A cascade high-efficiency water treatment device for removing hardness

By designing a tiered, high-efficiency upper and lower chamber structure and an independent power supply in the electrochemical hardening device, the problem of low descaling efficiency in existing equipment has been solved, achieving efficient removal of carbonates and calcium and magnesium hardness, thus meeting practical engineering needs.

CN116813032BActive Publication Date: 2026-11-20HUANENG YINGCHENG THERMAL POWER CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311044541.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-16
Publication Date
2026-11-20
Estimated Expiration
2043-08-16

AI Technical Summary

Technical Problem

Existing electrochemical hardness removal equipment has low descaling efficiency, with a carbonate hardness removal rate of only 3% to 5%, which is difficult to meet the actual engineering needs. This is mainly because the diffusion and migration of carbonate and hardness ions in the solution are constrained by the mass transfer conditions inside the reactor, as well as the treatment time and water volume.

Method used

A stepwise high-efficiency water hardness removal device is designed. The reactor shell is divided into upper and lower chambers, and an electrostatic hardness removal component is installed in each chamber. An independent power supply is adopted. The first chamber is used to remove calcium and magnesium, and the second chamber is used to remove carbonates. By adjusting the current density and the distance between the anode and cathode, the stepwise removal of carbonate hardness and calcium and magnesium hardness can be achieved.

Benefits of technology

It achieves shorter treatment time and larger water volume, with bicarbonate removal rate of 40% to 48% and calcium removal rate of 26% to 35%, significantly improving descaling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116813032B_ABST
    Figure CN116813032B_ABST
Patent Text Reader

Abstract

The application discloses a kind of water treatment devices of echelon high efficiency except hard, including direct current power supply group and reactor shell;Reactor shell is divided into upper chamber and lower chamber by partition in it, the upper chamber is divided into first chamber and second chamber by first insulating partition and second insulating partition, a plurality of first static electricity removes hard components are provided in the first chamber, a plurality of second static electricity removes hard components are provided in the second chamber, the partition includes shunt water distribution plate and insulating support plate that are spliced, shunt water distribution plate is opposite the first chamber, first static electricity removes hard components and second static electricity removes hard components are connected with direct current power supply group respectively, the side of lower chamber is provided with device water inlet, the side of the top of second chamber is provided with water outlet;When working, the water body to be treated is removed calcium magnesium in the first chamber, and carbonate is removed in the second chamber, the processing time of the device is shorter, and the water quantity is larger.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of electro-water treatment and relates to a tiered high-efficiency hardness removal water treatment device. Background Technology

[0002] Electrochemical hardening removal technology utilizes the electrochemical properties and redox reactions of water and its ions under an electric field by applying low-voltage direct current, causing scale-forming ions to precipitate on the cathode plate, thus preventing and inhibiting scale formation. This technology consumes only a small amount of electricity and requires no chemical additives, making it a clean and pollution-free water treatment process. Furthermore, electrochemical hardening removal offers excellent scale prevention and removal, sterilization and algae control, and corrosion inhibition, making it well-suited to the requirements of a resource-saving society. However, current mainstream electrostatic precipitators suffer from low removal efficiency, with carbonate hardness removal rates of only 3%–5%, and even with some equipment achieving 8%. This low carbonate hardness removal rate is insufficient to meet practical engineering needs.

[0003] The low efficiency of electrochemical hardness removal equipment is mainly due to the fundamental difference between chemical and electrochemical reactions. Electrochemical reactions are electrically driven, highly efficient, and involve rapid electron transfer. In contrast, carbonate and hardness ions in solution migrate via ion diffusion, which is constrained by the mass transfer conditions inside the reactor, including cathode area, water flow state, hydraulic residence time, and current density. Diffusion, movement, and collision are required for the nucleation, aggregation, and growth of calcium carbonate microcrystals. This process requires a relatively long cycle, which leads to unsatisfactory treatment efficiency in practical engineering applications due to factors such as treatment time and water volume, seriously hindering the promotion and application of the technology. Summary of the Invention

[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a tiered high-efficiency water hardness removal device with a shorter processing time and a larger processing capacity.

[0005] To achieve the above objectives, the present invention discloses a tiered high-efficiency water hardness removal device, comprising a DC power supply unit and a reactor shell;

[0006] The reactor shell is divided into an upper chamber and a lower chamber by a partition. The upper chamber is further divided into a first chamber and a second chamber by a first insulating partition and a second insulating partition. The first chamber is equipped with a plurality of first electrostatic hardening components, and the second chamber is equipped with a plurality of second electrostatic hardening components. The partition includes a water distribution plate and an insulating support plate that are spliced ​​together. The water distribution plate faces the first chamber. The first and second electrostatic hardening components are respectively connected to a DC power supply. The lower chamber has a device inlet on its side, and the second chamber has an outlet on its top side.

[0007] During operation, the water to be treated undergoes calcium and magnesium removal in the first chamber and carbonate removal in the second chamber.

[0008] The first electrostatic discharge assembly includes a first cathode tube segment and a first anode rod inserted into the first cathode tube segment; a plurality of first openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the first cathode tube segment, and a DC power supply is connected to the first cathode tube segment and the first anode rod.

[0009] The second electrostatic discharge assembly includes a second cathode tube segment and a second anode rod inserted into the second cathode tube segment. Several second openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the second cathode tube segment. A DC power supply is connected to the second cathode tube segment and the second anode rod.

[0010] The radius of the first cathode tube segment is smaller than the radius of the second cathode tube segment;

[0011] The distance between the first anode rod and the first cathode tube segment is less than the distance between the second anode rod and the second cathode tube.

[0012] Rubber rings are provided between the inner wall of the top opening of the first cathode tube section and the first anode rod, and between the inner wall of the top opening of the second cathode tube section and the second anode rod.

[0013] Each first cathode tube segment is fixed to the first chamber by the first upper porous partition;

[0014] Each second cathode tube segment is fixed to the second chamber by a second upper perforated partition.

[0015] The upper ends of the first cathode tube section, the second cathode tube section, the first anode rod, and the second anode rod are all located above the water surface in the first chamber and the second chamber, respectively.

[0016] The first anode rod and the first cathode tube section in the first chamber are powered independently from the second anode rod and the second cathode tube section in the second chamber.

[0017] A layer of heat-melting insulating material is provided on the inner wall of the reactor shell.

[0018] The lower end of the first insulating partition is connected to the partition, the upper end of the second insulating partition is connected to the inner wall of the top of the upper chamber, and there is a gap between the first insulating baffle and the second insulating partition, a gap between the upper end of the first insulating partition and the top of the upper chamber, and a gap between the lower end of the second insulating partition and the partition.

[0019] The present invention has the following beneficial effects:

[0020] In specific operation, the tiered high-efficiency hardness removal water treatment device of the present invention mainly uses electrostatic descaling to remove HCO3. - with Ga 2+ Mg 2+ Due to the limitations of cathode-proportional sedimentation and ion migration rate, the actual descaling efficiency is low. This invention redesigns the electrostatic descaling water treatment device to address the issue of Ga in water. 2+ Mg 2+ And HCO3 - The device employs a tiered removal process to achieve scale inhibition and removal in water. Specifically, based on the reaction kinetics of carbonate hardness and calcium and magnesium hardness in water under an electric field, a first chamber and a second chamber are designed. The water to be treated undergoes calcium and magnesium removal in the first chamber, while carbonate removal occurs in the second chamber. This tiered removal of carbonate and calcium / magnesium hardness in the water results in a shorter treatment time and a larger water volume.

[0021] Furthermore, in this invention, the first chamber and the second chamber are powered independently, and through coordinated control, the efficient removal of carbonate hardness and calcium and magnesium hardness from the water is achieved. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the structure of the present invention.

[0023] Among them, 1 is the reactor shell, 2 is the device inlet, 3 is the diversion plate, 4 is the first anode rod, 5 is the first cathode tube section, 6 is the upper porous baffle, 7 is the first insulating baffle, 8 is the second insulating baffle, 9 is the second anode rod, 10 is the second cathode tube section, 11 is the rubber ring, 12 is the insulating support plate, 13 is the sludge discharge port, 14 is the water outlet, and 15 is the DC power supply group. Detailed Implementation

[0024] To enable those skilled in the art to better understand the present invention, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are merely some embodiments of the present invention, not all embodiments, and are not intended to limit the scope of the present invention. Furthermore, in the following description, descriptions of well-known structures and technologies are omitted to avoid unnecessary confusion regarding the concepts disclosed in the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort should fall within the scope of protection of the present invention.

[0025] The accompanying drawings show structural schematic diagrams according to embodiments disclosed in this invention. These drawings are not drawn to scale, and some details have been enlarged for clarity, and some details may have been omitted. The shapes of the various regions and layers shown in the drawings, as well as their relative sizes and positional relationships, are merely exemplary and may deviate from reality due to manufacturing tolerances or technical limitations. Furthermore, those skilled in the art can design regions / layers with different shapes, sizes, and relative positions as needed.

[0026] refer to Figure 1 The water treatment device for tiered high-efficiency hardness removal described in this invention includes a DC power supply group 15 and a reactor shell 1.

[0027] The reactor shell 1 is divided into an upper chamber and a lower chamber by a partition. The partition includes a water distribution plate 3 spliced ​​together and an insulating support plate 12. The upper chamber is divided into a first chamber and a second chamber by a first insulating partition 7 and a second insulating partition 8. A plurality of first electrostatic hardening components are provided in the first chamber, and a plurality of second electrostatic hardening components are provided in the second chamber. The water distribution plate 3 is directly opposite the first chamber.

[0028] The first electrostatic hardening assembly includes a first cathode tube segment 5 and a first anode rod 4 inserted into the first cathode tube segment 5; a plurality of first openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the first cathode tube segment 5.

[0029] The second electrostatic hardening assembly includes a second cathode tube segment 10 and a second anode rod 9 inserted into the second cathode tube segment 10. Several second openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the second cathode tube segment 10.

[0030] In this embodiment, rubber rings 11 are provided between the inner wall of the top opening of the first cathode tube section 5 and the first anode rod 4, and between the inner wall of the top opening of the second cathode tube section 10 and the second anode rod 9.

[0031] The positive terminal of the DC power supply group 15 is connected to each of the first anode rods 4 and each of the second anode rods 9, and the negative terminal of the DC power supply group 15 is connected to each of the first cathode tube segments 5 and each of the second cathode tube segments 10.

[0032] In this embodiment, the lower end of the first insulating partition 7 is connected to the partition, the upper end of the second insulating partition 8 is connected to the inner wall of the top of the upper chamber, and there is a gap between the first insulating baffle and the second insulating partition 8, a gap between the upper end of the first insulating partition 7 and the top of the upper chamber, and a gap between the lower end of the second insulating partition 8 and the partition.

[0033] In this embodiment, a sludge discharge port 13 is provided at the bottom of the lower chamber, a device inlet 2 is provided on the side of the lower chamber, and an outlet 14 is provided on the side of the top of the second chamber.

[0034] In this embodiment, each first cathode tube segment 5 is fixed in the first chamber by the first upper porous partition 6, and each second cathode tube segment 10 is fixed in the second chamber by the second upper porous partition 6.

[0035] In this embodiment, the upper chamber is a cuboid structure and the lower chamber is a cone structure.

[0036] In this embodiment, the first chamber is used for calcium removal, and the second chamber is used for removing carbonate hardness.

[0037] In this embodiment, the water distribution plate 3 is a double-layer rigid porous insulating plate.

[0038] In this embodiment, the first anode rod 4 and the second anode rod 9 are both made of carbon-based materials, and the first cathode tube section 5 and the second cathode tube section 10 are both made of carbon steel or stainless steel and have a tube mesh structure.

[0039] In this embodiment, the upper ends of the first cathode tube section 5, the second cathode tube section 10, the first anode rod 4, and the second anode rod 9 are all located above the water surface in the first chamber and above the water surface in the second chamber.

[0040] In this embodiment, a hot-melt insulating material layer is provided on the inner wall of the reactor shell 1 to prevent the shell from becoming electrified.

[0041] In this embodiment, the first anode rod 4 and the first cathode tube segment 5 in the first chamber and the second anode rod 9 and the second cathode tube segment 10 in the second chamber are powered independently.

[0042] The principle of this invention is as follows:

[0043] Analysis shows that different reaction states exist within the anode and cathode regions under varying current densities, anode-cathode area ratios, and anode-cathode distances. At low current densities, the ion diffusion rate is high, thus mass transfer is influenced by the slower electromigration rate. As the current density increases, the electromigration rate rises rapidly, leading to a faster increase in descaling capacity and hardness removal rate. However, as the current density continues to increase, the limiting factor for descaling efficiency shifts from the electromigration rate to the ion diffusion rate. The diffusion rate of ions parallel to the water flow is constant and does not change with increasing solution voltage.

[0044] Therefore, based on this reaction principle, different main reactions occur by changing the distance between the anode and cathode and the operating voltage / current density. This invention designs a smaller anode-cathode distance in the first chamber and adjusts the voltage / current appropriately to make the main reaction a precipitation reaction of calcium and magnesium ions, specifically manifested as the reaction of bicarbonate ions with OH-. - Combined to produce carbonate ions, Ca 2+ The formation of CaCO3 follows a first-order kinetic equation. 2+ The precipitation rate increases with increasing current density, which increases the probability of scale-forming ions colliding and combining, resulting in a higher removal rate. The resulting precipitates, such as calcium carbonate, adhere to the cathode tube wall.

[0045] That is, the radius of the first cathode tube segment 5 is smaller than the radius of the second cathode tube segment 10, and the distance between the first anode rod 4 and the first cathode tube segment 5 is smaller than the distance between the second anode rod 9 and the second cathode tube.

[0046] In the second chamber, under certain voltage / current density conditions, the removal of bicarbonate ions is catalyzed. The removal of bicarbonate ions is divided into two parts. The smaller part aggregates and combines with hardness ions to form calcium carbonate scale, while the remaining part can generate carbon dioxide that overflows from the water, thereby reducing the bicarbonate content in the treated water sample and achieving the purpose of descaling and scale inhibition in the water.

[0047] The specific working process of this invention is as follows:

[0048] 1) The water sample to be treated enters the reactor shell 1 through the device inlet 2;

[0049] 2) The water sample enters the lower chamber, is deflected by the conical bottom surface, and after being evenly distributed by the diversion plate 3, it enters the first chamber;

[0050] 3) After the device is filled with water, the DC power supply group 15 is turned on to control the working current of the first anode rod 4 and the first cathode tube section 5. The scale-forming ions in the water near the first cathode tube section 5 are electrolyzed and precipitated. The water enters the first cathode tube section 5 through the first opening on the lower side of the first cathode tube section 5, and then flows out through the first opening in the middle of the second cathode tube section 10. The first upper porous baffle 6 constrains the fluid state inside the first chamber and ensures that the connection of the first anode rod 4 and the first cathode tube section 5 is insulated.

[0051] 4) The water in the first chamber enters the second chamber through the space between the first insulating partition 7 and the second insulating partition 8;

[0052] 5) The water enters the second cathode tube section 10 through the second opening on the bottom side of the second cathode tube section 10 and then begins electrolysis treatment. By adjusting the operating voltage and current, the pH value of the water is reduced and the carbonate hardness removal rate is improved. The water then flows out through the second opening on the middle side of the second cathode tube section 10.

[0053] 6) The water in the second chamber is eventually discharged through outlet 14;

[0054] 7) During the operation of the reactor, the first chamber can be cleaned by intermittent reverse polarity cleaning. The scale is discharged from the sludge outlet 13 through the diversion water distribution plate 3. The second chamber is mainly for removing carbonate hardness, and the scale formation reaction is a side reaction. A small amount of scale is deposited. After running for a certain period of time, it can be cleaned by the removable top surface of the reaction shell or the anode and cathode can be replaced.

[0055] Example 1

[0056] Taking the circulating water of a thermal power plant in the Yangtze River Basin as an example, the circulating water quality has a bicarbonate concentration of 3 mmol / L, a total hardness of 10 mmol / L, and a calcium hardness of 7.5 mmol / L. After treatment for 30 minutes by the electrostatic hardening device, the bicarbonate content in the water is reduced to 1.8 mmol / L and the calcium hardness is 5.5 mmol / L. The removal rate of bicarbonate is 40% and the removal rate of calcium hardness is 26%. The first chamber in the device is used as the main descaling chamber. It is cleaned by reversing the electrode every 10 to 12 hours. The scale sample is discharged with the water flow from the sludge discharge port 13 and used as a desulfurizing agent.

[0057] Example 2

[0058] Taking the circulating water of a thermal power plant in the lower reaches of the Yellow River as an example, the circulating water contained 5.0 mmol / L of bicarbonate, 14 mmol / L of total hardness, and 10 mmol / L of calcium hardness. After treatment for 30 minutes by the electrostatic hardness removal device, the bicarbonate content in the water was reduced to 2.6 mmol / L and the calcium hardness to 6.5 mmol / L. The removal rate of bicarbonate was 48% and the removal rate of calcium hardness was 35%. The first chamber was cleaned by reversing the electrode every 8 to 10 hours. The scale sample water was discharged from the sludge discharge port 13 and used as a desulfurizing agent.

[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A tiered, high-efficiency water hardness removal device, characterized in that, Includes a DC power supply unit (15) and a reactor shell (1); The reactor shell (1) is divided into an upper chamber and a lower chamber by a partition. The upper chamber is further divided into a first chamber and a second chamber by a first insulating partition (7) and a second insulating partition (8). The first chamber is provided with a plurality of first electrostatic hardening components, and the second chamber is provided with a plurality of second electrostatic hardening components. The partition includes a water distribution plate (3) spliced ​​together and an insulating support plate (12). The water distribution plate (3) faces the first chamber. The first electrostatic hardening components and the second electrostatic hardening components are respectively connected to a DC power supply group (15). The side of the lower chamber is provided with a device inlet (2), and the side of the top of the second chamber is provided with an outlet (14). During operation, the water to be treated undergoes calcium and magnesium removal in the first chamber and carbonate removal in the second chamber. The first electrostatic hardening assembly includes a first cathode tube segment (5) and a first anode rod (4) inserted into the first cathode tube segment (5); a plurality of first openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the first cathode tube segment (5); and a DC power supply group (15) is connected to the first cathode tube segment (5) and the first anode rod (4). The second electrostatic hardening assembly includes a second cathode tube segment (10) and a second anode rod (9) inserted into the second cathode tube segment (10). Several second openings are provided circumferentially on the side wall at the bottom and the side wall in the middle of the second cathode tube segment (10). A DC power supply group (15) is connected to the second cathode tube segment (10) and the second anode rod (9). The radius of the first cathode tube segment (5) is smaller than the radius of the second cathode tube segment (10); The distance between the first anode rod (4) and the first cathode tube segment (5) is less than the distance between the second anode rod (9) and the second cathode tube. The lower end of the first insulating partition (7) is connected to the partition, the upper end of the second insulating partition (8) is connected to the inner wall of the top of the upper chamber, and there is a gap between the first insulating baffle and the second insulating partition (8), a gap between the upper end of the first insulating partition (7) and the top of the upper chamber, and a gap between the lower end of the second insulating partition (8) and the partition.

2. The tiered high-efficiency hardness removal water treatment device according to claim 1, characterized in that, Rubber rings (11) are provided between the inner wall of the top opening of the first cathode tube section (5) and the first anode rod (4), and between the inner wall of the top opening of the second cathode tube section (10) and the second anode rod (9).

3. The tiered high-efficiency hardness removal water treatment device according to claim 1, characterized in that, Each first cathode tube segment (5) is fixed in the first chamber by the first upper porous partition (6); Each second cathode tube segment (10) is fixed in the second chamber by the second upper porous partition (6).

4. The tiered high-efficiency hardness removal water treatment device according to claim 1, characterized in that, The upper ends of the first cathode tube section (5), the second cathode tube section (10), the first anode rod (4), and the second anode rod (9) are all located above the water surface in the first chamber and above the water surface in the second chamber.

5. The tiered high-efficiency hardness removal water treatment device according to claim 1, characterized in that, The first anode rod (4) and the first cathode tube segment (5) in the first chamber are powered independently from the second anode rod (9) and the second cathode tube segment (10) in the second chamber.

6. The tiered high-efficiency hardness removal water treatment device according to claim 1, characterized in that, A layer of hot-melt insulating material is provided on the inner wall of the reactor shell (1).

Citation Information

Patent Citations

  • Water treatment device for removing hardness through fluidization electrolysis

    CN220618552U