一种变压器引线模块化定位安装结构及安装方法

The modular positioning and installation structure solves the problems of complex installation and difficult maintenance of high-voltage leads, and realizes precise positioning and convenient disassembly of leads, which is suitable for the installation of ultra-high voltage large-capacity transformers.

CN116504506BActive Publication Date: 2026-07-17BAODING TIANWEI BAOBIAN ELECTRICAL

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
BAODING TIANWEI BAOBIAN ELECTRICAL
Filing Date
2023-06-12
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing high-voltage lead installation structure is complex, difficult to disassemble and maintain independently, and the placement process is cumbersome, which cannot meet the installation requirements of ultra-high voltage large-capacity transformers.

Method used

It adopts a modular positioning and installation structure, including lead wire, support frame, base, positioning pin and guide rail groove. By adjusting the pad and guide rail groove, the lead wire can be accurately inserted and removed, which facilitates modular maintenance.

Benefits of technology

It simplifies the installation process, improves the accuracy of lead wire placement, facilitates individual disassembly and maintenance, and meets the installation requirements of UHV large-capacity transformers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116504506B_ABST
    Figure CN116504506B_ABST
Patent Text Reader

Abstract

本发明涉及一种变压器引线模块化定位安装结构及安装方法,属于变压器结构设计技术领域。技术方案是:引线(1)是由垂直段(1.1)、水平段(1.2)和通向器身(8)的插入段(1.3)构成的一体结构,箱底(10)上设有两个定位钉(4),一个定位钉(4)位于引线(1)的垂直段(1.1)中心线与箱底(10)的垂直交点,另一个定位钉(4)位于引线(1)的水平段(1.2)和插入段(1.3)连接处中心点与箱底(10)的垂线交点;底座(3)上设有两个导轨槽(6),两个导轨槽(6)的方向与引线(1)的插入段(1.3)方向相同。本发明的有益效果是:可以将引线及器身模块化,便于维修、检查,同时可较精准的将引线安装到位。