A device and method for automatically turning over a dredging discharge pipe on water
By using an automatic flipping device and method, the buoyancy difference of airbags and magnetic adsorption are utilized to achieve automatic flipping of dredging and sludge discharge steel pipes on water. This solves the problems of low flipping efficiency and poor safety in existing technologies, improves flipping efficiency and accuracy, and reduces costs.
Patent Information
- Application Number
- CN202310508943.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-05-08
AI Technical Summary
Existing methods for overturning steel pipes used in water dredging and sludge removal are cumbersome, inefficient, labor-intensive, and dangerous, and it is difficult to precisely control the overturning angle.
An automatic flipping device is adopted, which includes an operation box, an inflatable airbag, an inflation tube, and an airbag connecting rope. The steel tube is automatically flipped by controlling the inflation and deflation of the airbag. The operation box is fixed by magnetic attraction, and the airbag is flipped by controlling the buoyancy difference of the airbag in combination with the air compressor.
It improves the efficiency of flipping, reduces labor intensity and equipment investment, enhances the accuracy of the flipping angle, extends the service life of steel pipes, and reduces pipeline costs.
Smart Images

Figure CN116553453B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of dredging engineering technology, and in particular to a device and method for automatically flipping steel pipes used for dredging and sludge removal on water. Background Technology
[0002] Dredgers use floating sludge pipelines to transport dredged soil. These pipelines typically consist of steel pipes encased in PE float material that float on the water. Multiple sections of steel pipe are connected by flanges to form the sludge pipeline. For soil materials such as sand, gravel, and rocks, these materials mainly settle at the bottom of the steel pipe and are transported by the water flow, causing impact and wear on the bottom of the steel pipe. Therefore, the bottom of the steel pipe experiences more severe wear than other parts. To ensure uniform wear across all parts of the steel pipe and extend its service life, the pipeline needs to be rotated after a period of transport.
[0003] The current method for pipeline flipping involves cutting the steel pipe on the water into small sections, using steel wire ropes on an anchor boat to connect the bolt holes at appropriate positions on the flange of the steel pipe, lifting the steel pipe with the anchor boat, and flipping the steel pipe under gravity. Then, the multiple small sections of the pipeline are connected into a whole, with the flipping angle of the pipeline being 120° or 180°.
[0004] This method involves steps such as dismantling the sludge discharge pipeline, lifting and flipping small sections of the pipeline, and reassembling each section of the pipeline. The process is complicated and inefficient, requiring the use of multiple anchor boats. Furthermore, the labor intensity for workers is high, the operation is dangerous, and the flipping angle is difficult to control precisely. Summary of the Invention
[0005] In view of the above technical problems, the present invention provides a device and method for automatically reversing steel pipes used for dredging and sludge removal on water to improve pipeline reversing efficiency.
[0006] The present invention provides a device for automatically flipping steel pipes for dredging and sludge removal on water, characterized in that it includes an operation box, an inflatable airbag, an inflation pipe and an airbag connecting rope, wherein the inflatable airbag is connected to the airbag connecting rope and the inflatable airbag is connected to the operation box through the inflation pipe.
[0007] The control box includes a control box body, an air inflator connector, an air compressor connector, a magnetic switch knob, and a magnet. The magnet is installed inside the control box body. The air inflator connectors are connected to the left and right sides of the control box body, and the air compressor connector is connected to the top of the control box body. The magnetic switch knob is connected to the front of the control box body. The control box body is attached to the top of the steel pipe by the magnet.
[0008] The present invention provides a device for automatically flipping the steel pipe for dredging and sludge discharge on water, characterized in that it further includes an air compressor and a valve, wherein the air supply pipe of the air compressor and the air compressor pipe joint are connected through the valve.
[0009] The number of operation boxes is 1, the number of inflatable airbags is 3, the number of inflation tubes is 3, the number of airbag connecting ropes is 3, and the airbag connecting ropes are elastic.
[0010] The number of air inflator pipe connectors is 3, and the number of air compressor pipe connectors is 3.
[0011] The inflatable airbag is marked with symbols A, B, and C at both ends, and the air compressor pipe joint is also marked with symbols A, B, and C.
[0012] This invention provides a method for automatically flipping steel pipes used for dredging and sludge removal on water, the specific steps of which are as follows:
[0013] Step 1: Install the flipping device and mark the air compressor pipe joint and both ends of the inflatable air bag with symbols A, B, and C;
[0014] Step 2: The staff approaches the pipe section equipped with the tilting device by riding in a vehicle, turns off the magnetic switch knob, removes the control box and places it on the vehicle, connects the air compressor's air supply pipe to the air compressor pipe connector marked with the symbol B on the control box, opens the valve of the air compressor pipe connector marked with the symbol B to start inflating, and the air bladder at the bottom of the steel pipe continuously expands. At the same time, the valve of the air compressor pipe connector marked with the symbol A is opened to start deflating, and the air bladder marked with the symbol A continuously shrinks in volume.
[0015] Step 3: When the buoyancy of the sludge discharge steel pipe is unbalanced on the left and right sides, the steel pipe equipped with the overturning device will overturn along with other pipe sections. After the sludge discharge steel pipe stabilizes and is overturned 120° from the previous position, the crew will close the valve of the air compressor pipe joint marked with symbols A and B, disconnect the air compressor air supply pipe, place the control box back on top of the steel pipe, and turn on the magnetic switch knob to make the control box firmly attached to the steel pipe. When the sludge discharge steel pipe needs to be overturned again, repeat the above operation to achieve the three-sided overturning of the sludge discharge pipe.
[0016] Step 4: After the dredging operation is completed, the staff board the anchor boat, open the valves of each air compressor pipe joint on the control box, deflate each airbag, disconnect the inflation pipe connected to the control box, turn off the magnetic switch knob, remove the control box, disconnect the airbag connecting ropes of the two upper airbags, and pull the three airbags together onto the anchor boat deck.
[0017] The beneficial effects of this invention are as follows: This invention provides a device and method for automatically flipping dredging and sludge discharge steel pipes on water. The automatic flipping device for dredging and sludge discharge steel pipes consists of an operating box, three inflatable airbags, three airbag connecting ropes, and three inflation pipes. The three inflatable airbags are connected by the airbag connecting ropes, and each airbag is connected to the operating box via an inflation pipe. The airbag connecting ropes have a certain degree of elasticity and can maintain a certain tension. The operating box consists of an operating box body, an inflation pipe connector, an air compressor pipe connector, and a magnetic switch knob. A magnet is installed inside the operating box body, and the magnetic switch and magnetic force can be controlled by rotating the magnetic switch knob, thereby realizing the adsorption and fixation of the operating box on the top of the pipeline and its detachment. Three inflation pipe connectors are installed on both sides of the operating box body, and each inflation pipe connector can be connected to an inflation pipe. Three air compressor pipe connectors are installed on the upper part of the operating box body, and each air compressor pipe connector is equipped with a valve control connector. The system allows for the connection of each air compressor pipe joint to the air compressor's air delivery pipe. Steel pipes equipped with automatic tilting devices are inserted between steel pipes with PE floats installed, with one section installed at intervals. The air compressor inflates the two upper air bladders while keeping the bottom air bladder deflatable, ensuring the stability of the dredging and sludge removal pipe. The system maintains a constant state of two inflated air bladders and one deflated air bladder. By switching the inflation state of the three inflated air bladders, the dredging and sludge removal steel pipe can be automatically tilted. Compared to existing technologies, the raw materials for the tilting device are readily available and inexpensive. Furthermore, the tilting device is easy to manufacture, transport, and install. This invention provides a simple and efficient method for automatically tilting dredging and sludge removal steel pipes, accelerating the tilting process, reducing investment in ship machinery and equipment, decreasing crew workload, improving tilting angle accuracy, extending pipe lifespan, and reducing pipeline costs. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the automatic overturning device for dredging and sludge discharge steel pipes of the present invention.
[0019] Figure 2 This is a schematic diagram of the operating box structure of the present invention;
[0020] Figure 3 This is a schematic diagram showing the automatic flipping device of the present invention after installation;
[0021] Figure 4 This is a schematic diagram of the automatic flipping device of the present invention being inflated and stabilized.
[0022] Figure 5 This is a schematic diagram of the water-based sludge discharge steel pipe of the present invention before it is flipped over;
[0023] Figure 6 This is a schematic diagram showing the completion of the water-based sludge removal steel pipe flipping process of the present invention;
[0024] Figure 7 This is a three-dimensional structural schematic diagram of the automatic overturning device for dredging and sludge removal steel pipes of the present invention;
[0025] Figure 8 This is a three-dimensional schematic diagram of the connection between the various pipe sections of the water pipe of the present invention;
[0026] Figure 9 This is a three-dimensional schematic diagram of the automatic flipping device of the present invention after installation.
[0027] Attached reference numerals: 1-Control box body, 2-Inflation pipe connector, 3-Air compressor pipe connector, 4-Magnetic switch knob, 5-Inflation airbag, 6-Airbag connecting rope, 7-Inflation pipe, 8-Steel pipe, 9-Water surface, 10-PE float. Detailed Implementation
[0028] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings.
[0029] Example 1
[0030] Introduction to the traditional pipeline overturning method: A cutter suction dredger was dredging medium-coarse sand, which was then transported to the reclamation area via a surface sludge discharge pipeline. The surface sludge discharge pipeline was 792m long and 800mm in diameter, using a single 6m steel pipe section encased in PE floats, with each section connected by flanges. Based on construction experience, the wear rate at the bottom of the steel pipe during the transport of medium-coarse sand is approximately 0.1mm / 10,000 cubic meters. After two months of construction and the transport of 900,000 cubic meters of medium-coarse sand, the wear on the steel pipe wall was approximately 9mm, down from the original 16mm, leaving a remaining wall thickness of 7mm. Continued wear posed a risk of pipe bursting, therefore, pipeline overturning was immediately initiated. Two anchor boats and six pipeline workers were deployed. The pipeline workers cut the 792m long water pipeline into eight 99m sections, which took 0.5 days. Then, the two anchor boats lifted both ends of each section and rotated each section 120°, which took 0.5 days. The pipeline workers then reconnected the sections, which took 0.5 days. Therefore, the entire pipeline rotation took 1.5 days.
[0031] Example 2
[0032] Introduction to the traditional pipeline overturning method: A cutter suction dredger was dredging medium-coarse sand, which was then transported to the reclamation area via an above-water sludge discharge pipeline. The pipeline was 854m long and 900mm in diameter, using a single 7m steel pipe section encased in PE floats, with each section connected by flanges. Based on construction experience, the wear rate at the bottom of the steel pipe during medium-coarse sand transport is approximately 0.1mm / 10,000 cubic meters. After two months of construction and transporting 1 million cubic meters of medium-coarse sand, the steel pipe wall thickness had worn down by approximately 10mm, from an original thickness of 18mm to a remaining thickness of 8mm. Continued wear posed a risk of pipe bursting, therefore, pipeline overturning was immediately initiated. Two anchor boats and six pipeline workers were deployed. The pipeline workers cut the 854m long water pipeline into seven sections, each 122m long, which took 0.8 days. Then, the two anchor boats lifted both ends of each section and rotated each section 120°, which took 0.8 days. The pipeline workers then reconnected the sections, which took another 0.8 days. Therefore, the entire pipeline rotation took 2.4 days.
[0033] Example 3
[0034] The method for pipeline reversal using this invention is described below:
[0035] Installation and fabrication of a turning device for dredging and sludge removal steel pipes on water:
[0036] like Figure 7 As shown, the automatic tilting device for dredging and sludge removal steel pipes consists of one control box, three inflatable airbags 5, three connecting ropes 6 for the airbags, and three inflation pipes 7. Each inflatable airbag 5 is 0.4m wide and 5m long. The three airbags 5 are connected by six connecting ropes 6. Each airbag 5 is connected to the control box via an inflation pipe 7, which is 3m long. The connecting ropes 6 have a certain degree of elasticity to maintain a certain tension. The ends of each inflatable airbag 5 are marked with A, B, and C symbols, and their volume can be significantly increased when inflated. The control box consists of a control box body 1, an inflation pipe connector 2, an air compressor pipe connector 3, and four sets of magnetic switch knobs. The control box 1 measures 0.2m × 0.2m × 0.3m. A magnet is installed inside the control box 1, and the magnetic force and intensity can be controlled by rotating the magnet switch knob 4. Three air inlet pipe connectors 2 are installed on both sides of the control box 1, each marked with A, B, or C. Each air inlet pipe connector 2 can be connected to an air inlet pipe 7. Three air compressor pipe connectors 3 are installed on the top of the control box 1, each equipped with a valve to control the opening and closing of the connector. Each air compressor pipe connector 3 can be connected to the air compressor's air delivery pipe, and each air compressor pipe connector 3 is marked with A, B, or C.
[0037] like Figure 8As shown, when the dredging and sludge discharge steel pipe overturning device is assembled on the water pipeline, the steel pipe with the overturning device is inserted between the steel pipes with PE floats 10 installed, one section is installed every 60m, and a total of 13 sets of overturning devices are installed. The installation of each set of overturning devices is achieved as follows: three air inflators 7 are installed on the corresponding air inflator joints 2 of the operation box according to the symbols A, B, and C. The three air inflators 5 are tightly connected and fixed to the steel pipe wall through the three air inflator connecting ropes 6. The air inflator 5 marked with symbol B is placed at the bottom of the steel pipe. The magnetic switch knob is turned on, and the operation box is placed and adsorbed on the top of the steel pipe.
[0038] like Figure 9 As shown, after the water pipe is lowered into the water, the air compressor's air delivery pipe connects to air compressor pipe connector 3 marked with symbols A and C on the control box. Opening the valve on air compressor pipe connector 3 (marked with symbols A and C) begins inflation. The air bladders marked with symbols A and C continuously expand, their lower ends submerged in the water providing equal buoyancy, thus stabilizing the water pipe. When the water pipe slightly tilts, the difference in buoyancy on both sides allows the water pipe to return to its original position. Close the valve on the air compressor pipe connector (marked with symbols A and C) and disconnect the air compressor's air delivery pipe.
[0039] Example 4
[0040] The steps to achieve the overturning of the sludge discharge steel pipe on the water:
[0041] The crew members approached the pipe section equipped with the tipping device in the transport boat, turned off the magnetic switch knob 4, removed the control box and placed it on the transport boat, connected the air compressor supply pipe to the air compressor pipe connector 3 marked with the symbol B on the control box, opened the valve of the air compressor pipe connector 3 marked with the symbol B to start inflating, and the air bladder 5 at the bottom of the steel pipe continued to expand. At the same time, the valve of the air compressor pipe connector 3 marked with the symbol A was opened to start deflating, and the volume of the air bladder marked with the symbol A continued to shrink.
[0042] At this time, the buoyancy of the sludge discharge steel pipe on both sides is unbalanced. The steel pipe equipped with the tilting device tilts along with other pipe sections. After the sludge discharge steel pipe stabilizes, it tilts 120° from the previous posture. The crew closes the valve of the air compressor pipe joint 3 marked with symbols A and B, disconnects the air compressor air supply pipe, and places the control box back on top of the steel pipe. The magnetic switch knob 4 is turned on to make the control box firmly attached to the steel pipe. The operation time of a single tilting device is about 20 minutes. The total operation time of 13 tilting devices is about 4.5 hours, which is 7 times more efficient than the 36 hours in the traditional method in Example 1 and 11.8 times more efficient than the 57.6 hours in Example 2.
[0043] Example 5
[0044] Dismantling steps for the overturning device of the dredging and sludge discharge steel pipe:
[0045] After the dredging operation is completed, the crew boarded the anchor boat, opened the valves of each air compressor pipe joint 3 on the control box, deflated each airbag, removed the inflation pipe connected to the control box, closed the magnetic switch knob 4, removed the control box, disconnected the airbag connecting ropes of the two upper inflatable airbags 5, and pulled the three inflatable airbags 5 together onto the anchor boat deck.
[0046] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. The various components mentioned in this invention are common technologies in the existing field. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.
Claims
1. A method for automatically rotating a dredging and sludge discharge steel pipe on water, comprising the following steps: Step 1: Install the flipping device, which includes an operation box, an inflatable airbag, an inflation tube, and an airbag connecting rope. The inflatable airbag is connected to the airbag connecting rope, and the inflatable airbag is connected to the operation box through the inflation tube. The control box includes a control box body, an air inflator connector, an air compressor connector, a magnetic switch knob, and a magnet. The magnet is installed inside the control box body. The air inflator connectors are connected to the left and right sides of the control box body, the air compressor connector is connected to the top of the control box body, and the magnetic switch knob is connected to the front of the control box body. The control box body is attached to the top of the steel pipe by the magnet. The overturning device also includes an air compressor and a valve, and the air supply pipe of the air compressor is connected to the air compressor pipe joint through the valve; Furthermore, the air compressor pipe joints and both ends of the inflatable airbag are marked with symbols A, B, and C; Step 2: The staff approaches the pipe section equipped with the tilting device by riding in a vehicle, turns off the magnetic switch knob, removes the control box and places it on the vehicle, connects the air compressor's air supply pipe to the air compressor pipe connector marked with the symbol B on the control box, opens the valve of the air compressor pipe connector marked with the symbol B to start inflating, and the air bladder at the bottom of the steel pipe continuously expands. At the same time, the valve of the air compressor pipe connector marked with the symbol A is opened to start deflating, and the air bladder marked with the symbol A continuously shrinks in volume. Step 3: When the buoyancy of the sludge discharge steel pipe is unbalanced on the left and right sides, the steel pipe equipped with the overturning device will carry other pipe sections and overturn. After the sludge discharge steel pipe stabilizes and overturns 120º from the previous posture, the crew will close the valve of the air compressor pipe joint marked with symbols A and B, disconnect the air compressor air supply pipe, place the control box back on top of the steel pipe, and turn on the magnetic switch knob to make the control box firmly attached to the steel pipe. When the sludge discharge steel pipe needs to be overturned again, repeat the above operation to achieve the three-sided overturning of the sludge discharge pipe. Step 4: After the dredging operation is completed, the staff board the anchor boat, open the valves of each air compressor pipe joint on the control box, deflate each airbag, disconnect the inflation pipe connected to the control box, turn off the magnetic switch knob, remove the control box, disconnect the airbag connecting ropes of the two upper airbags, and pull the three airbags together onto the anchor boat deck.
Citation Information
Patent Citations
Drainage device and biological sewage treatment system
CN112174298A