Construction method of steel gap drainage ditch for steep slope underground passage
By employing stainless steel slotted drainage ditches welded with pre-embedded integral reinforcing frames and a detachable, easily dredged water channel structure in steep underground passages, the problems of easy structural damage and silt blockage of slotted drainage ditches in steep underground passages have been solved, achieving structural stability and rapid silt removal.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ANHUI HIGHWAY ENG CORP
- Filing Date
- 2023-05-23
- Publication Date
- 2026-06-30
AI Technical Summary
Existing slotted drainage ditches suffer from problems such as unreasonable structural stress, easy damage to sidewalls due to pressure, and difficulty in clearing silt blockages, which are particularly evident in underground passages with steep slopes.
The construction method of steel slotted drainage ditch for underground passage with large slope includes the construction of a compacted soil layer, a crushed stone cushion layer and a plain concrete cushion layer in the foundation trench, and the welding of stainless steel slotted drainage ditch to pre-embedded symmetrical integral reinforcement frame to fix the steel, and the installation of steel slotted drainage ditch inspection well and detachable and easy-to-clean water channel structure.
It effectively stabilizes the structure of the steel slotted drainage ditch, ensures the stability of the prefabricated assembled well cylinder, and achieves rapid dredging, solving the problems of easy structural damage and silt blockage.
Smart Images

Figure CN116575559B_ABST