Numerical prediction method of linear underground engineering inflow during construction process

By employing numerical simulation methods involving three-dimensional geological modeling and dynamic boundary condition adjustment, the problem of accurately predicting water inflow during linear underground engineering construction was solved, reducing safety risks and improving construction efficiency.

CN116756807BActive Publication Date: 2026-11-24YELLOW RIVER ENG CONSULTING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310584357.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2026-11-24
Estimated Expiration
2043-05-23

AI Technical Summary

Technical Problem

Existing technologies cannot accurately predict the volume of sudden water inrushes during the construction of linear underground engineering projects, especially under complex geological conditions, which leads to high construction safety risks and increased costs.

Method used

The hydrogeological structure of the study area was precisely characterized by three-dimensional geological modeling technology. The boundary conditions were dynamically adjusted in combination with the construction progress and lining measures. The water inflow of the underground chamber was predicted by numerical simulation, and the model parameters were corrected in real time to improve the prediction accuracy.

Benefits of technology

It enables dynamic prediction of water inflow in underground engineering projects, reduces the risk of sudden water inrush disasters, improves the ability to ensure construction progress, and saves costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116756807B_ABST
    Figure CN116756807B_ABST
Patent Text Reader

Abstract

This invention discloses a numerical prediction method for water inflow in linear underground engineering coupled with the construction process. It employs 3D geological modeling software to finely depict underground structures and major water-conducting structures within the study area. Dynamic boundary conditions are assigned to different structures based on the construction excavation progress and tunnel lining conditions. This predicts the dynamic changes in groundwater level and water inflow during the construction process, forming a dynamic prediction and simulation technology for underground tunnel water inflow coupled with the construction process. This makes the water inflow prediction results more accurate and practical. It provides data and technical support for the dynamic adjustment of tunnel drainage design schemes, effectively reduces the risk of safety accidents caused by sudden water inflow disasters, improves the construction progress guarantee capability of deeply buried long tunnels, and saves costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of coupled construction technology for underground engineering, and in particular to a numerical prediction method for water inflow in linear underground engineering during coupled construction processes. Background Technology

[0002] Calculating and predicting water inflow in linear underground engineering projects is a typical engineering geological challenge. Whether during tunnel construction or post-construction maintenance, water inflow remains a key concern for tunnel construction safety. Limited by current exploration methods and accuracy, the prediction accuracy of tunnel inrush water volume is low and the task is difficult. Furthermore, inrush water often exhibits characteristics such as suddenness, large flow rate, and high water pressure, posing a significant threat to personnel and construction equipment during construction, and often resulting in incalculable economic losses and project delays. Therefore, reasonable and dynamic prediction of water inflow during the construction of linear underground engineering projects is one of the problems that must be addressed and solved in the construction of deep-buried long tunnel chambers, and it is also an urgent issue to be resolved in water supply and drainage design.

[0003] However, due to the complexity of geological conditions, the variability of tunnel water inflow, and the incomplete understanding of hydrogeological conditions, there is still no mature theory or universally accepted accurate calculation method. Currently, the methods used for tunnel water inflow can be broadly categorized into deterministic and non-deterministic methods. Deterministic methods mainly include analytical methods, numerical simulation methods, physical simulation methods, and water balance methods. Analytical methods can be further subdivided into empirical formula methods and analytical formula methods. Non-deterministic methods include hydrogeological analogy methods, regression (correlation) analysis methods, fuzzy mathematical models, grey system theory, BP artificial neural networks, and time series analysis. Currently, the most widely used methods for predicting and calculating water inflow both domestically and internationally are empirical formula methods, analytical formula methods, and numerical calculation methods.

[0004] For example, some foreign scholars use Feflow to set the tunnel as a transformation boundary, with the boundary head being the elevation at various points in the tunnel. Based on the tunnel excavation status, the boundary transformation coefficient for unexcavated tunnels is set to a fixed value, while the excavated tunnels are set to 0, thus achieving dynamic prediction of tunnel water inflow. Other scholars use the Modflow module in GMS to divide the tunneling process into a series of continuous segments according to the TBM construction progress. The tunnel boundary conditions are generalized as Drain boundaries, with the boundary elevation being the elevation of each segment of the tunnel. The permeability coefficient of each tunnel segment is assigned according to the tunneling speed, achieving dynamic simulation of tunnel water inflow. Some domestic scholars consider the continuously excavated tunnel during construction as a dynamically changing boundary condition. In the simulation, the unit boundary condition is set as a Dirichlet boundary condition (constant head boundary). The MODFLOW groundwater flow simulation program is further developed using MATLAB software. The water head result after one simulation is used as the initial water head for the next simulation of that unit, thus achieving dynamic simulation of tunnel water inflow under ideal conditions.

[0005] However, empirical and analytical formula methods typically make many assumptions, mostly considering only the isotropic permeability of the surrounding rock. They are suitable for circular cross-section tunnels with simple boundary conditions and only study the excavated bare tunnel, failing to account for the coupling effects of support structures, grouting reinforcement rings, etc. Analytical formula methods can only simplify three-dimensional problems into two-dimensional models.

[0006] While numerical simulation methods are not limited by the above conditions and are applicable to calculating tunnel water inflow under complex hydrogeological conditions, current simulation techniques are mostly static. They typically require defining boundary conditions throughout the simulation process during model building, and these conditions cannot be changed at any point during the simulation. Therefore, dynamic simulation that couples construction schedule and lining measures cannot be achieved. No mature numerical prediction method for water inflow that couples construction schedule and lining measures has yet been found for application in the production field. Summary of the Invention

[0007] The purpose of this invention is to provide a numerical prediction method for the inrush volume of linear underground engineering coupled with the construction process, which is used to solve the problem of predicting the inrush volume of deep buried long tunnels under the dynamic coupling of construction progress and lining measures under structural fractures with different permeability characteristics.

[0008] To achieve the above objectives, the present invention adopts the following technical solution: The numerical prediction method for linear underground engineering water inflow during coupled construction processes described in this invention includes the following steps: S1, based on geological survey data, obtain the hydrogeological structure, strata and permeability parameters of faults in the study area; S2, determine the boundary conditions of the study area, construct a three-dimensional geological model of the study area, and characterize the underground chambers and the geological bodies that have a significant impact on the water inflow of the underground chambers; S3, based on historical drainage volume, rainfall data and surrounding groundwater data, corrects the initial water level of the three-dimensional geological model; S4. Based on the actual construction progress of the underground chamber, the excavation of the underground chamber is simulated in a three-dimensional geological model to obtain the predicted values ​​of the underground chamber's water inflow and groundwater level, which are used to guide subsequent construction. S5. After comparing and analyzing the predicted value with the actual monitoring value and correcting the hydrogeological parameters of the three-dimensional geological model, step S4 is executed to obtain the predicted value of the water inflow in the next stage of the underground chamber.

[0009] Furthermore, in step S2, the method for characterizing the fracture structure that has a significant impact on the inflow of water in the underground chamber includes: for thin geological bodies with isotropic permeability, the thickness of the geological body is represented by a surface without thickness in the three-dimensional geological model, and the thickness and permeability parameters of the geological body are incorporated into the three-dimensional geological model for calculation through the method of attribute values; For geological bodies with a certain thickness and obvious normal-direction water resistance and horizontal-direction water guidance, a three-layer model consisting of the main zone and the two side fracture zones is used in the three-dimensional geological model. For geological bodies with permeability anisotropy, values ​​are assigned and calculated in the form of permeability tensors in three-dimensional geological models; For geological bodies with permeability anisotropy and high hydraulic gradient, values ​​are assigned and calculated in the form of permeability tensor and non-Darcy coefficient tensor in the three-dimensional geological model.

[0010] Furthermore, in step S4, the excavation coordinates and time of the underground chamber in the three-dimensional geological model are dynamically controlled according to the actual construction progress of the underground chamber, so that the simulated construction progress of the underground chamber is consistent with the actual construction progress; the surface flow velocity and external water head of the three-dimensional geological model are adjusted by the rainfall forecast; the permeability of the underground chamber is adjusted according to the actual construction progress, and the water inflow in the unexcavated, excavated but unlined, and excavated and lined areas of the underground chamber is predicted.

[0011] Furthermore, the actual monitoring values ​​mentioned in step S5 refer to the measured water inflow and groundwater level of the underground chambers at each monitoring point during the actual construction process; the hydrogeological parameters of the corrected three-dimensional geological model include correcting the hydrogeological parameters of the three-dimensional geological model based on the changes in surface water level and groundwater level monitored by the groundwater level monitoring points and the actual water inflow of the underground chambers.

[0012] Furthermore, methods for measuring the inflow of water in underground chambers include the buoy method and the flow rate meter method.

[0013] The advantages of this invention lie in its use of 3D geological modeling software to meticulously depict underground structures and major water-conducting structures within the study area. Combined with the construction excavation progress and tunnel lining conditions, dynamic boundary conditions are assigned to different structures to predict the dynamic changes in groundwater level and inflow during the construction process. This forms a dynamic prediction and simulation technology for underground chamber inflow coupled with the construction process, making the inflow prediction results more accurate and practical. It provides data and technical support for the dynamic adjustment of chamber drainage design schemes; effectively reduces the risk of safety accidents caused by sudden water inrush disasters; improves the construction progress guarantee capability of deeply buried long tunnels; and saves costs. Attached Figure Description

[0014] Figure 1 This is a flowchart of the method described in this invention.

[0015] Figure 2 This is a schematic diagram of the three-layer model in the three-dimensional geological model of the method described in this invention.

[0016] Figure 3 This is a simplified diagram of the structure of the study area in Embodiment 2 of the present invention.

[0017] Figure 4 This is a schematic diagram of a three-dimensional geological model of the study area in Embodiment 2 of the present invention.

[0018] Figure 5 This is a schematic diagram of the underground chamber in the three-dimensional geological model of the study area in Embodiment 2 of the present invention.

[0019] Figure 6 This is a schematic diagram of the dynamic excavation of the inclined shaft at different times in Embodiment 2 of the present invention.

[0020] Figure 7 This is a comparison chart of the dynamic change curves of the inclined well drainage volume in Embodiment 2 of the present invention.

[0021] Figure 8 This is a comparison chart of the dynamic change curves of the total water inflow in the cavern in Embodiment 2 of the present invention. Detailed Implementation

[0022] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0023] Example 1: Detailed Explanation of the Numerical Prediction Method for Linear Underground Engineering Water Inflow in Coupled Construction Processes as Described in this Invention like Figure 1As shown, the numerical prediction method for linear underground engineering water inflow during coupled construction processes according to the present invention includes the following steps: S1, based on geological survey data, obtain the hydrogeological structure, strata and permeability parameters of faults in the study area; Geological exploration data includes, but is not limited to, field hydrogeological surveys, geophysical exploration, drilling, in-situ tests, and laboratory experiments; the hydrogeological structure of the study area includes hydrogeological boundaries such as the boundary line between the permeable layer and the relatively impermeable layer, and boundary conditions; the permeability parameters of the geological body can be permeability coefficients or permeability rates, and can be in the form of constants, variables, tensors, etc.

[0024] S2, determine the boundary conditions of the study area, construct a three-dimensional geological model of the study area, and characterize the underground chambers and geological bodies that have a significant impact on the inflow of water into the underground chambers; that is, construct a three-dimensional groundwater seepage numerical simulation model for underground engineering, which includes the three-dimensional geological model of the study area; the main water-conducting structures in the study area, i.e., the geological bodies that have a significant impact on the inflow of water into the underground chambers; and the underground linear engineering, i.e., the underground chambers.

[0025] First, the boundary conditions of the study area, i.e., the boundaries of the three-dimensional geological model to be established, are determined based on the data obtained in the first step. Specifically, the boundary conditions of the study area are determined based on data such as water recharge, hydrogeological structure, and permeability coefficients determined by stratigraphic faults. The water recharge factors considered in this model include atmospheric precipitation and lateral groundwater recharge. For atmospheric precipitation, the surface infiltration rate is determined based on the converted infiltration amount, and it is a function related to time t.

[0026] Then, using professional numerical modeling software, a three-dimensional geological model was established, and the fracture structure and underground cavern that have a significant impact on the tunnel's water inflow were depicted. Structural fractures can be characterized and simulated in different ways depending on their scale and seepage characteristics: For thin geological bodies with isotropic permeability, they are represented by a surface without thickness in the three-dimensional geological model. The thickness and permeability parameters of the geological body are then incorporated into the three-dimensional geological model for calculation using the attribute value method. For geological bodies with a certain thickness and obvious water-blocking properties along the normal direction and water-guiding properties along the strike direction, a three-layer model consisting of the main zone and two fracturing zones on both sides is used in a three-dimensional geological model, such as... Figure 2 As shown; For geological bodies with permeability anisotropy, values ​​are assigned and calculated in the form of permeability tensors in three-dimensional geological models; For geological bodies with permeability anisotropy and high hydraulic gradient, values ​​are assigned and calculated in the form of permeability tensor and non-Darcy coefficient tensor in the three-dimensional geological model.

[0027] S3, based on historical drainage volume, rainfall data and surrounding groundwater data, corrects the initial water level of the three-dimensional geological model; Based on the numerical model established in the second step, along with its initial parameters and boundary conditions, the initial water level in the study area is fitted, and the hydrogeological parameters are corrected. Steady-state flow is used to fit the initial water level in the study area, while simultaneously determining boundary conditions, source-sink terms, and hydrogeological parameters.

[0028] S4. Based on the actual construction progress of the underground chamber, the excavation of the underground chamber is simulated in a three-dimensional geological model to obtain the predicted value of the water inflow of the underground chamber, which is used to guide subsequent construction. Specifically, based on the actual construction progress of the underground chamber, the excavation coordinates and excavation time of the underground chamber in the three-dimensional geological model are dynamically controlled to ensure that the simulated construction progress of the underground chamber is consistent with the actual construction progress; the surface flow velocity and external water head of the three-dimensional geological model are adjusted by the rainfall forecast; the permeability of the underground chamber is adjusted according to the actual construction progress, and the water inflow in the unexcavated, excavated but unlined, and excavated and lined areas of the underground chamber is predicted.

[0029] First, based on the actual construction progress of the underground chamber, the daily construction progress of the underground chamber in the three-dimensional geological model is set. By dynamically controlling the excavation coordinates and excavation time of the underground chamber in the three-dimensional geological model, the construction progress is dynamically simulated.

[0030] Then, based on the rainfall forecast, the surface flow velocity and external water head of the three-dimensional geological model are adjusted.

[0031] The surface of the underground chamber is set as a Class III hydrogeological boundary, and the boundary water head of the underground structure is set to z, meaning the pressure water head at the structure surface is 0. The permeability of the underground chamber is adjusted according to the actual construction progress; for example, areas that have been excavated and completed lining have lower permeability, while areas that have been excavated but not yet completed lining have higher permeability. After the underground chamber working face is excavated, the permeability values ​​of different areas of the underground chamber are adjusted in real time to simulate the changes in tunnel permeability under different construction states. A nested double if statement is used to control commands, based on the boundary node elevation z and the continuous change time t, to determine the external water head and permeability parameter Rb to simulate the dynamic excavation and lining process.

[0032] S5. Compare and analyze the predicted value with the actual monitored value of the water inflow in the underground chamber, correct the hydrogeological parameters of the three-dimensional geological model, and then execute step S4 to obtain the predicted value of the water inflow in the next stage of the underground chamber.

[0033] During the construction of underground caverns, a monitoring plan must be developed based on the design data of the underground cavern. The plan should include the monitoring points, the types of monitoring equipment, and the monitoring indicators. The monitoring plan should meet the current mandatory provisions.

[0034] Groundwater level monitoring points are mainly used to monitor changes in surface water level and groundwater level. The points can be located using existing wells, borehole monitoring points, or in the location of surface water such as rivers and lakes. The monitoring equipment can be manual measurement, automatic data acquisition, or monitoring equipment with wireless transmission capability. Monitoring equipment with wireless transmission capability is preferred. The frequency of collecting monitoring data can be set according to the parameter inversion and correction frequency in step four.

[0035] The water inflow in underground chambers can be measured using methods such as the float method and the flow meter method. The frequency of collecting monitoring data can be set according to the parameter inversion and correction frequency in the third step.

[0036] Correcting the hydrogeological parameters of a three-dimensional geological model involves adjusting these parameters based on changes in surface water and groundwater levels monitored by groundwater level monitoring points. This ensures that the hydrogeological conditions of the three-dimensional geological model are consistent with the actual geological conditions, thereby improving the accuracy of water inflow prediction in the next stage.

[0037] Compared to traditional methods, the linear underground engineering water inflow numerical prediction method coupled with the construction process described in this invention establishes a three-dimensional geological model of the study area by creating a more detailed model of the hydrogeological structure. Based on this three-dimensional geological model, the boundary conditions of the underground tunnels are adjusted in real time according to the construction progress, construction sequence, and predicted rainfall, making the calculation model closer to the real-time situation and improving the accuracy of underground tunnel water inflow prediction. This invention effectively reduces the risk of safety accidents caused by sudden water inrush disasters, improves the construction progress guarantee capability of deeply buried long tunnels, and saves costs.

[0038] Example 2 illustrates the application effect of the present invention using the construction of a neutrino experimental station in a certain region as an example. Step 1: Collect geological survey data A regional neutrino experiment station is located at the boundary between two towns in a certain city. The area is a low mountain and hilly region, with the main mountain ridge trending approximately north-south. Based on field survey data, the hydrogeological structure of the study area was obtained, along with the permeability parameters of geological bodies such as strata and faults.

[0039] The ground elevation in this area generally ranges from 30 to 300 meters, with slopes typically ranging from 10° to 20°. The highest point reaches an elevation of approximately 326 meters, serving as the watershed within the region. The lowest point has a surface elevation of 30.0 meters. The main gullies run roughly east-west, exhibiting a high density of gully incisions with depths of 50 to 100 meters, and many contain perennial streams.

[0040] The exposed strata mainly consist of Cambrian, Ordovician, Quaternary, and Yanshanian intrusive rocks. Geologically, the study area belongs to the Kaiping-Fold-Fault Band (IV). Due to the influence of multiple tectonic events and magmatic activity, the geological structure of this area is relatively complex. Figure 3 The diagram shown is a simplified structural diagram of the study area.

[0041] Because the Cambrian and Ordovician sandstone, mudstone, and shale are distributed in bands with steep dip angles, generally 50°–80°, groundwater tends to migrate deeper along bedding planes and fissures. In contrast, in granite, joints and fissures are well-developed, and groundwater migrates along the fissure network. There are no obvious aquitards, and regional geological data and geological surveys show no major fault structures traversing the study area. Therefore, the groundwater in the study area can be considered as a unified fissure-prone aquifer.

[0042] Step 2: Determine the boundary conditions of the study area, construct a three-dimensional geological model, and perform detailed characterization. Based on the aforementioned geological survey data, the study area is divided into two parts: a granite stock in the middle, surrounded by sandstone, mudstone, and shale. The upper boundary of the study area is the surface, and considering that groundwater flow below elevation -680m is very weak, the lower boundary of the model is the -680m elevation line. Based on the obtained 3D coordinate scatter information of the surface and granite stock in the engineering calculation area, two interfaces are established in the model using the parametric surface function of the software, thus creating a 3D geological model consistent with the topography and dimensions of the engineering calculation area, such as... Figure 4 As shown.

[0043] During construction, the underground chambers of this neutrino experiment station were quite complex. Besides vertical and inclined shafts, the main hall of the station was interconnected with surrounding chambers, which were irregularly arranged and often had slopes and curvatures. Except for the vertical shafts, most of the chambers were horseshoe-shaped. Considering that the shape of the chambers had little impact on the calculation of water inflow, the horseshoe-shaped chambers were converted into circular chambers based on the principle of having the same cross-sectional area. For example... Figure 5 The figure shows the numerical models of the underground chambers in the study area. The left figure shows the numerical models of all the underground chambers in the study area, and the right figure shows the numerical models of the experimental station hall and surrounding caves in the left figure.

[0044] In addition, based on the preliminary survey data, six faults that have a significant impact on the water inflow of the underground cavern were identified and marked as F2, F8, XF1, SF1, xf02, and P3F1 faults. The spatial location of the fault planes was delineated within the model range by controlling the positions of the four endpoints, and the six faults were delineated by trimming using Boolean operations in software.

[0045] Based on preliminary exploration data, the fault thickness ranges from 0.3m to 2.2m, and the thickness of the same fault varies significantly in different locations. This simulation uses a permeability coefficient of 30m / d for the fault, as determined by previous research.

[0046] Step 3: Correct the initial water level of the three-dimensional geological model based on historical drainage volume, rainfall data, and surrounding groundwater data. Considering that the water inflow recharge of the underground chamber includes atmospheric precipitation and lateral groundwater recharge, atmospheric precipitation infiltration is distributed throughout the area, and the model represents non-point source infiltration recharge. The water head around the study area changes continuously as construction progresses. Based on collected data and field survey results, construction water inflow affects distant surface rivers and basin surface water bodies or groundwater levels. Therefore, the lateral groundwater recharge is generalized by setting the model's four boundaries as a universal water head boundary (i.e., a variable water head boundary).

[0047] Unsteady flow prediction of groundwater level is influenced by the initial water level. Using previous data on well drainage, rainfall, and surrounding groundwater surveys, a steady flow numerical simulation method was employed to correct the initial water level in the model. First, steady flow was used to fit the initial water level in the study area, while simultaneously determining boundary conditions, source and sink terms, and hydrogeological parameters. Vertical joints are well-developed in the study area. The permeability parameters of the model rock mass were repeatedly corrected using monitoring data from inclined and vertical shaft excavation, resulting in the permeability parameters shown in Table 1.

[0048] Table 1. Permeability Coefficient Zoning Table for Numerical Model Step 4: Based on the actual construction progress of the underground chamber, simulate the excavation of the underground chamber in the three-dimensional geological model to obtain the predicted value of the water inflow of the underground chamber. Taking the inclined shaft as an example, the elevation of the entrance is 64.27m and the elevation of the end is (-460.00)m. The end of the inclined shaft is the horizontal section, which leads to the side wall of the experimental hall.

[0049] The specific operation steps are as follows: The construction progress is simulated using two parameters: coordinates and time. The difference lies in setting a lower permeability value 'b' to the excavation face 10 days after excavation, assuming a change in tunnel permeability after lining. A nested double 'if' statement is used to control commands, based on the boundary node elevation 'z' and the continuous change time 't', to determine the external water head and permeability parameters to simulate the dynamic excavation and lining process. Specifically, the opening elevation coordinate of the inclined shaft is 70m, and excavation begins on the 60th day of the calculation, with a tunneling rate of 0.69m / d. The control commands are as follows: if((70-z[1 / m]) / 0.69<(t[1 / d]-60),if((70-z[1 / m]) / 0.69<(t[1 / d]-70),b,a),0) Two if statements are used to determine the excavation status of the underground chamber, such as unexcavated, excavated but not lined, or excavated and lined. The command structure is if(test condition, if(test condition, true, false), false). In the above command control statement, 70 is the opening elevation of the inclined shaft; z is the elevation of the boundary node, i.e., the elevation of the predicted position; 1 / m represents the elevation unit calculated in meters, but it can also be set to other elevation units as needed. 0.69 is the tunneling rate. t is the continuous variation time, [1 / d] represents the time unit calculated in days, but it can also be set to other time units as needed. 60 represents the start of tunneling on the 60th day of the calculation. 0, a, and b in the command represent the permeability in the unexcavated, excavated but not lined, and excavated and lined states, respectively. In other words, the test condition (70-z[1 / m]) / 0.69<(t[1 / d]-60) is used to determine whether the chamber has been excavated, and the test condition (70-z[1 / m]) / 0.69<(t[1 / d]-70) is used to determine whether the chamber has been lined. The permeability value is determined based on the judgment result.

[0050] Boundary control conditions were used in the established numerical model to simulate the dynamic excavation of the inclined shaft. The schematic diagram of the dynamic excavation is shown in the figure, illustrating four segments in the construction process. Different colors represent different permeability. The red section represents the unlined cavern under construction; the dark blue section at the front represents the unexcavated cavern; and the light blue section at the rear represents the completed and lined cavern. Figure 6 As shown, from left to right and from top to bottom, the diagrams illustrate the dynamic excavation of the inclined shaft at 60 days, 70 days, 550 days, and 870 days of construction, respectively, and predict the water inflow of the inclined shaft at different construction periods.

[0051] Based on this, the inflow of water into the cavern of the model and the groundwater level at the monitoring point are calculated, and step 5 is executed simultaneously.

[0052] Step 5: Compare and analyze the predicted values ​​with the actual monitored values ​​of water inflow in the underground chamber, and correct the hydrogeological parameters of the three-dimensional geological model.

[0053] Since construction began in 2015, the neutrino experiment station has been tracking the water inflow from its shafts monthly. Figure 6 As shown, as of October 6, 2021, after the inclined shaft and vertical shaft were connected, seepage water in the tunnel was discharged through the inclined shaft. The initial excavation work progressed smoothly, with minimal seepage in the siltstone, mudstone, and shale sections. During the excavation of the granite section, as the excavation depth increased, seepage gradually increased, leading to water inrushes. In some areas, the working face was flooded due to large inrushes.

[0054] On November 6, 2019, a groundwater observation well was completed, with a surface elevation of 187.20m. The initial water level was taken as the groundwater level observed in the well on November 6, 2019 (-318.03m). Then, the model in step 4 was identified and verified using monitoring data from vertical shafts, inclined shafts, and monitoring wells.

[0055] like Figure 7 The figure shows a comparison of the dynamic changes in the drainage volume of the inclined shaft. The red line in the figure represents the actual drainage volume in the inclined shaft, and the blue line represents the water inflow volume in the inclined shaft calculated by the calculation model. Figure 7 This indicates that the actual monitored values ​​are quite close to the calculated values.

[0056] Through the above work, the calculation model is made closer to the actual situation, the water level of long-sequence observation wells is fitted, and the model recognition is achieved.

[0057] Based on the completed model recognition, the experimental station hall is then analyzed according to the predicted working conditions. The water table is calculated at 0d, 500d, 1000d, 1500d, and 2500d. As time increases, the funnel formed by the water table continuously deepens and enlarges. At 0d, the water table is calculated as the initial surface in a stable state according to the set initial conditions. At 500d, two funnels are formed due to the excavation and drainage of the vertical and inclined shafts. At 1000d, the vertical and inclined shafts are completed, and the two small funnels form a larger funnel. At 1500d, the experimental station hall is partially excavated, the dewatering funnel further enlarges and deepens, the arch of the experimental station hall is in a dewatered state, and the surrounding side walls and caverns are still in saturated rock mass. At 2500d, the entire water table is in a stable state, and the final water level of the monitoring well is 344.7m.

[0058] Repeat steps 4 and 5 until construction is complete. The curve showing the change in total water inflow over time in the tunnel is shown below. Figure 7 As shown, it can be clearly seen that the water inflow gradually increases as the cavern is excavated. The experimental station hall is designed to be excavated from top to bottom according to the construction plan.

[0059] like Figure 8 The figure shows a comparison of the total inflow of water in the underground chambers of the project. Red represents the actual monitored values, and blue represents the calculated values. As can be seen from the figure, the predicted values ​​using the method described in this application are basically consistent with the actual observed values. This indicates that the method effectively solves the problem of predicting the dynamic changes in groundwater level and inflow during different excavation stages and tunnel lining conditions in underground engineering construction, resulting in more accurate and practical inflow prediction results.

Claims

1. A numerical prediction method for water inflow in linear underground engineering coupled with the construction process, characterized in that: Includes the following steps: S1, based on geological survey data, obtain the hydrogeological structure, strata and permeability parameters of faults in the study area; S2, determine the boundary conditions of the study area, construct a three-dimensional geological model of the study area, and characterize the underground chambers and the geological bodies that have a significant impact on the water inflow of the underground chambers; The method for characterizing fracture structures that have a significant impact on the inflow of water in underground chambers includes: for thin geological bodies with isotropic permeability, they are represented by a surface without thickness in a three-dimensional geological model, and the thickness and permeability parameters of the geological body are incorporated into the three-dimensional geological model for calculation through the method of attribute values; For geological bodies with a certain thickness and obvious normal-direction water resistance and horizontal-direction water guidance, a three-layer model consisting of the main zone and the two side fracture zones is used in the three-dimensional geological model. For geological bodies with permeability anisotropy, values ​​are assigned and calculated in the form of permeability tensors in three-dimensional geological models; For geological bodies with permeability anisotropy and high hydraulic gradient, the permeability tensor and non-Darcy coefficient tensor are used for value assignment and calculation in the three-dimensional geological model. S3, based on historical drainage volume, rainfall data and surrounding groundwater data, corrects the initial water level of the three-dimensional geological model; S4. Based on the actual construction progress of the underground chamber, the excavation of the underground chamber is simulated in a three-dimensional geological model to obtain predicted values ​​of the underground chamber's water inflow and groundwater level, which are used to guide subsequent construction. Based on the actual construction progress of the underground chamber, the excavation coordinates and excavation time of the underground chamber in the three-dimensional geological model are dynamically controlled to ensure that the simulated construction progress of the underground chamber is consistent with the actual construction progress. The surface flow velocity and external water head of the three-dimensional geological model are adjusted by the rainfall forecast. The permeability of the underground chamber is adjusted according to the actual construction progress to predict the water inflow in the unexcavated, excavated but unlined, and excavated and lined areas of the underground chamber. S5. After comparing and analyzing the predicted value with the actual monitoring value and correcting the hydrogeological parameters of the three-dimensional geological model, step S4 is executed to obtain the predicted value of the water inflow in the next stage of the underground chamber.

2. The method for numerical prediction of water inflow in linear underground engineering during coupled construction processes according to claim 1, characterized in that: The actual monitoring values ​​mentioned in step S5 refer to the measured water inflow and groundwater level of each monitoring point during the actual construction process; the hydrogeological parameters of the corrected three-dimensional geological model include correcting the hydrogeological parameters of the three-dimensional geological model based on the changes in surface water level and groundwater level monitored by the groundwater level monitoring points and the actual water inflow of the underground chambers.

3. The method for numerical prediction of water inflow in linear underground engineering during coupled construction processes according to claim 1, characterized in that: Methods for measuring the inflow of water in underground chambers include the buoy method and the flow rate meter method.

Citation Information

Patent Citations

  • Water inflow prediction and calculation method based on hydrogeological model of adjacent mines after mine closing

    CN110567854A

  • Tunnel water inflow prediction method

    CN110795878A