A visual construction device and method of BIM

By designing BIM-based visual construction equipment that includes a water tank, water jet, nozzles, remote monitoring camera, and heat conduction system, the problem of limited functionality of existing equipment has been solved. This enables real-time monitoring of the construction environment, dust reduction, and motor cooling, thereby enhancing the overall functionality of the equipment.

CN116546168BActive Publication Date: 2026-11-24CHINA RAILWAY 21ST BUREAU GROUP FIFTH ENGINEERING CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310583030.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2026-11-24
Estimated Expiration
2043-05-23

AI Technical Summary

Technical Problem

Existing BIM visualization construction equipment is mainly a camera device that can only be used to monitor the construction situation, and its function is relatively simple.

Method used

A BIM-based visual construction device was designed, comprising a water tank, a water jet, a nozzle, a remote monitoring camera, a motor, and a heat conduction system. The motor drives the water jet to rotate, which in turn rotates the nozzle and the remote monitoring camera, thereby expanding the monitoring range. A water pump sprays water mist to suppress dust, and a filter plate and scraper are installed to remove debris. A heat conduction plate is used to dissipate heat from the motor.

Benefits of technology

It enables real-time monitoring and management of the construction environment, expands the monitoring range, reduces dust at the construction site, enhances the heat dissipation capacity of the equipment, and improves the overall function of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116546168B_ABST
    Figure CN116546168B_ABST
Patent Text Reader

Abstract

This invention discloses a BIM-based visual construction equipment and method, comprising a water tank. A drive frame is fixedly connected to the bottom of the water tank through an opening. A ventilated plate is fixedly connected to the lower inner wall of the drive frame. A motor is fixedly installed on the top of the ventilated plate. The output shaft of the motor is fixedly connected to a water column via a coupling. This invention relates to the field of BIM-based visual construction technology. This BIM-based visual construction equipment and method monitors the construction environment by activating a remote monitoring camera. Then, the motor is activated, causing the water column to rotate. The rotation of the water column causes the remote monitoring camera to rotate, thus expanding the monitoring range. The real-time monitoring images are transmitted to a remote viewing module and recorded in a BIM information storage module, allowing for real-time review and management of the project progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of BIM visualization construction technology, specifically to a BIM visualization construction device and method. Background Technology

[0002] BIM, also known as Building Information Modeling, is a new tool in architecture, engineering, and civil engineering. It describes computer-aided design that is primarily based on three-dimensional graphics, object-oriented, and related to architecture. BIM has visualization characteristics, meaning it's a "what you see is what you get" format. For the construction industry, the application of visualization has a significant impact. BIM provides a visualization approach, allowing people to transform previously linear components into three-dimensional, solid-state graphics. The construction industry also uses design renderings. Existing BIM visualization construction equipment is mainly a type of camera device that can only be used to monitor construction progress, with relatively limited functionality. Therefore, a new type of BIM visualization construction equipment needs to be designed to address these issues. Summary of the Invention

[0003] To address the shortcomings of existing technologies, this invention provides a BIM-based visual construction equipment and method, which solves the problem that existing BIM-based visual construction equipment is mainly a camera device that can only be used to monitor construction conditions, resulting in relatively limited functionality.

[0004] To achieve the above objectives, the present invention provides the following technical solution: a BIM-based visual construction device, comprising a water tank, a drive frame fixedly connected to the bottom of the water tank through an opening, a vent plate fixedly connected to the lower inner wall of the drive frame, a motor fixedly installed on the top of the vent plate, a water column fixedly connected to the output shaft of the motor via a coupling, a filter plate fixedly connected to the upper inner wall of the water tank, the top of the water column passing through the drive frame and the filter plate sequentially and extending to the outside of the water tank, L-shaped pipes connecting to the lower sides of the water column, a water pump fixedly installed on the surface of the water column, and nozzles rotatably connected to the sides, front, and rear of the water column via brackets, with a flexible hose connected to the end of the nozzle near the water column, and the end of the flexible hose near the water column connected to one side of the water column.

[0005] Preferably, the surface of the water column is provided with a reciprocating threaded groove, the surface of the reciprocating threaded groove is threaded with a threaded sleeve, both sides of the threaded sleeve are fixedly connected with a support plate, the top of the support plate is fixedly connected with a first traction rod, the top of the first traction rod is fixedly connected with a support ring, the top of the support ring is provided with ball grooves on both sides, front side and rear side, and balls are provided inside the ball grooves.

[0006] Preferably, telescopic rods are fixedly connected to both sides of the water tank, and the top of the telescopic rods is fixedly connected to the bottom of the support plate.

[0007] Preferably, a second traction rod is fixedly connected to both sides of the water column, and a scraper for use with the filter plate is fixedly connected to the bottom of the second traction rod.

[0008] Preferably, a first heat-conducting plate is fixedly connected to both sides of the motor, and a heat-conducting rod is fixedly connected to the side of the first heat-conducting plate away from the motor.

[0009] Preferably, the end of the heat-conducting rod away from the motor passes through the drive frame and extends into the interior of the water tank, and a second heat-conducting plate is fixedly connected to the end of the heat-conducting rod extending into the interior of the water tank.

[0010] Preferably, a remote monitoring camera is fixedly installed at one end of the water column extending outside the water tank. The output end of the remote monitoring camera is connected to the input end of the wireless transmission module. The output end of the wireless transmission module is connected to the input end of the remote viewing module. The output end of the remote viewing module is connected to the input end of the BIM information storage module. A rain shield is fixedly connected to the top of the remote monitoring camera.

[0011] Preferably, the left side of the water tank is fixedly connected to an inlet pipe through an opening.

[0012] Preferably, load-bearing columns are fixedly connected to both sides of the bottom of the water tank.

[0013] This invention also discloses a construction method for BIM-based visual construction equipment, specifically including the following steps:

[0014] S1. Start the remote monitoring camera to monitor the construction environment, then start the motor. The motor starts and drives the water column to rotate, which in turn drives the remote monitoring camera to rotate. The rotation of the remote monitoring camera expands the monitoring range. The remote monitoring camera transmits the real-time image to the remote viewing module through the wireless transmission module and records it in the BIM information storage module.

[0015] S2. Water is supplied to the water tank through the inlet pipe and the water pump is started. The water pump supplies water to the water column through two L-shaped pipes. After entering the water column, the water is transported to the hose and then sprayed out through the nozzle to achieve the dust suppression effect.

[0016] S3. Start the motor to make the water column rotate. The rotation of the water column drives the nozzle to rotate. The rotation of the nozzle can increase the water mist coverage area. The rotation of the water column causes the threaded sleeve to move up and down. The movement of the threaded sleeve drives the support plate to move. The movement of the support plate drives the first traction rod to move. The movement of the first traction rod causes the nozzle to flip up and down, which further expands the spraying range.

[0017] S4. Rainwater can fall into the water tank through the filter plate. When there is debris on the top of the filter plate, the motor is started. The motor starts and drives the water column to rotate. The rotation of the water column drives the second traction rod to rotate. The rotation of the second traction rod drives the scraper to move. The scraper moves to remove the debris from the top of the filter plate.

[0018] S5. The heat generated by the water column during startup is transferred to the first heat-conducting plate. The first heat-conducting plate then transfers the heat to the second heat-conducting plate via a heat-conducting rod. The second heat-conducting plate transfers the heat to the water inside the water tank through contact with the water, thereby achieving the effect of cooling the motor.

[0019] Beneficial effects

[0020] This invention provides a BIM-based visual construction device and method. Compared with existing technologies, it has the following advantages:

[0021] (1) The BIM visualization construction equipment and method monitors the construction environment by starting a remote monitoring camera, then starting a motor, which drives the water column to rotate, which in turn drives the remote monitoring camera to rotate, thus expanding the monitoring range. The real-time monitoring image is transmitted to the remote viewing module and recorded in the BIM information storage module, so that the project progress can be reviewed and managed in real time.

[0022] (2) The BIM-based visual construction equipment and method delivers water to the water tank through the inlet pipe and starts the water pump. The water pump delivers water to the water column through two L-shaped pipes. After entering the water column, the water is delivered to the hose and then sprayed out through the nozzle to achieve the dust reduction effect. At the same time, the motor is started to rotate the water column. The rotation of the water column drives the nozzle to rotate. The rotation of the nozzle can increase the coverage of the water mist. The rotation of the water column causes the threaded sleeve to move up and down. The movement of the threaded sleeve causes the nozzle to flip up and down, which further expands the spraying range. By setting a filter plate, rainwater can fall into the water tank through the filter plate. When there are debris on the top of the filter plate, the motor is started. The motor starts to drive the water column to rotate. The rotation of the water column drives the second traction rod to rotate. The rotation of the second traction rod drives the scraper to move. The movement of the scraper achieves the effect of scraping away the debris on the top of the filter plate.

[0023] (3) The BIM visualization construction equipment and method, by setting up a first heat-conducting plate, allows the heat emitted by the water column to be transferred to the first heat-conducting plate. The first heat-conducting plate then transmits the heat to the second heat-conducting plate through the heat-conducting rod. The second heat-conducting plate then transfers the heat to the water by contacting the water inside the water tank, thereby achieving the effect of cooling the motor. Attached Figure Description

[0024] Figure 1 This is a schematic diagram of the structure of the present invention;

[0025] Figure 2 This is a cross-sectional view of the water tank, drive box, and support ring structure of the present invention;

[0026] Figure 3 For the present invention Figure 2 A magnified view of a section at point A in the middle;

[0027] Figure 4 For the present invention Figure 2 A magnified view of a section at point B in the middle;

[0028] Figure 5 This is a top view of the support ring, ball groove, and ball structure of the present invention;

[0029] Figure 6 This is a bottom view of the structure of the water tank, drive frame, and ventilated plate of the present invention;

[0030] Figure 7 This is a structural principle block diagram of the system of the present invention.

[0031] In the diagram: 1. Water tank; 2. Drive frame; 3. Motor; 4. Filter plate; 5. Water column; 6. Water pump; 7. L-shaped pipe; 8. Nozzle; 9. Remote monitoring camera; 10. Rain shield; 11. Reciprocating threaded groove; 12. Threaded sleeve; 13. First traction rod; 14. Support ring; 15. Ball groove; 16. Ball; 17. Support plate; 18. Telescopic rod; 19. Second traction rod; 20. Scraper; 21. First heat conduction plate; 22. Heat conduction rod; 23. Second heat conduction plate; 24. Ventilation plate; 25. Water inlet pipe; 26. Load-bearing column; 27. Flexible hose; 28. Wireless transmission module; 29. ​​Remote viewing module; 30. BIM information storage module. Detailed Implementation

[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0033] Please see Figure 1-7 The present invention provides the following technical solutions:

[0034] Example 1

[0035] A BIM-based visualization construction device includes a water tank 1. A water inlet pipe 25 is fixedly connected to the left side of the water tank 1 via an opening. Load-bearing columns 26 are fixedly connected to both sides of the bottom of the water tank 1. A drive frame 2 is fixedly connected to the bottom of the water tank 1 via an opening. A ventilated plate 24 is fixedly connected to the lower inner wall of the drive frame 2. A motor 3 (servo motor) is fixedly installed on the top of the ventilated plate 24. The output shaft of the motor 3 is fixedly connected to a water-passing column 5 via a coupling. A filter plate 4 is fixedly connected to the upper inner wall of the water tank 1. The top of the water-passing column 5 passes through the drive frame 2 and the filter plate 4 and extends to the outside of the water tank 1. A remote monitoring camera 9 is fixedly installed at the end of the water-passing column 5 extending to the outside of the water tank 1. The remote monitoring camera 9 is a common camera on the market. The output end of the remote monitoring camera 9 is connected to the input end of the wireless transmission module 28. The output end of the wireless transmission module 28 is connected to the input end of the remote viewing module 29. The output end of the remote viewing module 29 is connected to the input end of the BIM information storage module 30. A rain shield 10 is fixedly connected to the top of the remote monitoring camera 9. L-shaped pipes 7 are connected to the lower sides of both sides of the water column 5. A water pump 6 is fixedly installed on the surface of the water column 5. Spray nozzles 8 are rotatably connected to both sides, front and rear of the water column 5 through brackets. A hose 27 is connected to the end of the spray nozzle 8 near the water column 5. The end of the hose 27 near the water column 5 is connected to one side of the water column 5.

[0036] Furthermore, in order to increase the spraying range, the surface of the water column 5 is provided with a reciprocating threaded groove 11, and a threaded sleeve 12 is threadedly connected to the surface of the reciprocating threaded groove 11. Support plates 17 are fixedly connected to both sides of the threaded sleeve 12. A first traction rod 13 is fixedly connected to the top of the support plate 17. A support ring 14 is fixedly connected to the top of the first traction rod 13. Ball grooves 15 are provided on both sides, front and rear sides of the top of the support ring 14. Balls 16 are provided inside the ball grooves 15. Telescopic rods 18 are fixedly connected to both sides of the water tank 1. The top of the telescopic rods 18 is fixedly connected to the bottom of the support plate 17.

[0037] Example 2

[0038] A BIM-based visual construction device includes a water tank 1. A water inlet pipe 25 is fixedly connected to the left side of the water tank 1 via an opening. Load-bearing columns 26 are fixedly connected to both sides of the bottom of the water tank 1. A drive frame 2 is fixedly connected to the bottom of the water tank 1 via an opening. A ventilated plate 24 is fixedly connected to the lower inner wall of the drive frame 2. A motor 3 (a servo motor) is fixedly installed on the top of the ventilated plate 24. The output shaft of the motor 3 is fixedly connected to a water-passing column 5 via a coupling. A filter plate 4 is fixedly connected to the upper inner wall of the water tank 1. The top of the water-passing column 5 passes through the drive frame 2 and the filter plate 4 sequentially. Plate 4 extends to the outside of water tank 1. A remote monitoring camera 9 is fixedly installed at one end of the water column 5 extending to the outside of water tank 1. The remote monitoring camera 9 is a common camera on the market. A rain shield 10 is fixedly connected to the top of the remote monitoring camera 9. L-shaped pipes 7 are connected to the lower sides of both sides of the water column 5. A water pump 6 is fixedly installed on the surface of the water column 5. Spray nozzles 8 are rotatably connected to both sides, front and rear of the water column 5 through brackets. A hose 27 is connected to the end of the spray nozzle 8 near the water column 5. The end of the hose 27 near the water column 5 is connected to one side of the water column 5.

[0039] Furthermore, in order to increase the spraying range, the surface of the water column 5 is provided with a reciprocating threaded groove 11, and a threaded sleeve 12 is threadedly connected to the surface of the reciprocating threaded groove 11. Support plates 17 are fixedly connected to both sides of the threaded sleeve 12. A first traction rod 13 is fixedly connected to the top of the support plate 17. A support ring 14 is fixedly connected to the top of the first traction rod 13. Ball grooves 15 are provided on both sides, front and rear sides of the top of the support ring 14. Balls 16 are provided inside the ball grooves 15. Telescopic rods 18 are fixedly connected to both sides of the water tank 1. The top of the telescopic rods 18 is fixedly connected to the bottom of the support plate 17.

[0040] Furthermore, in order to scrape away the debris on the top of the filter plate 4, a second traction rod 19 is fixedly connected to both sides of the water column 5, and a scraper 20 that works in conjunction with the filter plate 4 is fixedly connected to the bottom of the second traction rod 19.

[0041] Furthermore, in order to achieve the effect of heat dissipation for motor 3, a first heat-conducting plate 21 is fixedly connected to both sides of motor 3. The first heat-conducting plate 21 is made of aluminum. A heat-conducting rod 22 is fixedly connected to the side of the first heat-conducting plate 21 away from motor 3. The heat-conducting rod 22 is made of aluminum. The end of the heat-conducting rod 22 away from motor 3 passes through drive frame 2 and extends into the interior of water tank 1. A second heat-conducting plate 23 is fixedly connected to the end of the heat-conducting rod 22 extending into the interior of water tank 1. The second heat-conducting plate 23 is made of aluminum.

[0042] The advantage of Embodiment 2 over Embodiment 1 is that by setting up a filter plate 4, rainwater can fall into the water tank 1 through the filter plate 4. When there is debris on the top of the filter plate 4, the motor 3 is started. The motor 3 starts and drives the water column 5 to rotate. The rotation of the water column 5 drives the second traction rod 19 to rotate. The rotation of the second traction rod 19 drives the scraper 20 to move. The movement of the scraper 20 achieves the effect of scraping away the debris on the top of the filter plate 4. Furthermore, by setting up a first heat-conducting plate 21, the heat emitted by the water column 5 is transferred to the first heat-conducting plate 21. The first heat-conducting plate 21 transfers the heat to the second heat-conducting plate 23 through the heat-conducting rod 22. The second heat-conducting plate 23 transfers the heat to the water inside the water tank 1 through contact, thereby achieving the effect of cooling the motor 3.

[0043] This invention also discloses a construction method for BIM-based visual construction equipment, specifically including the following steps:

[0044] S1. Start the remote monitoring camera 9 to monitor the construction environment, and then start the motor 3. The motor 3 starts and drives the water column 5 to rotate. The rotation of the water column 5 drives the remote monitoring camera 9 to rotate. The rotation of the remote monitoring camera 9 achieves the effect of expanding the monitoring range. The remote monitoring camera 9 transmits the real-time image to the remote viewing module 29 through the wireless transmission module 28 and records it in the BIM information storage module 30.

[0045] S2. Water is supplied to the water tank 1 through the water inlet pipe 25, and the water pump 6 is started. The water pump 6 supplies water to the water column 5 through two L-shaped pipes 7. After entering the water column 5, the water is supplied to the hose 27 and then sprayed out through the nozzle 8 to achieve the dust suppression effect.

[0046] S3. Start the motor 3 to drive the water column 5 to rotate. The rotation of the water column 5 drives the nozzle 8 to rotate. The rotation of the nozzle 8 can increase the water mist coverage area. In addition, the rotation of the water column 5 causes the threaded sleeve 12 to move up and down. The movement of the threaded sleeve 12 drives the support plate 17 to move. The movement of the support plate 17 drives the first traction rod 13 to move. The movement of the first traction rod 13 causes the nozzle 8 to rotate up and down, which further expands the spraying range.

[0047] S4. Rainwater can fall into the water tank 1 through the filter plate 4. When there are debris on the top of the filter plate 4, the motor 3 is started. The motor 3 starts and drives the water column 5 to rotate. The rotation of the water column 5 drives the second traction rod 19 to rotate. The rotation of the second traction rod 19 drives the scraper 20 to move. The scraper 20 moves to achieve the effect of scraping away the debris on the top of the filter plate 4.

[0048] S5, the heat emitted by the water column 5 is transferred to the first heat-conducting plate 21. The first heat-conducting plate 21 transfers the heat to the second heat-conducting plate 23 through the heat-conducting rod 22. The second heat-conducting plate 23 transfers the heat to the water in the water tank 1 through contact with the water, thereby achieving the effect of cooling the motor 3.

[0049] Furthermore, any content not described in detail in this specification is existing technology known to those skilled in the art.

[0050] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A BIM-based visual construction device, comprising a water tank (1), characterized in that: The bottom of the water tank (1) is fixedly connected to a drive frame (2) through an opening. A breathable plate (24) is fixedly connected to the lower part of the inner wall of the drive frame (2). A motor (3) is fixedly installed on the top of the breathable plate (24). The output shaft of the motor (3) is fixedly connected to a water column (5) through a coupling. A filter plate (4) is fixedly connected to the upper part of the inner wall of the water tank (1). The top of the water column (5) passes through the drive frame (2) and the filter plate (4) in sequence and extends to the outside of the water tank (1). L-shaped pipes (7) are connected to the lower parts of both sides of the water column (5). A water pump (6) is fixedly installed on the surface of the water column (5). Spray nozzles (8) are rotatably connected to both sides, front and rear of the water column (5) through brackets. A hose (27) is connected to one end of the spray nozzle (8) near the water column (5). The end of the hose (27) near the water column (5) is connected to one side of the water column (5). A remote monitoring camera (9) is fixedly installed at one end of the water column (5) extending to the outside of the water tank (1). The output end of the remote monitoring camera (9) is connected to the input end of the wireless transmission module (28). The output end of the wireless transmission module (28) is connected to the input end of the remote viewing module (29). The output end of the remote viewing module (29) is connected to the input end of the BIM information storage module (30). The surface of the water column (5) is provided with a reciprocating threaded groove (11), and a threaded sleeve (12) is threadedly connected to the surface of the reciprocating threaded groove (11). A support plate (17) is fixedly connected to both sides of the threaded sleeve (12). A first traction rod (13) is fixedly connected to the top of the support plate (17). A support ring (14) is fixedly connected to the top of the first traction rod (13). Ball grooves (15) are provided on both sides, front side and rear side of the top of the support ring (14). Balls (16) are provided inside the ball grooves (15). Both sides of the water tank (1) are fixedly connected to telescopic rods (18), and the top of the telescopic rods (18) is fixedly connected to the bottom of the support plate (17). The water column (5) is fixedly connected to both sides with a second traction rod (19), and the bottom of the second traction rod (19) is fixedly connected to a scraper (20) that works in conjunction with the filter plate (4). Both sides of the motor (3) are fixedly connected to a first heat-conducting plate (21), and a heat-conducting rod (22) is fixedly connected to the side of the first heat-conducting plate (21) away from the motor (3). The end of the heat-conducting rod (22) away from the motor (3) passes through the drive frame (2) and extends into the interior of the water tank (1). The end of the heat-conducting rod (22) extending into the interior of the water tank (1) is fixedly connected to a second heat-conducting plate (23).

2. The BIM-based visualization construction equipment according to claim 1, characterized in that: The top of the remote monitoring camera (9) is fixedly connected to a rain shield (10).

3. The BIM-based visualization construction equipment according to claim 2, characterized in that: The water tank (1) has an inlet pipe (25) fixedly connected to its left side by opening.

4. The BIM-based visualization construction equipment according to claim 3, characterized in that: The bottom of the water tank (1) is fixedly connected to two load-bearing columns (26) on both sides.

5. The construction method executed by BIM-based visual construction equipment according to claim 4, characterized in that: Specifically, the following steps are included: S1. Start the remote monitoring camera (9) to monitor the construction environment, and then start the motor (3). The motor (3) starts and drives the water column (5) to rotate. The rotation of the water column (5) drives the remote monitoring camera (9) to rotate. The rotation of the remote monitoring camera (9) achieves the effect of expanding the monitoring range. The remote monitoring camera (9) transmits the real-time image to the remote viewing module (29) through the wireless transmission module (28) and records it in the BIM information storage module (30). S2. Water is supplied to the water tank (1) through the inlet pipe (25), and the water pump (6) is started. The water pump (6) supplies water to the water column (5) through two L-shaped pipes (7). After entering the water column (5), the water is supplied to the hose (27) and then sprayed out through the nozzle (8) to achieve the dust reduction effect. S3. Start the motor (3) to make the motor (3) drive the water column (5) to rotate. The rotation of the water column (5) drives the nozzle (8) to rotate. The rotation of the nozzle (8) can increase the water mist coverage area. The rotation of the water column (5) causes the threaded sleeve (12) to move up and down. The movement of the threaded sleeve (12) drives the support plate (17) to move. The movement of the support plate (17) drives the first traction rod (13) to move. The movement of the first traction rod (13) causes the nozzle (8) to flip up and down. At this time, the effect of expanding the spraying range is further achieved. S4. Rainwater can fall into the interior of the water tank (1) through the filter plate (4). When there are debris on the top of the filter plate (4), the motor (3) is started. The motor (3) starts and drives the water column (5) to rotate. The rotation of the water column (5) drives the second traction rod (19) to rotate. The rotation of the second traction rod (19) drives the scraper (20) to move. The movement of the scraper (20) achieves the effect of scraping away debris on the top of the filter plate (4). S5. The heat emitted by the water column (5) is transferred to the first heat-conducting plate (21). The first heat-conducting plate (21) transfers the heat to the second heat-conducting plate (23) through the heat-conducting rod (22). The second heat-conducting plate (23) transfers the heat to the water by contacting the water inside the water tank (1), thereby achieving the effect of cooling the motor (3).

Citation Information

Patent Citations

  • Monitoring device for building intelligent engineering construction

    CN216825445U

  • Remote supervision device for BIM construction

    CN217684111U