Combined trench mechanical selection method for diaphragm wall vertical segmentation in complex strata

By employing a segmented combination of hydraulic grab trenching machine, twin-wheel trenching machine, and impact drilling rig in complex geological formations, the problem of lack of scientific selection in diaphragm wall construction was solved, and effective control of construction period and cost was achieved.

CN116579169BActive Publication Date: 2026-11-24CHINA CONSTR EIGHTH BUREAU RAIL TRANSIT CONSTR CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310559864.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-17
Publication Date
2026-11-24
Estimated Expiration
2043-05-17

AI Technical Summary

Technical Problem

Existing technologies lack scientific and systematic methods for selecting trenching machinery in the construction of diaphragm walls in strata with uneven hardness, which leads to increased construction difficulty and difficulty in cost control.

Method used

Hydraulic grab grooving machine, twin-wheel grooving machine and impact drilling machine are used to form grooves in vertical sections and layers. By constructing a construction period and cost calculation model, a scientific selection method is established to select the optimal combination of machinery.

Benefits of technology

It effectively controls the construction period and cost, provides scientific selection guidance for trenching of diaphragm walls in complex strata, and improves construction efficiency and cost management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116579169B_ABST
    Figure CN116579169B_ABST
Patent Text Reader

Abstract

This invention discloses a method for selecting trenching machinery for vertical segmentation of diaphragm walls in complex geological formations. Based on geological adaptability, it selects hydraulic grab trenching machines, twin-wheel trenching machines, and impact drilling rigs for vertical segmentation and layering trenching. It establishes basic conditions for selecting diaphragm wall trenching machinery in complex geological formations with uneven hardness, and provides selection calculation formulas with construction period control as the boundary. Simultaneously, it provides estimation formulas and values ​​for the construction period indicators of the three trenching machines. Furthermore, it establishes selection calculation formulas with cost control as the boundary, and combines the construction period and cost control boundaries of diaphragm wall trenching with a system of simultaneous equations for comprehensive selection. This invention solves the problem of lacking a scientific and systematic selection method when using multiple trenching machines in uneven geological formations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, specifically to a method for selecting mechanical components for vertically segmented trenching of diaphragm walls in complex geological formations. Background Technology

[0002] As a retaining structure that can both stop water and bear loads, diaphragm walls are increasingly widely used as the scale of foundation pit engineering expands. Currently, with the increase in foundation pit depth and the increasing complexity of geological conditions, especially in the case of uneven strata, the construction difficulty is constantly increasing. Single trenching machinery and processes are no longer sufficient to fully adapt to complex strata, posing new requirements for construction period and cost control.

[0003] Although some engineering practices have adopted trenching methods combining "grab milling" or "grab drilling," these methods are limited to simply addressing the adaptability of unevenly hard strata within a limited scope, and have not formed a scientific and systematic selection theory and method.

[0004] The information disclosed in this background section is intended only to enhance the understanding of the overall background of the invention and should not be construed as an admission or in any way implying that the information constitutes prior art known to those skilled in the art. Summary of the Invention

[0005] To overcome the shortcomings of existing technologies, a method for selecting combined trenching machinery for vertical segmentation of diaphragm walls in complex strata is provided to address the problem of lacking a scientific and systematic selection method when using multiple trenching machines in strata with uneven hardness.

[0006] To achieve the above objectives, a method for selecting the mechanical components for vertically segmented trenching of diaphragm walls in complex geological formations is provided, comprising the following steps:

[0007] The geological distribution of complex strata is determined to determine the trenching depth of each of the combined trenching machines, which includes the trenching depth of a grab trenching machine, a twin-wheel trenching machine, and an impact drill.

[0008] The average construction time per linear meter of trenching depth was obtained for grab trenching machines, twin-wheel trenching machines, and impact drilling rigs in the complex strata.

[0009] Based on the trenching depth and the construction time, a construction period calculation model and a cost calculation model based on segmentation along the trenching depth direction are constructed, involving multiple trenching machines. The construction period calculation model is as follows:

[0010] T0=δ1H1+δ2H2+δ3H3+T c ,

[0011] Where T0 represents the construction period for trenching a diaphragm wall, δ1, δ2, and δ3 represent the average time taken per linear meter of trenching depth for each diaphragm wall using the grab trenching machine, twin-wheel milling machine, and impact drill, respectively, and H1, H2, and H3 represent the trenching depth for each diaphragm wall using the grab trenching machine, twin-wheel milling machine, and impact drill, respectively. c The required interval time for switching between different tank forming processes is obtained through statistical methods or based on experience.

[0012] The cost calculation model is as follows:

[0013] B0=γ1H1+γ2H2+γ3H3+B T +B c ,

[0014] Where B0 represents the total construction management cost of the diaphragm wall, and γ1, γ2, and γ3 represent the unit depth construction cost of trenching for each diaphragm wall using a grab bucket trenching machine, a twin-wheel trenching machine, and an impact drilling rig, respectively. T B represents the construction time and cost incurred for trenching each continuous wall section. c Other costs not yet included in the estimated costs;

[0015] Based on multiple continuous walls, the project duration calculation model and the cost calculation model are summed to obtain a selection model, which is as follows:

[0016]

[0017] The optimal solution of the selection model is chosen as the cost-effective combination of various trenching machines, based on different requirements such as actual construction period, cost focus, or balance between the two.

[0018] Furthermore, the complex strata, from top to bottom, consist of soil, fully to strongly weathered rock layers, moderately weathered rock layers, and slightly weathered rock layers. The grab trenching machine excavates in the soil and fully to strongly weathered rock layers, the twin-wheel trenching machine excavates in the moderately weathered rock layers, and the impact drilling rig excavates in the slightly weathered rock layers.

[0019] Furthermore, the average time δ1 taken per meter of trenching depth for each wall grab bucket trenching machine is calculated using a formula, which is:

[0020]

[0021] n is the number of horizontal segments in each wall section, S is the thickness of the diaphragm wall, L is the segment length of each wall section, and ω, q, θ x θ s t b t k All are inherent performance parameters of the trenching machine, where ω is the width of the trenching machine's grab bucket in its fully open state, q is the grab bucket capacity, and θ is the tangent.x For the descent speed of the grab, θ s For the grab's upward speed, t b The time t is the time required for the grab bucket to close. k The time required for the grab bucket to open, t c This includes the time for other possible operations during each cycle of excavation and grabbing.

[0022] The beneficial effects of this invention are as follows: The method for selecting trenching machinery for vertical segmentation of diaphragm walls in complex strata, based on geological adaptability, selects hydraulic grab trenching machines, twin-wheel trenching machines, and impact drilling rigs for vertical segmentation and layering trenching. It establishes basic conditions for selecting trenching machinery for complex diaphragm walls in "uneven hardness" strata, and provides selection calculation formulas with construction period control as the boundary. At the same time, it provides estimation formulas and values ​​for the construction period indicators of three trenching machines. In addition, the selection calculation formula with cost control as the boundary is a system of equations for comprehensive selection based on the construction period and cost control boundaries of diaphragm wall trenching.

[0023] The present invention provides a method for selecting trenching machinery for vertical segmentation of diaphragm walls in complex strata. This method establishes a boundary control selection method for trenching machinery and processes for diaphragm walls in complex strata, which has good guiding significance. It enables the selection of trenching machinery and processes for diaphragm walls in complex strata to form a more scientific and systematic method, and upgrades the existing passive selection method to a proactive selection method, effectively controlling the construction period and cost. Attached Figure Description

[0024] Other features, objects, and advantages of this application will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings:

[0025] Figure 1 This is a schematic diagram of a combination of various trenching mechanical processes according to an embodiment of the present invention.

[0026] Figure 2 This is a schematic diagram of the construction of a hydraulic grab bucket trenching machine according to an embodiment of the present invention. Detailed Implementation

[0027] The present application will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, only the parts relevant to the invention are shown in the accompanying drawings.

[0028] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.

[0029] Reference Figure 1 and Figure 2 As shown, this invention provides a method for selecting mechanical components for vertically segmented trenching of diaphragm walls in complex strata, comprising the following steps:

[0030] S1: Determine the geological distribution of complex strata to determine the trenching depth of each of the combined trenching machines, which include the trenching depth of the grab trenching machine 11, the twin-wheel trenching machine 12, and the impact drill 13.

[0031] The complex strata, from top to bottom, consist of soil, fully to strongly weathered rock layers, moderately weathered rock layers, and slightly weathered rock layers. The grab troughing machine 11 excavates in the soil and fully to strongly weathered rock layers, the twin-wheel troughing machine 12 excavates in the moderately weathered rock layers, and the impact drilling machine 13 excavates in the slightly weathered rock layers.

[0032] S2: Obtain the average construction time per meter of trenching depth for the grab trenching machine 11, twin-wheel trenching machine 12, and impact drilling machine 13 in complex strata.

[0033] S3: Based on trenching depth and construction time, a time calculation model and a cost calculation model based on trenching depth segmentation are constructed, involving multiple trenching machines. The time calculation model is as follows:

[0034] T0=δ1H1+δ2H2+δ3H3+T c ;

[0035] Where T0 is the construction period for a diaphragm wall trench, in hours (h);

[0036] δ1, δ2, and δ3 represent the average time taken per meter of trenching depth for each wall grab grooving machine 11, twin-wheel grooving machine 12, and impact drill 13, respectively, in h / m (hours / meter).

[0037] H1, H2, and H3 represent the trenching depths of each wall grab grooving machine 11, twin-wheel grooving machine 12, and impact drill 13, respectively, in meters.

[0038] T c The interval time required for switching between different tank forming processes, in hours, is obtained through statistical methods or based on experience.

[0039] In this embodiment, the average time δ1 taken per linear meter of trenching depth for each wall grab trenching machine 11 is calculated using the following formula:

[0040]

[0041] n represents the number of horizontal segments in each wall section;

[0042] S represents the thickness of the diaphragm wall, in meters (m).

[0043] L represents the section length of each wall panel, in meters.

[0044] ω, q, θ x θ s t b t k These are all inherent performance parameters of the trenching machine;

[0045] Where ω is the width of the grab bucket in its fully open state, in meters (m);

[0046] q represents the grab bucket capacity, in meters (m). 3 ;

[0047] θ x The descent speed of the grab bucket is expressed in m / min.

[0048] θ s The grab's lifting speed is expressed in m / min.

[0049] t b Time required for the grab bucket to close;

[0050] t k Time taken for the grab bucket to open;

[0051] t c This represents the time for other possible operations during each excavation and grabbing cycle, in minutes. Note that the δ1 calculated by the formula is in minutes per meter (min / m), and should be converted to hours per meter (h / m) when used in the project duration calculation model.

[0052] In this embodiment, due to the complex excavation mechanism of the twin-wheel trenching machine and the impact drilling rig, and the numerous influencing factors, it is difficult to establish a clear mathematical model for δ2 and δ3. Therefore, a sample statistical method is used to obtain relevant numerical indicators. After statistical analysis and conversion of relevant data, reference values ​​for δ2 and δ3 are given, as detailed in Table 1 below.

[0053] Table 1, Values ​​of δ2 and δ3

[0054]

[0055] In this embodiment, the cost calculation model is as follows:

[0056] B0=γ1H1+γ2H2+γ3H3+B T +B c ,

[0057] Where B0 represents the total construction and management cost of the diaphragm wall;

[0058] γ1, γ2, and γ3 represent the unit depth construction cost of trenching for each continuous wall using grab trenching machine 11, twin-wheel trenching machine 12, and impact drilling machine 13, respectively, in yuan / m.

[0059] B T Cost of construction time for each continuous wall section, in yuan / day;

[0060] B c Other costs not yet included in the estimated costs are listed in yuan.

[0061] S4: Based on multiple continuous walls (j continuous walls), the time calculation model and cost calculation model are summed to obtain the selection model. The selection model is as follows:

[0062]

[0063] S5: Select the optimal solution of the selection model as a cost-effective combination of various trenching machines based on different requirements such as actual construction period, cost emphasis, or balance between the two.

[0064] The present invention provides a method for selecting diaphragm wall trenching machinery in complex geological formations by vertically segmenting and combining different types of trenching equipment. Based on geological adaptability, this method selects hydraulic grab trenching machines, twin-wheel trenching machines, and impact drilling rigs to perform vertical segmented and layered trenching. It establishes basic conditions for selecting diaphragm wall trenching machinery in complex geological formations with uneven hardness, and provides selection calculation formulas with construction period control as the boundary. It also provides estimation formulas and values ​​for the construction period indicators of the three types of trenching machinery. In addition, a selection calculation formula with cost control as the boundary is established by combining the construction period and cost control boundaries of diaphragm wall trenching with a system of simultaneous equations.

[0065] The present invention provides a method for selecting trenching machinery for vertical segmentation of diaphragm walls in complex strata. This method establishes a boundary control selection method for trenching machinery and processes for diaphragm walls in complex strata, which has good guiding significance. It enables the selection of trenching machinery and processes for diaphragm walls in complex strata to form a more scientific and systematic method, and upgrades the existing passive selection method to a proactive selection method, effectively controlling the construction period and cost.

[0066] The above description is merely a preferred embodiment of this application and an explanation of the technical principles employed. Those skilled in the art should understand that the scope of the invention involved in this application is not limited to technical solutions formed by specific combinations of the above-described technical features, but should also cover other technical solutions formed by arbitrary combinations of the above-described technical features or their equivalents without departing from the inventive concept. For example, technical solutions formed by substituting the above features with (but not limited to) technical features with similar functions disclosed in this application.

Claims

1. A method for selecting mechanical components for vertically segmented trenching of diaphragm walls in complex strata, characterized in that, Includes the following steps: The geological distribution of complex strata is determined to determine the trenching depth of each of the combined trenching machines, which includes the trenching depth of a grab trenching machine, a twin-wheel trenching machine, and an impact drill. The average construction time per linear meter of trenching depth was obtained for grab trenching machines, twin-wheel trenching machines, and impact drilling rigs in the complex strata. Based on the trenching depth and the construction time, a construction period calculation model and a cost calculation model based on segmentation along the trenching depth direction are constructed, involving multiple trenching machines. The construction period calculation model is as follows: T0=δ1H1+δ2H2+δ3H3+T c , Where T0 represents the construction period for trenching a diaphragm wall, δ1, δ2, and δ3 represent the average time taken per linear meter of trenching depth for each diaphragm wall using the grab trenching machine, twin-wheel milling machine, and impact drill, respectively, and H1, H2, and H3 represent the trenching depth for each diaphragm wall using the grab trenching machine, twin-wheel milling machine, and impact drill, respectively. c The required interval time for switching between different tank forming processes is obtained through statistical methods or based on experience. The cost calculation model is as follows: B0=γ1H1+γ2H2+γ3H3+B T +B c , Where B0 represents the total construction management cost of the diaphragm wall, and γ1, γ2, and γ3 represent the unit depth construction cost of trenching for each diaphragm wall using a grab bucket trenching machine, a twin-wheel trenching machine, and an impact drilling rig, respectively. T B represents the construction time and cost incurred for trenching each continuous wall section. c Other costs not yet included in the estimated costs; Based on multiple continuous walls, the project duration calculation model and the cost calculation model are summed to obtain a selection model, which is as follows: The optimal solution of the selection model is chosen as the cost-effective combination of various trenching machines, based on different requirements such as actual construction period, cost focus, or balance between the two.

2. The method for selecting mechanical components for vertically segmented trenching of diaphragm walls in complex strata according to claim 1, characterized in that, The complex strata, from top to bottom, consist of soil, fully to strongly weathered rock layers, moderately weathered rock layers, and slightly weathered rock layers. The grab troughing machine excavates in the soil and fully to strongly weathered rock layers, the twin-wheel troughing machine excavates in the moderately weathered rock layers, and the impact drilling rig excavates in the slightly weathered rock layers.

3. The method for selecting mechanical components for vertically segmented trenching of diaphragm walls in complex strata according to claim 1, characterized in that, The average time δ1 taken per meter of trenching depth for each wall grab bucket trenching machine is calculated using the following formula: n is the number of horizontal segments in each wall section, S is the thickness of the diaphragm wall, L is the segment length of each wall section, and ω, q, θ x θ s t b t k All are inherent performance parameters of the trenching machine, where ω is the width of the trenching machine's grab bucket in its fully open state, q is the grab bucket capacity, and θ is the tangent. x For the descent speed of the grab, θ s For the grab's upward speed, t b The time t is the time required for the grab bucket to close. k The time required for the grab bucket to open, t c This includes the time for other possible operations during each cycle of excavation and grabbing.

Citation Information

Patent Citations

  • Prefabricated underground diaphragm wall capable of being integrally recycled, hanging tool and construction method

    CN108221955A

  • Underground diaphragm wall groove forming construction method adopted under complex geological condition

    CN110984132A