核电机组二回路系统稳态运行过程的鲁棒数据校正方法

By constructing a robust data correction model and using robust estimation and influence functions to assess robustness, combined with the law of mass conservation and variable constraints, the problem of data correction in the secondary loop system of nuclear power units being susceptible to significant errors was solved, achieving accurate data correction and precise estimation of unmeasured variables.

CN116561981BActive Publication Date: 2026-07-17SOUTHEAST UNIV

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
SOUTHEAST UNIV
Filing Date
2023-04-13
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the existing technology, the data correction method for the secondary loop system of nuclear power units is easily affected by significant errors, resulting in inaccurate correction results and difficulty in correcting significant errors online.

Method used

A robust data correction model is constructed using robust estimation theory. Robustness is evaluated through robust estimation function and influence function. Correction is performed by combining flow measurement variable data and estimation of unmeasured variables. Data correction is performed using the law of conservation of mass and variable constraints.

Benefits of technology

During the steady-state operation of the secondary loop system of a nuclear power unit, the impact of random and significant errors should be reduced to provide accurate data correction results and improve the reliability and accuracy of the data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116561981B_ABST
    Figure CN116561981B_ABST
Patent Text Reader

Abstract

本发明涉及数据校正方法技术领域,特别是涉及一种核电机组二回路系统稳态运行过程的鲁棒数据校正方法。其包括获取核电机组运行过程中二回路系统中稳态时间段的流量测量变量数据;基于本发明提出的鲁棒估计函数及所述流量变量数据,建立鲁棒稳态数据校正模型;基于鲁棒稳态数据校正模型,对各流量测量变量的数据进行校正处理,包括对已测流量变量数据进行校正和对未测流量变量的数据进行估计。本发明的数据校正方法在存在显著误差时仍能获得准确的校正结果。
Need to check novelty before this filing date? Find Prior Art