A connecting structure of a main pipe and a branch pipe of a hydrogen production reformer transfer line header
By using internal and external chamfering design and multi-stage beveling transition section connection structure, combined with low ferrite welding materials and new welding technology, the stress release and weld embrittlement problems of the connection between the main pipe branch seat and the main pipe of the hydrogen production converter oil transfer line were solved, improving the pressure resistance and service life, reducing the risk of cracking, and realizing the efficient operation and economic benefits of the unit.
Patent Information
- Application Number
- CN202310634023.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-05-31
AI Technical Summary
The existing connection structure between the branch pipe and the main pipe of the hydrogen production converter oil transfer line is prone to cracking under high temperature and high pressure, and the weld metal is prone to embrittlement. There is a lack of effective stress relief and material degradation solutions.
The branch pipe seat with internal and external chamfer design and multi-stage beveled transition section connection structure, combined with low ferrite content welding materials and new welding processes, including ER347 welding wire for root pass and ER16-8-2 welding wire for fill pass, avoids heat treatment, ensures that the weld can be used in the weld state, and improves the thermoplasticity and pressure resistance of the weld.
It effectively avoids weld metal embrittlement, improves the pressure resistance and service life of the connection structure, reduces the risk of cracking, and ensures the reliability and economy of the equipment operation.
Smart Images

Figure CN116677844B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a main oil transfer line of a hydrogen production converter, specifically to a connection structure between the main pipe and branch pipes of the main oil transfer line of a hydrogen production converter. Background Technology
[0002] The main oil transfer line refers to the pipeline used for convection and radiation in the steam reformer of the hydrogen production unit. This type of main oil transfer line is designed for a pressure of 3.3 MPa and a temperature of 685℃, indicating that its operating pressure and temperature are extremely high. Therefore, the structural strength requirements for the main oil transfer line are extremely stringent, especially the connection structure between the main pipe and the branch pipes.
[0003] Currently, the hydrogen production furnace tubes are made of TP347H material. The original welding process was argon arc welding for the root pass (ER347 welding wire) followed by manual electric arc welding (CHS137 welding rod) for the fill and cap passes, and then heat treatment was performed after welding. Crystal phase analysis of the weld revealed the presence of a σ phase. Ferrite content determination of the weld fracture sample showed a gradual increase in ferrite content from the inner wall to the outer wall, indicating severe precipitation of the σ phase and Laves phase (Fe2Nb). This suggests that the weld metal material has experienced material degradation due to σ phase embrittlement.
[0004] Currently, the branch pipes of the conventional oil transfer line main pipe are connected to the main pipe through branch pipe seats. The welding structure of the branch pipe seat and the main pipe generally adopts a placement fillet weld structure or a pull-out structure.
[0005] The drawn-out structure refers to a main pipe with an opening, where the opening is drawn to form a butt flange for welding to the branch pipe seat. This structure is typically used when the main pipe wall is thin. However, during the drawing process, the wall thickness of the main pipe at the drawing opening is reduced, and the drawing opening height is not suitable for being too high. Under harsh operating conditions (high design pressure or high design temperature), the drawing method cannot uniformly draw thick-walled main pipes, and the low drawing opening height also has a certain impact on the inspection of the weld.
[0006] The placement-type fillet weld structure refers to a main pipe opening, where the branch pipe seat is beveled and placed at the main pipe opening, and then filledet welded. This type of structure can be used when the main pipe wall is thick, but the fillet weld quality is poor, and the weld quality can only be initially inspected by surface inspection. The welded structure is prone to local abrupt changes, which can easily lead to cracking under high temperature and pressure.
[0007] Chinese patent CN200710178674.0 discloses an outlet manifold for a hydrogen production converter. Located at the bottom of the converter body, the outlet manifold, connected to the lower tail pipe, is made of ZG1Cr20Ni32 high-alloy material produced domestically using centrifugal casting technology. This material exhibits high creep rupture strength, a high-temperature creep rupture performance capable of operating for 100,000 hours, excellent resistance to carburization, and high-temperature plasticity. It also allows the formation of dendritic eutectic niobium carbide in the steel microstructure, hindering crack propagation and resulting in a long service life. This patent describes a cast furnace tube, primarily utilizing high-alloy materials.
[0008] Chinese patent CN201420358461.1 discloses an outlet manifold for a hydrogen production converter, which is connected to a cold wall manifold branch pipe via a hot wall manifold, effectively reducing the pipe system stress of the outlet manifold and enabling the hydrogen production converter to operate safely for a long time.
[0009] Chinese patent CN201810697979.0 discloses a method for preventing hydrogen damage to pipelines and an oil transfer line and manifold for a refinery-to-hydrogen converter using this method. Specifically, this patent relates to a method for preventing hydrogen damage to pipelines and an oil transfer line and manifold for a refinery-to-hydrogen converter using this method.
[0010] Chinese patent CN201911182258.7 discloses a welding process for the main pipe of a hydrogen production unit's oil transfer line, initially proposing an embedded structure for welding the branch pipe seat and the main pipe together. However, in practical applications, it has been found that the individual external chamfer design and single-stage beveled transition section connection cannot perfectly solve the stress release problem, thus affecting the pressure resistance performance of the branch pipe seat.
[0011] In summary, there is currently a lack of a structure for connecting the branch pipe seat of the hydrogen production converter oil transfer line main pipe to the main pipe that can solve stress release, prevent weld metal embrittlement at the connection point, and ultimately solve the cracking problem that occurs in the hydrogen production converter oil transfer line main pipe after commissioning. Summary of the Invention
[0012] The purpose of this invention is to overcome the above-mentioned shortcomings and provide a connection structure for the main pipe and branch pipes of the main oil transfer line of a hydrogen production converter. Through internal and external chamfering design and a multi-stage beveling transition section connection design, it rationally solves the stress release problem of the branch pipe seat, improves its pressure resistance, and is applicable to pipe walls of different thicknesses. Simultaneously, a new welding process is adopted. Analysis of failed weld metals reveals that embrittlement is caused by high ferrite content in the weld metal, which generates severe σ phase under high-temperature conditions, leading to material deterioration. New welding materials are used to reduce the ferrite content in the weld, eliminating the post-weld heat treatment process and avoiding the precipitation of harmful phases during heat treatment that would cause material deterioration. According to YB / T5092-2005 "Stainless Steel Wire for Welding," ER347 uses niobium to stabilize carbon, prevent intergranular chromium carbide precipitation, and improve the steel's resistance to intergranular corrosion, making it suitable for welding stainless steels with similar compositions. Using welding materials with low ferrite content ensures that the ferrite content in the weld is no higher than 5% (by volume). This results in a weld with good thermoplasticity, preventing hot cracking and crater cracking even under stress. The weld can be used in the as-welded or solution-treated state. In practice, ER16-8-2 welding electrodes have been found to possess low ferrite properties and are primarily used for welding high-temperature, high-pressure stainless steel pipes. Therefore, using this welding material as a filler, employing it in the as-welded state, and avoiding solution treatment can effectively prevent the precipitation of brittle phases in the weld material, reducing the risk of cracking.
[0013] The connection structure of this invention is implemented as follows:
[0014] A connection structure for the main pipe and branch pipe of a hydrogen production converter oil transfer line main pipe is disclosed. The main pipe includes a main pipe and a branch pipe. The main pipe is provided with an elliptical connecting pipe hole for connecting to the branch pipe. A tubular branch pipe seat for connecting the main pipe and the branch pipe is provided on the connecting pipe hole. The branch pipe seat is inverted T-shaped, with its bottom connected to the connecting pipe hole of the main pipe and its top connected to the branch pipe. The bottom of the branch pipe seat is folded outward with a flange. The side of the flange is welded to the wall of the connecting pipe hole of the main pipe. The outer wall of the branch pipe seat and the upper surface of the flange, as well as the inner wall of the branch pipe seat and the lower surface of the flange, are connected by arc transitions. The outer wall of the branch pipe seat consists of a chamfered transition section and a stress-relieving vertical edge section that are connected by arc transitions from top to bottom.
[0015] Furthermore, the outer wall of the branch pipe seat consists of, from top to bottom, a first chamfered transition section, a first stress-relieving vertical section, a second chamfered transition section, and a second stress-relieving vertical section, all connected by a circular arc. The included angle between the first chamfered transition section and the first stress-relieving vertical section is 10–20°, and the included angle between the second chamfered transition section and the second stress-relieving vertical section is 30–40°.
[0016] Furthermore, a reinforcing section is provided along the outer wall of the branch pipe seat. The top of the reinforcing section has a welding bevel, and the bottom of the bevel is folded outwards to form a flange. The outer wall of the reinforcing section and the upper surface of the flange are connected by an arc transition. The upper part of the bevel transition section and the welding bevel are connected by an arc transition or by a vertical straight edge section. The included angle between the bevel transition section and the stress-relieving vertical edge section is 30°.
[0017] Furthermore, a reinforcing section is provided along the outer wall of the branch pipe seat. The top of the reinforcing section has a welding bevel, and the bottom has an outwardly folded flange. The outer wall of the reinforcing section and the upper surface of the flange are connected by an arc transition. The inner wall of the reinforcing section and the lower surface of the flange are connected by an arc transition. The outer wall of the reinforcing section, from top to bottom, consists of a first bevel transition section, a first stress-relieving vertical edge section, a second bevel transition section, and a second stress-relieving vertical edge section. The upper part of the first bevel transition section and the welding bevel are connected by an arc transition. The lower part of the first bevel transition section and the upper part of the first stress-relieving vertical edge section are connected by an arc transition. The lower part of the first stress-relieving vertical edge section and the upper part of the second bevel transition section are connected by an arc transition. The lower part of the second bevel transition section and the upper part of the second stress-relieving vertical edge section are connected by an arc transition. The lower part of the second stress-relieving vertical edge section and the upper surface of the flange are connected by an arc transition. The angle between the first bevel transition section and the first stress-relieving vertical section is 10°, and the angle between the second bevel transition section and the second stress-relieving vertical section is 35°.
[0018] Furthermore, a reinforcing section is provided along the outer wall of the branch pipe seat. The top of the reinforcing section has a welding bevel, and the bottom has an outwardly folded flange. The outer wall of the reinforcing section and the upper surface of the flange are connected by an arc transition. The bottom of the reinforcing section of the branch pipe seat is set as an elliptical structure with one end higher and the other lower, matching the main pipe body and the end cap. The bottom of the elliptical structure has an outwardly folded flange, and the side of the flange is welded to the wall of the connecting pipe hole of the elliptical structure of the main pipe. The outer wall of the reinforcing section and the upper surface of the flange are connected by an arc transition. The inner wall of the reinforcing section and the lower surface of the flange are connected by an arc transition. The reinforcing section is connected in the following manner: from top to bottom, the outer wall consists of a first beveled transition section, a first stress-relieving vertical edge section, a second beveled transition section, and a second stress-relieving vertical edge section. The upper part of the first beveled transition section is connected to the welding bevel by an arc transition; the lower part of the first beveled transition section is connected to the upper part of the first stress-relieving vertical edge section by an arc transition; the lower part of the first stress-relieving vertical edge section is connected to the upper part of the second beveled transition section by an arc transition; the lower part of the second beveled transition section is connected to the upper surface of the flange by an arc transition. The included angle between the first beveled transition section and the first stress-relieving vertical edge section is 14°; the included angle between the second beveled transition section and the second stress-relieving vertical edge section is 30°.
[0019] A new welding process is adopted: TGF347 welding wire is used for the root pass, with three passes, and the root pass weld undergoes 100% RT-II inspection; British Manchet welding wire ER16-8-2, with superior resistance to hot cracking, is used for the filler and cap pass, with rapid cooling between passes, ensuring the temperature between each pass does not exceed 60℃, strictly guaranteeing weld quality, resulting in a white or gold color, avoiding blue or black; after welding, the weld undergoes 100% RT-II inspection; the weld surface hardness is less than 190HV. Grain size is controlled at 4-7, and ferrite content is 4-8%. No heat treatment is performed; the weld is used in the as-welded state.
[0020] Compared with the prior art, the beneficial effects of the present invention are:
[0021] (1) The flange of the branch pipe seat of the present invention adopts an inner and outer chamfer design, which makes the transition smoother and can play a role in relieving stress, preventing peak stress caused by sudden changes in local structure, thereby improving its pressure resistance. In addition, the chamfered transition section adopts a slope design with two different slopes to ensure a sufficiently long slope length within a limited height, thereby ensuring the stability of the connection between branch pipes and branch pipe seats of different thicknesses;
[0022] (2) This invention not only considers reducing the precipitation of harmful phases in the weld and improving the high-temperature performance of steel, but also uses niobium-containing welding materials for the base coat. At the same time, considering that δ ferrite will precipitate σ phase at high temperature, causing the surrounding Cr to be depleted and causing the weld metal to become embrittled, welding materials with low ferrite content are used for filling and used in the welded state to avoid the metal becoming embrittled due to high-temperature heat treatment.
[0023] (3) In the welding method of embedded branch pipe seats, the branch pipe seat can be processed with an embedded structure flange. Therefore, the length of the embedded flange can be higher than the drawing height, so that the weld zone, fusion zone and heat-affected zone of the embedded branch pipe seat are far away from the root of the branch pipe seat. Since the stress at the root of the branch pipe seat is usually large, the weld is far away from the root of the branch pipe seat, which can make the structure more resilient to stress and more pressure-resistant, thereby improving the service life. Moreover, since the embedded structure adopts the butt joint form, the weld can be inspected by 100% radiographic inspection + 100% surface inspection, which also ensures the welding quality from the inspection point. Attached Figure Description
[0024] Figure 1 : A schematic diagram of the connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line of the present invention.
[0025] Figure 2 Example 1: Connection structure of main pipe and branch pipe.
[0026] Figure 3 : Figure 2 A magnified view of a portion of point A1 in the middle.
[0027] Figure 4 Example 2: Connection structure of main pipe and branch pipe.
[0028] Figure 5 : Figure 4 A magnified view of a portion of area A2 in the middle.
[0029] Figure 6 Example 3: Connection structure of main pipe and branch pipe.
[0030] Figure 7 : Figure 6 A magnified view of a portion of area A3 in the middle.
[0031] In the picture:
[0032] 1-Main pipe, 2-Branch pipe seat, 3-Branch pipe;
[0033] 21-Reinforcement section, 22-Flanged edge, 23-Stress relief vertical edge section, 24-Beveling transition section, 25-Welding bevel;
[0034] 231 - First stress-relieving vertical edge section; 232 - Second stress-relieving vertical edge section; 241 - First chamfered transition section; 242 - Second chamfered transition section;
[0035] 4-Weld. Detailed Implementation
[0036] Example 1
[0037] See Figure 1 , Figure 2 and Figure 3 A connection structure for the main pipe and branch pipe of a hydrogen production converter oil transfer line includes a main pipe 1, a branch pipe seat 2, and a branch pipe 3. The branch pipe seat 2 is welded to the body of the main pipe 1. The branch pipe seat 2 is inverted T-shaped, with its bottom connected to the connecting pipe hole of the main pipe 1 and its top connected to the branch pipe 3. The branch pipe seat 2 includes a reinforcing section 21, the top of which is provided with a welding bevel 25, and the bottom of the reinforcing section 21 is folded outward with a flange 22. The main pipe 1 is provided with a connecting pipe hole for connecting the branch pipe 3. The side of the flange 22 is welded to the wall of the connecting pipe hole of the main pipe 1. The outer wall of the reinforcing section 21 and the upper surface of the flange 22 are connected by an arc transition.
[0038] The inner wall of the reinforcing section 21 and the lower surface of the flange 22 are connected by an arc transition. The outer wall of the reinforcing section 21 consists of, from top to bottom, a first bevel transition section 241, a first stress-relieving vertical edge section 231, a second bevel transition section 242, and a second stress-relieving vertical edge section 232. The upper part of the first bevel transition section 241 is connected to the welding bevel 25 by an arc transition, and the lower part of the first bevel transition section 241 is connected to the upper part of the first stress-relieving vertical edge section 231 by an arc transition. The included angle between 241 and the first stress-relieving vertical edge segment 231 is 10°. The lower part of the first stress-relieving vertical edge segment 231 and the upper part of the second edge-cutting transition segment 242 are connected by an arc transition. The lower part of the second edge-cutting transition segment 242 and the upper part of the second stress-relieving vertical edge segment 232 are connected by an arc transition. The included angle between the second edge-cutting transition segment 242 and the second stress-relieving vertical edge segment 232 is 35°. The lower part of the second stress-relieving vertical edge segment 232 and the upper surface of the flange 22 are connected by an arc transition.
[0039] Weld 4 employs a new welding process: TGF347 welding wire is used for the root pass, with three passes. The root pass is then subjected to 100% RT-II testing. The filler and capping passes use Manchet ER16-8-2 welding wire from the UK, which offers superior resistance to hot cracking. Rapid cooling between passes ensures the temperature does not exceed 60℃ between each pass, strictly guaranteeing weld quality. The weld should be white or gold in color, avoiding blue or black. After welding, the weld undergoes 100% RT-II testing. The weld surface hardness is less than 190HV. Grain size is controlled at 4-7, with ferrite content at 4-8%. No heat treatment is performed; the weld is used in the as-welded state.
[0040] Example 2
[0041] See Figure 4 and Figure 5 A connection structure for the main pipe and branch pipe of a hydrogen production converter oil transfer line includes a main pipe 1, a branch pipe seat 2, and a branch pipe 3. The branch pipe seat 2 is welded to the body of the main pipe 1. The branch pipe seat 2 is inverted T-shaped, with its bottom connected to the connecting pipe hole of the main pipe 1 and its top connected to the branch pipe 3. The branch pipe seat 2 is welded between the body of the main pipe 1 and the end caps at both ends. The bottom of the reinforcing section 21 of the branch pipe seat 2 is set as an elliptical structure with one end higher and the other lower, matching the body of the main pipe 1 and the end caps at both ends. The bottom of the elliptical structure is folded outward with a flange 22. The side of the flange 22 is welded to the wall of the connecting pipe hole of the elliptical structure of the main pipe 1. The outer wall of the reinforcing section 21 and the upper surface of the flange 22 are connected by a rounded transition.
[0042] The inner wall of the reinforcing section 21 and the lower surface of the flange 22 are connected by an arc transition. The outer wall of the reinforcing section 21 consists of, from top to bottom, a first bevel transition section 241, a first stress-relieving vertical edge section 231, a second bevel transition section 242, and a second stress-relieving vertical edge section 232. The upper part of the first bevel transition section 241 is connected to the welding bevel 25 by an arc transition, and the lower part of the first bevel transition section 241 is connected to the upper part of the first stress-relieving vertical edge section 231 by an arc transition. The included angle between 241 and the first stress-relieving vertical edge segment 231 is 14°. The lower part of the first stress-relieving vertical edge segment 231 and the upper part of the second edge-cutting transition segment 242 are connected by an arc transition. The lower part of the second edge-cutting transition segment 242 and the upper part of the second stress-relieving vertical edge segment 232 are connected by an arc transition. The included angle between the second edge-cutting transition segment 242 and the second stress-relieving vertical edge segment 232 is 30°. The lower part of the second stress-relieving vertical edge segment 232 and the upper surface of the flange 22 are connected by an arc transition.
[0043] Weld 4 employs a new welding process: TGF347 welding wire is used for the root pass, with three passes. The root pass is then subjected to 100% RT-II testing. The filler and capping passes use Manchet ER16-8-2 welding wire from the UK, which offers superior resistance to hot cracking. Rapid cooling between passes ensures the temperature does not exceed 60℃ between each pass, strictly guaranteeing weld quality. The weld should be white or gold in color, avoiding blue or black. After welding, the weld undergoes 100% RT-II testing. The weld surface hardness is less than 190HV. Grain size is controlled at 4-7, with ferrite content at 4-8%. No heat treatment is performed; the weld is used in the as-welded state.
[0044] Example 3
[0045] See Figure 6 and Figure 7A connection structure for the main pipe and branch pipe of a hydrogen production converter oil transfer line includes a main pipe 1, a branch pipe seat 2, and a branch pipe 3. The branch pipe seat 2 is welded to the pipe body of the main pipe 1. The branch pipe seat 2 is inverted T-shaped, with its bottom connected to the connecting pipe hole of the main pipe 1 and its top connected to the branch pipe 3. The branch pipe seat 2 is welded between the pipe body of the main pipe 1 and the end caps at both ends. The side of the flange 22 is welded to the wall of the connecting pipe hole of the elliptical structure of the main pipe 1. The outer wall of the reinforcing section 21 and the upper surface of the flange 22 are connected by a rounded transition.
[0046] The inner wall of the reinforcing section 21 and the lower surface of the flange 22 are connected by an arc transition. The outer wall of the reinforcing section 21 consists of a bevel transition section 24 and a stress-relieving vertical edge section 23 from top to bottom. The upper part of the bevel transition section 24 and the welding bevel 25 are connected by an arc transition or by a vertical straight edge section. The lower part of the bevel transition section 24 and the upper part of the stress-relieving vertical edge section 23 are connected by an arc transition, and the included angle between the bevel transition section 24 and the stress-relieving vertical edge section 23 is 30°. The lower part of the stress-relieving vertical edge section 23 and the upper surface of the flange 22 are connected by an arc transition.
[0047] Weld 4 employs a new welding process: TGF347 welding wire is used for the root pass, with three passes. The root pass is then subjected to 100% RT-II testing. The filler and capping passes use Manchet ER16-8-2 welding wire from the UK, which offers superior resistance to hot cracking. Rapid cooling between passes ensures the temperature does not exceed 60℃ between each pass, strictly guaranteeing weld quality. The weld should be white or gold in color, avoiding blue or black. After welding, the weld undergoes 100% RT-II testing. The weld surface hardness is less than 190HV. Grain size is controlled at 4-7, with ferrite content at 4-8%. No heat treatment is performed; the weld is used in the as-welded state.
[0048] In Examples 1, 2, and 3, stress relief and improved pressure resistance are achieved through the internal and external design between the flange 22 and the reinforcing section 21, as well as the single- or multi-stage design of the stress-relieving vertical edge section and the beveled transition section. Weld 4 adopts a new welding process, using niobium-containing welding material for the root pass and low-ferritic welding material for the fill pass, without post-weld heat treatment.
[0049] By adopting a new welding process, the converter manifolds of the 12×10⁴ Nm³ / h and 5×10⁴ Nm³ / h hydrogen production units were replaced with new embedded branch manifolds. This significantly improved the reliability of the unit operation, reduced the possibility of large fluctuations in overall plant production caused by hydrogen production unit shutdowns, and successfully enabled single-unit hydrogen production operation. It also resulted in substantial savings in both production costs and maintenance expenses.
[0050] By implementing this invention, its effects are mainly reflected in two aspects: the benefits generated by the operation of a single hydrogen production unit and the benefits generated by saving maintenance costs.
[0051] (1) Benefits generated from the operation of a single hydrogen production unit
[0052] a) Key energy consumption data
[0053] When both hydrogen production units operate simultaneously, the 12×10⁴ Nm³ / h unit operates at 58% load, and the 5×10⁴ Nm³ / h unit operates at 60% load, indicating that the loads of the two units are essentially the same. The current feedstock and main energy consumption data for the two hydrogen production units are as follows:
[0054]
[0055] When both units operate simultaneously, the total natural gas feed rate is 14.4 t / h, and the total PSA1 desorbed gas feed rate is 10.5 t / h, with desorbed gas accounting for approximately 42% of the total feed (currently, the inlet temperature of both hydrogen production converters is controlled at 608±2℃). The total supplementary fuel gas consumption for both units is 3.66 t / h. The total electricity consumption for both hydrogen production units is 2380 kW·h / h.
[0056] A single 12×10⁴ Nm³ / h hydrogen production unit is operating at approximately 80% load. Corresponding data is as follows:
[0057]
[0058] Under 80% load operation of a single 12×10⁴ Nm³ / h hydrogen production unit, the natural gas feed rate is 16.9 t / h, and the PSA1 desorbed gas feed rate is 6.53 t, with the desorbed gas accounting for approximately 30% of the total feed (the inlet temperature of the converter is controlled at 585–600℃). The supplementary fuel gas consumption is 3.74 t / h. The electricity consumption is 1575 kW·h / h.
[0059] Based on the above data, under the same hydrogen production conditions, the natural gas feed consumption of a single 12×104Nm3 / h hydrogen production unit is higher than that of two units currently operating simultaneously.
[0060] b) Changes in natural gas consumption
[0061] If the current conversion furnace inlet temperature of 608±2℃ is maintained, the PSA1 desorbed gas feed ratio can be increased to approximately 40%, resulting in a PSA1 desorbed gas feed rate of approximately 9.4 t / h. The natural gas feed rate is expected to decrease to below 14 t / h. Under these conditions, the natural gas consumption of a single 12×10⁴ Nm³ / h hydrogen production unit would be lower than the current scenario of two hydrogen production units operating simultaneously. Based on a natural gas price of 1.45 yuan / Nm³, a single 12×10⁴ Nm³ / h hydrogen production unit can reduce natural gas consumption by approximately 548 Nm³ / h, saving 799 yuan per hour and 575,400 yuan per month. Annual savings are also expected to be:
[0062] 575400 * 12 = 6904800 (yuan)
[0063] Based on current data, the supplementary fuel gas consumption is not significantly different between two hydrogen production units operating simultaneously and a single 12×10⁴ Nm³ / h hydrogen production unit operating. However, considering the different inlet temperatures of the reformer and the impact of changes in the desorbed gas feed on the reformer temperature, the specific trend of supplementary fuel gas consumption cannot yet be determined.
[0064] c) Changes in electricity consumption
[0065] In terms of power consumption, a single 12×10⁴ Nm³ / h hydrogen production unit consumes significantly less power than two units operating simultaneously, saving 805 kWh per hour. Based on an electricity price of 0.34 yuan / kWh, this translates to a saving of 273.7 yuan per hour, or 197,064 yuan per month. Annual savings are also possible.
[0066] 197064 * 12 = 2364763 (yuan)
[0067] Considering both of the above, under the same 80% load, the 12×104Nm3 / h hydrogen production unit can save 772,000 yuan per month when operating as a single unit, which is more economical than operating two units simultaneously.
[0068] (2) Saving maintenance costs generates benefits
[0069] 12×10 4 Nm 3 Hydrogen production is running smoothly at / h, with a shutdown of 5×10 4 Nm 3 Compared to the maintenance frequency before the manifold replacement, the hydrogen production per hour has reduced the maintenance frequency by 3 times per year for each converter, totaling a reduction of 6 times per year. Assuming an emergency repair cost of 200,000 yuan per instance, the annual savings in maintenance costs are:
[0070] 6 * 200,000 = 1,200,000 (yuan)
[0071] In summary, the total annual savings amount to 10.464 million yuan. At the same time, the reduced frequency of maintenance significantly lowers daily production and maintenance safety risks.
[0072] The terms used to describe position and direction in this application are illustrated with the accompanying drawings, but changes may be made as needed, and all such changes should be included within the scope of this application.
Claims
1. A connection structure for the main pipe and branch pipes of a hydrogen production converter oil transfer line main pipe, wherein the hydrogen production converter oil transfer line main pipe includes a main pipe (1) and branch pipes (3), characterized in that: The main pipe (1) is provided with an elliptical connecting pipe hole for connecting with the branch pipe (3). A tubular branch pipe seat (2) for connecting the main pipe (1) and the branch pipe (3) is provided on the connecting pipe hole. The branch pipe seat (2) is inverted T-shaped, with its bottom connected to the connecting pipe hole of the main pipe (1) and its top connected to the branch pipe (3). The bottom of the branch pipe seat (2) is folded outward with a flange (22). The side of the flange (22) is connected to the hole wall of the connecting pipe hole of the main pipe (1) by welding. The outer wall of the branch pipe seat (2) and the upper surface of the flange (22) and the inner wall of the branch pipe seat (2) and the lower surface of the flange (22) are all connected by a round arc transition. The outer wall of the branch pipe seat (2) is provided with a reinforcing section (21). The top of the reinforcing section (21) is provided with a welding bevel (25), and the bottom is folded outward with a flange (22). The inner wall of the reinforcing section (21) and the lower surface of the flange (22) are connected by an arc transition. The outer wall of the reinforcing section (21) is, from top to bottom, a first bevel transition section (241), a first stress-relieving vertical edge section (231), a second bevel transition section (242), and a second stress-relieving vertical edge section (232). The first bevel transition section (241) has... The upper part and the welding bevel (25) are connected by a circular arc transition. The lower part of the first edge-cutting transition section (241) and the upper part of the first stress-relieving vertical edge section (231) are connected by a circular arc transition. The lower part of the first stress-relieving vertical edge section (231) and the upper part of the second edge-cutting transition section (242) are connected by a circular arc transition. The lower part of the second edge-cutting transition section (242) and the upper part of the second stress-relieving vertical edge section (232) are connected by a circular arc transition. The lower part of the second stress-relieving vertical edge section (232) and the upper surface of the flange (22) are connected by a circular arc transition. The root pass of the branch pipe (2) and the main pipe (1) is welded with TGF347 welding wire; the fill and cover passes are welded with ER16-8-2 welding wire, and the interpass temperature is rapidly cooled, with the temperature between each pass not exceeding 60°C. The outer wall of the branch pipe seat (2) consists of, from top to bottom, a first chamfered transition section (241), a first stress-relieving vertical section (231), a second chamfered transition section (242), and a second stress-relieving vertical section (232) that are connected by circular arcs. The angle between the first edge-cutting transition section (241) and the first stress-relieving vertical edge section (231) is 10~20°, and the angle between the second edge-cutting transition section (242) and the second stress-relieving vertical edge section (232) is 30~40°.
2. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to claim 1, characterized in that: A reinforcing section (21) is provided along the outer wall of the branch pipe seat (2). The top of the reinforcing section (21) is provided with a welding bevel (25), and the bottom is folded outward with a flange (22). The outer wall of the reinforcing section (21) and the upper surface of the flange (22) are connected by a circular arc transition. The upper part of the beveled transition section (24) and the welding bevel (25) are connected by a circular arc transition or by a vertical straight edge section.
3. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to claim 2, characterized in that: The included angle between the chamfered transition section (24) and the stress-relieving vertical section (23) is 30°.
4. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to claim 1, characterized in that: The angle between the first chamfered transition section (241) and the first stress-relieving vertical section (231) is 10°, and the angle between the second chamfered transition section (242) and the second stress-relieving vertical section (232) is 35°.
5. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to claim 1, characterized in that: A reinforcing section (21) is provided along the outer wall of the branch pipe seat (2). The top of the reinforcing section (21) is provided with a welding bevel (25), and the bottom is folded outward with a flange (22). The outer wall of the reinforcing section (21) and the upper surface of the flange (22) are connected by a circular arc transition. The bottom of the reinforcing section (21) of the branch pipe seat (2) is set as an elliptical structure with one end high and the other end low, matching the pipe body and end cap of the main pipe (1). The bottom of the elliptical structure is folded outward with a flange (22). The side of the flange (22) is welded to the wall of the connecting pipe hole of the elliptical structure of the main pipe (1). The outer wall of the reinforcing section (21) and the upper surface of the flange (22) are connected by a circular arc transition. The inner wall of the reinforcing section (21) and the lower surface of the flange (22) are connected by a circular arc transition. The outer wall of the reinforcing section (21) consists of a first bevel transition section (241), a first stress-relieving vertical edge section (231), a second bevel transition section (242), and a second stress-relieving vertical edge section (232) from top to bottom. The upper part of the first bevel transition section (241) and the welding bevel (25) are connected by a circular arc transition. The lower part of the first bevel transition section (241) and the upper part of the first stress-relieving vertical edge section (231) are connected by a circular arc transition. The lower part of the first stress-relieving vertical edge section (231) and the upper part of the second bevel transition section (242) are connected by a circular arc transition. The lower part of the second bevel transition section (242) and the upper part of the second stress-relieving vertical edge section (232) are connected by a circular arc transition. The lower part of the second stress-relieving vertical edge section (232) and the upper surface of the flange (22) are connected by a circular arc transition.
6. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to claim 5, characterized in that: The angle between the first bevel transition section (241) and the first stress-relieving vertical section (231) is 14°; the angle between the second bevel transition section (242) and the second stress-relieving vertical section (232) is 30°.
7. The connection structure of the main pipe and branch pipes of the hydrogen production converter oil transfer line according to any one of claims 1-6, characterized in that: Three root pass welding passes were performed using TGF347 welding wire. After the weld was completed, the weld was subjected to 100% RT-II inspection. The surface hardness of the weld is less than 190HV, the grain size is controlled at level 4-7, and the ferrite content is 4-8%. After the weld is completed, the weld is not heat-treated and can be used directly in the welded state.
Citation Information
Patent Citations
Hydrogen making converting kiln exit port collecting tube
CN101249411A
Method for preventing pipeline hydrogen damage, and oil transfer line and manifold of oil refining and hydrogen production reformer applying method
CN108709041A
Welding process of hydrogen manufacturing unit transfer line main pipe