Virtual power plant flexible resource hierarchical partitioning method and system considering resource effectiveness

By establishing a linearized AC power flow model and optimizing the resource hierarchical partitioning of virtual power plants using transfer factors, the problem of the impact of the power grid structure on virtual power plants is solved. This achieves efficient partitioning of flexible resources and mitigation of distribution network line overload, supporting the optimized operation of virtual power plants in various regional power grids.

CN116599056BActive Publication Date: 2026-11-20SOUTHEAST UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310635049.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2026-11-20
Estimated Expiration
2043-05-31

AI Technical Summary

Technical Problem

Existing research on virtual power plants rarely considers the grid structure, resulting in the dispersion of flexible resource locations affecting the power flow distribution of the grid, making it difficult to participate efficiently in the optimized operation of the grid in various regions, and making it difficult to alleviate the overload problem of distribution network lines.

Method used

By receiving transmission and distribution network operation data, a linear AC power flow model is established, a transfer factor is defined, and flexible resource hierarchical partitioning is optimized to alleviate line overload. Resource hierarchical partitioning optimization and aggregation are performed using a data setting module, a model optimization module, and a hierarchical partitioning module.

Benefits of technology

It enables efficient hierarchical and zoning of virtual power plant resources, alleviates the overload problem of distribution network lines, supports the optimized operation of virtual power plants in regional power grids at various levels, and expands energy market trading business.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116599056B_ABST
    Figure CN116599056B_ABST
Patent Text Reader

Abstract

The application discloses a virtual power plant flexible resource hierarchical partitioning method and system considering resource effectiveness, relates to the technical field of virtual power plants, and comprises the following steps: receiving power transmission network and power distribution network system operation data respectively, obtaining setting data by setting the power transmission network and power distribution network system operation data, wherein the power transmission network and power distribution network system operation data comprise system bus voltage, system branch voltage phase angle difference, network structure and line impedance admittance parameters; inputting the setting data into a linearized alternating current power flow model to obtain a linearized alternating current power flow model for flexible resource effectiveness analysis of the power transmission and distribution network; defining a transfer factor, inputting the transfer factor into the linearized alternating current power flow model for flexible resource effectiveness analysis of the power transmission and distribution network, and obtaining flexible resource overload relief effectiveness; and inputting the flexible resource overload relief effectiveness into a virtual power plant flexible resource hierarchical partitioning optimization aggregation model for relieving line overload to obtain a virtual power plant flexible resource hierarchical partitioning result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of virtual power plant technology, specifically to a flexible resource hierarchical partitioning method and system for virtual power plants that considers resource efficiency. Background Technology

[0002] Under the "dual carbon" target, the proportion of renewable energy generation is constantly increasing, posing new challenges to the regulation and control capabilities and operational economics of the power system. Virtual power plants (VPPs), as an effective means of tapping demand resources, use advanced information and communication technologies and software systems to aggregate and coordinate flexible distributed resources such as distributed power sources, energy storage systems, controllable loads, and electric vehicles, effectively promoting flexible interaction on the load side.

[0003] Virtual power plants can be categorized into commercial and technical types, and their management models can be classified as centralized, partially centralized, and fully decentralized. my country's virtual power plant development has been rapid, with large-scale pilot projects already underway in Hebei, Shanghai, Guangdong, and other regions. However, existing research primarily focuses on the economic optimization and dispatch of virtual power plants and their participation in the electricity market, with less consideration given to security constraints related to the power system grid structure. The dispersed location of flexible resources under virtual power plants negatively impacts power flow distribution, hindering system safety and stability, and makes efficient participation in grid optimization at various levels and in different regions difficult. Therefore, it is urgent to optimize and aggregate the flexible resources of virtual power plants in a hierarchical and regional manner, taking into account the transmission and distribution network structure and the actual operational needs of the power grid. Summary of the Invention

[0004] To address the shortcomings mentioned in the background section, the present invention aims to provide a flexible resource hierarchical partitioning method and system for virtual power plants that considers resource efficiency, thereby alleviating line overload problems in distribution networks.

[0005] The objective of this invention can be achieved through the following technical solution: a flexible resource hierarchical partitioning method for virtual power plants considering resource efficiency, the method comprising the following steps:

[0006] The system receives operation data from the transmission network and distribution network systems respectively, and sets the operation data of the transmission network and distribution network systems to obtain set data. The operation data of the transmission network and distribution network systems includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters.

[0007] Input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the transmission and distribution network;

[0008] Define a transfer factor and input the transfer factor into the linearized AC power flow model for the analysis of the effectiveness of flexible resources in the power transmission and distribution network to obtain the effectiveness of flexible resources in mitigating line overload.

[0009] The effectiveness of flexible resource mitigation of line overload is input into the pre-established virtual power plant flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload, and the result of virtual power plant flexible resource hierarchical partitioning is obtained.

[0010] Preferably, the setting data includes: the voltage of each bus in the system is set to its rated value: V i =1, where V i For the voltages of each bus in the system, the phase angle difference between the voltages at both ends of each branch in the system is set to be small: cosθ ij =1, sinθ ij =θ ij =θ i -θ j , where θ ij This represents the phase angle difference between the voltages at both ends of each branch of the system.

[0011] Preferably, the linearized AC power flow model is used to accurately describe the relationship between active power, reactive power, voltage amplitude, and voltage phase angle.

[0012] Preferably, the linearized AC power flow model is defined in polar coordinates by defining an admittance matrix and setting a data V. i =1, cosθ ij =1, sinθ ij =θ ij =θ i -θ j By inputting the linearized AC power flow model, a linearized AC power flow model for the flexible resource effectiveness analysis of the transmission and distribution network is obtained. The formula for the linearized AC power flow model for the flexible resource effectiveness analysis of the transmission and distribution network is as follows:

[0013]

[0014]

[0015] The admittance matrix Y is defined. ij =G ij +jB ij :

[0016]

[0017] For ease of explanation, we define an admittance matrix Y' that does not contain nodal-to-ground admittances. ij =G' ij +jB' ij ,in:

[0018]

[0019] Among them, y ij For line admittance; G ij B ij B' ij Y ij The real and imaginary parts, Y' ij The imaginary part of V. j θ j These represent the voltage magnitude and phase angle at node j, respectively.

[0020] Rewrite the above equation in matrix form:

[0021]

[0022] Where ΔP, ΔQ, ΔV, and Δθ are all N×1 vectors, representing the changes in active power injection, reactive power injection, voltage magnitude, and voltage phase angle at the nodes, respectively. G, B, and B' are the real and imaginary parts of matrix Y and the imaginary part of matrix Y', respectively.

[0023] Preferably, the linearized AC power flow model for the flexible resource effectiveness analysis of the transmission and distribution network needs to consider the impact of different types of nodes, including:

[0024] PQ node: Given the active and reactive power injection at the node, calculate the node voltage magnitude and phase angle, and determine that the generator node and load node with reactive power output are both PQ nodes.

[0025] PV node: Given the active power injection and voltage amplitude of a node, find the reactive power injection and voltage phase angle of the node. Generator nodes with adjustable reactive power and nodes with adjustable reactive power supply are all PV nodes.

[0026] Balanced node: Given the node voltage magnitude and phase angle, calculate the active and reactive power injection at the node. There is usually only one balanced node, which is used to provide a reference phase angle and provide balancing power for the system.

[0027] Preferably, equation (8) is processed to obtain:

[0028]

[0029] Where I1 is the identity matrix after removing the rows containing the balanced nodes, and I2 is the identity matrix after removing the rows containing the balanced nodes and PV nodes. After processing, the equation becomes:

[0030]

[0031] Since matrices B, B', and G no longer contain the rows and columns corresponding to the balance nodes after processing, matrix M must be a non-singular matrix. Taking the inverse of M, we get:

[0032]

[0033] Where the H, J, K, and F matrices are M -1 The block submatrix.

[0034] Preferably, the transfer factor SF is defined as follows: the change in active power flow on line mn when the active power injection at node i increases by a unit amount, as shown in the following formula:

[0035]

[0036] Among them, X ij Let be the reactance of line ij;

[0037] From equations (7) and (11), assuming that the reactive power injection remains constant when the active power injection at node i changes by a unit amount, we have:

[0038]

[0039] Where, Φ mn Let ΔP be a row vector whose m-th element is 1, whose n-th element is -1, and all other elements are 0; i It is a column vector where the i-th element is 1 and the rest are 0.

[0040] Preferably, the effectiveness of the flexible resource in mitigating line overload is defined as: the ability of a unit power allocation of a certain flexible resource to meet demand in a specific scenario.

[0041] In scenarios where line mn is overloaded, the effectiveness of flexible resource allocation in mitigating line overload is E. m,n,i The formula for the ability of flexible resources at node i to meet the demand for alleviating the overload of line mn is as follows:

[0042] E m,n,i =SF mn,i =g mn Φ mn I2 T KI1ΔP i -b mn Φ mn I1 T HI1ΔP i (14).

[0043] Among them, g mn b mn These are the real and imaginary parts of the line mn admittance, respectively, and K and H are the M values ​​described in equation (11). -1 The corresponding block submatrices of the matrix, I1 and I2, are the matrices described in equation (9), Φ mn ΔP i The vector is defined in equation (13).

[0044] Preferably, the flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload in the virtual power plant is as follows:

[0045] minF(P cha ,P dis (15)

[0046] Among them, P cha P dis It is an N×T matrix, where N is the number of system nodes and T is the number of time periods.

[0047] The constraints of the flexible resource hierarchical and partitioned optimization aggregation model for mitigating line overload in the virtual power plant include constraints on reducing line overload and constraints on the upper limit of resource allocation.

[0048] In another aspect of the present invention, in order to achieve the above-mentioned objective, a flexible resource hierarchical partitioning system for virtual power plants considering resource efficiency is disclosed, comprising:

[0049] Data setting module: used to receive the operation data of the transmission network and distribution network system respectively, and set the operation data of the transmission network and distribution network system to obtain setting data. The operation data of the transmission network and distribution network system includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters.

[0050] Model optimization module: used to input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the power transmission and distribution network;

[0051] Effectiveness calculation module: used to define transfer factors, input the transfer factors into the linearized AC power flow model of the flexible resource effectiveness analysis of the transmission and distribution network, and obtain the effectiveness of flexible resources in mitigating line overload;

[0052] The hierarchical partitioning module is used to input the effectiveness of flexible resource mitigation of line overload into the pre-established virtual power plant flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload, and obtain the virtual power plant flexible resource hierarchical partitioning results.

[0053] The beneficial effects of this invention are:

[0054] This invention provides a new approach for virtual power plant operators to expand into new businesses beyond energy market trading, and helps them to efficiently aggregate flexible resources to participate in the optimized operation of power grids at all levels and in all regions. It provides technical support for the flexible resource layering and zoning optimization and aggregation of virtual power plants, and can alleviate the problem of line overload in distribution networks. Attached Figure Description

[0055] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0056] Figure 1 This is a schematic diagram of the method flow of the present invention;

[0057] Figure 2 This is a schematic diagram of the system structure of the present invention. Detailed Implementation

[0058] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0059] like Figure 1 As shown, a flexible resource hierarchical partitioning method for virtual power plants considering resource efficiency is described. The method includes the following steps:

[0060] The system receives operation data from the transmission network and distribution network systems respectively, and sets the operation data of the transmission network and distribution network systems to obtain set data. The operation data of the transmission network and distribution network systems includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters.

[0061] It should be noted that, in this embodiment, the setting data includes: the voltage of each bus in the system is set to its rated value: V i =1, where V i For the voltages of each bus in the system, the phase angle difference between the voltages at both ends of each branch in the system is set to be small: cosθ ij =1, sinθ ij =θ ij =θ i -θ j Where, θ ij This represents the phase angle difference between the voltages at both ends of each branch of the system.

[0062] Input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the transmission and distribution network;

[0063] It should be further explained that, in the specific implementation process, the linearized AC power flow model can accurately describe the relationship between active power, reactive power, voltage amplitude, and voltage phase angle, and its expression in polar coordinates can be written as:

[0064]

[0065]

[0066] Define the admittance matrix Y ij =G ij +jB ij Admittance matrix Y' excluding nodal-to-ground admittance ij =G' ij +jB' ij ,in:

[0067]

[0068]

[0069] Among them, y ij For line admittance; G ij B ij B' ij Y ij The real and imaginary parts, Y' ij The imaginary part of V. j θ j These represent the voltage magnitude and phase angle at node j, respectively.

[0070] Applying the aforementioned set data to equation (1), we have:

[0071]

[0072] Among them, g ij b ij , and are respectively the line admittance y ij The real and imaginary parts, V j θ j These represent the voltage magnitude and phase angle at node j, respectively, θ ij B represents the phase angle difference between the voltages at both ends of line ij. ij B' ij As mentioned above.

[0073]

[0074] Similarly, from equation (2), we can obtain:

[0075]

[0076] Equations (5) and (6) are linearized AC power flow models applicable to the flexible resource efficiency analysis of power transmission and distribution networks. They can linearly describe the relationship between active power, reactive power, voltage amplitude, and voltage phase angle.

[0077] Meanwhile, the linearized expression for the power flowing through line ij can be easily obtained from the above derivation process:

[0078] P ij =g ij (V i -V j )-b ij (θ i -θ j (7)

[0079] Among them, g ij b ij , and are respectively the line admittance y ij The real and imaginary parts, V j θ j These represent the voltage magnitude and phase angle at node j, respectively.

[0080] To facilitate subsequent derivation and program writing, equations (5) and (6) are rewritten in matrix form:

[0081]

[0082] Where ΔP, ΔQ, ΔV, and Δθ are all N×1 vectors, representing the changes in active power injection, reactive power injection, voltage magnitude, and voltage phase angle at the nodes, respectively. G, B, and B' are the real and imaginary parts of matrix Y, and the imaginary part of matrix Y', respectively.

[0083] Meanwhile, unlike the classic DC power flow model, the linearized AC power flow model proposed in this invention still includes the node voltage magnitude V, so the influence of different types of nodes needs to be considered:

[0084] ①PQ node: Given the active and reactive power injection at the node, determine the node voltage magnitude and phase angle. Assume that both the generator node and the load node with reactive power output are PQ nodes.

[0085] ②PV node: Given the active power injection and voltage magnitude at the node, find the reactive power injection and voltage phase angle at the node.

[0086] Generator nodes with adjustable reactive power and nodes equipped with adjustable reactive power sources are all PV nodes.

[0087] ③ Balancing Node: Given the node voltage magnitude and phase angle, determine the active and reactive power injection at the node. There is usually only one balancing node, which is used to provide a reference phase angle and balance power for the system.

[0088] Define a transfer factor and input the transfer factor into the linearized AC power flow model for the analysis of the effectiveness of flexible resources in the power transmission and distribution network to obtain the effectiveness of flexible resources in mitigating line overload.

[0089] It should be further explained that, in the specific implementation process, in order to ensure that the calculation meets the requirements of different node types, equation (8) is processed as follows:

[0090]

[0091] Where I1 is the identity matrix after removing the rows containing the balanced nodes, and I2 is the identity matrix after removing the rows containing the balanced nodes and PV nodes. Equation (8) is then processed to obtain:

[0092]

[0093] Where, ΔP * ΔQ * B * B' * G1 * G2 * , Δθ * ΔV * The matrices are obtained by processing ΔP, ΔQ, B, B', G, Δθ, and ΔV using equation (9).

[0094] Since matrices B, B', and G no longer contain the rows and columns corresponding to the balance nodes after processing, matrix M must be a non-singular matrix. Taking the inverse of M, we get:

[0095]

[0096] Where the H, J, K, and F matrices are M -1 The block submatrix.

[0097] (2-2) Calculation of effectiveness based on transfer factor

[0098] The shift factor (SF) is defined as the change in active power flow along line mn when the active power injection at node i increases by a unit amount. The widely used SF is derived from the DC power flow model.

[0099]

[0100] Among them, X ij Let be the reactance of line ij.

[0101] Since the DC power flow model assumes R << X, it is not applicable to scenarios such as distribution networks. This invention proposes to derive a transfer factor expression applicable to both transmission and distribution networks through the linearized AC power flow model described in the formula.

[0102] From equations (7) and (11), assuming that the reactive power injection remains constant when the active power injection at node i changes by a unit amount, we have:

[0103]

[0104] Where, Φ mn Let ΔP be a row vector whose m-th element is 1, whose n-th element is -1, and all other elements are 0; i It is a column vector where the i-th element is 1 and the rest are 0.

[0105] The effectiveness of flexible resources is defined as: the ability of a unit of power of a flexible resource to meet demand in a specific scenario.

[0106] In scenarios where line mn is overloaded, the flexible resource effectiveness E m,n,i The ability of flexible resources at node i to meet the needs of alleviating overload on line mn, i.e.:

[0107] E m,n,i =SF mn,i =g mn Φ mn I2 T KI1ΔP i -b mn Φ mn I1 T HI1ΔP i (14)

[0108] Among them, g mn b mn Let M and H be the real and imaginary parts of the line admittance mn, respectively; K and H are the corresponding block submatrices of the M-1 matrix described in equation (11); I1 and I2 are the matrices described in equation (9); Φ mn ΔP i The vector is defined in equation (13).

[0109] The effectiveness of flexible resource mitigation of line overload is input into the pre-established virtual power plant flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload, and the result of virtual power plant flexible resource hierarchical partitioning is obtained.

[0110] The flexible resource hierarchical and partitioned optimization aggregation model for mitigating line overload in the virtual power plant is as follows:

[0111] minF(P cha ,P dis (15)

[0112]

[0113] Among them, P cha P dis Let P be an N×T matrix, where N is the number of system nodes and T is the number of time periods. cha,i,t P dis,i,tC represents the charging (adjustable load increase) power and discharging (adjustable load decrease, distributed generator power generation) power of the resource at the i-th node during time period t, respectively; cha,i C dis,i These represent the cost curves for charging / discharging by calling the resources of the i-th node.

[0114] The constraints include:

[0115] ① Reduce line overload constraints

[0116]

[0117] Where τ is the line overload event number, P ad (τ), m(τ), n(τ), and t(τ) represent the overload power, the starting node of the line, the ending node of the line, and the time period of the event, respectively, for the τth line overload event.

[0118] ②Resource access limit constraint

[0119]

[0120]

[0121] Among them, P dis,i,t P cha,i,t These represent the power of resource discharge (adjustable load reduction, distributed generator power generation) and the maximum charging (adjustable load increase) at node i during time period t, respectively. These represent the maximum discharge (adjustable load decrease, distributed generator set power generation) and maximum charging (adjustable load increase) power of the resource at node i, respectively.

[0122] Model linearization and solution

[0123] The C in the formula cha,i and C dis,i Since it is a piecewise linear function, equation (16) can be linearized.

[0124] Let C dis,i Let be a linear function with n segments and its division points be b. dis,i,1 ≤b dis,i,2 ≤...≤b dis,i,n ≤b dis,i,n+1 Then, we introduce an auxiliary variable w. dis,i,t :

[0125]

[0126]

[0127] Define w dis,i,t,k and 0-1 variable zdis,i,t,k ,satisfy:

[0128]

[0129]

[0130]

[0131] Similarly, for C cha,i ,have:

[0132]

[0133]

[0134] Define w cha,i,t,k and 0-1 variable z cha,i,t,k ,satisfy:

[0135]

[0136]

[0137]

[0138] After linearization, the objective function of the model is Equation (15), and the constraints are composed of Equations (16) to (29). It is a mixed integer linear programming problem. The above optimization problem is solved by calling the gurobi solver in the MATLAB environment through yalmip, and finally the result of flexible resource hierarchical partitioning of the virtual power plant is obtained.

[0139] On the other hand, to solve the above problems, embodiments of the present invention disclose a flexible resource hierarchical partitioning system for virtual power plants that considers resource effectiveness, including:

[0140] Data setting module: used to receive the operation data of the transmission network and distribution network system respectively, and set the operation data of the transmission network and distribution network system to obtain setting data. The operation data of the transmission network and distribution network system includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters.

[0141] Model optimization module: used to input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the power transmission and distribution network;

[0142] Effectiveness calculation module: used to define transfer factors, input the transfer factors into the linearized AC power flow model of the flexible resource effectiveness analysis of the transmission and distribution network, and obtain the effectiveness of flexible resources in mitigating line overload;

[0143] The hierarchical partitioning module is used to input the effectiveness of flexible resource mitigation of line overload into the pre-established virtual power plant flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload, and obtain the virtual power plant flexible resource hierarchical partitioning results.

[0144] Based on the same inventive concept, this invention also provides a computer device, comprising: one or more processors, and a memory for storing one or more computer programs; the programs include program instructions, and the processor executes the program instructions stored in the memory. The processor may be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing and control core of the terminal, used to implement one or more instructions, specifically for loading and executing one or more instructions stored in a computer storage medium to implement the above-described method.

[0145] It should be further explained that, based on the same inventive concept, the present invention also provides a computer storage medium storing a computer program, which, when executed by a processor, performs the above-described method. This storage medium can be any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In the present invention, the computer-readable storage medium can be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device.

[0146] In the description of this specification, references to terms such as "an embodiment," "example," "specific example," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this disclosure. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0147] The foregoing has shown and described the basic principles, main features, and advantages of this disclosure. Those skilled in the art should understand that this disclosure is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this disclosure. Various changes and modifications can be made to this disclosure without departing from its spirit and scope, and all such changes and modifications fall within the scope of this disclosure as claimed.

Claims

1. A flexible resource hierarchical partitioning method for virtual power plants considering resource efficiency, characterized in that: The method includes the following steps: The system receives operation data from the transmission network and distribution network systems respectively, and sets the operation data of the transmission network and distribution network systems to obtain set data. The operation data of the transmission network and distribution network systems includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters. Input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the transmission and distribution network; Define a transfer factor and input the transfer factor into the linearized AC power flow model for the analysis of the effectiveness of flexible resources in the power transmission and distribution network to obtain the effectiveness of flexible resources in mitigating line overload. The effectiveness of flexible resources in mitigating line overload is defined as: the ability of a unit power allocation of a flexible resource to meet demand in a specific scenario. In scenarios where line mn is overloaded, the effectiveness of flexible resource allocation in mitigating line overload is... The formula for the ability of flexible resources at node i to meet the demand for alleviating overload on line mn is as follows: (14) in, , These are the real and imaginary parts of the line mn admittance, respectively, and K and H are the real and imaginary parts of the line mn admittance. The corresponding block submatrices of the inner M-1 matrix, To remove the identity matrix after removing the row containing the balancing node, To remove the identity matrix after removing the rows containing the balanced nodes and PV nodes, This is a row vector where the m-th element is 1, the n-th element is -1, and the rest are 0. It is a column vector where the i-th element is 1 and the rest are 0; The effectiveness of flexible resource mitigation of line overload is input into the pre-established flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload in virtual power plants, and the results of flexible resource hierarchical partitioning in virtual power plants are obtained. The flexible resource hierarchical and partitioned optimization aggregation model for virtual power plants to alleviate line overload is as follows: (15) in, , for The matrix is ​​N, where N is the number of system nodes and T is the number of time periods. (16) Among them, elements , Let represent the charging power and discharging power of the resource at the i-th node during time period t, respectively. , These represent the cost curves for calling the resources of the i-th node for charging and discharging, respectively. Constraints include constraints on reducing line overload: (17) in, Number the line overload event. , , , They represent the first The overload power, starting node, ending node, and time period of each line overload event; The constraints of the flexible resource hierarchical and partitioned optimization aggregation model for mitigating line overload in the virtual power plant include constraints on reducing line overload and constraints on the upper limit of resource allocation.

2. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 1, characterized in that, The set data includes: the voltage of each bus in the system is set to its rated value. ,in Vi For the voltage of each bus in the system, the phase angle difference between the voltages at both ends of each branch in the system is set to be small: , ,in, This represents the phase angle difference between the voltages at both ends of each branch of the system.

3. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 1, characterized in that, The linearized AC power flow model is used to accurately describe the relationship between active power, reactive power, voltage amplitude, and voltage phase angle.

4. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 1, characterized in that, The linearized AC power flow model, in polar coordinates, defines the admittance matrix and sets the data... , , By inputting the linearized AC power flow model, a linearized AC power flow model for the flexible resource effectiveness analysis of the transmission and distribution network is obtained. The formula for the linearized AC power flow model for the flexible resource effectiveness analysis of the transmission and distribution network is as follows: (6) (7) The admittance matrix Y is defined. : Define the admittance matrix Y' that does not contain nodal-to-ground admittance. ,in: in, For line admittance; , , They are respectively The real and imaginary parts The imaginary part, , These represent the voltage magnitude and phase angle at node j, respectively. Rewrite equation (6) in matrix form: (8) in, , , , All The vectors represent the changes in active power injection at the nodes, the changes in reactive power injection at the nodes, the node voltage magnitude, and the node voltage phase angle, respectively. , , Each is a matrix The real and imaginary parts of the matrix The imaginary part.

5. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 4, characterized in that, The linearized AC power flow model for the flexible resource efficiency analysis of the transmission and distribution network needs to consider the impact of different types of nodes, including: PQ node: Given the active and reactive power injection at the node, calculate the node voltage magnitude and phase angle, and determine that the generator node and load node with reactive power output are both PQ nodes. PV node: Given the active power injection and voltage amplitude of a node, find the reactive power injection and voltage phase angle of the node. Generator nodes with adjustable reactive power and nodes with adjustable reactive power supply are all PV nodes. Balanced node: Given the node voltage magnitude and phase angle, calculate the active and reactive power injection at the node. There is usually only one balanced node, which is used to provide a reference phase angle and provide balancing power for the system.

6. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 5, characterized in that, Processing equation (8), we obtain: (9) in, To remove the identity matrix after removing the row containing the balancing node, To remove the identity matrix after removing the rows containing the balancing nodes and PV nodes, equation (8) is processed to obtain: (10) Since matrices B, B', and G no longer contain the rows and columns corresponding to the balance nodes after processing, matrix M must be a non-singular matrix. Taking the inverse of M, we get: (11) Wherein, the H, J, K, and F matrices are The block submatrix.

7. The flexible resource hierarchical partitioning method for virtual power plants considering resource effectiveness according to claim 1, characterized in that, The transfer factor SF is defined as follows: when the active power injection at node i increases by a unit amount, the change in active power flow on line mn is expressed by the following formula: (12) in, Let be the reactance of line ij; From equations (7) and (11), assuming that the reactive power injection remains constant when the active power injection at node i changes by a unit amount, we have: (13) in, This is a row vector where the m-th element is 1, the n-th element is -1, and the rest are 0. It is a column vector where the i-th element is 1 and the rest are 0.

8. A flexible resource hierarchical and partitioned virtual power plant system considering resource efficiency, characterized in that: include: Data setting module: used to receive the operation data of the transmission network and distribution network system respectively, and set the operation data of the transmission network and distribution network system to obtain setting data. The operation data of the transmission network and distribution network system includes the voltage of each bus of the system and the phase angle difference of the voltage at both ends of each branch of the system, the grid structure and the line impedance admittance parameters. Model optimization module: used to input the set data into the pre-established linearized AC power flow model to obtain the linearized AC power flow model for flexible resource effectiveness analysis of the power transmission and distribution network; Effectiveness calculation module: used to define transfer factors, input the transfer factors into the linearized AC power flow model of the flexible resource effectiveness analysis of the transmission and distribution network, and obtain the effectiveness of flexible resources in mitigating line overload; The effectiveness of flexible resources in mitigating line overload is defined as: the ability of a unit power allocation of a flexible resource to meet demand in a specific scenario. In scenarios where line mn is overloaded, the effectiveness of flexible resource allocation in mitigating line overload is... The formula for the ability of flexible resources at node i to meet the demand for alleviating overload on line mn is as follows: (14) in, , These are the real and imaginary parts of the line mn admittance, respectively, and K and H are the real and imaginary parts of the line mn admittance. The corresponding block submatrices of the inner M-1 matrix, To remove the identity matrix after removing the row containing the balancing node, To remove the identity matrix after removing the rows containing the balanced nodes and PV nodes, This is a row vector where the m-th element is 1, the n-th element is -1, and the rest are 0. It is a column vector where the i-th element is 1 and the rest are 0; The hierarchical partitioning module is used to input the effectiveness of flexible resource mitigation of line overload into the pre-established virtual power plant flexible resource hierarchical partitioning optimization aggregation model for mitigating line overload, and obtain the virtual power plant flexible resource hierarchical partitioning results. The flexible resource hierarchical and partitioned optimization aggregation model for virtual power plants to alleviate line overload is as follows: (15) in, , for The matrix is ​​N, where N is the number of system nodes and T is the number of time periods. (16) Among them, elements , Let represent the charging power and discharging power of the resource at the i-th node during time period t, respectively. , These represent the cost curves for calling the resources of the i-th node for charging and discharging, respectively. Constraints include constraints on reducing line overload: (17) in, Number the line overload event. , , , They represent the first The overload power, starting node, ending node, and time period of each line overload event; The constraints of the flexible resource hierarchical and partitioned optimization aggregation model for mitigating line overload in the virtual power plant include constraints on reducing line overload and constraints on the upper limit of resource allocation.

Citation Information

Patent Citations

  • AC power flow linear sensitivity analysis method

    CN110535136A

  • Virtual power plant partition construction model and construction method based on voltage regulation and control

    CN112271724A