By using the staggered arrangement of prefabricated inserts and slot assemblies and the connection of I-beams in the shield tunnel segment structure, the problem of poor overall integrity of the support system in the existing technology has been solved, and the stability and service life of the structure have been improved.

CN116816383BActive Publication Date: 2026-07-17ZHEJIANG INST OF COMM CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
ZHEJIANG INST OF COMM CO LTD
Filing Date
2023-07-27
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing shield tunnel segment structure is connected by bolts, which results in poor overall support system integrity, large stress at the joints, easy damage, and reduced overall service life.

Method used

The tunnel segments are connected in both circumferential and axial directions by using a combination of prefabricated insert components and prefabricated slot components, along with I-beams and connecting plates. This avoids the use of bolt holes, disperses the surrounding rock pressure, and enhances connection stability.

Benefits of technology

It improves the overall stability and stress capacity of the shield tunnel segment structure, reduces the probability of damage at the joints, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116816383B_ABST
    Figure CN116816383B_ABST
Patent Text Reader

Abstract

本发明提供了一种盾构隧道管片结构及盾构隧道衬砌,涉及隧道工程技术领域,本发明提供的盾构隧道管片结构包括隧道管片本体、第一预制组件和第二预制组件;隧道管片本体具有两平行于隧道横断面的第一侧端面以及两沿隧道径向延伸的第二侧端面;各第一侧端面以及各第二侧端面均设有第一预制组件,沿隧道管片本体周向以及轴向相邻的两隧道管片本体间相对设置的第一预制组件对应连接;两第一侧端面均设有第二预制组件,两第二预制组件延伸至隧道管片本体的内壁且两第二预制组件间通过第一连接件连接于隧道管片本体的内壁。上述盾构隧道管片结构能够保证支护体系的整体性,同时降低了管片连接处破坏的几率,保证了整体结构的使用寿命。
Need to check novelty before this filing date? Find Prior Art