一种大倾角通廊底板施工测设方法
By using a total station to measure and a programming calculator to calculate the correction value δ, the problems of low surveying accuracy and low efficiency in the construction of the bottom slab of the steep-angle corridor were solved, enabling rapid and accurate determination of the top surface points of the bottom slab, thus improving construction efficiency and surveying convenience.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- MCC TIANGONG GROUP
- Filing Date
- 2023-04-13
- Publication Date
- 2026-07-17
AI Technical Summary
Existing technologies for surveying the foundation slab of steeply inclined corridors suffer from problems such as low accuracy, low efficiency, high labor input, and poor operability. In particular, conventional surveying methods are difficult to achieve accurate elevation control and rapid surveying during the construction of the foundation slab of steeply inclined corridors.
The plane coordinates and elevation of the top of the elevation pile are measured using a total station. Combined with a programming calculator program, the correction value δ is calculated and marked using the formula (δ=Z0+(X-X0)×tg(α)-Z pile or δ=Z0+(Y-Y0)×tg(α)-Z pile), thus achieving rapid and accurate determination of the top surface point of the base plate.
It improves the accuracy and efficiency of surveying the bottom slab of steep-angle corridors, simplifies the measurement steps, reduces human calculation errors, and makes it convenient to measure on slopes and planes, thus enhancing the practicality and flexibility of the method.
Smart Images

Figure CN116657662B_ABST