一种盾构隧道管片结构及盾构隧道衬砌
By using the staggered arrangement of prefabricated inserts and slot assemblies and the connection of I-beams in the shield tunnel segment structure, the problem of poor overall integrity of the support system in the existing technology has been solved, and the stability and service life of the structure have been improved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHEJIANG INST OF COMM CO LTD
- Filing Date
- 2023-07-27
- Publication Date
- 2026-07-17
AI Technical Summary
The existing shield tunnel segment structure is connected by bolts, which results in poor overall support system integrity, large stress at the joints, easy damage, and reduced overall service life.
The tunnel segments are connected in both circumferential and axial directions by using a combination of prefabricated insert components and prefabricated slot components, along with I-beams and connecting plates. This avoids the use of bolt holes, disperses the surrounding rock pressure, and enhances connection stability.
It improves the overall stability and stress capacity of the shield tunnel segment structure, reduces the probability of damage at the joints, and extends the service life.