A wind farm engineering quality management system
By using the wind farm engineering quality management system, textual and numerical information from the wind farm engineering quality list is extracted using OCR and KNN algorithms, and visualized reports are generated. This solves the problem of inconsistent information acquisition and improves operation and maintenance efficiency and the safety of the wind farm.
Patent Information
- Application Number
- CN202310875779.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-07-17
AI Technical Summary
In the existing technology, the acquisition of quality list information for wind farm projects is inconsistent, resulting in low efficiency for operation and maintenance personnel in obtaining information on the operation of wind farms and making it difficult to meet real-time requirements.
Design a wind farm engineering quality management system, including engineering information acquisition, extraction, integration and transmission units. Use OCR and KNN algorithms to extract text and numerical information respectively, and generate visualized text and numerical reports.
It enables accurate extraction and classification of wind farm engineering quality list information, generating clear and concise visual reports, which improves the work efficiency of operation and maintenance personnel and the safe operation of wind farms.
Smart Images

Figure CN116822483B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wind farm monitoring technology, and more specifically, to a wind farm engineering quality management system. Background Technology
[0002] Currently, wind farm maintenance tasks are diverse. Even for the same task, differences in the technical capabilities and work experience of the personnel performing the task, the environment in which it takes place, and other factors lead to variations in the information obtained from the engineering quality checklist. Existing technologies mostly rely on engineering quality checklists to acquire wind farm data, which typically include both textual and numerical information about the wind farm's operational status. Therefore, analyzing and displaying the wind farm's engineering quality checklist is crucial to further improve the speed at which maintenance personnel can obtain information about wind farm operations. Summary of the Invention
[0003] The purpose of this invention is to provide a wind farm engineering quality management system.
[0004] The embodiments of the present invention are achieved through the following technical solutions: A wind farm engineering quality management system includes an engineering information acquisition unit, an engineering information extraction unit, an engineering information integration unit, and an engineering information transmission unit;
[0005] The engineering information acquisition unit is used to obtain the engineering quality list of the wind farm;
[0006] The engineering information extraction unit is used to extract textual and numerical information from the engineering quality list;
[0007] The engineering information integration unit is used to generate text reports on wind farm engineering based on textual information and to generate digital reports on wind farm engineering based on digital information.
[0008] The engineering information transmission unit is used to transmit text reports and digital reports of wind farm engineering to user terminals for visualization.
[0009] The technical solution of this invention has at least the following advantages and beneficial effects: the wind farm engineering quality management system can extract textual and numerical information from the engineering quality list, differentiate and process information of different forms, ensure that the extracted information categories are clear, and facilitate operation and maintenance personnel to quickly obtain the required information according to real-time needs; at the same time, the generated visual reports can concisely and clearly display the wind farm operation status, further improve the work efficiency of operation and maintenance personnel, and ensure the safe operation of the wind farm.
[0010] Furthermore, the engineering information extraction unit extracts the textual information from the engineering quality list, including the following steps:
[0011] Convert the engineering quality list into an image format to generate an engineering quality list image;
[0012] Calculate the centroid feature value of each pixel in the engineering quality list image;
[0013] The first outline clipping box is determined based on the centroid feature values of each pixel.
[0014] The first outline cropping box is used to traverse and crop the engineering quality list image to determine the text area of the engineering quality list image;
[0015] Use OCR algorithms to extract text information from text regions.
[0016] Furthermore, the formula for calculating the centroid feature value μ of a pixel is:
[0017]
[0018] In the formula, x i The x-coordinate of the i-th pixel in the project quality list image is represented by y. i Let x0 represent the ordinate of the i-th pixel in the engineering quality list image, x0 represent the abscissa of the pixel containing the centroid of the engineering quality list image, and y0 represent the ordinate of the pixel containing the centroid of the engineering quality list image.
[0019] Furthermore, the method for determining the first contour clipping box is as follows: calculate the average value between the maximum centroid feature value and the minimum centroid feature value, and use it as the length and width of the first contour clipping box to construct a first contour clipping box with a window size of a×a.
[0020] Furthermore, the engineering information extraction unit extracts the digital information from the engineering quality list, including the following steps:
[0021] Convert the engineering quality list into an image format to generate an engineering quality list image;
[0022] Calculate the center feature value of each pixel in the engineering quality list image;
[0023] The second contour clipping box is determined based on the center feature value of each pixel.
[0024] The second outline cropping box is used to traverse and crop the engineering quality list image to determine the digital area of the engineering quality list image.
[0025] The KNN algorithm is used to extract digital information from digital regions.
[0026] Furthermore, the formula for calculating the center feature value λ of a pixel is:
[0027]
[0028] In the formula, x i The x-coordinate of the i-th pixel in the project quality list image is represented by y. i Let a0 represent the ordinate of the i-th pixel in the project quality list image, a0 represent the abscissa of the pixel at the center of the project quality list image, b0 represent the ordinate of the pixel at the center of the project quality list image, and N represent the number of pixels in the project quality list image.
[0029] Furthermore, the method for determining the second contour clipping box is as follows: calculate the average value between the maximum center feature value and the minimum center feature value, and use it as the length and width of the second contour clipping box to construct a second contour clipping box with a window size of b×b.
[0030] Furthermore, the method for generating the wind farm project text report is as follows: obtain a blank text report template from the database of the user terminal, obtain the word frequency value of each word in the text information, fill each word into the blank text report template in descending order of word frequency value, and generate the wind farm project text report.
[0031] Furthermore, the method for generating digital reports for wind farm projects is as follows: obtain a blank digital report template from the database of the user terminal, encapsulate the blank digital report template into a class object, generate query tags for the class object using an SQL query script, fill the blank digital report template with digital information according to the query tags, and generate a digital report for wind farm projects. Attached Figure Description
[0032] Figure 1 This is a schematic diagram of the structure of the wind farm engineering quality management system provided in an embodiment of the present invention. Detailed Implementation
[0033] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0034] like Figure 1 As shown, the present invention provides a wind farm engineering quality management system, including an engineering information acquisition unit, an engineering information extraction unit, an engineering information integration unit, and an engineering information transmission unit;
[0035] The engineering information acquisition unit is used to obtain the engineering quality list of the wind farm;
[0036] The engineering information extraction unit is used to extract textual and numerical information from the engineering quality list;
[0037] The engineering information integration unit is used to generate text reports on wind farm engineering based on textual information and to generate digital reports on wind farm engineering based on digital information.
[0038] The engineering information transmission unit is used to transmit text reports and digital reports of wind farm engineering to user terminals for visualization.
[0039] In this embodiment of the invention, the engineering information extraction unit extracts textual information from the engineering quality list, including the following steps:
[0040] Convert the engineering quality list into an image format to generate an engineering quality list image;
[0041] Calculate the centroid feature value of each pixel in the engineering quality list image;
[0042] The first outline clipping box is determined based on the centroid feature values of each pixel.
[0043] The first outline cropping box is used to traverse and crop the engineering quality list image to determine the text area of the engineering quality list image;
[0044] Use OCR algorithms to extract text information from text regions.
[0045] Converting the engineering quality list into an image format facilitates text extraction in subsequent steps. This conversion can be performed using existing software or by photographing the engineering quality list. First and second outline cropping boxes are generated based on pixel features to precisely crop text and number regions.
[0046] In this embodiment of the invention, the formula for calculating the centroid feature value μ of a pixel is:
[0047]
[0048] In the formula, x i The x-coordinate of the i-th pixel in the project quality list image is represented by y. i Let x0 represent the ordinate of the i-th pixel in the engineering quality list image, x0 represent the abscissa of the pixel containing the centroid of the engineering quality list image, and y0 represent the ordinate of the pixel containing the centroid of the engineering quality list image.
[0049] In this embodiment of the invention, the method for determining the first contour clipping frame is as follows: calculate the average value between the maximum centroid feature value and the minimum centroid feature value, and use it as the length and width of the first contour clipping frame to construct a first contour clipping frame with a window size of a×a.
[0050] In this embodiment of the invention, the engineering information extraction unit extracts digital information from the engineering quality list, including the following steps:
[0051] Convert the engineering quality list into an image format to generate an engineering quality list image;
[0052] Calculate the center feature value of each pixel in the engineering quality list image;
[0053] The second contour clipping box is determined based on the center feature value of each pixel.
[0054] The second outline cropping box is used to traverse and crop the engineering quality list image to determine the digital area of the engineering quality list image.
[0055] The KNN algorithm is used to extract digital information from digital regions.
[0056] In this embodiment of the invention, the formula for calculating the center feature value λ of a pixel is:
[0057]
[0058] In the formula, x i The x-coordinate of the i-th pixel in the project quality list image is represented by y. i Let a0 represent the ordinate of the i-th pixel in the project quality list image, a0 represent the abscissa of the pixel at the center of the project quality list image, b0 represent the ordinate of the pixel at the center of the project quality list image, and N represent the number of pixels in the project quality list image.
[0059] In this embodiment of the invention, the method for determining the second contour clipping frame is as follows: calculate the average value between the maximum center feature value and the minimum center feature value, and use it as the length and width of the second contour clipping frame to construct a second contour clipping frame with a window size of b×b.
[0060] In this embodiment of the invention, the method for generating a text report of a wind farm project is as follows: obtain a blank text report template from the database of the user terminal, obtain the word frequency value of each word in the text information, fill each word into the blank text report template in descending order of word frequency value, and generate a text report of a wind farm project.
[0061] In this embodiment of the invention, the method for generating a digital report for a wind farm project is as follows: obtain a blank digital report template from the database of the user terminal, encapsulate the blank digital report template into a class object, generate query tags for the class object using an SQL query script, fill the blank digital report template with digital information according to the query tags, and generate a digital report for a wind farm project.
[0062] Since text reports mostly contain text information and number reports mostly contain string information, the two types of reports are generated differently. Text reports consist of multiple words, and word frequency values represent the frequency of word occurrences, indicating the importance of the words. Therefore, words are filled into the blank text report template based on their word frequency values. Number reports can be generated from query tags of class objects, which also facilitate querying during visualization on the user's terminal.
[0063] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A wind farm engineering quality management system, characterized in that, It includes an engineering information acquisition unit, an engineering information extraction unit, an engineering information integration unit, and an engineering information transmission unit; The engineering information acquisition unit is used to acquire the engineering quality list of the wind farm; The engineering information extraction unit is used to extract textual and numerical information from the engineering quality list; The engineering information integration unit is used to generate text reports of wind farm engineering based on text information and to generate digital reports of wind farm engineering based on digital information. The engineering information transmission unit is used to transmit text reports and digital reports of wind farm engineering to the user terminal for visual display. The engineering information extraction unit extracts the text information of the engineering quality list, including the following steps: Convert the engineering quality list into an image format to generate an engineering quality list image; Calculate the centroid feature value of each pixel in the engineering quality list image; The first outline clipping box is determined based on the centroid feature values of each pixel. The first outline cropping box is used to traverse and crop the engineering quality list image to determine the text area of the engineering quality list image; Use OCR algorithms to extract text information from text regions; The centroid feature value of the pixel μ The calculation formula is: In the formula, x i The image showing the first item in the project quality list i The x-coordinate of each pixel y i The image showing the first item in the project quality list i The ordinate of each pixel x 0 represents the x-coordinate of the pixel containing the centroid of the project quality list image. y 0 represents the ordinate of the pixel where the centroid of the project quality list image is located.
2. The wind farm engineering quality management system according to claim 1, characterized in that: The method for determining the first contour clipping box is as follows: calculate the mean between the maximum and minimum centroid eigenvalues, and use it as the length and width of the first contour clipping box, constructing a window of size [missing value]. a × a The first outline clipping frame.
3. The wind farm engineering quality management system according to claim 1, characterized in that: The engineering information extraction unit extracts the digital information of the engineering quality list, including the following steps: Convert the engineering quality list into an image format to generate an engineering quality list image; Calculate the center feature value of each pixel in the engineering quality list image; The second contour clipping box is determined based on the center feature value of each pixel. The second outline cropping box is used to traverse and crop the engineering quality list image to determine the digital area of the engineering quality list image. The KNN algorithm is used to extract digital information from digital regions.
4. The wind farm engineering quality management system according to claim 3, characterized in that: The center feature value of the pixel λ The calculation formula is: In the formula, x i The image showing the first item in the project quality list i The x-coordinate of each pixel y i The image showing the first item in the project quality list i The ordinate of each pixel a 0 represents the x-coordinate of the pixel where the center of the project quality list image is located. b 0 represents the ordinate of the pixel where the center of the project quality list image is located. N This indicates the number of pixels in the project quality list image.
5. The wind farm engineering quality management system according to claim 3, characterized in that: The method for determining the second contour clipping frame is as follows: calculate the average value between the maximum and minimum center feature values, and use this average as the length and width of the second contour clipping frame, constructing a window with a size of [missing value]. b × b The second outline clipping frame.
6. The wind farm engineering quality management system according to claim 1, characterized in that: The method for generating the wind farm project text report is as follows: obtain a blank text report template from the database of the user terminal, obtain the word frequency value of each word in the text information, fill each word into the blank text report template in descending order of word frequency value, and generate the wind farm project text report.
7. The wind farm engineering quality management system according to claim 1, characterized in that: The method for generating the digital report of the wind farm project is as follows: obtain a blank digital report template from the database of the user terminal, encapsulate the blank digital report template into a class object, generate query tags for the class object using an SQL query script, fill the blank digital report template with digital information according to the query tags, and generate the digital report of the wind farm project.
Citation Information
Patent Citations
Cost quality fine management system
CN106960309A
BIM-based wind power plant digital construction management system
CN113052573A