保温装饰一体化大开洞剪力墙装配连接结构与施工工艺
By combining steel tube bundle wall segments with connecting beams, the challenges of openings and node connections in steel tube bundle concrete shear wall structures were solved, enabling the assembly and connection of large-opening shear walls that integrate insulation and decoration, thereby improving the building's space utilization and construction efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- YANSHAN UNIV
- Filing Date
- 2023-07-17
- Publication Date
- 2026-07-17
AI Technical Summary
Existing steel tube bundle concrete shear wall structures are inconvenient to open in the walls, have limited door and window placement, and complex node connections, which affect the prefabricated building design and the integrated effect of insulation and decoration.
The steel tube bundle wall segments are combined with steel tube bundle connecting beams, and large-opening shear wall structures are formed by welding, studs and fasteners. Combined with precast floor slabs and cast-in-place concrete, the steel tube bundle wall segments can be connected in a variety of ways and assembled.
It achieves flexible division of building functions, improves space utilization and aesthetics, simplifies the construction process, enhances connection strength and rigidity, meets the requirements of modularization and industrialization of buildings, and reduces material consumption and environmental pollution.