Rail transit depot protection area power supply and cut-off control method, device and equipment

By integrating the DCC system server and terminal equipment of rail transit, closed-loop management of power control operations has been realized, solving the problems of low safety and efficiency in the maintenance work of driverless vehicles in depots. It has also achieved intelligent and paperless power outage and restoration control, improving the safety and efficiency of maintenance operations.

CN116581876BActive Publication Date: 2026-11-20ZHUHAI UNITECH POWER TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310455166.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-24
Publication Date
2026-11-20
Estimated Expiration
2043-04-24

AI Technical Summary

Technical Problem

During the maintenance of unmanned vehicles, existing technologies have problems such as difficulty in ensuring the safety of workers and low maintenance efficiency. In particular, when multiple shifts are working together, there is a lack of effective technical control measures, which leads to the risk of electric shock and non-standard operation.

Method used

By using the DCC system server of the rail transit system and the power control request point terminal to obtain power control request point information, combined with the five-prevention safety interlocking workstation and grounding control terminal, closed-loop management of power control operation is realized, including the automated control of power outage and power restoration operations, eliminating manual operation and realizing the intelligent and paperless operation of the maintenance work area.

Benefits of technology

It has enabled intelligent and paperless power supply and shutdown control in the protection zone of rail transit vehicle depot, ensuring the safety of staff, improving the efficiency of maintenance operations, and reducing the safety hazards of manual operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116581876B_ABST
    Figure CN116581876B_ABST
Patent Text Reader

Abstract

The application provides a rail transit depot protection area power supply and stop control method, device and equipment, and the method comprises the following steps: obtaining power control request point information through a request and cancellation point terminal; the target operation mode comprises a large five-protection request and cancellation point mode, a small five-protection request and cancellation point mode or a small five-protection independent mode; when the target operation mode is the large five-protection request and cancellation point mode, the power control request point information is sent to the terminal equipment of a designated person to obtain the approval passing information of the designated person; the power control request point information that has been approved is obtained through a five-protection safety interlocking workstation terminal, an operation ticket is generated based on the power control request point information, the operation ticket is sent to a grounding control terminal, and the power control operation is controlled and executed through the grounding control terminal. In this way, the power supply and stop request point information is closed-loop controlled, the grounding device is used to automatically execute the power control operation, the intelligentization of the power supply and stop control process is realized, the safety of the workers is ensured, and the efficiency of the maintenance operation is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power outage and restoration management, and in particular to a method, apparatus, and equipment for controlling power outage and restoration in the protected area of ​​a rail transit vehicle depot. Background Technology

[0002] During maintenance work on unmanned vehicles, workers need to submit a handwritten work request form. After successful request, workers enter the protected area with a key and manually operate the isolating switch and grounding to disconnect the power. Maintenance of the vehicles and related equipment in the protected area then begins. After maintenance, the area is manually cleared, power is restored, and then the equipment is deactivated. Many operations during maintenance require manual intervention, and the large number of workers involved, coupled with the lack of effective technical control measures when multiple shifts are working simultaneously, makes it difficult to guarantee worker safety and poses a high risk of electric shock. Furthermore, the efficiency of the maintenance work is low. Summary of the Invention

[0003] In view of this, the purpose of the present invention is to provide a method, device and equipment for controlling power outage and restoration in the protection zone of a rail transit depot. By using technical means to implement closed-loop management of the operation process, the safety of personnel in the protection zone during depot maintenance operations is ensured and the efficiency of maintenance operations is improved.

[0004] In a first aspect, embodiments of the present invention provide a method for controlling power outages and restorations in the protection zone of a rail transit depot. This method is applied to a rail transit DCC system server. Power control request information is obtained through a request / cancellation terminal. This power control request information is either power outage request information or power restoration request information. The power outage request information or power restoration request information includes: the target track to be controlled and the target operating mode. The target operating mode includes a large-scale five-prevention request / cancellation mode, a small-scale five-prevention request / cancellation mode, or a small-scale five-prevention independent mode. If the target operating mode is a large-scale five-prevention request / cancellation mode, the power control request information is sent to the terminal device of a designated person to obtain approval information. The approved power control request information is obtained through a five-prevention safety interlocking workstation terminal to generate an operation ticket based on the power control request information, and the operation ticket is sent to a grounding control terminal. The power control operation is executed through the grounding control terminal. The power control operation includes a power outage operation or a power restoration operation. The power control operation is matched with the power control request information.

[0005] The steps described above for obtaining power control request information through the request point terminal include: obtaining the target track to be controlled through the request point terminal; determining alternative operating modes based on the track type of the target track and the equipment status of the specified equipment; determining the target operating mode from the alternative operating modes through the request point terminal; and generating power control request information based on the target track and the target operating mode.

[0006] The aforementioned track types include: tracks equipped with maintenance platforms or tracks without maintenance platforms. The steps for determining alternative operating modes based on the track type of the target track and the equipment status of the designated equipment include: if the cancellation point terminal is operating normally, and the target track in the power control cancellation information is equipped with a maintenance platform, and the grounding control terminal is operating normally, the alternative operating modes are determined to be the large-scale five-prevention cancellation point mode, the small-scale five-prevention cancellation point mode, and the small-scale five-prevention independent mode; if the cancellation point terminal is operating normally, but the target track in the power control cancellation information is not equipped with a maintenance platform, or the grounding control terminal malfunctions, or the aforementioned five-prevention safety interlocking workstation terminal malfunctions, the alternative operating modes are determined to be the small-scale five-prevention cancellation point mode and the small-scale five-prevention independent mode; if the cancellation point terminal malfunctions, the alternative operating mode is determined to be the small-scale five-prevention independent mode.

[0007] If the target operation mode is the "five-prevention request cancellation point" mode, after the step of sending the power control request information to the terminal device of the designated personnel to obtain the approval information of the designated personnel, the above method also includes: sending the operation permission corresponding to the power control request information to the grounding control terminal corresponding to the target track.

[0008] The aforementioned power outage request information or power restoration request information also includes operation information; the aforementioned operation information includes one or more of the target equipment to be operated, the operator, and the monitoring personnel; the aforementioned step of obtaining the approved power control request information through the five-prevention safety interlocking workstation terminal, generating an operation ticket based on the power control request information, and sending the operation ticket to the grounding control terminal includes: obtaining the approved power control request information through the five-prevention safety interlocking workstation terminal, extracting ticket information from the power control request information; wherein, the ticket information includes: the target equipment to be operated, the operator, and the monitoring personnel; the ticket information is the same as the operation information in the power control request information; generating an operation ticket based on the ticket information, and sending the operation ticket to the grounding control terminal.

[0009] The steps described above for controlling and executing power control operations via a grounding control terminal include: obtaining the interlocking table information corresponding to the operation ticket through the grounding control terminal, determining whether there is at least one power control request point information corresponding to the operation ticket in the interlocking table; if there is at least one power control request point information corresponding to the operation ticket, determining whether each power control request point information has been approved; if all power control request point information has been approved, returning an approval notification to the cancellation point terminal; obtaining operation instructions through the grounding control terminal, and controlling and executing power control operations based on the operation instructions.

[0010] The aforementioned power control request information is power supply request information; before the aforementioned step of obtaining operation instructions through the grounding control terminal and controlling the execution of power control operations based on the operation instructions, the method further includes: obtaining the number of personnel in the protection area corresponding to the target track through the access control terminal; obtaining a clearance signal through the cancellation point terminal; wherein, the clearance signal is used to: indicate that the protection area corresponding to the target track has been inspected;

[0011] Following the steps of controlling and executing power control operations via the grounding control terminal, the method further includes: obtaining power control cancellation information through the cancellation point terminal; determining whether the grounding control terminal is closed; if the grounding control terminal is closed, confirming that the power control cancellation information has been successfully submitted; revoking the operation permissions corresponding to the power control cancellation information on the grounding control terminal; and sending the power control cancellation information to the terminal device of the designated personnel to obtain the designated personnel's approval information. If the number of personnel is zero, a clearance signal is obtained, a clearance completion confirmation instruction is obtained through the cancellation point terminal, and the designated access control of the protected area is in a closed state, the clearance operation is confirmed to be complete.

[0012] The above method also includes: if the target operation mode is the small-scale power control request and cancellation mode, sending the above power control request information to the terminal device of the designated personnel to obtain the approval information of the designated personnel; issuing access control permissions to the access control terminal in the protection area corresponding to the target track; generating an operation ticket through the designated invoicing operation and sending the operation ticket to the computer key; controlling the staff to enter the protection area through the access control terminal so that the staff can perform power control operations through the computer key; wherein, the power control operation includes power outage operation or power supply operation; the power control operation is matched with the power control request information.

[0013] The aforementioned power control request information is power supply request information; prior to the aforementioned step of controlling personnel to enter the protected area via access control terminal so that personnel can perform power control operations via computer key, the method further includes: operating a designated inspection terminal in the protected area via computer key to confirm that the clearing operation is completed.

[0014] Following the steps described above, which involve controlling staff entry into the protected area via access control terminals to enable staff to perform power control operations using computer keys, the method further includes: obtaining power control cancellation information via a cancellation point terminal; revoking access control permissions corresponding to the power control cancellation information from the access control terminal; and sending the power control cancellation information to the terminal device of a designated person to obtain the designated person's approval information.

[0015] The above method also includes: if the target operation mode is the small-scale independent five-prevention mode, generating an operation ticket through the five-prevention safety interlocking workstation terminal and sending the operation ticket to the computer key; wherein, in the small-scale independent five-prevention mode, designated personnel operate the five-prevention safety interlocking workstation terminal to generate the operation ticket; the power control request information is paper information and is approved by designated personnel; using the universal key of the protection area corresponding to the target track, personnel are controlled to enter the protection area so that they can perform power control operations through the computer key; wherein, the power control operations include power outage operations or power supply operations; the power control operations are matched with the power control request information.

[0016] The aforementioned power control request information is power supply request information; before the aforementioned step of controlling personnel to enter the protected area through the universal key corresponding to the target track so that personnel can perform power control operations through the computer key, the method further includes: operating the designated inspection terminal in the protected area through the computer key to confirm that the clearing operation is completed.

[0017] Secondly, embodiments of the present invention provide a power outage and restoration control device for the protection zone of a rail transit depot, which is installed on the rail transit DCC system server. The device includes: a first acquisition module, used to acquire power control request information through a request / cancellation terminal; wherein the power control request information is either power outage request information or power restoration request information; the power outage request information or power restoration request information includes: the target track to be controlled and the target operating mode; the target operating mode includes a large-scale five-prevention request / cancellation mode, a small-scale five-prevention request / cancellation mode, or a small-scale five-prevention independent mode; a first sending module, used to send the power control request information to the terminal device of a designated person if the target operating mode is a large-scale five-prevention request / cancellation mode, to obtain the designated person's approval information; a first generation module, used to acquire the approved power control request information through a five-prevention safety interlocking workstation terminal, to generate an operation ticket based on the power control request information, and send the operation ticket to a grounding control terminal; and a first execution module, used to control and execute power control operations through the grounding control terminal; wherein the power control operations include power outage operations or power restoration operations; the power control operations are matched with the power control request information.

[0018] Thirdly, embodiments of the present invention provide a power outage and power supply control device for a protected area of ​​a rail transit depot. The device includes a processor and a memory. The memory stores machine-executable instructions that can be executed by the processor. The processor executes the machine-executable instructions to implement the aforementioned power outage and power supply control method for a protected area of ​​a rail transit depot.

[0019] Fourthly, embodiments of the present invention provide a machine-readable storage medium storing machine-executable instructions. When the machine-executable instructions are invoked and executed by a processor, the machine-executable instructions cause the processor to implement the above-described power outage and power supply control method for the protected area of ​​a rail transit vehicle depot.

[0020] The embodiments of the present invention bring the following beneficial effects:

[0021] The above provides a method, device, and equipment for controlling power outages and restorations in the protection zone of a rail transit depot. Power control request information is obtained through a request / cancellation terminal. This power control request information includes either power outage or power restoration requests. The power outage or power restoration request information includes the target track to be controlled and the target operating mode. The target operating mode includes a large-scale five-prevention request / cancellation mode, a small-scale five-prevention request / cancellation mode, or a small-scale five-prevention independent mode. If the target operating mode is a large-scale five-prevention request / cancellation mode, the power control request information is sent to the terminal device of a designated person to obtain their approval. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal to generate an operation ticket based on the power control request information, and the operation ticket is sent to the grounding control terminal. The grounding control terminal controls and executes the power control operation. The power control operation includes either a power outage operation or a power restoration operation. The power control operation is matched with the power control request information. In this method, power control request information, such as the target track and target operating mode, is obtained through the request cancellation point terminal. The target operating mode includes the large-scale five-prevention request cancellation point mode, the small-scale five-prevention request cancellation point mode, or the small-scale five-prevention independent mode. When the target operating mode is the large-scale five-prevention request cancellation point mode, the power control request information is sent to the terminal device of designated personnel to obtain approval information. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated and sent to the grounding control terminal. The power control operation is then executed through the grounding control terminal. This method achieves centralized closed-loop management of power outage and restoration control request information through the rail transit DCC system server, request cancellation point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal. The grounding control terminal is used to execute power control operations and automatically connect the grounding wire, eliminating manual operation and realizing intelligent and paperless power outage and restoration control processes in the maintenance work area. This ensures the safety of personnel and improves the efficiency of maintenance work.

[0022] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention are realized and obtained in accordance with the structures particularly pointed out in the description, claims and drawings.

[0023] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, preferred embodiments are described below in detail with reference to the accompanying drawings. Attached Figure Description

[0024] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0025] Figure 1 A flowchart of a power outage and restoration control method for a protected area of ​​a rail transit vehicle depot, provided as an embodiment of the present invention;

[0026] Figure 2 A schematic diagram of a five-prevention cancellation point model provided in an embodiment of the present invention;

[0027] Figure 3 A schematic diagram of a small-scale anti-fraud point model provided in an embodiment of the present invention;

[0028] Figure 4 A schematic diagram of a small-scale independent protection mode provided in an embodiment of the present invention;

[0029] Figure 5 A schematic diagram of a power outage and restoration control device for a protected area of ​​a rail transit vehicle depot, provided in an embodiment of the present invention;

[0030] Figure 6 This is a schematic diagram of a power outage and restoration control device for a protected area of ​​a rail transit vehicle depot, provided as an embodiment of the present invention. Detailed Implementation

[0031] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0032] Generally, the maintenance process of unmanned vehicle depots first requires staff to apply for a power outage at the power outage request point. After the application is successful, staff enter the protected area to carry out power outage operations, and then begin platform maintenance. After the operation is completed, the platform is cleared, power is restored, and finally the power outage is performed.

[0033] In this technical process, workers need to go to the DCC (Depot Control Center) to handwrite a work request form for approval. After approval, they take a key to enter the protected area, then manually perform disconnection and grounding operations. Finally, they manually clear the area, restore power, and return to the DCC for verification. Throughout this process, due to the involvement of multiple shifts and a complex personnel structure, coupled with the lack of technical means to control power outages and restorations, there are significant safety hazards. The problems exposed by this process are as follows:

[0034] 1) The sales process is entirely manual and has not been digitized;

[0035] 2) Access to the protected area is not linked to the cancellation point;

[0036] 3) The power supply operation and the clearing of platform personnel are not linked and controlled by technical means, which poses a great risk as there is a possibility that power will be supplied when people are still on the platform.

[0037] 4) The power outage and restoration process lacks closed-loop management and is not linked to the request and cancellation point. Relying entirely on personnel management can sometimes lead to safety hazards.

[0038] 5) When inspecting vehicles in the tracks, there is no unified management for tracks with and without inspection platforms;

[0039] In particular, when the approver is busy or there are multiple shifts experiencing power outages at the management site, it is difficult to guarantee the safety of every maintenance team by relying solely on manual management, which poses a significant safety hazard.

[0040] Based on this, embodiments of the present invention provide a method, apparatus, and equipment for controlling power outages and restorations in the protected area of ​​a rail transit depot. The method is applied to a rail transit DCC system server. The rail transit DCC system server (hereinafter referred to as the DCC system) can be understood as a system server that uniformly commands train operation within the depot. This DCC system is mainly responsible for data transmission and coordination related to daily vehicle maintenance, shunting, and other vehicle entry and exit operations. This system has high-speed acquisition and storage of communication data packets and permission distribution functions. The above-mentioned method for controlling power outages and restorations in the protected area of ​​a rail transit depot can be applied to rail transit, petrochemical, power transmission, substation, and distribution networks, mainly involving safe operation processes in these fields.

[0041] To facilitate understanding of this embodiment, the specific process of this embodiment is described below. Please refer to [link / reference]. Figure 1 This invention provides an embodiment of a power outage and restoration control method for a protected area of ​​a rail transit vehicle depot, comprising:

[0042] Step S101: Obtain power control request information through the request cancellation point terminal; wherein, the power control request information is power outage request information or power supply request information; the power outage request information or power supply request information includes: the target track to be controlled and the target operating mode; the target operating mode includes the large five-prevention request cancellation point mode, the small five-prevention request cancellation point mode or the small five-prevention independent mode.

[0043] The aforementioned power outage / restoration request terminal is a terminal device used to apply for power outage / restoration operations. It can be a handheld terminal, an all-in-one terminal, etc. Staff can log in to the terminal and input basic power outage / restoration request or cancellation information. The input includes the power outage / restoration track information, operation time, operator, supervisor, and reason for the outage / restoration. It should be noted that the terminal is interconnected with the DCC system, allowing information exchange so that the system can determine the subsequent power outage / restoration operation mode based on the input information. The aforementioned power control request information is determined by the basic power outage / restoration request information input by the staff, indicating the execution content of the power control operation. There are two types of power control request information: power outage request information and power restoration request information, corresponding to power outage and power restoration operations in power control operations. The aforementioned tracks are numbered tracks within the depot, used to determine the specific location where vehicles stop. Generally, to facilitate vehicle maintenance, some tracks also have maintenance platforms built next to them.

[0044] In this step, the DCC system obtains power control request information through the request / cancellation terminal. This information can be either power outage or power restoration requests. The power outage or power restoration request information includes the target track to be controlled and the target operating mode. The target track can be a track equipped with a maintenance platform or a track without one. The target operating mode refers to the interlocking function mode for power outages and restorations within the protection zone of the target track. This interlocking function can be divided into three modes: the large-scale five-prevention request / cancellation mode, the small-scale five-prevention request / cancellation mode, and the small-scale five-prevention independent mode. The large-scale five-prevention request / cancellation mode has the highest intelligence, while the small-scale five-prevention independent mode has the lowest. The target operating mode can be one of these three modes.

[0045] In this method, power control request information is input through the request / cancellation point terminal, and the DCC system obtains the power control request information through the request / cancellation point terminal, avoiding the trouble of handwriting power outage and restoration work orders and improving maintenance work efficiency.

[0046] Step S102: If the target operation mode is the five-prevention request cancellation mode, send the power control request information to the terminal device of the designated personnel to obtain the approval information of the designated personnel.

[0047] It is understandable that power control requests require review by designated personnel to ensure the accuracy of the information. These designated personnel can be one or more, depending on the needs.

[0048] Here, after obtaining power control request information through the request cancellation terminal, if the target operation mode is the five-prevention request cancellation mode, the DCC system will automatically send the power control request information to the terminal device of the designated personnel. The terminal device will remind the designated personnel to review it through sound, light, vibration and other means. After receiving the message, the designated personnel will review it according to the actual situation. After the review is approved, the DCC system will receive the approval information from the designated personnel.

[0049] Step S103: Obtain the approved power control request information through the five-prevention safety interlocking workstation terminal, generate an operation ticket based on the power control request information, and send the operation ticket to the grounding control terminal.

[0050] The aforementioned five-prevention safety interlocking workstation is a safety interlocking management workstation set up to ensure the safety of personnel and equipment during maintenance operations in the depot. The workstation can collect real-time status and operational information of relevant equipment within the depot, including isolating switches, voltage testing points, grounding points, and maintenance platform doors, and display this information in the background. Before actual operation, the workstation performs a simulation to determine the interlocking logic of the operation steps, generating an operation ticket and a sequence of operations conforming to anti-misoperation logic, which is then transmitted to the grounding control terminal. This ensures that operators follow the prompts during actual operation, guaranteeing correct execution of the work. The grounding control terminal can be understood as a small computer that receives signals from the five-prevention safety interlocking workstation and automatically connects the grounding device, eliminating manual operation. Compared to computer keys, this reduces human involvement and achieves a more automated, intelligent, and safer effect.

[0051] Here, the power control request terminal, DCC system, five-prevention safety interlocking workstation, and grounding control terminal are interconnected and share information. Staff can retrieve the approved power control request information from the power control request terminal on the five-prevention safety interlocking workstation terminal, correlate the operating equipment and personnel information contained in the power control request information, generate an operation ticket, and send the operation ticket to the grounding control terminal to facilitate the subsequent execution of the power control operation corresponding to the power control request information through the grounding control terminal.

[0052] In this step, the five-prevention safety interlocking workstation terminal generates an operation ticket based on the power control request information and sends it to the grounding control terminal, ensuring that the operation process is standardized and safe. At the same time, the entire process does not require any manual writing of information, making it more intelligent and convenient.

[0053] Step S104: Power control operation is executed through the grounding control terminal; wherein, the power control operation includes power outage operation or power supply operation; the power control operation is matched with the power control point information.

[0054] After the operation ticket is sent to the grounding control terminal, the grounding control terminal can verify the relevant information in the operation ticket. When the verification is successful, the grounding control terminal controls the execution of the power control operation corresponding to the power control request information. The power control operation can be a power outage operation or a power supply operation.

[0055] Under this method, the grounding control terminal is used to prevent accidental locking of the disconnecting switches, grounding wires, and mesh gates in the train inspection depot. This eliminates the safety hazards that exist during vehicle maintenance, such as manually disconnecting, energizing, and connecting grounding wires to the contact network in the depot. Compared with the traditional five-prevention operation, which requires first using a voltage tester to check for electricity and then manually connecting the grounding wire, this method greatly improves work efficiency while ensuring personal safety.

[0056] The above provides a method for controlling power outages and restorations in the protection zone of a rail transit depot. Power control request information is obtained through a request / cancellation terminal. This power control request information includes either power outage or power restoration requests. The power outage or power restoration request information includes the target track to be controlled and the target operating mode. The target operating mode includes a large-scale five-prevention request / cancellation mode, a small-scale five-prevention request / cancellation mode, or a small-scale five-prevention independent mode. If the target operating mode is a large-scale five-prevention request / cancellation mode, the power control request information is sent to the terminal device of a designated person to obtain their approval. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated based on this information. The operation ticket is then sent to the grounding control terminal. The grounding control terminal controls and executes the power control operation. The power control operation includes either a power outage or power restoration operation. The power control operation is matched with the power control request information. In this method, power control request information, such as the target track and target operating mode, is obtained through the request cancellation point terminal. The target operating mode includes the large-scale five-prevention request cancellation point mode, the small-scale five-prevention request cancellation point mode, or the small-scale five-prevention independent mode. When the target operating mode is the large-scale five-prevention request cancellation point mode, the power control request information is sent to the terminal device of designated personnel to obtain approval information. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated and sent to the grounding control terminal. The power control operation is then executed through the grounding control terminal. This method achieves centralized closed-loop management of power outage and restoration control request information through the rail transit DCC system server, request cancellation point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal. The grounding control terminal is used to execute power control operations and automatically connect the grounding wire, eliminating manual operation and realizing intelligent and paperless power outage and restoration control processes in the maintenance work area. This ensures the safety of personnel and improves the efficiency of maintenance work.

[0057] The following embodiments provide specific implementation methods for obtaining power control point information.

[0058] Specifically, the target track to be controlled is obtained through the request / cancellation point terminal; based on the track type of the target track and the equipment status of the specified equipment, alternative operating modes are determined; the target operating mode is determined from the alternative operating modes through the request / cancellation point terminal; and power control request / cancellation information is generated based on the target track and the target operating mode.

[0059] After staff input basic power outage / restoration request information at the request cancellation point terminal, the DCC system obtains the target track information to be controlled. Based on the target track type and the equipment status of other specified devices, it provides a list of supported interlocking function modes as alternative operating modes for staff selection. Staff then select the target operating mode from the alternative modes through the request cancellation point terminal, generating power control request information based on the target track type and the target operating mode. It should be noted that if the alternative operating modes include the "Five-Prevention" request cancellation mode, the DCC system automatically determines the "Five-Prevention" request cancellation mode as the target operating mode.

[0060] Here, the type of track includes tracks equipped with maintenance platforms or tracks without maintenance platforms; the selection of alternative operating modes can be based on the following methods:

[0061] If the cancellation point terminal is operating normally, and the target track in the power control cancellation information is equipped with a maintenance platform, and the grounding control terminal is operating normally, the alternative operating modes are determined to be the large-scale five-prevention cancellation point mode, the small-scale five-prevention cancellation point mode, and the small-scale five-prevention independent mode; if the cancellation point terminal is operating normally, but the target track in the power control cancellation information is not equipped with a maintenance platform, or the grounding control terminal is faulty, or the five-prevention safety interlocking workstation terminal is faulty, the alternative operating modes are determined to be the small-scale five-prevention cancellation point mode and the small-scale five-prevention independent mode; if the cancellation point terminal is faulty, the alternative operating mode is determined to be the small-scale five-prevention independent mode.

[0062] In other words, the designated equipment can be the cancellation point terminal and the grounding control terminal. When the cancellation point terminal is operating normally, the target track is equipped with a maintenance platform, and the grounding control terminal is operating normally, the alternative operating modes are the large-scale five-prevention cancellation point mode, the small-scale five-prevention cancellation point mode, and the small-scale five-prevention independent mode. When the cancellation point terminal is operating normally, but at least one of the following situations occurs: the target track in the power control cancellation information is not equipped with a maintenance platform, the grounding control terminal is faulty, or the five-prevention safety interlocking workstation terminal is faulty, the alternative operating modes are determined to be the small-scale five-prevention cancellation point mode and the small-scale five-prevention independent mode. When the cancellation point terminal is faulty, the alternative operating mode is the small-scale five-prevention independent mode.

[0063] In this approach, the DCC system provides corresponding backup operation modes for power outages and restorations to meet the needs of various situations, ensuring the normal implementation of power outage and restoration operations. Based on the backup operation modes, it can easily and quickly help staff determine the target operation mode. When the backup operation modes include the "Five Major Preventive Measures Cancellation Point" mode, the system automatically determines the target operation mode as the "Five Major Preventive Measures Cancellation Point" mode, further improving the efficiency of maintenance operations.

[0064] The following embodiments provide a specific implementation of power outage and restoration control in the protection zone of a rail transit depot after determining the target operation mode as the "Big Five-Prevention Cancellation Point" mode.

[0065] First, the power control request information is sent to the terminal device of the designated personnel to obtain their approval information;

[0066] In practice, when the target operation mode is the "Big Five Defenses Request Cancellation Mode," the DCC system automatically sends the power control request information to the designated personnel's terminal device. The terminal device can remind the designated personnel to review the power control request information through sound, light, vibration, etc. When there are multiple designated personnel, approval can be completed by swiping a card or entering a password. Once the designated personnel approve the request, the DCC system will receive an approval notification.

[0067] Furthermore, the power control request information corresponding to the operation permissions is sent to the grounding control terminal corresponding to the target track.

[0068] After receiving the approval information from the designated personnel, the DCC system will automatically issue access permissions for the relevant protected areas and the grounding control terminals associated with the tracks to the relevant personnel based on the target track information of the power control request.

[0069] Furthermore, the power outage request information or power restoration request information also includes operation information; the operation information includes one or more of the target equipment to be operated, the operator, and the monitoring personnel; the approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and the invoice information is extracted from the power control request information; the invoice information includes: the target equipment to be operated, the operator, and the monitoring personnel; the invoice information is the same as the operation information in the power control request information; an operation ticket is generated based on the invoice information, and the operation ticket is sent to the grounding control terminal.

[0070] In this step, staff, such as the DCC control director, need to log in to the five-prevention safety interlocking workstation terminal to retrieve power control request information from the request cancellation point terminal. The five-prevention safety interlocking workstation extracts the invoicing information of the target equipment to be operated, the operator, and the supervisor based on these power outage request information or power restoration request information, generates an operation ticket, sends the operation ticket to the grounding control terminal, and notifies the relevant personnel that the power outage operation has been approved and that power control operations can be performed in the five-prevention request cancellation point mode.

[0071] In this step, by retrieving the power control request information from the request point terminal, the target equipment and personnel information to be operated are forcibly associated with the information in the operation ticket, so that the employee's permissions in the protected area are bound to the request point terminal, and the accuracy of the operation is ensured by associating and controlling the card through technical means.

[0072] Furthermore, the interlocking table information corresponding to the operation ticket is obtained through the grounding control terminal, and it is determined whether there is at least one power control request information corresponding to the operation ticket in the interlocking table; if there is at least one power control request information corresponding to the operation ticket, it is determined whether each power control request information has been approved; if all power control request information has been approved, a notification of approved operation is returned to the cancellation point terminal; the operation instruction is obtained through the grounding control terminal, and the power control operation is executed based on the operation instruction.

[0073] The above operation instructions are generated by the grounding control terminal based on the operation ticket information. These instructions can be prompted by voice to guide the operator to perform the power control operation step by step until it is completed.

[0074] Here, after the grounding control terminal receives the operation ticket, it needs to verify the corresponding interlocking table information. The interlocking table information displays multiple items, including request / cancellation point task information, whether power supply is permitted, whether power outage is permitted, platform information, personnel information, and task time information. Generally, the request / cancellation point task information in the interlocking table involves multiple request / cancellation point tasks. Therefore, before executing the power control operation corresponding to the power control request / cancellation information according to the operation ticket, it is necessary to determine whether all power control request / cancellation information corresponding to the current operation ticket exists in the interlocking table. If these power control request / cancellation information exist, it is then determined whether each power control request / cancellation information has been approved. Only when the power control request / cancellation information corresponding to the operation ticket exists and each power control request / cancellation information shows approval can the interlocking table information verification be considered successful. After the interlocking table information verification is successful, the grounding control terminal will return an approval operation notification to the request / cancellation point terminal. Only after receiving the approval operation information is the staff allowed to enter the protected area, open the grounding control terminal, obtain operation instructions through the grounding control terminal, and complete the power control operation according to the voice prompts.

[0075] It should be noted that the verification process for the interlocking table information varies depending on the type of power outage and restoration information corresponding to the power control request information.

[0076] In one scenario, when the power control request information is a power outage request, the grounding control terminal checks the power outage and restoration interlocking table information. It checks whether the power outage request information exists in the request task information column. If it does, it checks whether the power outage and restoration flags under the platform where the request task is located meet the conditions of "power outage not allowed" and "power outage allowed". If both conditions are met, it means that the power outage interlocking table verification is passed and the power outage is allowed; otherwise, the power outage is not allowed.

[0077] In another scenario, when the power control request information is for power supply, the interlocking table information also needs to ensure that the protection zone clearing operation is completed. That is, if the task information column for canceling the request indicates a power supply request, and the power outage / suppression flags on the platform where the request task is located meet the conditions of "power supply permitted" and "power outage not permitted," it is still necessary to further verify that the clearing operation on that platform is complete before confirming that the power supply interlocking table verification has passed.

[0078] Table 1 below is an example of a locking table, which includes multiple fields. The explanation of each field is shown in Table 1.

[0079] Table 1

[0080]

[0081] In one approach, the completion of the clearing operation can be determined as follows:

[0082] The number of personnel in the protected area corresponding to the target track is obtained through the access control terminal; the exit signal is obtained through the exit point terminal; the exit signal is used to indicate that the protected area corresponding to the target track has been inspected; if the number of personnel is zero, the exit signal is obtained, the exit completion confirmation instruction is obtained through the exit point terminal, and the designated access control of the protected area is in the closed state, the exit operation is confirmed to be completed.

[0083] The clearing process can be understood as the process of inspecting the protected area corresponding to the target track to ensure that personnel have evacuated the protected area. Personnel performing the operation, such as power supply operators and supervisors, execute the clearing process according to the operation ticket from the grounding control terminal. In one method, the clearing process is as follows: the power supply operator and supervisor enter the protected area platform and, in order from the tail to the head of the storage area, swipe their access cards sequentially (entering at the tail and exiting at the head) to inspect the protected area. During the inspection, a clearing signal can be generated via the access card or other signal generator and reported to the cancellation point terminal to indicate that the protected area corresponding to the target track has been inspected. After the personnel performing the operation have completed their inspection, the tail door is closed. Alternatively, to accurately determine the number of personnel in the protected area based on card swipe records, access cards can be set to be revoked immediately after each swipe at the corresponding location. This allows the access control terminal to obtain the number of personnel entering the protected area corresponding to the target track, achieving the purpose of technically controlling the clearing operation.

[0084] Here, the DCC system receives the clearing signal from the cancellation point terminal and confirms the number of personnel on the platform through the access control terminal. It then confirms again whether the clearing is complete and receives a clearing completion confirmation instruction. When the following conditions are met simultaneously: the number of personnel is zero, a clearing signal has been received, a clearing completion confirmation instruction has been received, and the designated access control of the protected area, such as the warehouse tail door, is closed, the clearing operation can be considered complete.

[0085] In this method, the number of personnel in the protected area is determined through the access control terminal, and whether the clearing operation has been completed is determined through the cancellation point terminal, grounding control terminal, and rail transit DCC system server. The platform personnel clearing operation technology is linked and controlled, which ensures the safety of the staff and improves the efficiency of maintenance work.

[0086] Furthermore, the power outage and restoration interlocking table is verified through the grounding control terminal to ensure the accuracy of power control request information and the correctness of operations. The power outage and restoration operation process is managed in a closed loop and bound to the request cancellation point. The power outage and restoration control request information is centrally managed in a closed loop through equipment such as the rail transit DCC system server, request cancellation point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal. The power control operation is executed by controlling the grounding terminal to complete the automatic grounding wire connection, eliminating manual operation and realizing the intelligent and paperless power outage and restoration control process in the maintenance work area. This ensures the safety of the staff and improves the efficiency of maintenance work.

[0087] After the personnel performing the operation complete the power control operation, they also need to cancel the operation at the cancellation point terminal.

[0088] Specifically, the power control cancellation information is obtained through the cancellation point terminal; it is determined whether the grounding control terminal has been turned off. If the grounding control terminal has been turned off, the power control cancellation information is confirmed to have been successfully submitted; the operation permissions corresponding to the power control cancellation information of the grounding control terminal are revoked, and the power control cancellation information is sent to the terminal device of the designated personnel to obtain the review information of the designated personnel.

[0089] In practice, after completing the power control operation, the personnel performing the task need to close the grounding control terminal and return to the cancellation point terminal to input the power control cancellation information. The DCC system obtains the power control cancellation information through the cancellation point terminal, checks if the grounding control terminal door is closed, and confirms successful submission of the power control cancellation information when the door is closed. It then revokes access permissions for the protected area and the grounding control terminal. Finally, the power control cancellation information is sent to the designated personnel's terminal device to obtain their approval. For example, the system sends the power control cancellation information to the signal tower for password or card confirmation, then to the DCC control supervisor for review. Once approved, the process is archived.

[0090] The above method provides the implementation process of power outage and restoration control in the protection zone of the rail transit depot when the target operation mode is the five-prevention request cancellation point mode. The power outage and restoration control request point information is centrally managed by the rail transit DCC system server, request cancellation point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal equipment. The power control operation is executed by using the grounding control terminal, realizing the intelligent and paperless power outage and restoration control process in the maintenance work area, ensuring the safety of the staff and improving the efficiency of maintenance work.

[0091] The following embodiments provide the specific manifestation of the power outage and restoration control of the protection zone of the rail transit vehicle depot when the target operation mode is the small five-prevention cancellation point mode.

[0092] Specifically, if the target operation mode is the "small five-prevention request and cancellation point" mode, the power control request information is sent to the terminal device of the designated personnel to obtain their approval information; access control permissions are issued to the access control terminal in the protection area corresponding to the target track; an operation ticket is generated through the designated invoicing operation and sent to the computer key; the access control terminal controls the staff to enter the protection area so that the staff can perform power control operations through the computer key; the power control operation includes power outage operation or power supply operation; the power control operation is matched with the power control request information.

[0093] In practice, after obtaining power control request information through the request cancellation point terminal, if the target operation mode is the "small five-prevention request cancellation point" mode, the DCC system submits the power control request information to the designated personnel's terminal device. The terminal device will remind the designated personnel to review the power control request information through sound, light, vibration, etc. After receiving the message, the designated personnel will review it according to the actual situation. After the review is approved, the system will receive the approval information from the designated personnel. After receiving the approval information, the system will automatically issue the access control permissions for the relevant protected areas according to the target track information of the power control request information. Further, based on the content of the power control request information, the system will simulate invoicing, generate an operation sequence, issue the issued invoice to the computer key, and notify the relevant personnel to approve the execution of the power control operation. After receiving the approval notification, the relevant personnel will enter the protected area by swiping a card or using facial recognition technology, and follow the prompts on the computer key to perform the power control operation corresponding to the power control request information step by step. The power control operation includes power outage or power restoration operations.

[0094] Similarly, when the power control request information is a power supply request information, it is also necessary to operate the designated inspection terminal in the protected area through the computer key to confirm that the clearing operation is completed.

[0095] In the small-scale prevention and control point cancellation mode, the clearance process is as follows: After entering the protected area, the personnel performing the operation task, such as the operator and the supervisor, take the computer key and operate the inspection terminal equipment on the platform of the protected area in turn, and inspect it to ensure that no personnel are left behind. The clearance is then completed. Therefore, the clearance operation can be determined based on the operation record of the computer key.

[0096] Finally, after the personnel performing the operation complete the power control operation, they also need to complete the cancellation process at the cancellation point terminal. Specifically, the cancellation point terminal obtains the power control cancellation information; it revokes the access control permissions corresponding to the power control cancellation information from the access control terminal; and it sends the power control cancellation information to the designated personnel's terminal device to obtain the designated personnel's approval information.

[0097] In practice, after completing the power supply operation, the personnel performing the task return to the power control cancellation terminal to input the power control cancellation information. Upon receiving this information, the DCC system simply revoks the access control permissions for the protected area and sends the power control cancellation information to the designated personnel's terminal device to obtain their approval. For example, the system sends the power control cancellation information to the signal tower for password or card confirmation, then sends it to the DCC control supervisor for review. Once approved, the process is archived.

[0098] The above method provides the implementation process of power outage and restoration control in the protection zone of the rail transit depot when the target operation mode is the small-scale five-prevention cancellation point mode. In this process, the rail transit DCC system server and cancellation point terminal are used to complete the paperless cancellation point information transmission process, and the issued operation ticket is issued to the computer key. According to the computer key prompts, the clearing and power control operation process is completed, which ensures the safety of the staff and improves the efficiency of maintenance work.

[0099] The following embodiments provide the specific manifestation of the power outage and restoration control of the protected area when the target operation mode is the small five-proof independent mode.

[0100] Specifically, if the target operation mode is the independent five-prevention mode, an operation ticket is generated through the five-prevention safety interlocking workstation terminal and sent to the computer key. In the independent five-prevention mode, designated personnel operate the five-prevention safety interlocking workstation terminal to generate the operation ticket. The power control request information is paper-based and approved by designated personnel. The universal key corresponding to the protection area of ​​the target track controls the personnel to enter the protection area, enabling them to perform power control operations using the computer key. The power control operations include power outage or power restoration operations. The power control operations are matched with the power control request information.

[0101] Here, when the target operation mode is the independent mode of the five-prevention system, staff need to fill out a paper work application form at the DCC dispatch office, obtain power control request information from the work application form, and then approve it. In this embodiment, the power control request information is approved by the aforementioned designated personnel, such as the control director. Based on the approved power control request information, the designated personnel operate on the five-prevention safety interlocking workstation terminal and generate an operation ticket, generate an operation sequence, and issue the issued operation ticket to the computer key. Using the universal key of the protection area corresponding to the target track, the personnel performing the operation task are controlled to enter the protection area. According to the computer key operation instructions, the personnel performing the operation task execute the power control operation corresponding to the power control request information step by step until completion. The power control operation includes power outage operation or power restoration operation.

[0102] Similarly, when the power control request information is a power supply request information, it is also necessary to operate the designated inspection terminal in the protected area through the computer key to confirm that the clearing operation is completed.

[0103] The clearing process of the small-scale independent mode is as follows: After entering the protected area, the personnel performing the operation task, such as the operator and the supervisor, take the computer key and operate the inspection terminal equipment on the platform of the protected area in turn, and inspect it to ensure that no personnel are left behind. The clearing is then completed. Therefore, the clearing operation can be determined based on the operation record of the computer key.

[0104] Finally, after completing the power control operation, the personnel performing the operation only need to return to the DCC dispatch room, return the master key and computer key, have the plant dispatch and signal building sign for confirmation, and complete the power outage and restoration process filing.

[0105] The above process requires filling out a paper work application form, which is then manually approved and managed. An operation ticket is generated through the five-prevention safety interlocking workstation terminal and sent to the computer key. The clearing and power control operations are completed according to the computer key prompts, ensuring the safety of the staff. When the request and cancellation point system malfunctions, the power outage and restoration operations can be carried out normally.

[0106] The above describes the manifestations of power outage and power restoration control in the protection zone of rail transit depot under three operating modes. The following sections will provide a detailed introduction to the entire process of each operating mode from the perspectives of power outage application and power restoration application.

[0107] In one embodiment, the flowchart of the "Big Five Defense Cancellation Point" mode is as follows: Figure 2 As shown below, the application process for power outage operations under the "Big Five Defenses Cancellation Point" mode is described in detail.

[0108] 1) The person performing the power outage work, such as the operator and the supervisor, logs into the power outage request terminal (i.e., the aforementioned power outage request terminal), applies for a power outage operation on the track, and fills in the basic power outage application information, which includes: the target track to be controlled, the time of the power outage operation, the operator of the power outage, the supervisor of the power outage, the reason for the power outage, etc. The DCC system provides the supported power outage operation modes for selection according to the track type. Tracks with maintenance platforms default to the five-prevention power outage request mode and submits it to the DCC control director for review.

[0109] 2) Upon receiving the power outage request, the DCC control director will approve the power outage based on the situation. Then, the control director, plant dispatchers, and signal tower personnel will swipe their cards or enter their passwords in sequence to approve the power outage.

[0110] 3) After the power outage is approved, the DCC system automatically issues access permissions to the protection zone access control and the grounding control terminal associated with the track involved in the power outage application based on the power outage request information;

[0111] 4) The DCC control supervisor logs into the five-prevention safety interlocking workstation terminal, selects the approved power outage request form, and automatically imports the invoicing information, including the operating equipment, operator, and supervisor. Then, during simulated invoicing, a forced association is established, generating an operation sequence. The completed invoice is then sent to the designated grounding control terminal. The grounding control terminal verifies the power outage interlocking table information and notifies the power outage operator that the power outage operation has been approved and can proceed with the five-prevention power outage request form. It should be noted that when generating the operation ticket, the operating equipment, operator, supervisor, and power outage request information on the operation ticket must be consistent. In the future, automatic ticket generation can be achieved, eliminating the need for simulated invoicing.

[0112] 5) Upon receiving permission to perform a power outage, the worker enters the protected area by swiping their card or using facial recognition.

[0113] 6) The person performing the power outage operation swipes their card to open the grounding control terminal door. The DCC system automatically retrieves the operation task requested by the person who swipes their card. Then, following the system's voice prompts, the person operates step by step to complete the power outage process.

[0114] 7) After the power outage operation is completed, the person performing the power outage operation manually closes the grounding control terminal door and returns to the power outage cancellation terminal to apply for power outage cancellation. When cancelling, the DCC system determines whether the grounding control terminal door is closed. If it is not closed, the cancellation application is not allowed to be submitted. If the cancellation application is successfully submitted, the DCC system automatically revoks the access rights of the protection zone and the grounding control terminal involved in the power outage operation.

[0115] 8) The power outage task application is submitted to the DCC control director for review. After the review is completed, the power outage process is archived.

[0116] In another embodiment, the application process for power supply operation under the "five-prevention cancellation point" mode is described in detail.

[0117] 1) Power supply workers, such as power supply operators and power supply supervisors, log in to the power outage request terminal (i.e., the aforementioned power outage request terminal), apply for power outage operation on the track, and fill in the basic power supply application information. The basic power outage application information includes: the target track to be controlled, the power supply operation time, the power supply operator, the power supply supervisor, the reason for power supply, etc. The DCC system provides the supported power supply operation modes for selection according to the track type. Tracks with maintenance platforms default to the five-prevention power outage request mode and submit it to the DCC control director for review.

[0118] 2) Upon receiving the power supply request, the DCC control director approves the power supply based on the actual situation. Then, the DCC control director and the plant dispatcher swipe their cards or enter their passwords in turn to approve the power supply.

[0119] 3) After approval of power transmission, the DCC system automatically issues access control permissions for the protected areas, clearing platforms and grounding control terminals involved in the power transmission operation;

[0120] 4) The DCC control supervisor logs into the five-prevention safety interlocking workstation terminal, selects the approved power restoration application form for the cancellation point, and automatically imports the invoicing information, including the operating equipment, operator, and supervisor. Then, during simulated invoicing, a forced association is established, generating an operation sequence. The completed invoice is then sent to the designated grounding control terminal. The grounding control terminal verifies the power restoration interlocking table information and notifies the power outage operator that the power restoration operation has been approved and can proceed with the large-scale five-prevention cancellation point mode power outage. It should be noted that when generating the operation ticket, the operating equipment, operator, supervisor, and power restoration application information on the operation ticket must be consistent. In the future, automatic ticket generation can be achieved, eliminating the need for simulated invoicing.

[0121] 5) After receiving the power supply permission notice, the power supply worker shall swipe his card or use facial recognition to enter the protected area;

[0122] 6) The power supply operator swipes their card to open the grounding control terminal, views the list of pending power supply tasks, selects the task to be executed, and follows the system's voice prompts step-by-step to complete the power supply process. The clearing process involves the operator going to the platform and swiping their access card from the tail of the warehouse to the head of the warehouse, swiping the entry card at the tail and exit card at the head, completing a round of inspection to clear the area. For example, the card swiping sequence could be tail entry 1, tail exit 2, head entry 1, head exit 2. During the inspection, a clearing signal can be generated via access card or other signal generators and reported to the cancellation point terminal to indicate that the protected area corresponding to the target track has been inspected. After the operator completes the inspection, the tail door is closed. Furthermore, to accurately determine the number of personnel in the protected area based on card swipe records, access cards can be set to be revoked immediately after each swipe at the corresponding location. This allows the access control terminal to obtain the number of personnel entering the protected area corresponding to the target track, achieving technical control over the clearing operation. After receiving the clearing signal from the cancellation point terminal and confirming the number of personnel on the platform through the access control terminal, the DCC system will confirm again whether the clearing is complete and receive a clearing completion confirmation instruction. The clearing operation can be determined to be complete when the following conditions are met simultaneously: the number of personnel is zero, a clearing signal has been received, a clearing completion confirmation instruction has been received, and the designated access control of the protected area, such as the warehouse tail door, is closed.

[0123] 7) After the power supply operation is completed, the power supply operator manually closes the grounding control terminal door and returns to the power supply cancellation terminal to apply for power supply cancellation. When cancelling, the system determines whether the grounding control terminal door is closed. If it is not closed, the cancellation application is not allowed to be submitted. If the cancellation application is successfully submitted, the DCC system will revoke the access rights of the protection zone access control and the grounding control terminal.

[0124] 8) The power supply cancellation application is submitted to DCC. The signal tower first confirms the cancellation with a password or card, and then the DCC control director reviews and approves the cancellation. The power supply process is then archived.

[0125] It should be noted that the process of the grounding control terminal verifying the power outage and restoration interlocking information can be carried out in the following manner:

[0126] When the power control request information is a power outage request information, the grounding control terminal checks the power outage and power supply interlocking table information. It checks whether the power outage request information is in the request cancellation task information column. If it is, it checks whether the platform where the request task is located meets the conditions of "not allowing power supply" and "allowing power outage". If both conditions are met, it means that the power outage interlocking table verification is passed and the power outage is allowed; otherwise, the power outage is not allowed.

[0127] When the power control request information is a power supply request, the interlocking table information also needs to ensure that the protection zone clearing operation is completed. In other words, after determining that there is a power supply request in the request cancellation task information column, and determining that the platform where the request task is located meets the conditions of "power supply allowed" and "power outage not allowed", it is still necessary to further determine that the clearing operation under that platform is completed before the power supply interlocking table verification is confirmed to be successful.

[0128] This approach utilizes equipment such as the rail transit DCC system server, power outage / restoration point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal to establish a new power outage / restoration management model that integrates functions such as electronic power outage / restoration point, power outage / restoration management, error prevention judgment, interlocking management, and interlocking management. This changes the current operational process that relies excessively on purely manual management and is inefficient in hanging and removing grounding equipment. It ensures the operational safety of work leaders and maintenance personnel while also gaining more effective maintenance time.

[0129] The core feature of this invention is that it ensures the safety of each operation by centrally managing the work process through information, realizes the intelligent and paperless operation of the entire work process, and truly improves the efficiency of on-site operation and maintenance.

[0130] In one embodiment, the flowchart of the Xiaowu prevention and cancellation point mode is as follows: Figure 3 As shown below, the application process for power outage operations under the "small five-prevention request cancellation point" mode is described in detail.

[0131] 1) The person performing the power outage work, such as the operator and the supervisor, logs into the power outage request terminal (i.e., the aforementioned power outage request terminal), applies for a power outage operation on the track, and fills in the basic power outage application information, which includes: the target track to be controlled, the time of the power outage operation, the operator of the power outage, the supervisor of the power outage, the reason for the power outage, etc. When the power outage request terminal is operating normally, but the target track does not have a maintenance platform installed, or the grounding control terminal is faulty, or the five-prevention safety interlocking workstation terminal is faulty, the DCC control director and equipment personnel swipe their cards or enter their passwords to switch to the small five-prevention power outage request mode and submit it for review by the DCC control director.

[0132] 2) Upon receiving the power outage application, the DCC control director approves the power outage based on the actual situation. Then, the control director, plant dispatchers, and signal tower personnel swipe their cards or passwords in sequence to approve the outage.

[0133] 3) Upon completion of the review, the DCC system automatically authorizes and issues access control permissions for the protected areas involved in the power outage operation;

[0134] 4) DCC dispatch selects the approved power outage task, simulates ticketing according to the power outage mode in the power outage task, generates an operation sequence, sends the ticket to the computer key, and notifies the power outage operator that the power outage operation has been approved and can proceed with the small five-prevention cancellation point mode power outage.

[0135] 5) Personnel performing power outage work must swipe their cards or use facial recognition to enter the protected area;

[0136] 6) The power outage worker (follows the computer key operation instructions, follows the steps one by one, and finally completes the power outage process);

[0137] 7) After the power outage is completed, return to the power outage cancellation terminal and apply for power outage cancellation. The DCC system will then reclaim the access control permissions for the protected area.

[0138] 8) The power outage cancellation application is submitted to the DCC control director for review. Once approved by DCC, the power outage process is archived.

[0139] In another embodiment, the application process for power supply operation under the "small five-prevention cancellation point" mode is described in detail.

[0140] 1) Power supply workers, such as power supply operators and power supply supervisors, log in to the power outage request terminal (i.e., the aforementioned power outage request terminal), apply for track power outage operation, and fill in the basic power outage application information, which includes: the target track to be controlled, the power supply operation time, the power supply operator, the power supply supervisor, the reason for power supply, etc. When the power outage request terminal is operating normally, but the target track does not have a maintenance platform installed, or the grounding control terminal malfunctions, or the five-prevention safety interlocking workstation terminal malfunctions, the DCC control director and equipment personnel swipe their cards or enter their passwords to switch to the small five-prevention request terminal mode and submit it for review by the DCC control director.

[0141] 2) Upon receiving the power supply request, the DCC control director will approve the power supply based on the circumstances. Then, the control director and the plant dispatcher will swipe their cards or passwords in sequence to approve the power supply.

[0142] 3) Upon completion of the review, issue access control permissions for the protected area involved in the power transmission operation;

[0143] 4) DCC dispatch selects the power outage task that has been approved by the plant dispatch, simulates the issuance of invoices, generates the operation sequence, sends the issued invoices to the computer key, and notifies the power restoration operator that the power restoration operation has been approved and can proceed with clearing and power restoration.

[0144] 5) After receiving the notification, the power supply worker shall swipe their card or use facial recognition to enter the protected area;

[0145] 6) The power supply operator shall follow the instructions on the computer key and operate step by step to complete the power supply process; the clearing process is as follows: the power supply operator goes up to the platform, takes the computer key and operates the inspection points on the platform one by one, inspects them, and completes the clearing.

[0146] 7) After the power supply operator completes the power supply operation, he / she returns to the power supply cancellation terminal to continue applying for power supply cancellation. The DCC system reclaims the access control permissions for the protected area.

[0147] 8) The power supply cancellation application is submitted to DCC. The signal tower first swipes a card or password to confirm, and then the DCC control director reviews and approves the cancellation. The power supply process is then archived.

[0148] In the above process, the paperless information transmission of the request and cancellation point is completed by using the rail transit DCC system server and the request and cancellation point terminal. The issued operation ticket is then sent to the computer key. Following the prompts of the computer key, the clearing and power outage and restoration operations are completed, which ensures the safety of the staff and improves the efficiency of maintenance work.

[0149] In one embodiment, the flowchart of the small-scale independent defense mode is as follows: Figure 4 As shown below, the application process for power outage operations under the independent mode of the small five-prevention system is described in detail.

[0150] 1) Personnel performing power outage work, such as operators and supervisors, should fill out a paper power outage application form at the DCC dispatch office;

[0151] 2) The DCC control director, plant commissioning and signal building staff sign and confirm;

[0152] 3) The DCC control director operates (password verification) at the five-prevention safety interlocking workstation terminal to switch to independent operation mode.

[0153] 4) The DCC control director simulates issuing a ticket on the terminal of the five-prevention safety interlocking workstation, fills in the information of the power outage operator and the supervisor, generates the operation sequence, issues the issued ticket to the computer key, and gives the universal key of the area where the power outage track is located to the power outage operator.

[0154] 5) The person performing the power outage work uses a master key to open the protected area door;

[0155] 6) The power outage worker shall follow the computer key operation instructions step by step to complete the power outage process.

[0156] 7) After the power outage is completed, the power outage operator shall return to the DCC dispatch room to return the master key and computer key, fill in the power outage completion information, submit the paper form to the dispatcher for confirmation, and archive the power outage process.

[0157] In another embodiment, the application process for power supply operation under the "small five-prevention cancellation point" mode is described in detail.

[0158] 1) Power transmission workers, such as operators and supervisors, should fill out a paper power transmission application form at the DCC dispatch office;

[0159] 2) The DCC control director signs and reviews the document; the plant control director also signs and reviews the document.

[0160] 3) The DCC control director switches to independent operation mode at the terminal of the five-prevention safety interlocking workstation.

[0161] 4) The DCC control director simulates issuing a ticket on the terminal of the five-prevention safety interlocking workstation, fills in the information of the power supply operator and the supervisor, generates the operation sequence, issues the issued ticket to the computer key, and gives the universal key of the area where the power supply track is located to the power supply operator.

[0162] 5) The power supply operator, based on the approved power supply order, uses a master key to open the protected area door;

[0163] 6) The power supply operator shall follow the instructions on the computer key and operate step by step to complete the power supply process; the clearing process is as follows: the power supply operator goes up to the platform, takes the computer key and operates the inspection points on the platform one by one, inspects them, and completes the clearing.

[0164] 7) After completing the power transmission operation, the power transmission operator shall return to the DCC dispatch room and return the master key and computer key.

[0165] 8) The plant dispatch and signal tower sign and confirm, and complete the power supply process and file it.

[0166] During this process, an operation ticket needs to be generated through the five-prevention safety interlocking workstation terminal and sent to the computer key. Following the computer key prompts, the clearing and power control operations are completed to ensure the safety of the staff. When the cancellation point system malfunctions, the power outage and restoration operations can be carried out normally.

[0167] For the corresponding method embodiments described above, see [link to relevant documentation]. Figure 5 The diagram shows a structural schematic of a power outage and restoration control device for a rail transit depot protection zone. This device is installed on the rail transit DCC system server; the device includes:

[0168] The first acquisition module 501 is used to acquire power control request information through the request cancellation point terminal; wherein, the power control request information is power outage request information or power supply request information; the power outage request information or power supply request information includes: the target track to be controlled and the target operating mode; the target operating mode includes the large five-prevention request cancellation point mode, the small five-prevention request cancellation point mode or the small five-prevention independent mode.

[0169] The first sending module 502 is used to send power control request information to the terminal device of the designated personnel if the target operation mode is the five-prevention request cancellation mode, so as to obtain the approval information of the designated personnel.

[0170] The first generation module 503 is used to obtain the approved power control request information through the five-prevention safety interlocking workstation terminal, and generate an operation ticket based on the power control request information and send the operation ticket to the grounding control terminal.

[0171] The first execution module 504 is used to control and execute power control operations through a grounding control terminal; wherein, the power control operations include power outage operations or power supply operations; the power control operations are matched with power control point information.

[0172] The above provides a power outage and restoration control device for the protection zone of a rail transit vehicle depot. It obtains power control request information through a request / cancellation terminal. This power control request information includes either power outage or power restoration requests. The power outage or power restoration request information includes the target track to be controlled and the target operating mode. The target operating mode includes a large-scale five-prevention request / cancellation mode, a small-scale five-prevention request / cancellation mode, or a small-scale five-prevention independent mode. If the target operating mode is a large-scale five-prevention request / cancellation mode, the power control request information is sent to the terminal equipment of a designated person to obtain their approval. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated based on this information. The operation ticket is then sent to the grounding control terminal. The grounding control terminal controls and executes the power control operation. The power control operation includes either a power outage or power restoration operation. The power control operation is matched with the power control request information. In this method, power control request information, such as the target track and target operating mode, is obtained through the request cancellation point terminal. The target operating mode includes the large-scale five-prevention request cancellation point mode, the small-scale five-prevention request cancellation point mode, or the small-scale five-prevention independent mode. When the target operating mode is the large-scale five-prevention request cancellation point mode, the rail transit DCC system server sends the power control request information to the terminal device of designated personnel to obtain approval information. The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated and sent to the grounding control terminal. The grounding control terminal is then used to control and execute the power control operation. This method achieves centralized closed-loop management of power outage and restoration control request information through the rail transit DCC system server, request cancellation point terminal, five-prevention safety interlocking workstation terminal, and grounding control terminal. The grounding control terminal is used to control and execute the power control operation, automatically connecting the grounding wire, eliminating manual operation, and realizing intelligent and paperless power outage and restoration control processes in the maintenance work area. This ensures the safety of personnel and improves the efficiency of maintenance work.

[0173] The first acquisition module described above is used to acquire the target track to be controlled through the request / cancellation point terminal; determine the alternative operation modes based on the track type of the target track and the equipment status of the specified equipment; determine the target operation mode from the alternative operation modes through the request / cancellation point terminal; and generate power control request / cancellation information based on the target track and the target operation mode.

[0174] The aforementioned track types include: tracks equipped with maintenance platforms or tracks without maintenance platforms; the aforementioned device further includes a first determining module, used to determine the alternative operating modes as the large-scale five-prevention maintenance cancellation point mode, the small-scale five-prevention maintenance cancellation point mode, and the small-scale five-prevention independent mode if the cancellation point terminal is operating normally, the target track in the power control maintenance cancellation information is equipped with a maintenance platform, and the grounding control terminal is operating normally; if the cancellation point terminal is operating normally, but the target track in the power control maintenance cancellation information is not equipped with a maintenance platform, or the grounding control terminal malfunctions, or the aforementioned five-prevention safety interlocking workstation terminal malfunctions, the alternative operating modes are determined as the small-scale five-prevention maintenance cancellation point mode and the small-scale five-prevention independent mode; if the cancellation point terminal malfunctions, the alternative operating mode is determined as the small-scale five-prevention independent mode.

[0175] The aforementioned device also includes a second transmitting module, used to send the operation permissions corresponding to the power control request information to the grounding control terminal corresponding to the target track.

[0176] The aforementioned power outage request information or power restoration request information also includes operation information; this operation information includes one or more of the target equipment to be operated, the operator, and the monitoring personnel; the aforementioned first sending module is also used to obtain the approved power control request information through the five-prevention safety interlocking workstation terminal, and extract invoice information from the power control request information; wherein, the invoice information includes: the target equipment to be operated, the operator, and the monitoring personnel; the invoice information is the same as the operation information in the power control request information; an operation ticket is generated based on the invoice information, and the operation ticket is sent to the grounding control terminal.

[0177] The aforementioned first execution module is further configured to: obtain the interlocking table information corresponding to the operation ticket through the grounding control terminal, determine whether there is at least one power control request information corresponding to the operation ticket in the interlocking table; if there is at least one power control request information corresponding to the operation ticket, determine whether each power control request information has been approved; if all power control request information has been approved, return an approval operation notification to the cancellation point terminal; obtain the operation instruction through the grounding control terminal, and control the execution of power control operation based on the operation instruction.

[0178] The aforementioned power control request information is power supply request information; the aforementioned device also includes a second confirmation module, used to obtain the number of personnel in the protected area corresponding to the target track through the access control terminal; and to obtain a clearance signal through the clearance point terminal; wherein, the clearance signal is used to: indicate that the protected area corresponding to the target track has been inspected; if the number of personnel is zero, a clearance signal is obtained, a clearance completion confirmation instruction is obtained through the clearance point terminal, and the designated access control of the protected area is in the closed state, the clearance operation is confirmed to be completed.

[0179] The aforementioned device also includes a third sending module, used to obtain power control cancellation information through the cancellation point terminal; determine whether the grounding control terminal has been closed; if the grounding control terminal has been closed, confirm that the power control cancellation information has been successfully submitted; revoke the operation permission corresponding to the power control cancellation information of the grounding control terminal; and send the power control cancellation information to the terminal device of the designated personnel to obtain the review information of the designated personnel.

[0180] The aforementioned device further includes a second execution module, used to, if the target operation mode is the "small five-prevention request cancellation point" mode, send power control request information to the terminal device of a designated person to obtain the designated person's approval information; issue access control permissions to the access control terminal in the protection area corresponding to the target track; generate an operation ticket through a designated invoicing operation and send the operation ticket to the computer key; control the staff to enter the protection area through the access control terminal so that the staff can perform power control operations through the computer key; wherein, the power control operation includes power outage operation or power supply operation; the power control operation is matched with the power control request information.

[0181] The aforementioned device also includes a third determining module, used to operate a designated inspection terminal in the protected area via a computer key to determine that the clearing operation is complete.

[0182] The aforementioned device also includes a second acquisition module, used to acquire power control cancellation information through the cancellation point terminal; reclaim the access control permissions corresponding to the power control cancellation information from the access control terminal; and send the power control cancellation information to the terminal device of a designated person to obtain the designated person's review information.

[0183] The aforementioned device also includes a third execution module, used to generate an operation ticket through the five-prevention safety interlocking workstation terminal and send the operation ticket to the computer key if the target operation mode is the small five-prevention independent mode; wherein, in the small five-prevention independent mode, a designated person operates the five-prevention safety interlocking workstation terminal to generate the operation ticket; the power control request information is paper information and is approved by a designated person; the universal key corresponding to the protection area of ​​the target track controls the staff to enter the protection area, so that the staff can perform power control operations through the computer key; wherein, the power control operations include power outage operations or power supply operations; the power control operations are matched with the power control request information.

[0184] The aforementioned power control request information is power supply request information; the aforementioned device also includes a fourth determination module, used to operate a designated inspection terminal in the protected area via a computer key to determine that the clearing operation is complete.

[0185] This embodiment also provides a power outage and restoration control device for a protected area of ​​a rail transit depot, including a processor and a memory. The memory stores machine-executable instructions that can be executed by the processor. The processor executes the machine-executable instructions to implement the aforementioned power outage and restoration control method for the protected area of ​​a rail transit depot. This electronic device can be a server or a terminal device.

[0186] See Figure 6 As shown, the electronic device includes a processor 100 and a memory 101. The memory 101 stores machine-executable instructions that can be executed by the processor 100. The processor 100 executes the machine-executable instructions to implement the above-mentioned power outage and power supply control method for the protected area of ​​the rail transit vehicle depot.

[0187] Furthermore, Figure 6 The electronic device shown also includes a bus 102 and a communication interface 103, with the processor 100, the communication interface 103 and the memory 101 connected via the bus 102.

[0188] The memory 101 may include high-speed random access memory (RAM) or non-volatile memory, such as at least one disk storage device. Communication between this system network element and at least one other network element is achieved through at least one communication interface 103 (which can be wired or wireless), such as the Internet, wide area network, local area network, or metropolitan area network. The bus 102 may be an ISA bus, PCI bus, or EISA bus, etc. The bus can be divided into address bus, data bus, control bus, etc. For ease of representation, Figure 6 The symbol is represented by a single double-headed arrow, but this does not mean that there is only one bus or one type of bus.

[0189] Processor 100 may be an integrated circuit chip with signal processing capabilities. In implementation, each step of the above method can be completed by the integrated logic circuitry in the hardware of processor 100 or by instructions in software form. Processor 100 may be a general-purpose processor, including a Central Processing Unit (CPU), a Network Processor (NP), etc.; it may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field-Programmable Gate Array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components. It can implement or execute the methods, steps, and logic block diagrams disclosed in the embodiments of this invention. The general-purpose processor may be a microprocessor or any conventional processor. The steps of the methods disclosed in the embodiments of this invention can be directly manifested as execution by a hardware decoding processor, or execution by a combination of hardware and software modules in the decoding processor. The software module can reside in a readily available storage medium in the art, such as random access memory, flash memory, read-only memory, programmable read-only memory, electrically erasable programmable memory, or registers. This storage medium is located in memory 101, and the processor 100 reads the information from memory 101 and, in conjunction with its hardware, completes the steps of the method described in the foregoing embodiments.

[0190] This embodiment also provides a machine-readable storage medium storing machine-executable instructions. When the machine-executable instructions are called and executed by a processor, the machine-executable instructions cause the processor to implement the above-mentioned power outage and power supply control method for the protected area of ​​the rail transit vehicle depot.

[0191] The computer program product of the power outage and restoration control method, device, equipment and storage medium for the protection zone of rail transit vehicle depot provided in the embodiments of the present invention includes a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the methods described in the preceding method embodiments. For specific implementation, please refer to the method embodiments, which will not be repeated here.

[0192] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working process of the system and apparatus described above can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.

[0193] Furthermore, in the description of the embodiments of the present invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in the present invention based on the specific circumstances.

[0194] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this invention, essentially, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0195] In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0196] Finally, it should be noted that the above embodiments are merely specific implementations of the present invention, used to illustrate the technical solutions of the present invention, and not to limit it. The scope of protection of the present invention is not limited thereto. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that any person skilled in the art can still modify or easily conceive of changes to the technical solutions described in the foregoing embodiments within the technical scope disclosed in the present invention, or make equivalent substitutions for some of the technical features; and these modifications, changes, or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A method for controlling power outage and restoration in the protected area of ​​a rail transit vehicle depot, characterized in that, The method is applied to a DCC (Digital Control Center) system server for rail transit; the method includes: Power control request information is obtained through the request and cancellation point terminal; wherein, the power control request information is power outage request information or power supply request information; the power outage request information or power supply request information includes: the target track to be controlled and the target operating mode; the target operating mode includes the large five-prevention request and cancellation point mode, the small five-prevention request and cancellation point mode, or the small five-prevention independent mode; If the target operation mode is the five-prevention cancellation mode, the power control cancellation information is sent to the terminal device of the designated personnel to obtain the approval information of the designated personnel; The approved power control point information is obtained through the five-prevention safety interlocking workstation terminal, and an operation ticket is generated based on the power control point information and sent to the grounding control terminal. The power control operation is executed through the grounding control terminal; wherein the power control operation includes a power outage operation or a power supply operation; the power control operation is matched with the power control point information; If the target operation mode is the small five-prevention cancellation point mode, the staff can be controlled to enter the protection area through the access control terminal in the protection area corresponding to the target track, so that the staff can perform the power control operation; If the target operation mode is the small-scale independent protection mode, the staff can be controlled to enter the protection area through the universal key of the protection area corresponding to the target track, so that the staff can perform the power control operation.

2. The method according to claim 1, characterized in that, The steps for obtaining power control request information through the request / cancellation point terminal include: The target stock to be controlled is obtained through the cancellation point terminal; Based on the track type of the target track and the equipment status of the specified equipment, determine the alternative operation modes; The target operation mode is determined from the alternative operation modes through the cancellation point terminal; Power control request information is generated based on the target track and the target operating mode.

3. The method according to claim 2, characterized in that, The track types include: tracks equipped with maintenance platforms, or tracks without maintenance platforms. The step of determining alternative operating modes based on the track type of the target track and the equipment status of the specified equipment includes: If the request cancellation point terminal is operating normally, and the target track in the power control request point information is equipped with a maintenance platform, and the grounding control terminal is operating normally, the alternative operation modes are determined to be the large five-prevention request cancellation point mode, the small five-prevention request cancellation point mode, and the small five-prevention independent mode. If the cancellation point terminal is operating normally, but the target track in the power control cancellation point information does not have a maintenance platform installed, or the grounding control terminal malfunctions, or the five-prevention safety interlocking workstation terminal malfunctions, the alternative operation modes are determined to be the small five-prevention cancellation point mode and the small five-prevention independent mode. If the terminal at the cancellation point malfunctions, the alternative operating mode is determined to be the independent mode for small-scale anti-malfunction operations.

4. The method according to claim 1, characterized in that, If the target operation mode is the "Big Five Defense Request Cancellation Point Mode", after the step of sending the power control request information to the terminal device of the designated personnel to obtain the approval information of the designated personnel, the method further includes: Send the operation permission corresponding to the power control request information to the grounding control terminal corresponding to the target track.

5. The method according to claim 1, characterized in that, The power outage request message or power restoration request message also includes operation information; the operation information includes one or more of the target equipment to be operated, the operator, and the monitoring personnel. The step of obtaining the approved power control point information through the five-prevention safety interlocking workstation terminal, generating an operation ticket based on the power control point information, and sending the operation ticket to the grounding control terminal includes: The approved power control request information is obtained through the five-prevention safety interlocking workstation terminal, and the invoice information is extracted from the power control request information; wherein, the invoice information includes: the target equipment to be operated, the operator, and the supervisor; the invoice information is the same as the operation information in the power control request information; An operation ticket is generated based on the invoicing information, and the operation ticket is sent to the grounding control terminal.

6. The method according to claim 1, characterized in that, The steps of controlling the execution of power control operations through the grounding control terminal include: The locking table information corresponding to the operation ticket is obtained through the grounding control terminal. Determine whether at least one power control point information corresponding to the operation ticket exists in the interlock table; If there is at least one power control request information corresponding to the operation ticket, determine whether each power control request information has been approved; If all the power control request information is approved, a notification of approval operation is returned to the request terminal; The operation instructions are obtained through the grounding control terminal, and the power control operation is executed based on the operation instructions.

7. The method according to claim 6, characterized in that, The power control point information is the power supply point information; Before the step of obtaining an operation command through the grounding control terminal and controlling the execution of power control operations based on the operation command, the method further includes: The number of personnel in the protected area corresponding to the target track is obtained through the access control terminal; The clearing signal is obtained through the cancellation point terminal; wherein, the clearing signal is used to indicate that the protection area corresponding to the target track has been inspected; If the number of personnel is zero, the clearing signal is received, a clearing completion confirmation instruction is obtained through the cancellation point terminal, and the designated access control of the protected area is in a closed state, the clearing operation is confirmed to be complete.

8. The method according to claim 1, characterized in that, After the step of controlling the execution of power control operations through the grounding control terminal, the method further includes: The power control cancellation point information is obtained through the cancellation point terminal; Determine whether the grounding control terminal is closed. If the grounding control terminal is closed, confirm that the power control terminal information has been successfully submitted. Revoke the operation permissions corresponding to the power control checkpoint information of the grounding control terminal, and send the power control checkpoint information to the terminal device of the designated person to obtain the review information of the designated person.

9. The method according to claim 1, characterized in that, The step of controlling personnel to enter the protected area through an access control terminal in the protected area corresponding to the target track, so that the personnel can perform the power control operation, includes: The power control request information is sent to the terminal device of the designated personnel to obtain the approval information of the designated personnel; Access control permissions are issued to the access control terminals in the protection area corresponding to the target track; An operation ticket is generated through the specified invoicing operation, and the operation ticket is sent to the computer key; The access control terminal controls personnel to enter the protected area, enabling them to perform power control operations using the computer key.

10. The method according to claim 9, characterized in that, The power control point information is the power supply point information; Prior to the step of controlling personnel to enter the protected area via the access control terminal, so that the personnel can perform power control operations via the computer key, the method further includes: The designated inspection terminal in the protected area is operated using the computer key to confirm that the clearing operation is complete.

11. The method according to claim 9, characterized in that, After controlling staff to enter the protected area via the access control terminal, and enabling staff to perform power control operations via the computer key, the method further includes: The power control cancellation point information is obtained through the cancellation point terminal; The access control permissions corresponding to the power control checkpoint information of the access control terminal are revoked, and the power control checkpoint information is sent to the terminal device of the designated person to obtain the review information of the designated person.

12. The method according to claim 1, characterized in that, The step of using a universal key to control personnel to enter the protected area corresponding to the target track, so that the personnel can perform the power control operation, includes: An operation ticket is generated through the five-prevention safety interlocking workstation terminal and sent to the computer key; wherein, in the small five-prevention independent mode, a designated person operates the five-prevention safety interlocking workstation terminal to generate the operation ticket; the power control request information is paper information and is approved by the designated person. Using a universal key to the protected area corresponding to the target track, personnel are controlled to enter the protected area, enabling them to perform the power control operation via the computer key.

13. The method according to claim 12, characterized in that, The power control point information is the power supply point information; Before the step of controlling personnel to enter the protected area via a universal key corresponding to the target track, so that the personnel can perform power control operations via the computer key, the method further includes: The designated inspection terminal in the protected area is operated using the computer key to confirm that the clearing operation is complete.

14. A power supply and shutdown control device for a protected area of ​​a rail transit vehicle depot, characterized in that, The device is installed on the DCC system server of the rail transit system; the device includes: The first acquisition module is used to acquire power control request information through the request point terminal; wherein, the power control request information is power outage request information or power supply request information; the power outage request information or power supply request information includes: the target track to be controlled and the target operating mode; the target operating mode includes the large five-prevention request point mode, the small five-prevention request point mode, or the small five-prevention independent mode; The first sending module is used to send the power control request information to the terminal device of a designated person if the target operation mode is the five-prevention request cancellation mode, so as to obtain the approval information of the designated person. The first generation module is used to obtain the approved power control request information through the five-prevention safety interlocking workstation terminal, generate an operation ticket based on the power control request information, and send the operation ticket to the grounding control terminal. The first execution module is used to control and execute power control operations through the grounding control terminal; wherein, the power control operations include power outage operations or power supply operations; the power control operations are matched with the power control point information; The second execution module is used to control staff to enter the protected area through the access control terminal in the protected area corresponding to the target track if the target operation mode is the small five-prevention cancellation point mode, so that the staff can perform the power control operation. The third execution module is used to control personnel to enter the protected area through the universal key of the protected area corresponding to the target track if the target operation mode is the small five-proof independent mode, so that the personnel can perform the power control operation.

15. A power supply and shutdown control device for a protected area of ​​a rail transit vehicle depot, characterized in that, The method includes a processor and a memory, the memory storing machine-executable instructions that can be executed by the processor, the processor executing the machine-executable instructions to implement the power outage and restoration control method for the protected area of ​​a rail transit vehicle depot as described in any one of claims 1-13.

16. A machine-readable storage medium, characterized in that, The machine-readable storage medium stores machine-executable instructions, which, when invoked and executed by a processor, cause the processor to implement the power outage and restoration control method for the protection zone of a rail transit vehicle depot as described in any one of claims 1-13.

Citation Information

Patent Citations

  • Technique for realizing transforming plant anti mis-closedown function in transforming plant observe and control apparatus

    CN101257224A

  • Automatic driving method of train, VOBC, TIAS and zone controller

    CN110758484A