用于工厂生产的图数据库的构建方法及构建系统

By constructing graph databases and time-series databases, linking event data groups and resource information of factory production equipment, the system lag problem caused by traditional databases is solved, and efficient and stable production management and bottleneck analysis are achieved.

CN116610837BActive Publication Date: 2026-07-17徐康敏

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
徐康敏
Filing Date
2022-02-08
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the factory production process, when existing technology connects the table data of multiple production devices through traditional database software, the amount of data to be processed is huge, which causes the production management system to lag and crash, affecting production efficiency.

Method used

A graph database software is used to construct a graph database containing multiple event data groups. Each event data group is linked by a link key, allowing for the rapid retrieval of multiple event data groups in a series of production processes. Resource information is stored in conjunction with a time series database, and link analysis is performed through processing functions.

Benefits of technology

It significantly reduces computational load, minimizes lag and crashes in production management systems, improves system stability and efficiency, enables rapid querying and analysis of production processes and resource consumption, and adapts to changes in the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116610837B_ABST
    Figure CN116610837B_ABST
Patent Text Reader

Abstract

本发明涉及一种用于工厂生产的图数据库的构建方法,对于与工厂生产相关的第一原始工业数据,通过图数据库软件来构建包括多个事件数据组的图数据库,一个事件数据组是所述图数据库中的一个节点,包括对象信息、事件信息、时间信息、链接信息,所述一个事件数据组示出如下关系:所述对象信息所示出的某一对象,在所述时间信息所示出的某一时间段内,实施了所述事件信息所示出的某一事件,所述多个事件数据组彼此通过所述图数据库的链接键进行链接,所述链接键所示出的信息包括针对某一链接信息的多个事件之间的前后顺序。
Need to check novelty before this filing date? Find Prior Art