Arch bridge outer package concrete web form construction method and its web form

By assembling and hoisting large formwork panels on the ground, the problems of limited construction space and high safety risks of high-altitude operations in the construction of web formwork for long-span rigid arch bridges were solved, achieving high-quality concrete surface forming and improved construction efficiency.

CN116556217BActive Publication Date: 2026-11-24GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310669948.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-07
Publication Date
2026-11-24
Estimated Expiration
2043-06-07

AI Technical Summary

Technical Problem

When constructing the web formwork of a long-span rigid frame arch bridge, the construction space on the arch is small, the construction operation conditions are limited, the safety risks of working at height are high, and it is difficult to guarantee the construction quality.

Method used

The outer template units are assembled on the ground and cut according to the arch rib line to form large template blocks. These blocks are then hoisted to the installation location for longitudinal splicing, reducing the process of cutting and assembling on the arch. Type I and Type II templates are used alternately to match the arch box curve and variable height line.

Benefits of technology

It improved the quality of template splicing and the flatness of the formed concrete surface, reduced the safety risks of high-altitude operations, improved construction efficiency and quality, and reduced the consumption of manpower and material resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116556217B_ABST
    Figure CN116556217B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of arch bridge outer concrete construction, and particularly relates to a kind of arch bridge outer concrete variable high curve web construction method, comprising: on ground group splicing preparation several outside formwork units, the outside formwork unit height is greater than arch ring section web pouring height;According to arch rib linear type, the outside formwork unit is first matched;Then the outside formwork unit is hoisted to the position to be installed, and splicing along the longitudinal direction of arch rib is carried out until the segment to be poured is covered.Forming large block module, ground assembly is not affected by construction space, construction operation is easy, can improve formwork splicing quality, improve the smoothness of forming concrete surface, aesthetic degree, at the same time, reduce the process of arch cutting and scattered splicing, reduce the safety risk of high-altitude work, in addition, large block module is matched according to arch rib linear type on ground, can directly adapt to arch box curve and variable height linear type, overall improve the web formwork construction efficiency and quality;The present application also relates to the web formwork using the above construction method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of construction technology for the outer concrete cladding of arch bridges, and particularly to a construction method for the web formwork of the outer concrete cladding of arch bridges and the web formwork thereof. Background Technology

[0002] Since its invention in 1898, the span of rigid-frame concrete arch bridges has been increasing at an average rate of 1.5m per year. Due to its advantages such as high stiffness, insensitivity to daily temperature differences, good durability, and reasonable cost, building rigid-frame concrete arch bridges with larger spans has become the primary choice for shortening time and space distances.

[0003] Long-span stiffened arch bridges require the steel pipe truss or steel-concrete composite structure to be used as the main load-bearing components after the steel pipe truss construction is completed. External formwork is used for the pouring of concrete. Unlike conventional box girders or continuous steel structures, the stiffened frame is a box structure that gradually decreases in height from bottom to top with the arch ribs and is curved. Because the concrete used for the external frame is relatively heavy, it is not possible to load the concrete in one go. Therefore, it is generally poured in three rings: bottom slab, web slab, and top slab.

[0004] For the construction of the web of traditional long-span stiffened concrete arch bridges, the height of the arch ring section gradually decreases from the arch foot to the arch crown due to the characteristic that the arch rib gradually decreases. Generally, a method of assembling formwork on the arch is adopted, with the outer and inner formwork of the web being built in sections to match the formwork with the arch rib line. However, the construction space on the arch is narrow, and the construction operation conditions are extremely limited. The safety risks of working at height on the outer side of the web are high. Moreover, as the span of the stiffened concrete arch bridge increases, the number of formwork pieces increases. The traditional assembly process of formwork is not only cumbersome and affects the construction period, but also makes it difficult to guarantee the construction quality. It is difficult to match the increasing height and curved characteristics of the stiffened frame, and problems such as misalignment of splice joints, grout leakage, and local bulging of formwork are prone to occur. This leads to defects such as misalignment on the surface of the cast concrete, which greatly affects the appearance and quality of the concrete surface.

[0005] Therefore, there is an urgent need for a technical solution to address the technical problems of existing large-span stiffened arch bridge web formwork construction, such as limited construction space on the arch, restricted construction operation conditions, high safety risks of high-altitude operations, and difficulty in ensuring construction quality. Summary of the Invention

[0006] The purpose of this invention is to address the technical problems of existing large-span stiffened arch bridge web formwork construction, such as limited construction space on the arch, restricted construction operation conditions, high safety risks of high-altitude operations, difficulty in matching the height variation curve characteristics of the stiffened frame, and difficulty in ensuring construction quality. This invention provides a method for constructing an outer concrete web formwork for an arch bridge and its web formwork.

[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A method for constructing an outer concrete web formwork for an arch bridge includes: assembling and preparing several outer formwork units on the ground, wherein the height of the outer formwork units is greater than the pouring height of the web section of the arch ring; cutting the outer formwork units in one go according to the arch rib profile; and then hoisting the outer formwork units to the installation position and splicing them along the longitudinal direction of the arch rib until they cover the section to be poured.

[0008] This invention discloses a construction method for the external concrete web formwork of an arch bridge. Before constructing the web formwork, outer modular units are assembled on the ground. Each outer template unit covers multiple template splicing seams along the casting height of the web section of the arch ring, forming large modules. Ground assembly is unaffected by construction space, facilitating construction operations and improving the quality of template splicing, as well as the flatness and aesthetics of the formed concrete surface. Simultaneously, the large templates are hoisted to their position and longitudinally spliced, reducing the need for piecemeal assembly on the arch and lowering the safety risks of high-altitude operations. Furthermore, since the large modules are cut according to the arch rib shape on the ground, the hoisted modules can be spliced ​​using folding instead of bending, directly adapting to the arch box curve and variable height lines. Overall, this improves the efficiency and quality of web formwork construction while reducing manpower and material consumption.

[0009] As a preferred embodiment of the present invention, the first cutting includes: cutting the top edge of the outer template unit to form a first type of template; the first cutting includes: cutting the top edge and the left / right edge of the outer template unit to form a second type of template; the first type of template and the second type of template can be matched with the arch rib line shape by arrangement and combination. By combining two different shaped templates, a better match between the template and the arch box curve and the variable height line shape can be achieved.

[0010] As a preferred embodiment of the present invention, the arrangement includes: alternately setting the first type of template and the second type of template along the longitudinal direction of the arch rib. This achieves a continuous change in the linear shape after combining the two types of templates, using folds instead of curves to achieve a good match with the arch box curve.

[0011] As a preferred embodiment of the present invention, the arch foot sides of both the first-type and second-type templates are designed with right-angled sides to ensure accurate template installation and ease of construction.

[0012] As a preferred embodiment of the present invention, the outer template unit is re-cut according to the arch rib shape of the next installation position during turnover. This allows the outer template unit to be reused, reducing the total amount of templates required for web formwork construction and lowering the construction cost of web formwork.

[0013] As a preferred embodiment of the present invention, the secondary cutting includes: cutting the top edge of the first type of template; and cutting the top edge and the oblique edge of the second type of template. This achieves a better match between the outer template unit and the increased height and curved features of the arch rib at the next construction location through fewer and simpler cutting processes.

[0014] In a preferred embodiment of the present invention, after the first and second cutting, a reinforcing member is provided flush with the top edge of the outer template unit to ensure the overall structural strength of the outer template unit.

[0015] In a preferred embodiment of the present invention, the outer template unit is installed before the inner template, and the inner template is formed by assembling template components layer by layer from bottom to top. This allows the outer template unit to provide external shielding for the rigid frame arch box, providing more construction space for the installation of the inner template and reducing the risks of high-altitude operations on the arch.

[0016] In a preferred embodiment of the present invention, after each outer template unit is fixed to the inner template tie rod, adjacent outer template units are welded together using connectors. This connects all outer template units into a whole.

[0017] As a preferred embodiment of the present invention, after the outer template unit is hoisted to the installation position, it is adjusted in angle to match the arch rib profile using a hoist. This reduces the difficulty of turning the outer template unit at the arch top angle, allowing the outer template unit to be fixed while maintaining its alignment with the arch rib profile, thus better matching the height variation and curved features of the arch rib.

[0018] An arch bridge external concrete web formwork includes an inner formwork and an outer formwork. The outer formwork includes several outer formwork units. The outer formwork units are cut into first-class and second-class formwork in one step according to the arch rib line. Several first-class and second-class formworks are alternately arranged along the longitudinal direction of the arch rib and are cut a second time according to the arch rib line of the installation position to match the arch rib line.

[0019] This invention provides an outer concrete web formwork for arch bridges. The height of the outer formwork unit is greater than the pouring height of the web section of the arch ring, forming a large formwork block. This reduces the difficulty of splicing on the arch and results in higher quality web formwork splicing. It can improve the flatness and aesthetics of the formed concrete surface. At the same time, it can reduce the process of cutting and splicing on the arch, reducing the safety risks of high-altitude operations. In addition, it can directly adapt to the arch box curve and variable height alignment through cutting, thus improving the overall construction efficiency and quality of the web formwork and reducing the consumption of manpower and material resources.

[0020] In a preferred embodiment of the present invention, the outer template unit includes a panel, a longitudinal distribution beam, and a transverse back rib arranged sequentially in the thickness direction, wherein the panel comprises a plurality of matrix-jointed building templates. This allows for the assembly of multiple building templates to form a large template block.

[0021] In summary, due to the adoption of the above technical solutions, the beneficial effects of the present invention's method for constructing an arch bridge with external concrete web formwork are: 1. By assembling the outer module units on the ground before constructing the web formwork, each outer module unit covers multiple formwork splicing joints on the web pouring height of the arch section, forming large modules. Ground assembly is not affected by the construction space, making construction easy and improving the quality of formwork splicing, as well as the flatness and aesthetics of the formed concrete surface. 2. Large formwork panels are hoisted to their location and then longitudinally spliced, reducing the need for disassembly and assembly on the arch and lowering the safety risks associated with working at heights. 3. The large modules were cut and matched on the ground according to the arch rib line, so that the large modules could be hoisted to the position and spliced ​​by folding instead of bending, which could directly adapt to the arch box curve and variable height line, thus improving the construction efficiency and quality of the web formwork. The beneficial effects of the arch bridge external concrete web formwork of the present invention are: The above-mentioned web formwork construction method results in high-quality web formwork splicing, which improves the flatness and aesthetics of the formed concrete surface. At the same time, it reduces the process of cutting and splicing on the arch, lowers the safety risks of high-altitude operations, and can directly adapt to the arch box curve and variable height alignment, thereby improving the overall efficiency and quality of web formwork construction and reducing the consumption of manpower and material resources. Attached Figure Description

[0022] Figure 1 This is a flowchart illustrating a construction method for the external concrete web formwork of an arch bridge, as described in Example 1. Figure 2 This is a schematic diagram of the cutting of a corresponding type of template in Example 1; Figure 3 This is a schematic diagram of the matching and cutting of the corresponding two types of templates in Example 1; Figure 4 This is a structural schematic diagram of a type of template described in Example 1; Figure 5 This is a schematic diagram of the structure of the two types of templates described in Example 1; Figure 6 This is a top view of the outer template unit described in this invention; Figure 7 This is a schematic diagram of the structure of the combination of type I template and type II template in this invention; Figure 8 yes Figure 7 A magnified structural diagram of part A in the middle; Figure 9 This is a structural schematic diagram of the outer template unit with reinforcing members in Embodiment 3; Figure 10This is a diagram illustrating the usage of the concrete web formwork for an arch bridge as described in Example 6. Figure 11 This is a schematic diagram of the hoisting state structure of the outer template unit described in this invention; Figure 12 This is a structural schematic diagram of the installation process of the outer template unit described in this invention.

[0023] icon: 1-Outer formwork unit, 11-Class I formwork, 12-Class II formwork, 13-Panel, 14-Distribution beam, 15-Back rib, 2-Cutting line, 3-Reinforcing member, 4-Inner formwork, 5-Outer formwork, 6-Tie rod, 7-Arch rib, 8-Connector, 9-Lifting hoist tool. Detailed Implementation

[0024] The present invention will now be described in detail with reference to the accompanying drawings.

[0025] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0026] Example 1 This embodiment uses a currently under-construction, world's largest span stiffened arch bridge as an example. The main bridge is a 600m span upper-bearing stiffened concrete arch bridge. The arch ring consists of two parallel arch ribs and inter-rib cross bracing. The arch crown is 8m high and the arch foot is 12m high, featuring a catenary variable cross-section design. The arch ring is constructed using the steel-concrete composite stiffened frame method, with the stiffened frame as support. A segmented, ring-by-ring process is employed for the erection of the outer concrete formwork and the pouring of concrete. Compared to existing stiffened arch bridges, the increased span significantly increases the overall construction difficulty and quality control of the outer concrete. The construction quality of the web concrete in each pouring section directly affects the overall appearance quality and arch rib alignment of the arch bridge.

[0027] like Figure 1 As shown in this embodiment, a method for constructing formwork for the outer concrete web of an arch bridge specifically includes: Step 1: Assemble several outer template units 1 on the ground. The height of the outer template unit 1 is greater than the casting height of the web of the arch section.

[0028] Specifically, such as Figures 4-6 As shown, the outer template unit 1 includes a panel 13, a longitudinal distribution beam 14 and a transverse back rib 15 arranged sequentially in the thickness direction. The panel 13 includes several matrix-jointed building templates, the longitudinal distribution beam 14 is a wooden distribution beam, and the transverse back rib 15 is a steel back rib 15.

[0029] Preferably, in this embodiment, the building template is a WISA board.

[0030] Preferably, in this embodiment, the outer template unit 1 is assembled into a panel 13 by assembling nine 1.22m×2.44m WISA boards. A wooden I-beam is used as the longitudinal distribution beam 14, and a double-sided channel steel is used as the transverse back rib 15. The WISA boards and the wooden I-beam are connected by floor nails, and the wooden I-beam is connected to the transverse back rib 15 by connecting claws. The outer template unit 1 is assembled in a large block using a conventional template connection method, forming a large template compared to the scattered assembly templates assembled on site.

[0031] Specifically, in this embodiment, through the above combination, an outer template unit 1 with a width of 3.66m and a height of 7.32m is obtained. The height of 7.32m can meet the maximum height for casting the web of the arch ring section of the rigid frame arch bridge currently under construction. It can form an outer template unit 1 that meets the current construction requirements of the arch rib web with a small number of panels. Moreover, the outer template unit 1 can be well matched with the arch rib line by cutting according to the actual size of the installation position. When the span of the arch bridge is further increased, the outer template unit 1 can be further expanded according to the actual situation.

[0032] Preferably, the transverse back rib 15 is reinforced with vertical steel structures at three equal divisions in the longitudinal direction to improve the integrity of the individual outer template unit 1 and ensure that the outer template unit 1 is not easily deformed during hoisting.

[0033] Step 2: Cut the outer template unit 1 in one go according to the arch rib line shape.

[0034] Specifically, such as Figure 2 As shown, the first cutting includes cutting the top edge of the outer template unit 1 along the cutting line 2 to form a template 11. Since the outer template unit 1 is rectangular in its initial state, in order to match the characteristic of the arch rib line that the height of the web plate gradually decreases from the arch foot to the arch top, the template 11 obtained by the first cutting has an inclined top edge line that conforms to the arch rib line and two right angles located on both sides of the bottom.

[0035] Specifically, such as Figure 3As shown, the first cutting includes cutting the top edge and left / right edges of the outer template unit 1 along the cutting line to form a second type of template 12. Since the outer template unit 1 is initially rectangular, in order to match the characteristic of the arch rib line with the gradually decreasing height of the web from the arch foot to the arch top, and in order to achieve the matching of the arch rib line by folding instead of bending after the arrangement and combination of the first type of template 11 and the second type of template 12, the second type of template 12 obtained by the first cutting has an inclined top edge line, a slanted left / right edge line, and a right angle located at one bottom corner that conforms to the arch rib line. It should be noted that the cutting mentioned in this embodiment refers to the cutting of the building template.

[0036] Step 3: Hoist the outer template unit to the installation position.

[0037] Specifically, in this embodiment, a tower crane is used to lift the outer formwork unit. During lifting, the tower crane hook is connected to the top two corners of the outer formwork unit 1 via steel wire rope. The formwork is lifted to a certain height according to the site conditions. During the lifting process, it is ensured that it will not collide with the arch rib segment, the hanger, or other temporary construction devices. The outer formwork unit 1 is lifted to the designated position and then slowly lowered to avoid interference between the outer formwork unit 1 and other components on the arch. This ensures that the installation of the outer formwork unit 1 occupies less space on the outer perimeter of the arch, and enables the safe vertical lifting of large formwork pieces into place on the arch.

[0038] Step 4: Splice along the longitudinal direction of the arch ribs until the section to be poured is covered.

[0039] Specifically, after the first type of template 11 and the second type of template 12 are hoisted into place and temporarily fixed according to the arch rib line, the arrangement of the first type of template 11 and the second type of template 12 is to match the arch rib line, and the matching degree with the arch box curve and the variable height line is good. The web area of ​​the section to be poured is covered.

[0040] Preferably, in this embodiment, the arrangement includes: alternatingly setting the first-type template 11 and the second-type template 12 along the longitudinal direction of the arch rib, with the arch foot side of both the first-type template 11 and the second-type template 12 being set as right-angled sides. By making the arch foot side of the second-type template 12 a right-angled side and the arch top side a slanted side, the template shape can be continuously changed through the combination of two template shapes, using folds instead of curves to achieve a good match with the arch box curve. Furthermore, the installation accuracy can be quickly determined based on the right-angled position of each outer template unit, ensuring that the template installation line is controllable, thereby improving the template installation accuracy. It also shortens the time required for construction personnel to match the template with the arch rib line on-site, improving construction convenience and efficiency.

[0041] Example 2 like Figures 1-10As shown in the figure, the construction method of the outer concrete web formwork of an arch bridge in this embodiment, based on embodiment 1, further includes, during turnover, secondary cutting of the outer formwork unit 1 according to the arch rib line of the next installation position.

[0042] This embodiment describes a construction method for the external concrete web formwork of an arch bridge. Due to the segmented and phased external concrete construction process, after the web concrete construction of the current pouring section is completed, the outer formwork unit 1 can be recycled to the next pouring section, realizing the overall recycling of the web formwork, reducing the total amount of formwork preparation required for web formwork construction, and lowering the construction cost of web formwork.

[0043] Specifically, since the arch rib is designed with a catenary variable cross section, the cross-sectional dimensions of the arch ring in each casting section are completely different. Therefore, it is necessary to perform secondary cutting of the first type of template 11 and the second type of template 12 to match the usage requirements of the next installation position.

[0044] Preferably, the secondary cutting includes: cutting the top edge of the template 11 while retaining the two right-angled features at the bottom of the template 11.

[0045] Preferably, the secondary cutting includes cutting the top edge and the oblique edge of the second type of template 12. Since the second type of template 12 is configured in this embodiment to have the installation characteristics of a right-angled side on the arch foot side and an oblique side on the arch top side, the secondary cutting includes cutting the oblique edge on the arch top side of the second type of template 12.

[0046] It should be noted that during the secondary cutting, since the arrangement and combination of the first-type template 11 and the second-type template 12 are already determined, the secondary cutting only requires using the already cut edges of the first-type template 11 and the second-type template 12 as a reference. Parallel cutting is performed along the top edge of the first-type template 11 and along the top edge and oblique edge of the second-type template 12. This provides a basis and reference for the cutting, improves the accuracy of the cutting, and reduces the difficulty of the cutting. Through a simpler cutting process, a better match is achieved between the outer template unit and the arch rib height and curve characteristics of the next construction position, reducing the difficulty of construction and improving the efficiency and quality of construction.

[0047] Example 3 like Figure 9 As shown in this embodiment, a method for constructing an outer concrete web formwork for an arch bridge, based on embodiment 1 or embodiment 2, involves setting a reinforcing member 3 flush with the top edge of the outer formwork unit 1 after the first and second cutting.

[0048] Specifically, in this embodiment, the reinforcing member 3 is preferably an additional steel back rib 15, which reinforces the edge of the cut template by means of the steel back rib 15, and moves downward with each template cut.

[0049] Example 4 like Figures 7-8 As shown in the figure, in this embodiment, a method for constructing an outer concrete web formwork for an arch bridge is based on embodiment 1, embodiment 2, or embodiment 3. After each outer formwork unit 1 is fixed to the inner formwork 4 with tie rod 6, adjacent outer formwork units 1 are welded together by connector 8.

[0050] This embodiment describes a construction method for the external concrete web formwork of an arch bridge. The outer formwork unit 1 is installed before the inner formwork 4. The outer formwork unit 1 provides external shielding for the stiffening frame arch box, providing a safer construction space for the installation of the inner formwork 4 and reducing the risk of high-altitude operations on the arch. Therefore, after the outer formwork unit 1 is hoisted to its position piece by piece, it is temporarily fixed on the construction site until it covers the section to be poured, and then waits for the installation of the inner formwork 4. The installation of the inner formwork 4 is limited by the internal working space, so a modular assembly formwork is used.

[0051] Specifically, during the construction of the inner formwork 4, bamboo plywood and square timber are used to assemble unit components. In conjunction with the socket-type scaffolding erected inside the arch box, the formwork components are assembled layer by layer from bottom to top. Each layer is equipped with a layer of steel back ribs 15, which are fixed to the outer formwork unit 1 by tie rods 6. The chamfers and widening parts are cut on site to achieve the connection and fixation between each outer formwork unit 1 and the inner formwork 4, forming the pouring space. After the construction of the inner formwork 4 is completed, the adjacent outer formwork units 1 are connected by steel plates, steel sections and other connectors 8, so that all the outer formwork units 1 are connected into a whole.

[0052] Specifically, in this embodiment, steel plates are used as connectors 8. Connectors 8 are welded to the top and bottom surfaces of each steel back rib 15 of the adjacent outer template unit 1. After the web of the current arch rib segment is constructed, connectors 8 are removed by flame cutting.

[0053] Example 5 like Figures 11-12 As shown in the figure, this embodiment of the construction method for the outer concrete web formwork of an arch bridge, based on embodiment 1, involves hoisting the outer formwork unit 1 to the installation position and then adjusting the angle with the arch rib line using the hoist tool 9.

[0054] This embodiment describes a construction method for the outer concrete web formwork of an arch bridge. The outer formwork unit 1 is hoisted to its installation position by a tower crane. During hoisting, a continuous steel wire rope connects the two top corners of the outer formwork unit 1 and is attached to a movable pulley. The movable pulley is connected to the tower crane hook via a jack rope. As the tower crane hook gradually moves upward, the steel wire rope becomes taut, thus lifting the outer formwork unit 1. During transport, the outer formwork unit 1 is hoisted to a certain height according to the site conditions. During the hoisting and translation process, it is ensured that it will not collide with the arch rib segments, the gantry, the gantry beam, or other temporary construction devices. Once the formwork is hoisted above the installation position, it is slowly lowered. When adjusting the angle, a hoist tool 9, such as an electric hoist, is connected to the bottom corner of the arch top side of the formwork. The electric hoist hook is connected to the arch rib member according to the site position of the formwork. The electric hoist's operation allows the outer formwork unit 1 to rotate slowly, matching the arch rib profile and temporarily fixing the outer formwork unit 1. The outer formwork unit 1 is rotated to the designated direction by using the tower crane hook and hoist tool 9. The outer formwork unit 1 is temporarily fixed by the hoist tool 9. After the adjacent outer formwork units 1 are connected and fixed by the connector 8, the hoist tool 9 is removed to complete the installation of the outer formwork unit 1.

[0055] Example 6 like Figures 2-10 As shown, a formwork for the outer concrete web of an arch bridge includes an inner formwork 4 and an outer formwork 5. The outer formwork 4 includes several outer formwork units 1. The outer formwork units 1 are cut once according to the arch rib shape and include several type I formwork 11 and type II formwork 12. The type I formwork 11 and type II formwork 11 are alternately arranged along the longitudinal direction of the arch rib and are cut twice according to the arch rib shape at the installation position to match the arch rib shape.

[0056] This embodiment of an arch bridge external concrete web formwork includes several outer formwork units 1 as described in Embodiment 1. The height of the outer formwork unit 1 in its initial state is greater than the maximum web pouring height of the arch cross section, such as the web pouring height of the arch foot section, or the web pouring height of the current arch foot side corresponding to the segment. At the same time, several outer formwork units 1 are cut into first-class formwork 11 and second-class formwork 12 in one step, and then combined and arranged to adapt to the arch box curve and variable height line type, resulting in high splicing quality. This can improve the flatness and aesthetics of the formed concrete surface, and improve the overall construction quality of the arch bridge web. In addition, the outer formwork unit 1 forms a large formwork, which can reduce the process of cutting and splicing on the arch, reduce the safety risks of high-altitude operations, and improve the overall construction efficiency of the arch bridge web. Furthermore, the first-class formwork 11 and second-class formwork 12 are arranged in an alternating manner, providing a reference for secondary cutting, so that the outer formwork unit 1 after secondary cutting can be quickly applied to the web construction of the next segment to be poured, realizing the reuse of the web formwork.

[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for constructing formwork for the outer concrete web of an arch bridge, characterized in that, include: Several outer template units (1) are assembled on the ground. The height of the outer template unit (1) is greater than the casting height of the web of the arch section. The outer template unit (1) is cut in one go according to the arch rib line. The outer template unit (1) is then hoisted to the installation position and spliced ​​along the longitudinal direction of the arch rib until it covers the section to be cast. The first cutting includes: cutting the top edge of the outer template unit (1) to form a first type of template (11); the first cutting includes: cutting the top edge and the left / right edge of the outer template unit (1) to form a second type of template (12); the first type of template (11) and the second type of template (12) can be matched with the arch rib line shape by arrangement and combination; The arrangement includes: alternating the first type of template (11) and the second type of template (12) along the longitudinal direction of the arch rib, wherein the arch foot side of the first type of template (11) and the second type of template (12) are both set as right angle sides; The outer template unit (1) is cut a second time according to the arch rib line of the next installation position during turnover; The secondary cutting includes: cutting the top edge of the first type of template (11); cutting the top edge and the oblique edge of the second type of template (12); The outer template unit (1) has a rectangular structure in the initial state. The first type of template (11) obtained by one cutting has an inclined top edge line that conforms to the arch rib line and two right angles on both sides of the bottom. The second type of template (12) obtained by one cutting has an inclined top edge line that conforms to the arch rib line, oblique edge lines on the left / right sides and a right angle at one corner of the bottom.

2. The construction method for the formwork of the outer concrete web of an arch bridge as described in claim 1, characterized in that, After the first and second cutting, a reinforcing member (3) is provided flush with the top edge of the outer template unit (1).

3. A construction method for the formwork of the outer concrete web of an arch bridge as described in any one of claims 1-2, characterized in that, The outer template unit (1) is installed before the inner template (4). The inner template (4) is formed by layering and assembling template components from bottom to top. After each outer template unit (1) is fixed to the inner template (4) by tie rod (6), adjacent outer template units (1) are welded together by connector (8).

4. The construction method for the external concrete web formwork of an arch bridge as described in claim 1, characterized in that, After the outer template unit (1) is hoisted to the installation position, the angle is adjusted to match the arch rib line shape with the hoist tool (9).

5. A formwork for the outer concrete web of an arch bridge, characterized in that, It includes an inner template (4) and an outer template (5). The outer template (5) includes several outer template units (1). The outer template unit (1) is cut once according to the arch rib line shape, including several first-class templates (11) and second-class templates (12). Several first-class templates (11) and second-class templates (12) are alternately arranged along the longitudinal direction of the arch rib, and are cut twice according to the arch rib line shape of the installation position to match the arch rib line shape.

6. The formwork for the outer concrete web of an arch bridge as described in claim 5, characterized in that, The outer template unit (1) includes a panel (13), a longitudinal distribution beam (14) and a transverse back rib (15) arranged sequentially in the thickness direction. The panel (13) includes several matrix-jointed building templates.

Citation Information

Patent Citations

  • Big template combined by small steel templates

    CN101672104A

  • Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus

    CN106592962A

  • Bridge formwork structure and movable lap joint formwork construction method

    CN108425324A