A candidate model self-adaptive adjustment urban flood multi-model combination prediction method

By selecting candidate models using the WIC criterion and the time-varying model averaging criterion, and combining them with the forward selection method, an integrated urban flood prediction model is constructed. This solves the problem of balancing model accuracy and timeliness in existing technologies, and achieves high-precision, low-cost, and high-timeliness urban flood prediction.

CN116796882BActive Publication Date: 2026-11-24ZHENGZHOU UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310259536.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2026-11-24
Estimated Expiration
2043-03-17

AI Technical Summary

Technical Problem

Existing technologies lack a candidate model selection method that can comprehensively consider model accuracy and timeliness in urban flood forecasting, resulting in unstable performance and high computational costs of integrated forecasting models, making it difficult to meet the needs of urban flood control and drainage.

Method used

Candidate models are selected using the weighted information criterion (WIC), and combined with the time-varying model averaging criterion and forward selection method to construct an integrated urban flood prediction model. The weights of candidate models are dynamically adjusted, and the candidate model combination scheme is optimized to ensure the high accuracy and timeliness of the model at different time points.

Benefits of technology

It significantly reduces the prediction error and uncertainty of individual models, improves prediction accuracy and stability, reduces computational costs, ensures the timeliness of flood control management, and provides more accurate and stable water accumulation prediction results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116796882B_ABST
    Figure CN116796882B_ABST
Patent Text Reader

Abstract

This invention discloses a candidate model adaptive adjustment method for urban flood multi-model combination prediction, comprising the following steps: S1. Using a weighted information criterion that comprehensively considers model accuracy and timeliness, candidate models suitable for integrated prediction models of urban flooding processes are selected from existing machine learning models; S2. Based on the prediction results of the selected candidate models, an integrated prediction model of urban flooding processes with time-varying weights is constructed by using a time-varying model averaging criterion to combine all candidate models; S3. Using a forward selection method, the performance of integrated prediction models under different candidate model combination schemes is compared and analyzed to obtain the optimal combination scheme of candidate models that balances model accuracy and model timeliness, and an integrated prediction model based on the optimal candidate model combination scheme is constructed to predict urban flooding processes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of urban flood water depth prediction technology, specifically to a multi-model combination prediction method for urban flooding with adaptive adjustment of candidate models. Background Technology

[0002] Driven by global warming and rapid urbanization, floods have become one of the most significant and frequent natural disasters facing the world. Studies show that between 1970 and 2009, 7,870 hydro-meteorological disasters were reported globally, causing 1.86 million deaths and trillions of yuan in property damage. An IPCC report indicates that the frequency and intensity of extreme weather events will further increase in the future. The increasing frequency and severity of floods pose a significant challenge to urban flood control and drainage, becoming a prominent bottleneck restricting the sustainable and healthy development of cities. Therefore, it is urgent to explore accurate and rapid urban flood forecasting methods to meet urban flood control and drainage needs and minimize the impact of floods.

[0003] In recent years, with the rapid development of big data and artificial intelligence technologies, scholars have explored various machine learning methods to predict urban flooding. Wu et al. established an urban flooding data warehouse using structured and unstructured urban flooding data. Based on this, they constructed a water depth prediction model using the Gradient Boosting Decision Tree (GBDT) algorithm. Validation results showed that the GBDT model had a relative error of 11.52% and could predict the water depth of urban flooding relatively well. Motta et al. constructed a water depth prediction model using six common machine learning methods (logistic regression, support vector machine, Gaussian Naive Bayes, random forest, K-nearest neighbors, and multilayer perceptron). The results showed that nonlinear models were more accurate in detecting floods, with random forest showing the highest performance. As can be seen from the above literature, although various machine learning methods such as GBDT and random forest have performed well in some applications of urban flooding, there is still no unified consensus on which model is optimal. The main reason is that machine learning methods may vary greatly when facing different prediction tasks. Therefore, it is usually unrealistic to find a model that is suitable for all situations. As Zhou et al. said, a single model often has a large degree of uncertainty. A model that achieves good results in the current situation may perform poorly in the prediction of another event. This uncertainty brings great challenges to the promotion and application of the model.

[0004] With the development of statistics and econometrics, model averaging is widely recognized as an effective means of reducing model uncertainty. Common model averaging methods include frequentist model averaging and Bayesian model averaging. Frequentist model averaging aims to select optimal weights to achieve some form of optimality, and various frequentist model averaging strategies have been developed, including the Mallows criterion, the knife-cut model averaging, and the time-varying model averaging. Bayesian model averaging is the most common and widely used method for combining multiple models. However, these studies using model averaging methods mostly focus on the accuracy of candidate models when selecting them, neglecting the significant impact of the computational cost of candidate models on the performance of the ensemble prediction model. For urban flood prediction, accuracy and timeliness are often equally important. Therefore, a candidate model selection method that comprehensively considers both model accuracy and timeliness may be more reasonable. However, the above studies show that there is no unified paradigm on how to reasonably select candidate models. In addition, these ensemble prediction models almost all ignore the impact of the number of candidate models and the combination of candidate models. As is well known, different candidate models have significantly different predictive performances, so different combinations of candidate models may lead to large differences in the performance of the ensemble prediction model. In summary, although it is widely believed that ensemble prediction models can improve the predictive performance of models, there are still some research gaps in how to reasonably select candidate models and how to obtain the optimal combination of candidate models in the construction of ensemble prediction models. Summary of the Invention

[0005] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a multi-model combination prediction method for urban flooding with adaptive adjustment of candidate models. First, a candidate model selection method that comprehensively considers model accuracy and timeliness is proposed using the WIC criterion. On this basis, an integrated urban flooding prediction model combining multiple machine learning models is constructed using a time-varying criterion. Finally, a forward selection method is used to achieve adaptive selection of candidate model combination schemes for the integrated prediction model.

[0006] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows:

[0007] A method for predicting urban flooding using a multi-model combination with adaptive adjustment of candidate models includes the following steps:

[0008] S1. Using a weighted information criterion that comprehensively considers model accuracy and timeliness, candidate models suitable for integrated prediction models of urban flooding processes are selected from existing machine learning models;

[0009] S2. Based on the prediction results of the selected candidate models, an integrated prediction model of urban flooding and waterlogging process with time-varying weights is constructed by using the time-varying model averaging criterion to combine all candidate models.

[0010] S3. Using a forward selection method, the performance of the integrated prediction model under different candidate model combination schemes is compared and analyzed to obtain the optimal candidate model combination scheme that balances model accuracy and model timeliness. An integrated prediction model based on the optimal candidate model combination scheme is then constructed to predict urban flooding processes.

[0011] Furthermore, in step S1, existing machine learning models include LR, Lasso, GNB, RR, KNN, SVR, MLP, BP, DT, RF, GBDT, and XGBoost.

[0012] Furthermore, in step S1, the model accuracy is determined by the RMSE and MAPE of K-fold cross-validation, and the model timeliness depends on the computation time t of the model in the prediction task.

[0013] Furthermore, in step S1, before selecting candidate models using the weighted information criterion, a model accuracy circuit breaker mechanism and a model timeliness circuit breaker mechanism are introduced. First, preliminary models that meet the error limit and maximum computation time are selected from existing machine learning models, and then candidate models are selected from the preliminary models.

[0014] Furthermore, in step S1, the MAPE, RMSE and computation time t of each model are first subjected to maximum and minimum normalization, and then the WIC value of each model is calculated.

[0015] Furthermore, in step S2, the time-varying model averaging criterion uses BIC and iterative iterations based on the minimization error criterion to determine the weights of the candidate model at different time points.

[0016] Furthermore, in step S2, the construction of the integrated prediction model for urban flooding processes includes the following steps:

[0017] S2-1. Calculate the initial weight vectors for all candidate models using the BIC criterion;

[0018] S2-2. Calculate the prediction error of the integrated prediction model at the start time t1 of the water accumulation process, and adjust the weights of the candidate models according to the sign of the prediction error. Then calculate the prediction error of the integrated prediction model after adjusting the weights. Repeat this step until the model prediction error reaches the preset accuracy and stop the iteration to obtain the optimal integrated prediction model weight vector at time t1.

[0019] S2-3. For each moment of the water accumulation process, repeat step S2-2 to calculate the optimal weight vector for different moments of the water accumulation process.

[0020] Furthermore, new samples are continuously added to the training set of the ensemble prediction model, and the process of steps S2-2 to S2-3 is repeated to obtain the weights of the ensemble prediction model that are updated with the samples.

[0021] Furthermore, in step S3, obtaining the optimal candidate model scheme using the forward selection method includes the following steps:

[0022] S3-1. Initial candidate model: The candidate model with the best performance among the k candidate models selected in step S1 is used as the initial candidate model for forward selection;

[0023] S3-2. Combine the candidate models determined in the previous step with the remaining k-1 candidate models to obtain k-1 combination schemes, and construct an ensemble prediction model for each combination scheme; calculate the WIC value of the prediction results of the ensemble prediction model under each combination scheme, and select the candidate model combination scheme with the smallest WIC as the forward selection output result;

[0024] S3-3. Repeat step S3-2 until k candidate model combination schemes are obtained through forward selection; calculate the WIC value under all candidate model combination schemes, and select the model combination scheme with the smallest WIC as the final baseline model of the integrated prediction model.

[0025] The beneficial effects of adopting the above technical solution are as follows:

[0026] (1) A candidate model selection strategy based on weighted information criteria was adopted. The performance of the candidate models was evaluated by comprehensively considering the model accuracy and timeliness. Candidate models for the integrated prediction model of urban flooding process were selected from 12 common machine learning models.

[0027] (2) Based on the prediction results of the candidate models, an integrated prediction model for urban flooding and waterlogging processes with dynamic changes in the weights of the candidate models was constructed using the time-varying criterion. Compared with traditional machine learning methods, the constructed integrated prediction model effectively integrates the prediction advantages of individual models, and can provide higher accuracy and more stable waterlogging prediction. The model prediction error is reduced by 46.9%-64.6% compared with individual models.

[0028] (3) The accuracy and timeliness of different candidate model combination schemes were compared by using the forward selection method. A candidate model combination scheme (Scheme D) that is suitable for urban flood waterlogging prediction and early warning and takes into account the optimal model accuracy and timeliness is proposed. This scheme has a MAPE of 6.71% and a running time of 41s. It not only improves the prediction accuracy of individual models, but also ensures that the model timeliness allows flood control managers to have sufficient time to respond.

[0029] (4) The forward selection method used when comparing different candidate model schemes reduced the computation time by 91.2%, effectively reducing the workload of model construction. Attached Figure Description

[0030] Figure 1 This is a framework diagram of the integrated prediction model for urban flooding processes of this invention;

[0031] Figure 2 This is a performance graph of the candidate model of this invention;

[0032] Figure 3 This is a graph showing the WIC values ​​of various candidate models at different water accumulation points;

[0033] Figure 4 It is a performance graph of the integrated prediction model that combines all candidate models;

[0034] Figure 5 This is a graph showing the prediction performance of different combinations of candidate models. Detailed Implementation

[0035] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0036] like Figure 1 As shown, this invention provides a method for predicting urban flooding using a multi-model combination with adaptive adjustment of candidate models, comprising the following steps:

[0037] S1. Selection of candidate models.

[0038] Candidate models, serving as the benchmark models for building integrated prediction models, are required not only to possess a certain level of accuracy but also to have high computational efficiency to meet the requirements of accuracy and timeliness in urban flood prediction. Therefore, the Weighted Information Criterion (WIC), which comprehensively considers both model accuracy and timeliness, is used to select candidate models, choosing the best-performing model from existing machine learning models as the benchmark model for integrated urban flood prediction.

[0039] Machine learning includes different forms of regression models. This invention selects 12 commonly used models in the field of machine learning (LR, Lasso, GNB, RR, KNN, SVR, MLP, BP, DT, RF, GBDT, XGBoost) to establish a regression prediction model for urban flooding.

[0040] Model accuracy is determined by the RMSE and MAPE of K-fold cross-validation. MAPE, expressed by formula (2), reflects the average level of the model's prediction results, while RMSE, expressed by formula (1), reflects the deviation between the predicted and actual results and the volatility of prediction performance. The smaller the RMSE of the cross-validation results, the smaller the volatility of the prediction error of the candidate model, and the more stable the prediction results. Experimental data shows that 10-fold cross-validation can achieve a good trade-off between cost and performance. Therefore, 10 runs of 10-fold cross-validation are performed to evaluate the accuracy of the candidate model. Model timeliness depends on the computation time t of the model in the prediction task. The longer the computation time of the model, the lower its timeliness.

[0041]

[0042]

[0043] In the formula, y i These are the actual values ​​of the sample. is the predicted value of the sample, and n represents the number of validation samples.

[0044] Furthermore, in urban flood forecasting tasks, excessively long computation times and high model errors can render the model's predictions worthless. Therefore, to meet the requirements of candidate models in terms of prediction accuracy and timeliness, a model accuracy circuit breaker mechanism and a model timeliness circuit breaker mechanism are introduced before selecting candidate models using the weighted information criterion to conduct an initial selection of candidate models. This includes the model accuracy circuit breaker mechanism f(MAPE). j ≥σ) and model time-sensitive circuit breaker mechanism f(t) j ≤t max Formula (3) is used to initially select models from existing machine learning models that satisfy the error limit σ and the maximum computation time t. max The model is then selected, and candidate models Ω are chosen from the initial selection models.

[0045] Ω=f(MAPE j ≥σ)∩f(t j ≤t max ),j=1,2,...,m (3)

[0046] In the formula, m represents the number of initial model selections.

[0047] Based on this, the MAPE, RMSE and computation time t of each model are normalized by formula (4), and then the WIC value of each model is calculated by formula (5).

[0048]

[0049]

[0050]

[0051] In the formula, λ,ξ represent the weight coefficients of WIC, and k represents the number of candidate models.

[0052] S2. Construction of an integrated prediction model based on time-varying criteria.

[0053] Based on the prediction results of the selected candidate models, an integrated prediction model of urban flooding process with time-varying weights is constructed by using the time-varying model averaging criterion. The time-varying model averaging criterion uses BIC and iterative iteration based on the minimization error criterion to determine the weights of the candidate models at different time points.

[0054] The integrated prediction model uses rainfall sensitivity indicators that affect water depth prediction as input variables (including rainfall amount, rainfall duration, rainfall peak, location coefficient, peak ratio, rainfall intensity variance, and concentration skewness), and uses the water depth corresponding to different times as the model's output variable.

[0055] The core of ensemble prediction model construction lies in estimating the optimal weights. In water accumulation process prediction, the predictive performance of candidate models may vary significantly at different times. Therefore, a time-varying criterion is introduced to construct an ensemble prediction model with time-varying weights. Furthermore, the determination of the initial weights is a crucial factor affecting the predictive performance and complexity of the ensemble prediction model. The initial weights of the candidate models are calculated using the Bayesian criterion (BIC) of the cross-validation results (10 times 10-fold cross-validation). BIC represents the Bayesian criterion for the m-th model. The weights determined by the BIC criterion are based on the cross-validation results. From an information theory perspective, the BIC criterion is asymptotically optimal within the cross-validation range and has been widely used in recent years for determining model weights.

[0056] Step S2 specifically includes the following steps:

[0057] S2-1. Calculate the initial weight vector ω(0) for all candidate models using the BIC criterion:

[0058]

[0059]

[0060] ω(0)=rank(ω i )=[ω(0)1,ω(0)2,...,ω(0) k (9)

[0061] In the formula, Let d represent the prediction error of the i-th model, and d represent the number of model parameters.

[0062] S2-2. Calculate the prediction error of the ensemble prediction model at the start time t1 of the water accumulation process, and adjust the weights of the candidate models according to the sign of the prediction error. Then calculate the prediction error of the ensemble prediction model after weight adjustment. Repeat this step until the model prediction error reaches the preset accuracy, and then stop the iteration to obtain the optimal ensemble prediction model weight vector ω at time t1. t1 ;

[0063] After the first adjustment, the weight vector ω(1) of all candidate models is:

[0064]

[0065] ω(1)=[ω(0)1,ω(0)2,...,ω(1) k (11)

[0066]

[0067] ω(1) k y represents the weights of the candidate models after the first adjustment of the k-th model. t This represents the actual value of the sample at time t. SSE represents the model mean at time t with initial weights. i This represents the sum of squared errors of the prediction results of the i-th model. ε represents the predicted value of the sample at time t. t (1) Residuals of the integrated prediction model after the first adjustment.

[0068] The optimal ensemble prediction model weights at time t1 are the ensemble prediction model weight vector ω. t1 for:

[0069] ω t1 =[ω(n')1,ω(n')2,...,ω(n') k (13)

[0070] In the formula, n' represents the number of iterations.

[0071] S2-3. For each time point t = [t1, t2, ..., t] during the water accumulation process. s Repeat step S2-2 to calculate the optimal weight vector ω at different times during the water accumulation process. op :

[0072]

[0073] S2-4. Dynamic update of weights: As new samples are continuously updated, new samples are added to the training set of the ensemble prediction model. The process of steps S2-2 to S2-3 is repeated to obtain the ensemble prediction model weights updated with the samples.

[0074] The above process not only enables dynamic changes in the weights within the ensemble prediction model, but also allows for dynamic updates to the model weights as new samples are added. This ensemble prediction method, which continuously updates weights by supplementing sample patterns, is effectively applicable to the nonlinear changes in rainfall and waterlogging processes.

[0075] S3. Using the forward selection method, an integrated prediction model based on the optimal candidate model combination scheme is constructed to predict urban flooding processes.

[0076] Since different combinations of candidate models can affect the performance of the ensemble prediction model, we can analyze the performance of the ensemble prediction model under different combinations to obtain the optimal combination of candidate models that balances model accuracy and timeliness.

[0077] Traditional random combination methods can analyze the performance of ensemble prediction models under all combination schemes, but the complexity and computational cost of this method increase explosively with the number of candidate models, making it difficult to effectively analyze their performance. Therefore, this invention proposes an ensemble prediction model selection mechanism based on a forward selection process to reduce the workload and computational cost of candidate model selection and ensemble prediction model computation.

[0078] Forward selection is a method for selecting independent variables in a regression model. This method selects variables with the greatest impact on the output from numerous factors affecting the output, thereby constructing a regression prediction model. For ensemble prediction models, candidate models are important variables influencing the output of the ensemble prediction model. The specific steps for selecting the optimal candidate model using forward selection include:

[0079] S3-1. Initial Candidate Model: The candidate model with the best performance among the k candidate models selected in step S1 is used as the initial candidate model M0 for forward selection.

[0080] M0 = f(WIC) min (15)

[0081] S3-2. Forward selection of candidate model schemes: Combine the candidate models determined in the previous step with the remaining k-1 candidate models to obtain k-1 combination schemes, and construct an integrated prediction model for each combination scheme; calculate the WIC value of the prediction results of the integrated prediction model under each combination scheme, and select the candidate model combination scheme with the smallest WIC as the forward selection output result;

[0082] The first forward selection output result is

[0083] M1=min{WIC(M0,Ω1),WIC(M0,Ω2),..,WIC(M0,Ω k-1 (16)

[0084] S3-3. Repeat step S3-2 until k candidate model combinations are obtained through forward selection; calculate the WIC value for all candidate model combinations, and select the model combination with the smallest WIC as the final baseline model M of the integrated prediction model:

[0085] M=min{WIC(M0),WIC(M1),..,WIC(M k )} (17)

[0086] From the above methods for constructing ensemble prediction models, it can be seen that with the same number of candidate models (12), the forward selection method requires constructing 66 ensemble prediction models and calculating the WIC value of the prediction results for each model, while the random combination method requires constructing 4096 ensemble prediction models. Therefore, compared with the random combination scheme, the candidate model selection scheme based on the forward selection method significantly reduces the workload and computational cost of selecting candidate model schemes in ensemble prediction models.

[0087] Experimental verification:

[0088] (I) Selection of the study area

[0089] The urban area of ​​Zhengzhou was selected as the study area. Zhengzhou is located in the north-central part of Henan Province, bordered by the Yellow River to the north and Mount Song to the west.

[0090] (II) Rainfall and waterlogging data related to urban flooding in the study area

[0091] Rainfall and waterlogging data related to urban flooding disasters are the foundation and key to data-driven model construction. To build a prediction model for urban flooding and waterlogging processes, rainfall and waterlogging data from 25 historical rainfall events between 2015 and 2021 were collected. Waterlogging prediction models were constructed for 18 waterlogging points in Zhengzhou with available monitoring data. Sample data from 16 rainfall events between 2015 and 2018 were used for candidate model construction and selection, 7 rainfall events between 2018 and 2021 were used for building the integrated prediction model, and 2 rainfall events in 2020 and 2021 were used to test the performance of the integrated prediction model.

[0092] Rainfall data from 25 historical rainfall events were collected from 16 automatic rain gauge stations in Zhengzhou. The rainfall data had a time resolution of 10 minutes. Since rain gauge data only reflects the rainfall process at the station's location, it is difficult to use for constructing a flooding prediction model at waterlogging points. Therefore, Kriging space interpolation was used to obtain rainfall process data for 18 waterlogging points. Based on this, the equidistant splitting and recombination method (a data processing method proven in recent years to effectively improve model accuracy) was used to split the rainfall process into continuous rainfall sequences. In other words, a 180-minute rainfall process was processed into rainfall sequences of 0-10min, 0-20min, ..., 0-180min. The rainfall sensitivity indices of the processed rainfall sequences, including rainfall amount, rainfall duration, peak rainfall, location coefficient, peak value ratio, rainfall intensity variance, and concentration skewness, were calculated and used as input variables for the waterlogging prediction model.

[0093] The water accumulation data from 18 water accumulation points were collected from road water accumulation monitoring equipment. The time resolution of the water accumulation data was 1 minute. To match the time resolution of the rainfall process, the time resolution of the water accumulation process was reduced to 10 minutes. The 18 water accumulation points covered different locations such as road intersections, underpasses, overpasses, and elevated bridges. These water accumulation points are mainly distributed in the old city area in central Zhengzhou. The main reason is that the old city area in central Zhengzhou has a high proportion of impermeable areas, low flood control design standards, and serious aging of urban pipe networks, making it extremely prone to water accumulation during heavy rainfall.

[0094] (III) Results of a Single Model

[0095] Sixteen rainfall events from 2015 to 2018 were selected as sample data for candidate model construction. The input variable of the model is rainfall characteristic data, and the output variable is the water depth at the corresponding time. A water accumulation process prediction model was constructed using Python 3.7. Figure 2 (a) Figure 2(b) and Table 1 reflect the accuracy and time cost of the 12 selected common machine learning models (LR, Lasso, GNB, RR, KNN, SVR, MLP, BP, DT, RF, GBDT, and XGBoost) in flood prediction. Among these 12 machine learning models, except for RR, LR, and Lasso, the prediction accuracy of the other 9 models is within the error limit (MAPE less than 20%). GBDT, XGBoost, and RF have higher prediction accuracy among all candidate models, mainly because they are ensemble learning models that integrate multiple decision trees, thus incorporating the data from individual models. Furthermore, the running time of these 12 machine learning models does not exceed the timeliness requirement (less than 1 minute), mainly because these models only need to capture the potential relationship between driving factors and output variables, without needing to understand the physical processes of urban flooding, resulting in smaller model size. Therefore, considering both prediction accuracy and timeliness requirements, 9 machine learning models were selected as candidate models for ensemble prediction.

[0096] Table 1. Validation results of 12 machine learning models

[0097]

[0098] To verify the overall performance of the nine candidate models, the WIC criterion was used to calculate the overall performance of the nine candidate models in 10 rounds of 10-fold cross-validation. For example... Figure 2 As shown in (c), GBDT has the lowest average WIC value, indicating that the GBDT model has superior performance in urban flooding prediction. However, DT, as the base learner of GBDT, performs poorly in flood prediction (having the highest average WIC value). The main reason is that although the DT algorithm is relatively simple and easy to implement, it is prone to overfitting, resulting in low generalization ability and poor performance in the validation stage. In contrast, the GBDT algorithm uses gradient descent to iterate the decision tree model repeatedly, which can better reduce the model's prediction error and improve its prediction stability. However, despite having the lowest average WIC value, GBDT's WIC value fluctuates significantly in different validations (ranging from 0.008 to 0.1), indicating that the GBDT model still has some uncertainty in flood prediction under different conditions.

[0099] like Figure 3As shown, the WIC values ​​of each candidate model at different water accumulation points are presented. Although GBDT has the lowest average WIC value, the validation results for different water accumulation points indicate that the optimal candidate model is not static. The optimal candidate models involved include RF, GBDT, XGBoost, SVR, BP, and KNN. The optimal candidate model for 83.3% of the water accumulation points is RF, GBDT, or XGBoost. Furthermore, the WIC values ​​of all nine candidate models show high volatility at different water accumulation points, indicating significant uncertainty in the prediction of individual models at different water accumulation points. This uncertainty poses a significant challenge to the transfer and application of the models. These results demonstrate that individual models have significant uncertainty when facing different types of prediction scenarios. Therefore, the predictive performance of a single model is always limited, necessitating the construction of an ensemble prediction model that integrates individual models to reduce prediction errors and uncertainty.

[0100] (iv) Results of the Integrated Prediction Model

[0101] The core of ensemble prediction model construction lies in the derivation of candidate model weights. The initial weights of the candidate models are determined using the BIC values ​​from 10-fold cross-validation of nine candidate models. Here, seven rainfall events from 2018 to 2021 are selected as sample data for ensemble prediction model construction. Two rainfall events in 2020 and 2021 are used to validate the ensemble learning model. The optimal weights of the candidate models at different times, derived using the time-varying criterion, are shown below. Figure 4 As shown in (a), the prediction results under two validation events are as follows: Figure 4 (b) and Figure 4 As shown in (c).

[0102] from Figure 4 (a) It can be seen that the weights of each candidate model changed significantly at different stages of the water accumulation process. This is mainly because the predictive performance of a single model is always limited and subject to considerable uncertainty; the model with the best predictive performance at one time step may perform poorly at the next. However, in general, GBDT, XGBoost, RF, and BP have higher weights than other candidate models. This is primarily because these models have superior predictive performance in water accumulation prediction, and they have lower BIC values ​​in the weight calculation, thus receiving higher weights. Figure 2 The analysis results are consistent with those of the candidate models.

[0103] from Figure 4(b) The results show that the predictions of the ensemble prediction model are stably distributed within the 10% error limit, indicating high robustness. Furthermore, the ensemble prediction model has a MAPE of 6.81% in the two validation events, representing a 46.9%–64.6% reduction in prediction error compared to individual models. The RMSE of the prediction results is also significantly lower than that of individual models. These results demonstrate that the ensemble prediction model, which combines all candidate models, significantly improves the prediction performance of individual models, providing higher accuracy and more stable predictions of water accumulation processes.

[0104] from Figure 4 The results in (c) show that the integrated prediction model has low prediction errors at the beginning and end of the flooding phases, but high prediction errors in the middle of the flooding period. This is mainly because the flooding process curve is relatively flat at the beginning and end of the flooding phases, allowing the model to capture the changes in water level well. Conversely, the flooding process curve fluctuates more significantly in the middle of the flooding phase, making it difficult for the model to accurately capture these changes. Nevertheless, the prediction error (MAPE) of the proposed integrated prediction model is within 9% at all stages of the flooding, indicating that the integrated prediction model can predict the changes in the flooding process relatively well.

[0105] (V) Optimal Candidate Model Combination Scheme

[0106] Although the combination scheme including all candidate models achieved excellent predictive performance, it significantly reduced the computational efficiency of the ensemble prediction model. Therefore, by comparing the model prediction characteristics under different candidate model combination schemes, this study analyzes the impact of the number and type of candidate models on model performance to select the optimal candidate model combination scheme that balances model accuracy and timeliness. Since candidate model combination scheme 2... q It can be very large, especially when there are many candidate models, in which case building and comparing 2 q The performance of individual candidate models is clearly difficult to achieve. Therefore, a forward selection process was used to obtain prediction results under nine candidate model combination schemes (AI), such as... Figure 5 As shown.

[0107] Figure 5 (a) reflects the prediction accuracy of all candidate model combinations obtained by the forward selection method. A total of 45 candidate model combinations were obtained by the forward selection method, which reduced the workload by 91.2% compared with the commonly used random combination method. Moreover, the advantages of the forward selection method become more and more prominent as the number of candidate models increases, and it is still easy to implement even with dozens or even hundreds of candidate models.

[0108] Furthermore, as the number of candidate models increases, the overall prediction accuracy of the ensemble prediction model shows an upward trend, combining... Figure 5(b) It was found that Scheme F is the integrated prediction model scheme with the highest prediction accuracy. In prediction tasks where high accuracy is prioritized but timeliness is not, Scheme F should be the preferred candidate model combination scheme for integrated prediction. However, from the perspective of timeliness, as the number of candidate models increases, the running time of the integrated prediction model shows an exponential growth trend. Among them, Scheme A (GBDT) has the lowest running time. When high timeliness is prioritized but high prediction accuracy is not required, Scheme A can be selected for water accumulation prediction. However, in urban flood water accumulation prediction, not only is high model accuracy required, but also good timeliness is needed to ensure that flood control management personnel have sufficient time to respond to flood disasters. Therefore, by calculating the WIC value, which comprehensively reflects the model's accuracy and timeliness... Figure 5 (c) It was found that scheme D (GBDT, RF, BP and SVR) is the candidate model combination scheme that balances model accuracy and timeliness. This scheme has a MAPE of 6.71% and a running time of 41s.

[0109] It should be noted that the proposed optimal solution is suitable for real-time urban flood forecasting and early warning tasks with high timeliness requirements. For different urban flood control requirements, it can be combined with... Figure 5 (b) Select a more suitable candidate model combination scheme based on the model's accuracy and timeliness performance.

[0110] (vi) Analysis of prediction results of a single model

[0111] Among the numerous machine learning methods, there is no unified consensus on the optimal method. The main reason is that while each machine learning method may have its unique advantages, the performance of the same machine learning model can vary significantly across different prediction tasks. In other words, a machine learning model that performs well on the current prediction task may perform poorly on other types of prediction tasks. Therefore, the optimal machine learning method may not exist in itself, and developing appropriate model selection methods for specific prediction tasks may be more scientifically and practically meaningful than searching for the absolute best machine learning method.

[0112] In urban flood forecasting and early warning, accuracy and timeliness are key factors determining model performance. The candidate model selection method based on the WIC criterion proposed in this invention comprehensively considers both model accuracy and timeliness. Results show that GBDT, XGBoost, and RF have higher prediction accuracy among all candidate models in urban flood waterlogging prediction. Although this invention only compares the prediction performance of 12 machine learning methods in urban flooding, this method can provide a certain reference for optimal model selection.

[0113] (VII) Comparative Analysis of Integrated Prediction Model and BMA Model

[0114] Model accuracy and timeliness are fundamental to the performance of urban flood simulation models. A high-accuracy and high-timeliness urban flood prediction model is crucial for urban flood control and early warning. However, due to the uncertainty of rainfall processes and the complexity of urban flooding processes, a single model struggles to effectively predict the inundation process under different scenarios. This invention constructs an ensemble prediction model based on common machine learning methods, effectively reducing the prediction error of a single model while improving the stability of the prediction results. As an effective means of reducing model uncertainty, more and more researchers are focusing on the importance of multi-model methods in improving urban flood prediction performance, among which BMA is one of the most widely used model averaging methods. As shown in Table 2, various BMA models were constructed by selecting different candidate models, achieving good results. However, the weights of each candidate model in the BMA model are fixed, and recent studies have shown that this may lead to significant biases in local predictions. In contrast, the integrated prediction model based on time-varying criteria proposed in this invention considers the changes in model weights at different times and the dynamic update of model weights, thus avoiding the problem of large deviations in prediction results caused by fixed weights. The research results also show that the prediction accuracy of the integrated prediction model is 56.7%-75.5% higher than that of BMA, indicating that the prediction accuracy of the proposed integrated prediction model is better than that of BMA.

[0115] Table 2 Comparative Analysis of Scheme D and BMA Model

[0116]

Claims

1. A candidate model self-adaptive adjustment urban flood multi-model combination prediction method, characterized in that, The method includes the following steps: S1. Using a weighted information criterion that comprehensively considers model accuracy and timeliness, candidate models suitable for integrated prediction of urban flooding processes are selected from existing machine learning models. Before selecting candidate models using the weighted information criterion, a model accuracy circuit breaker mechanism and a model timeliness circuit breaker mechanism are introduced. First, preliminary models that meet the error limit and maximum computation time are selected from existing machine learning models. Then, the MAPE, RMSE and computation time t of each model are subjected to maximum and minimum normalization processing, and the WIC value of each model is calculated. Candidate models are selected from the preliminary models. S2. Based on the prediction results of the selected candidate models, an integrated prediction model for urban flooding processes with time-varying weights is constructed by using the time-varying model averaging criterion, which combines all candidate models. The time-varying model averaging criterion uses BIC and iterative iteration based on the minimization error criterion to determine the weights of the candidate models at different time points. Newly updated samples are added to the training set of the integrated prediction model, and the process of iteratively determining the weights using BIC and the minimization error criterion is repeated to obtain the integrated prediction model weights updated with the samples. S3. Using a forward selection method, the performance of the integrated prediction model under different candidate model combination schemes is compared and analyzed to obtain the optimal candidate model combination scheme that balances model accuracy and model timeliness. An integrated prediction model based on the optimal candidate model combination scheme is then constructed to predict urban flooding processes.

2. The candidate model self-adaptive adjustment urban flood multi-model combination prediction method according to claim 1, characterized in that: In step S1, existing machine learning models include LR, Lasso, GNB, RR, KNN, SVR, MLP, BP, DT, RF, GBDT, and XGBoost.

3. The candidate model self-adaptive adjustment urban flood multi-model combination prediction method according to claim 1, characterized in that: In step S1, the model accuracy is determined by the RMSE and MAPE of K-fold cross-validation, and the model timeliness depends on the computation time t of the model in the prediction task.

4. The candidate model self-adaptive adjustment urban flood multi-model combination prediction method according to claim 1, characterized in that: In step S2, the construction of the integrated prediction model for urban flooding includes the following steps: S2-1. Calculate the initial weight vectors for all candidate models using the BIC criterion; S2-2. Calculate the prediction error of the integrated prediction model at the start time t1 of the water accumulation process, and adjust the weights of the candidate models according to the sign of the prediction error. Then calculate the prediction error of the integrated prediction model after adjusting the weights. Repeat this step until the model prediction error reaches the preset accuracy and stop the iteration to obtain the optimal integrated prediction model weight vector at time t1. S2-3. For each moment of the water accumulation process, repeat step S2-2 to calculate the optimal weight vector for different moments of the water accumulation process.

5. The candidate model self-adaptive adjustment urban flood multi-model combination prediction method according to claim 1, characterized in that: In step S3, obtaining the optimal candidate model scheme using the forward selection method includes the following steps: S3-1. Initial candidate model: Select the candidate model with the best performance from the k candidate models selected in step S1 as the initial candidate model for forward selection; S3-2. Combine the candidate models determined in the previous step with the remaining k-1 candidate models to obtain k-1 combination schemes, and construct an ensemble prediction model for each combination scheme; calculate the WIC value of the prediction results of the ensemble prediction model under each combination scheme, and select the candidate model combination scheme with the smallest WIC as the forward selection output result; S3-3. Repeat step S3-2 until k candidate model combination schemes are obtained through forward selection; calculate the WIC value under all candidate model combination schemes, and select the model combination scheme with the smallest WIC as the final baseline model of the integrated prediction model.

Citation Information

Patent Citations

  • Design flood derivation method and system based on equal reliability in climatic change scene

    CN111611692A

  • Rapid prediction method for rainstorm waterlogging event

    CN113344305A