Wherein, when the target message is the interaction instruction message, the notification message is an interaction notification message, used to notify that the interaction operation has been performed; when the target message is the task change message, the notification message is a task notification message, used to notify that the task that has been changed has been changed again. The received notification message is displayed in the conversation interface through the instant messaging application.

12. The method as described in claim 11, characterized in that, The tasks associated with the target project presented in the project management interface include: The project management interface presents the tasks associated with the target project and their task information according to at least two task dimensions.

13. The method as described in claim 12, characterized in that, The method further includes: When there are multiple tasks, the project management application displays the corresponding filter items for each task. In response to a trigger operation on the filter function item, filter conditions corresponding to each of the task dimensions are presented; In response to the confirmation operation for the target filtering criteria, the target task that meets the target filtering criteria is presented.

14. The method as described in claim 12, characterized in that, The method further includes: When there are multiple tasks, the project management application presents filtering options corresponding to each task dimension. In response to the triggering operation of the filtering function item for the target task dimension, the target tasks that meet the filtering conditions corresponding to the target task dimension are presented.

15. The method as described in claim 11, characterized in that, The task is associated with a target task document, and the method further includes: The project management interface displays the document viewing function for the task. In response to a trigger operation on the document viewing function item, the document content of the target task document and the application function entry corresponding to the target task document are presented. When a trigger operation is received for the application function entry, the target task document is presented through the document application associated with the application function entry; The document application is used to enable the associated objects of the task to collaboratively edit the target task document.

16. The method as described in claim 15, characterized in that, The method further includes: When there is an editing operation on the target task document in the document application, the editing information corresponding to the editing operation is received through the project management application; Based on the edited information, perform the corresponding update operation on the target task document in the project management interface, and Send a document notification message to the project management platform corresponding to the project management interface, so that the project management platform can send the document notification message to the associated object of the task through the service number of the project management platform; The document notification message is used to notify the target task document that it has been updated.

17. A task information processing device, characterized in that, The device includes: The first presentation module is used to present the conversation interface for communicating with the service account of the project management platform; The receiving module is used to receive a task notification message sent by the project management platform through the service number when the task associated with the target project in the project management platform changes and the current object is the associated object of the changed task. The task notification message is used to notify that the task associated with the target project has changed. The task has a corresponding creation object and execution object, and the associated object of the task includes at least one of the creation object and the execution object; The second presentation module is used to present the received task notification message in the session interface; The second presentation module is further configured to, after presenting the received task notification message in the session interface, receive an input target message for the task based on the session interface, wherein the target message is an interaction instruction message or a task change message; wherein the interaction instruction message is used to instruct the execution of a corresponding interaction operation for the task, and the task change message is used to instruct the task that has been changed to be changed again. In response to the sending instruction of the target message, the target message is sent to the project management platform corresponding to the service number, and the target message is presented in the session interface; After sending the target message, receive a notification message corresponding to the target message sent by the project management platform through the service number; Wherein, when the target message is the interaction instruction message, the notification message is an interaction notification message, used to notify that the interaction operation has been performed; when the target message is the task change message, the notification message is a task notification message, used to notify that the task that has been changed has been changed again. The received notification message is displayed in the session interface.

18. The apparatus according to claim 17, characterized in that, The second presentation module is further configured to present the received task notification message in the session interface through a notification message template; wherein the notification message template includes at least two task dimensions for the task.

19. The apparatus according to claim 17, characterized in that, When the changed task is a new task created for the target project, the second presentation module is further configured to receive an input task creation message for the target project based on the session interface before presenting the received task notification message. The task creation message is used to instruct the creation of the new task for the target project. In response to the sending instruction for the task creation message, the task creation message is sent to the project management platform corresponding to the service number, and the task creation message is presented in the session interface; wherein, the task creation message is used for the project management platform to create the new task based on the task creation message.

20. A task information processing apparatus, the apparatus being used to implement the task information processing method of claim 11, characterized in that, The device includes: The third presentation module is used to present the project management interface corresponding to the target project, and to present the tasks associated with the target project in the project management interface; The execution module is used to perform the task change operation indicated by the change instruction when a change instruction for the task is received based on the project management interface. The sending module is used to send a notification message to the project management platform corresponding to the project management interface to notify that the task has changed, so that the project management platform can send the notification message to the associated object of the task through the service number of the project management platform; The task has at least two associated objects, including the task creation object and the task execution object.

21. The apparatus according to claim 20, characterized in that, The task is associated with a target task document. The third presentation module is also used to present the document viewing function of the task in the project management interface; in response to a trigger operation on the document viewing function, to present the document content of the target task document and the application function entry corresponding to the target task document; when a trigger operation is received on the application function entry, to present the target task document through the document application associated with the application function entry; wherein, the document application is used for the associated objects of the task to collaboratively edit the target task document.

22. An electronic device, characterized in that, The electronic device includes: Memory, used to store executable instructions; A processor, when executing executable instructions stored in the memory, implements the task information processing method according to any one of claims 1 to 16.

23. A computer-readable storage medium storing executable instructions, characterized in that, When the executable instructions are executed by the processor, they implement the task information processing method according to any one of claims 1 to 16.

24. A computer program product, comprising a computer program or instructions, characterized in that, When the computer program or instructions are executed by the processor, they implement the task information processing method according to any one of claims 1 to 16.

Citation Information

Patent Citations

  • Message push management system and method

    CN109639824A

  • Information change notification method and system for JIRA system

    CN110648112A

  • Task management method and device based on instant messaging message, equipment and medium

    CN111193658A

  • Online document operation method, message collaboration system and computer storage medium

    CN113037613A