Park energy system operation regulation method and device, equipment and readable storage medium

By determining the energy supply structure and equipment parameters of the park's integrated energy system, setting user risk preferences, calculating market returns and risks, and formulating scheduling plans, the problem of balancing returns and risks in existing technologies has been solved, achieving economical and reliable energy demand satisfaction and operational optimization.

CN116822903BActive Publication Date: 2026-11-24GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310921272.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-25
Publication Date
2026-11-24
Estimated Expiration
2043-07-25

AI Technical Summary

Technical Problem

Existing technologies are insufficient to balance the benefits and risks of the park's integrated energy system participating in the market based on user settings, and cannot economically and reliably meet energy demand.

Method used

By determining the energy supply structure of the park's integrated energy system, the operating parameters of the energy supply equipment, the historical and predicted values ​​of day-ahead and real-time electricity prices, setting user risk preference coefficients, calculating market returns and risks, formulating interactive operation and scheduling schemes, and optimizing the operation of energy supply and energy storage equipment.

Benefits of technology

It has enabled the market participation of the park's integrated energy system to be balanced according to user preferences under different fluctuations in returns and risks, thus economically and reliably meeting energy demand and optimizing the operation and scheduling of the park's integrated energy system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116822903B_ABST
    Figure CN116822903B_ABST
Patent Text Reader

Abstract

This application provides a method, apparatus, equipment, and readable storage medium for the operation and control of an industrial park energy system. By comprehensively considering the returns and risks of the day-ahead and real-time markets, the mean and variance of electricity prices, and balancing returns and risks when the industrial park's integrated energy system participates in the electricity market, this application sets different user risk preference coefficients in the interactive operation optimization model. This effectively determines the interactive operation scheme for the industrial park's integrated energy system participating in the electricity market under different user risk preferences, effectively solving the difficulties in interactive operation when the industrial park's integrated energy system participates in the electricity spot market. It effectively achieves a balance between different return and risk fluctuations based on user preferences, economically and reliably meeting the energy needs of the industrial park's integrated energy system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of energy system management technology, and in particular to a method, apparatus, equipment and readable storage medium for the operation and control of an energy system in a park. Background Technology

[0002] Currently, with the widespread adoption of emerging renewable energy technologies and multi-energy devices, the transformation of the energy structure is at a critical stage. To achieve the effective utilization of multiple energy forms, integrated energy systems for industrial parks are widely used. These systems integrate electricity, natural gas, cooling, and heating systems, providing an effective solution for the simultaneous supply of various types of energy. Electricity is typically the core energy form in integrated energy systems due to its high efficiency and convenience in energy conversion and utilization. Compared to traditional electricity users, integrated energy systems are multi-energy coupled systems with greater load demand and more complex operating conditions. Therefore, integrated energy systems may participate in different electricity markets simultaneously, with the aim of maintaining a balance between electricity supply and demand. Due to the uncertainty of load and distributed energy resources, the real-time operation of integrated energy systems always deviates from day-ahead dispatch strategies, making participation in real-time markets unavoidable. Rapid price fluctuations in real-time markets can lead to significant changes in operating costs, which can be considered a risk in the operation of integrated energy systems.

[0003] Currently, the optimization of the integrated energy system in industrial parks participating in the electricity spot market often focuses on combining market-side price forecasts with different electricity markets, but neglects the greater flexibility brought about by the multi-energy coupling and complementarity of internal energy supply equipment; thus, it fails to fully utilize the potential benefits brought by electricity market price fluctuations. Therefore, how to balance the benefits and risks of market participation based on user settings, and economically and reliably meet the energy needs of the integrated energy system in industrial parks, is a problem that has been a focus of attention. Summary of the Invention

[0004] This application aims to address at least one of the aforementioned technical deficiencies. In view of this, this application provides a method, apparatus, equipment, and readable storage medium for the operation and control of a park energy system, which addresses the technical deficiency in the prior art of making it difficult to balance the benefits and risks of participating in the market according to user settings, and to economically and reliably meet the energy demand of the park's integrated energy system.

[0005] A method for regulating and controlling the operation of an energy system in a park, comprising:

[0006] Determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price for the target park's integrated energy system.

[0007] After setting the user risk preference coefficient of the target park integrated energy system, the interactive operation constraints of the target park integrated energy system are determined based on the energy supply structure and operating parameters of each energy supply device. The interactive operation constraints of the target park integrated energy system include the operating constraints of the energy supply devices, the operating constraints of the energy storage devices, and the system load supply and demand balance constraints.

[0008] Based on the historical day-ahead electricity price, the historical real-time electricity price, the predicted day-ahead electricity price for the operating day, and the predicted real-time electricity price for the operating day, the revenue and risk of the day-ahead market and the real-time market at different time periods are calculated, as well as the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets are calculated.

[0009] Based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operations in different markets, and the objective function selected by the user, the interactive operation scheduling scheme of the target park integrated energy system is determined.

[0010] Based on the interactive operation and scheduling scheme of the target park's integrated energy system, a scheduling plan for the target park's integrated energy system within a scheduling cycle is determined. This scheduling plan includes the expected operating costs and cost fluctuation risks of the target park's integrated energy system within the scheduling cycle, the total amount of electricity purchased by the target park's integrated energy system in each time period and its market allocation, the operating conditions and functional power of each energy supply device within the target park's integrated energy system, and the operating conditions and energy supply power of each energy storage device within the target park's integrated energy system.

[0011] Preferably, the formula for calculating the returns and risks of the day-ahead market and the real-time market at different time periods includes:

[0012]

[0013]

[0014]

[0015] in,

[0016] This represents the expected market return at time t.

[0017] This represents the expected return in the real-time market at time t.

[0018] Let t represent the electricity price in the market before time t.

[0019] This is expressed as the real-time market electricity price at time t;

[0020] This indicates the risk arising from electricity price fluctuations in the market before time t.

[0021] This represents the risk arising from real-time market electricity price fluctuations at time t;

[0022] N represents the total number of days in the historical data;

[0023] This represents the historical electricity price in the market at time t on day x in the historical data.

[0024] This represents the historical electricity price in the real-time market at time t on day x in the historical data.

[0025] Preferably, the formula for calculating the benefits and risks of the target park's integrated energy system participating in different market interactions includes:

[0026]

[0027]

[0028]

[0029] in,

[0030] C t This represents the total cost of purchased electricity for the target park's integrated energy system at time t;

[0031] y represents the proportion of the target park's integrated energy system participating in the real-time market;

[0032] △t represents the scheduling interval of the integrated energy system of the target park;

[0033] This indicates the risk arising from fluctuations in market electricity prices before time t.

[0034] This indicates the risk arising from real-time market electricity price fluctuations at time t;

[0035] N represents the total number of days in the historical data;

[0036] This represents the historical electricity price in the market at time t on day x in the historical data.

[0037] This represents the historical electricity price in the real-time market at time t on day x in the historical data.

[0038] Preferably, the objective function selected by the user includes the objective function that maximizes the profit, and the objective function that maximizes the profit includes:

[0039]

[0040]

[0041]

[0042] in,

[0043] S represents a set of operational strategies for the target park's integrated energy system to participate in the market;

[0044] This represents the amount of electricity purchased by the target park's integrated energy system in the day-ahead market at time t;

[0045] This represents the amount of electricity purchased from the real-time market by the target park's integrated energy system at time t;

[0046] C D This represents the start-up and shutdown penalty cost of different energy supply equipment in the target park's integrated energy system;

[0047] This indicates the start / stop status of different energy supply devices in the target park's integrated energy system at time t.

[0048] Preferably, the objective function selected by the user includes a minimum-risk objective function, which includes:

[0049]

[0050] in,

[0051] Var(S) represents the operational risk of the target park's integrated energy system's market participation strategy S;

[0052] This indicates the electricity price during the current market period (i-th hour).

[0053] This represents the real-time market electricity price for time period j.

[0054] This represents the amount of electricity purchased by the target park's integrated energy system during the day-ahead market period i.

[0055] This represents the amount of electricity purchased by the target park's integrated energy system during real-time market period j.

[0056] ρ ij This represents the correlation coefficient between the day-ahead market electricity price in time period i and the real-time market electricity price in time period j;

[0057] j represents the time period during which the target park's integrated energy system participates in the real-time market;

[0058] i represents the period during which the target park's integrated energy system participates in the day-ahead market.

[0059] Preferably, the objective function selected by the user includes the objective function that maximizes utility, wherein the objective function that maximizes utility includes:

[0060]

[0061] in,

[0062] U(S) represents the utility function of the target park's integrated energy system participating in market electricity purchase;

[0063] A represents the risk aversion coefficient of the target park's integrated energy system operation;

[0064] ρ ij This represents the correlation coefficient between the day-ahead market electricity price in time period i and the real-time market electricity price in time period j;

[0065] j represents the time period during which the target park's integrated energy system participates in the real-time market;

[0066] i represents the period during which the target park's integrated energy system participates in the day-ahead market;

[0067] Var(S) represents the operational risk of the target park's integrated energy system's market participation strategy S;

[0068] This indicates the risk of the target park's integrated energy system participating in the day-ahead market during period i;

[0069] This indicates the risk of the target park's integrated energy system participating in the real-time market during time period j;

[0070] This indicates the electricity price during the current market period (i-th hour).

[0071] This represents the real-time market electricity price for time period j.

[0072] This represents the amount of electricity purchased by the target park's integrated energy system during the day-ahead market period i.

[0073] This represents the amount of electricity purchased by the target park's integrated energy system during real-time market period j. This represents the amount of electricity purchased by the target park's integrated energy system in the day-ahead market at time t;

[0074] This represents the amount of electricity purchased from the real-time market by the target park's integrated energy system at time t;

[0075] C D This represents the start-up and shutdown penalty cost of different energy supply equipment in the target park's integrated energy system;

[0076] This indicates the start / stop status of different energy supply devices in the target park's integrated energy system at time t.

[0077] The operational constraints of the energy supply equipment, the operational constraints of the energy storage equipment, and the system load supply-demand balance constraints of the integrated energy system of the target park include:

[0078] The operating constraints for the energy supply equipment of the target park's integrated energy system are set as follows:

[0079]

[0080]

[0081]

[0082] in,

[0083] D∈{GSHP,EB} represents the type of energy supply equipment in the target park's integrated energy system;

[0084] This represents the heat generated by the energy supply equipment of the target park's integrated energy system at time t;

[0085] This represents the power consumption of the energy supply equipment in the target park's integrated energy system at time t;

[0086] This represents the auxiliary equipment power of the power supply equipment of the target park's integrated energy system at time t;

[0087] COP D This represents the performance coefficient of the energy supply equipment of the target park's integrated energy system at time t;

[0088] This indicates the start / stop status of the energy supply equipment of the target park's integrated energy system at time t;

[0089] Q - D This represents the lower limit of the heat output of the energy supply equipment in the target park's integrated energy system at time t;

[0090] This represents the upper limit of the heat output of the energy supply equipment in the target park's integrated energy system at time t;

[0091] This represents the performance coefficient of the energy supply equipment of the target park's integrated energy system at time t;

[0092] This represents the load rate of the energy supply equipment of the target park's integrated energy system at time t;

[0093] The operating constraints for the energy storage equipment in the target park's integrated energy system are set as follows:

[0094]

[0095]

[0096]

[0097]

[0098]

[0099] in,

[0100] H∈{HS,ES} represents the type of energy storage equipment in the target park's integrated energy system;

[0101] ε H This represents the energy self-loss rate of the energy storage equipment in the target park's integrated energy system;

[0102] This represents the energy stored in the energy storage device of the integrated energy system of the target park at time t+1;

[0103] This represents the energy stored in the energy storage device of the integrated energy system of the target park at time t;

[0104] This represents the charging power of the energy storage device in the target park's integrated energy system at time t;

[0105] This represents the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0106] η H,C This indicates the charging efficiency of the energy storage equipment in the target park's integrated energy system;

[0107] η H,D This indicates the energy release efficiency of the energy storage equipment in the target park's integrated energy system;

[0108] This indicates the charging status flag of the energy storage device in the target park's integrated energy system at time t;

[0109] This indicates the energy release status flag of the energy storage device in the target park's integrated energy system at time t;

[0110] △t represents the scheduling time interval of the integrated energy system of the target park;

[0111] This represents the lower limit of the charging power of the energy storage equipment in the target park's integrated energy system at time t;

[0112] This represents the upper limit of the charging power of the energy storage equipment in the target park's integrated energy system at time t;

[0113] This represents the lower limit of the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0114] This represents the upper limit of the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0115] This indicates the upper limit of the energy storage capacity of the energy storage devices in the target park's integrated energy system;

[0116] The system load supply and demand balance constraint condition of the target park's integrated energy system is set as follows:

[0117]

[0118]

[0119]

[0120]

[0121]

[0122] in,

[0123] This represents the electric boiler heat output power of the target park's integrated energy system at time t;

[0124] This represents the ground source heat pump heat output power of the target park's integrated energy system at time t;

[0125] This represents the electric boiler heating power of the target park's integrated energy system at time t;

[0126] This represents the electric boiler hot water supply power of the target park's integrated energy system at time t;

[0127] This represents the heat supply power of the hot water storage tank of the target park's integrated energy system at time t;

[0128] This represents the hot water supply power of the hot water storage tank of the target park's integrated energy system at time t;

[0129] This represents the charging power of the hot water storage tank of the target park's integrated energy system at time t;

[0130] This represents the energy release power of the hot water storage tank of the target park's integrated energy system at time t;

[0131] This represents the system electrical load of the target park's integrated energy system at time t;

[0132] This represents the system heat load of the target park's integrated energy system at time t;

[0133] This represents the system hot water load of the target park's integrated energy system at time t;

[0134] This represents the power consumption of the electric boiler in the integrated energy system of the target park at time t;

[0135] This represents the power consumption of the ground source heat pump in the target park's integrated energy system at time t.

[0136] This represents the electrical energy storage charging power of the target park's integrated energy system at time t;

[0137] This represents the electrical energy storage and release power of the target park's integrated energy system at time t;

[0138] This represents the purchased electricity power of the target park's integrated energy system at time t.

[0139] A control device for the operation of an energy system in a park, comprising:

[0140] The first determining unit is used to determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price for the operating day, and predicted real-time electricity price for the operating day of the comprehensive energy system of the target park.

[0141] The second determining unit is used to determine the interactive operation constraints of the target park integrated energy system after setting the user risk preference coefficient of the target park integrated energy system, based on the energy supply structure of the target park integrated energy system and the operating parameters of each energy supply device. The interactive operation constraints of the target park integrated energy system include the operating constraints of the energy supply devices of the target park integrated energy system, the operating constraints of the energy storage devices of the target park integrated energy system, and the system load supply and demand balance constraints of the target park integrated energy system.

[0142] The calculation unit is used to calculate the revenue and risk of the daytime market and the real-time market at different time periods based on the daytime historical electricity price value, the real-time historical electricity price value, the daytime predicted electricity price value of the operating day and the real-time predicted electricity price value of the operating day, as well as to calculate the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets.

[0143] The third determining unit is used to determine the interactive operation scheduling scheme of the target park integrated energy system based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operation in different markets, and the objective function selected by the user.

[0144] The fourth determining unit is used to determine the scheduling plan of the target park integrated energy system within a scheduling cycle based on the interactive operation and scheduling scheme of the target park integrated energy system. The scheduling plan of the target park integrated energy system within a scheduling cycle includes the expected operating cost and cost fluctuation risk of the target park integrated energy system within a scheduling cycle, the total amount of electricity purchased by the target park integrated energy system in each time period and the market allocation situation, the operating conditions and functional power of each energy supply device in the target park integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park integrated energy system.

[0145] An energy system operation and control device for a park includes: one or more processors, and a memory;

[0146] The memory stores computer-readable instructions, which, when executed by the one or more processors, implement the steps of the park energy system operation and control method described above.

[0147] A readable storage medium storing computer-readable instructions, which, when executed by one or more processors, cause the one or more processors to perform the steps of the park energy system operation control method described above.

[0148] As can be seen from the technical solutions described above, when it is necessary to regulate the participation of the integrated energy system of a park in market interaction, the method provided in this application embodiment can determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price for the operating day of the target park integrated energy system. After setting the user risk preference coefficient of the target park integrated energy system, the interactive operation constraints of the target park integrated energy system are further determined based on the energy supply structure and operating parameters of each energy supply equipment. The interactive operation constraints of the target park integrated energy system may include the operating constraints of the energy supply equipment, the operating constraints of the energy storage equipment, and the system load supply and demand balance constraints. Setting the interactive operation constraints of the target park integrated energy system can better ensure that the target park integrated energy system can better participate in the interactive operation of various markets according to user preferences. After determining the interactive operation constraints of the target park's integrated energy system, the revenue and risk of the daytime and real-time markets at different time periods can be calculated based on the historical daytime electricity price, historical real-time electricity price, the predicted daytime electricity price for the operating day, and the predicted real-time electricity price for the operating day. This also allows for the calculation of the revenue and risk of the target park's integrated energy system participating in interactive operations in different markets. This enables the determination of an interactive operation scheduling scheme for the target park's integrated energy system based on the interactive operation constraints, the revenue and risk of the target park's integrated energy system participating in interactive operations in different markets, and the objective function selected by the user. The interactive operation scheduling scheme for the target park's integrated energy system can guide better scheduling of the interactive operation of the target park's integrated energy system and helps to better schedule the operation of each energy supply or storage device within the target park's integrated energy system.

[0149] Therefore, after determining the interactive operation and dispatch scheme of the target park's integrated energy system, the dispatch plan for the target park's integrated energy system within a dispatch cycle can be determined based on the interactive operation and dispatch scheme. The dispatch plan for the target park's integrated energy system within a dispatch cycle may include the expected operating costs and cost fluctuation risks of the target park's integrated energy system within a dispatch cycle, the total amount of electricity purchased by the target park's integrated energy system in each time period and the market allocation situation, the operating conditions and functional power of each energy supply device in the target park's integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park's integrated energy system.

[0150] As described above, the method provided in this application comprehensively considers the returns and risks of the day-ahead and real-time markets, the mean and variance of electricity prices, and the balance of returns and risks when the integrated energy system of the park participates in the electricity market. By setting different user risk preference coefficients in the interactive operation optimization model, it can effectively determine the interactive operation scheme for the integrated energy system of the park to participate in the electricity market under different user risk preferences, and can effectively solve the difficulties in interactive operation when the integrated energy system of the park participates in the electricity spot market. It can effectively achieve a balance between different fluctuations in returns and risks according to user preferences, and economically and reliably meet the energy demand of the integrated energy system of the park. Attached Figure Description

[0151] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0152] Figure 1 A flowchart illustrating a method for controlling the operation of a park energy system, provided as an embodiment of this application;

[0153] Figure 2 This is a schematic diagram of the energy supply structure of the integrated energy system M in the park provided in an embodiment of this application;

[0154] Figure 3 The load value of the integrated energy system M in the park provided in the embodiments of this application;

[0155] Figure 4 A schematic diagram of day-ahead market and real-time market electricity value provided for embodiments of this application;

[0156] Figure 5 A schematic diagram illustrating the day-ahead and real-time market electricity price fluctuation risk values ​​provided in this application embodiment;

[0157] Figure 6 This application provides a schematic diagram of the system electricity purchase for the integrated energy system M in the park under different risk preferences, as part of a scenario provided in this embodiment.

[0158] Figure 7 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in a park under a high-risk preference scenario, provided in an embodiment of this application.

[0159] Figure 8 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in the park under a risk preference scenario provided in the embodiments of this application.

[0160] Figure 9 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in a park under a low-risk preference scenario, as provided in the embodiments of this application.

[0161] Figure 10 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under a high-risk preference scenario, as provided in the embodiments of this application.

[0162] Figure 11 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under risk preference in Scenario 2, as provided in the embodiments of this application.

[0163] Figure 12 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under a low-risk preference scenario, as provided in the embodiments of this application.

[0164] Figure 13 This is a schematic diagram illustrating the structure of a park energy system operation and control device, as exemplified by an embodiment of this application.

[0165] Figure 14 This is a hardware structure block diagram of a park energy system operation and control device disclosed in an embodiment of this application. Detailed Implementation

[0166] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0167] In practical applications, in order to achieve the effective utilization of multiple energy forms, the Community Integrated Energy System (CIES) has been widely used.

[0168] The park's integrated energy system combines electricity, natural gas, cooling, and heating systems, providing an effective solution for the simultaneous supply of various types of energy.

[0169] Electricity is typically the core energy form in a park's integrated energy system due to its high efficiency and convenience in energy conversion and utilization. However, electricity also has unique characteristics, such as low inertia, difficulty in storage, and the need for real-time balancing. Furthermore, compared to traditional electricity users, a park's integrated energy system is a multi-energy coupled system with greater load demands and more complex operating conditions.

[0170] Therefore, the integrated energy system of the industrial park may participate in different electricity markets simultaneously, the purpose of which is to maintain a balance between electricity supply and demand. These electricity markets have a significant impact on the operation of the integrated energy system because they bring about price fluctuations and arbitrage opportunities. These factors should be considered in the optimization of the integrated energy system's operation.

[0171] The day-ahead market and the real-time market are the two main components of the park's integrated energy system's participation in the electricity spot market.

[0172] In the day-ahead electricity market, electricity prices are determined one day in advance by a clearing mechanism involving the park's integrated energy system and other stakeholders. When the park's integrated energy system schedules its operations and submits its power purchase orders, the price is unknown. Therefore, day-ahead market prices have a degree of uncertainty.

[0173] In the real-time market, electricity prices are determined based on energy balance conditions after a period of operation. Purchases in the real-time market do not require advance declaration, leading to high price uncertainty. Due to the uncertainty of load and distributed energy resources, the real-time operation of the park's integrated energy system always deviates from the day-ahead dispatch strategy, making participation in the real-time market unavoidable. Rapid price fluctuations in the real-time market can lead to significant changes in operating costs, which can be considered a risk in the operation of the park's integrated energy system.

[0174] Currently, optimization of the interactive operation of integrated energy systems in industrial parks participating in the electricity spot market often involves considering market-side price forecasting and combining different electricity markets, but neglects the greater flexibility brought about by the multi-energy coupling and complementarity of internal energy supply equipment; or it optimizes the operation of internal energy supply equipment to meet the power requirements of the external electricity market, failing to fully utilize the potential benefits brought by electricity market price fluctuations. Therefore, there is an urgent need for an interactive operation method for integrated energy systems in industrial parks participating in the electricity spot market, which can balance the benefits and risks of market participation according to user settings, and economically and reliably meet the energy needs of integrated energy systems in industrial parks.

[0175] Given that most current operational control schemes for industrial park energy systems are ill-suited to the complex and ever-changing business demands, this applicant has developed an operational control scheme for industrial park energy systems. This method comprehensively considers the returns and risks of day-ahead and real-time markets, taking into account the mean and variance of electricity prices, as well as the balance between returns and risks when the integrated industrial park energy system participates in the electricity market. By setting different user risk preference coefficients in the interactive operation optimization model, it can effectively determine the interactive operation scheme for the integrated industrial park energy system's participation in the electricity market under different user risk preferences. This effectively solves the difficulties in interactive operation when the integrated industrial park energy system participates in the electricity spot market. It can effectively achieve a balance between different return and risk fluctuations based on user preferences, economically and reliably meeting the energy needs of the integrated industrial park energy system.

[0176] The methods provided in this application can be used in a variety of general-purpose or special-purpose computing device environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor devices, distributed computing environments including any of the above devices, etc.

[0177] This application provides a method for controlling the operation of a park energy system. This method can be applied to various energy management systems, as well as to various computer terminals or smart terminals. The executing entity can be the processor or server of the computer terminal or smart terminal.

[0178] The following is combined with Figure 1 This application describes the process of the operation and control method for the park energy system as given in the embodiments, such as... Figure 1 As shown, the process may include the following steps:

[0179] Step S101: Determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price for the operating day, and predicted real-time electricity price for the operating day of the integrated energy system of the target park.

[0180] Specifically, in practical applications, the functional structure of the park, the energy supply equipment, the operating parameters of the energy supply equipment, the day-ahead market electricity price, and the real-time market electricity price will all affect the operation of the park's integrated energy system in participating in market interactions.

[0181] Therefore, in order to better coordinate the participation of the target park's integrated energy system in market interactions, the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, and predicted day-ahead and real-time electricity price for the operating day can be determined. This allows the target park's integrated energy system to be regulated to participate in different market interactions based on its energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead and real-time electricity price, and predicted day-ahead and real-time electricity price for the operating day.

[0182] Step S102: After setting the user risk preference coefficient of the target park integrated energy system, determine the interactive operation constraints of the target park integrated energy system based on the energy supply structure of the target park integrated energy system and the operating parameters of each energy supply device.

[0183] Specifically, as described above, the method provided in this application embodiment can determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price for the operating day, and predicted real-time electricity price for the operating day of the target park's integrated energy system.

[0184] in,

[0185] The energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price on the operating day of the target park's integrated energy system can affect the operation of the target park's integrated energy system and its participation in different market interactions.

[0186] In practical applications, the user risk preference coefficient of the target park's integrated energy system will also affect the operation of the target park's integrated energy system and its participation in different market interactions.

[0187] Therefore, in order to better regulate the operation of the target park's integrated energy system and its participation in different market interactions, after determining the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price for the operating day, a user risk preference coefficient for the target park's integrated energy system can be further set. After setting the user risk preference coefficient, the interactive operation constraints of the target park's integrated energy system can be determined based on its energy supply structure and operating parameters of each energy supply equipment.

[0188] in,

[0189] The interactive operation constraints of the target park's integrated energy system may include the following:

[0190] (1) Operational constraints of the energy supply equipment of the target park's integrated energy system;

[0191] in,

[0192] The operating constraints of the energy supply equipment of the target park's integrated energy system can be set as follows:

[0193]

[0194]

[0195]

[0196] in,

[0197] D∈{GSHP,EB} can represent the type of energy supply equipment in the target park's integrated energy system;

[0198] This can represent the heat generated by the energy supply equipment of the target park's integrated energy system at time t;

[0199] It can represent the power consumption of the energy supply equipment of the target park's integrated energy system at time t;

[0200] It can represent the auxiliary equipment power of the power supply equipment of the target park's integrated energy system at time t;

[0201] COP D It can represent the performance coefficient of the energy supply equipment of the target park's integrated energy system at time t;

[0202] It can represent the start / stop status of the energy supply equipment of the target park's integrated energy system at time t;

[0203] It can represent the lower limit of the heat output of the energy supply equipment of the target park's integrated energy system at time t;

[0204] It can represent the upper limit of heat generation of the energy supply equipment of the target park's integrated energy system at time t;

[0205] It can represent the performance coefficient of the energy supply equipment of the target park's integrated energy system at time t;

[0206] It can represent the load rate of the energy supply equipment of the target park's integrated energy system at time t;

[0207] (2) Operational constraints of energy storage equipment in the target park's integrated energy system;

[0208] in,

[0209] The operating constraints for the energy storage equipment in the target park's integrated energy system can be set as follows:

[0210]

[0211]

[0212]

[0213]

[0214]

[0215] in,

[0216] H∈{HS,ES} can represent the type of energy storage equipment in the target park's integrated energy system;

[0217] ε H This can represent the energy self-loss rate of the energy storage equipment in the target park's integrated energy system;

[0218] This can represent the energy stored in the energy storage device of the target park's integrated energy system at time t+1;

[0219] This can represent the energy storage capacity of the energy storage device in the integrated energy system of the target park at time t;

[0220] This can represent the charging power of the energy storage device in the target park's integrated energy system at time t;

[0221] This can represent the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0222] η H,C This can represent the charging efficiency of the energy storage equipment in the target park's integrated energy system;

[0223] η H,D This can represent the energy release efficiency of the energy storage equipment in the target park's integrated energy system;

[0224] This can represent the charging status flag of the energy storage device in the target park's integrated energy system at time t;

[0225] This can represent the energy release status flag of the energy storage device in the target park's integrated energy system at time t;

[0226] △t can represent the scheduling time interval of the integrated energy system of the target park;

[0227] This can represent the lower limit of the charging power of the energy storage device in the target park's integrated energy system at time t;

[0228] This can represent the upper limit of the charging power of the energy storage device in the target park's integrated energy system at time t;

[0229] This can represent the lower limit of the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0230] This can represent the upper limit of the energy release power of the energy storage device in the target park's integrated energy system at time t;

[0231] This can represent the upper limit of the energy storage capacity of the energy storage devices in the target park's integrated energy system;

[0232] (3) System load supply and demand balance constraints of the target park's integrated energy system;

[0233] in,

[0234] The system load supply and demand balance constraints of the target park's integrated energy system can be set as follows:

[0235]

[0236]

[0237]

[0238]

[0239]

[0240] in,

[0241] This can represent the electric boiler heat output power of the target park's integrated energy system at time t;

[0242] This can represent the ground source heat pump heat output power of the target park's integrated energy system at time t; This can represent the heating power of the electric boiler in the integrated energy system of the target park at time t;

[0243] This can represent the electric boiler hot water supply power of the target park's integrated energy system at time t;

[0244] This can represent the heat supply power of the hot water storage tank of the target park's integrated energy system at time t;

[0245] This can represent the hot water supply power of the hot water storage tank of the target park's integrated energy system at time t;

[0246] This can represent the charging power of the hot water storage tank of the target park's integrated energy system at time t;

[0247] This can represent the energy release power of the hot water storage tank of the target park's integrated energy system at time t;

[0248] This can represent the system electrical load of the target park's integrated energy system at time t;

[0249] This can represent the system heat load of the target park's integrated energy system at time t;

[0250] This can represent the system hot water load of the target park's integrated energy system at time t;

[0251] This can represent the power consumption of the electric boiler in the integrated energy system of the target park at time t;

[0252] This can represent the power consumption of the ground source heat pump in the integrated energy system of the target park at time t; This can represent the electrical energy storage charging power of the target park's integrated energy system at time t;

[0253] This can represent the electrical energy storage and release power of the target park's integrated energy system at time t;

[0254] This can represent the purchased electricity power of the target park's integrated energy system at time t.

[0255] Step S103: Based on the historical daytime electricity price, the historical real-time electricity price, the predicted daytime electricity price for the operating day, and the predicted real-time electricity price for the operating day, calculate the returns and risks of the daytime market and the real-time market for different time periods, and calculate the returns and risks of the target park's integrated energy system participating in the interactive operation of different markets.

[0256] Specifically, as described above, the method provided in this application embodiment can determine parameters such as the historical value of day-ahead electricity price, the historical value of real-time electricity price, the predicted value of day-ahead electricity price for the operating day, and the predicted value of real-time electricity price for the operating day.

[0257] in,

[0258] Historical day-ahead electricity prices, historical real-time electricity prices, and forecasted day-ahead and real-time electricity prices for the operating day can affect the returns and risks of the day-ahead and real-time markets at different times, as well as the returns and risks of the target park's integrated energy system participating in different market interactions.

[0259] Therefore, after determining parameters such as the historical day-ahead electricity price, the historical real-time electricity price, the predicted day-ahead electricity price for the operating day, and the predicted real-time electricity price for the operating day, the revenue and risk of the day-ahead market and the real-time market for different time periods can be calculated based on these parameters. Furthermore, the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets can also be calculated.

[0260] in,

[0261] Formulas for calculating the returns and risks of the day-ahead market and the real-time market at different time periods can include the following:

[0262]

[0263]

[0264]

[0265] in,

[0266] This can be expressed as the expected market return at time t;

[0267] This can be expressed as the expected return in the real-time market at time t;

[0268] This can be expressed as the market electricity price at time t;

[0269] This can be represented as the real-time market electricity price at time t;

[0270] This can represent the risk brought about by the fluctuation of electricity prices in the market before time t;

[0271] This can represent the risk brought about by real-time market electricity price fluctuations at time t;

[0272] N can represent the total number of days in the historical data;

[0273] It can represent the historical electricity price in the market at time t on day x in historical data;

[0274] It can represent the historical electricity price in the real-time market at time t on day x in the historical data.

[0275] Formulas for calculating the benefits and risks of a target park's integrated energy system participating in different market interactions can include the following:

[0276]

[0277]

[0278]

[0279] in,

[0280] C t This can represent the total cost of purchased electricity for the target park's integrated energy system at time t;

[0281] y can represent the proportion of the target park's integrated energy system participating in the real-time market;

[0282] △t can represent the scheduling interval of the integrated energy system of the target park;

[0283] This can represent the risk brought about by the fluctuation of market electricity prices before time t;

[0284] This can represent the risk brought about by real-time market electricity price fluctuations at time t;

[0285] N can represent the total number of days in the historical data;

[0286] It can represent the historical electricity price in the market at time t on day x in historical data;

[0287] It can represent the historical electricity price in the real-time market at time t on day x in the historical data.

[0288] Step S104: Based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operations in different markets, and the objective function selected by the user, determine the interactive operation scheduling scheme of the target park integrated energy system.

[0289] Specifically, as can be seen from the above description, the method provided in this application embodiment can determine the interactive operation constraints of the target park's integrated energy system, as well as the benefits and risks of the target park's integrated energy system participating in interactive operations in different markets.

[0290] In practical applications, the interactive operation constraints of the target park's integrated energy system, the benefits and risks of the target park's integrated energy system participating in interactive operations in different markets, and the different objective functions selected by the user can all affect the interactive operation scheduling strategy of the target park's integrated energy system.

[0291] Therefore, after determining the interactive operation constraints of the target park's integrated energy system, the benefits and risks of the target park's integrated energy system participating in interactive operations in different markets, the interactive operation scheduling scheme of the target park's integrated energy system can be determined based on the interactive operation constraints of the target park's integrated energy system, the benefits and risks of the target park's integrated energy system participating in interactive operations in different markets, and the different objective functions selected by the user.

[0292] in,

[0293] The objective function selected by the user can include the objective function that yields the greatest benefit.

[0294] in,

[0295] The objective function that maximizes the profit can include the following:

[0296]

[0297]

[0298]

[0299] in,

[0300] S can represent a set of operational strategies for the target park's integrated energy system to participate in the market;

[0301] This can represent the amount of electricity purchased by the target park's integrated energy system in the day-ahead market at time t;

[0302] This can represent the amount of electricity purchased from the market by the target park's integrated energy system at time t.

[0303] CD This can represent the start-up and shutdown penalty costs of different energy supply equipment in the target park's integrated energy system;

[0304] It can represent the start-up and shutdown status of different energy supply equipment in the target park's integrated energy system at time t.

[0305] Furthermore,

[0306] The objective function selected by the user can also include the objective function with the lowest risk;

[0307] in,

[0308] The objective function that minimizes risk can include the following:

[0309]

[0310] in,

[0311] Var(S) can represent the operational risk of the target park's integrated energy system's market participation strategy S;

[0312] It can represent the electricity price during the i-day market period;

[0313] It can represent the real-time market electricity price for time period j;

[0314] This can represent the amount of electricity purchased by the target park's integrated energy system during the day-ahead market period i.

[0315] This can represent the amount of electricity purchased by the target park's integrated energy system in the real-time market during time period j;

[0316] ρ ij This can represent the correlation coefficient between the day-ahead market electricity price in time period i and the real-time market electricity price in time period j;

[0317] j can represent the time period during which the target park's integrated energy system participates in the real-time market;

[0318] i can represent the time period during which the target park's integrated energy system participates in the day-ahead market.

[0319] Furthermore,

[0320] The objective function selected by the user can also include the objective function that maximizes utility.

[0321] in,

[0322] The objective function that maximizes utility can include the following:

[0323]

[0324] in,

[0325] U(S) can represent the utility function of the target park's integrated energy system participating in the market for electricity purchase;

[0326] A can represent the risk aversion coefficient of the target park's integrated energy system operation;

[0327] ρ ij This can represent the correlation coefficient between the day-ahead market electricity price in time period i and the real-time market electricity price in time period j;

[0328] j represents the time period during which the target park's integrated energy system participates in the real-time market;

[0329] i can represent the period during which the target park's integrated energy system participates in the day-ahead market;

[0330] Var(S) can represent the operational risk of the target park's integrated energy system's market participation strategy S;

[0331] This can indicate the risk of the target park's integrated energy system participating in the day-ahead market during period i;

[0332] This can represent the risk of the target park's integrated energy system participating in the real-time market during time period j;

[0333] It can represent the electricity price during the i-day market period;

[0334] It can represent the real-time market electricity price for time period j;

[0335] This can represent the amount of electricity purchased by the target park's integrated energy system during the day-ahead market period i.

[0336] This can represent the amount of electricity purchased by the target park's integrated energy system in the real-time market during time period j;

[0337] This can represent the amount of electricity purchased by the target park's integrated energy system in the day-ahead market at time t;

[0338] This can represent the amount of electricity purchased from the market by the target park's integrated energy system at time t.

[0339] C D This can represent the start-up and shutdown penalty costs of different energy supply equipment in the target park's integrated energy system;

[0340] It can represent the start-up and shutdown status of different energy supply equipment in the target park's integrated energy system at time t.

[0341] Step S105: Based on the interactive operation and scheduling scheme of the target park integrated energy system, determine the scheduling plan of the target park integrated energy system within a scheduling cycle.

[0342] Specifically, as can be seen from the above description, the method provided in this application embodiment can determine the interactive operation and scheduling scheme of the integrated energy system of the target park.

[0343] The interactive operation and scheduling scheme for the integrated energy system of the target park can guide how to schedule the various energy supply devices of the integrated energy system of the target park to participate in the market interaction operation.

[0344] Therefore, after determining the interactive operation and scheduling scheme of the target park's integrated energy system, the scheduling plan of the target park's integrated energy system within a scheduling cycle can be further determined based on the interactive operation and scheduling scheme of the target park's integrated energy system.

[0345] in,

[0346] The scheduling plan for the integrated energy system of the target park within a scheduling cycle may include the following components:

[0347] (1) The expected operating cost of the target park's integrated energy system within a scheduling cycle;

[0348] (2) Risk of cost fluctuations in the target park's integrated energy system within a scheduling cycle;

[0349] (3) The total amount of externally purchased electricity and market allocation of the target park's integrated energy system in each time period;

[0350] (4) Operating conditions and functional power of each energy supply device in the target park's integrated energy system;

[0351] (5) Operating conditions and power supply of each energy storage device in the target park’s integrated energy system.

[0352] By using the scheduling plan of the target park's integrated energy system within a scheduling cycle, the system can be better scheduled to participate in different market interactions under different demands.

[0353] As can be seen from the technical solutions described above, the method provided in this application can effectively determine the interactive operation scheme for the integrated energy system of the park participating in the electricity market by comprehensively considering the returns and risks of the day-ahead and real-time markets, the mean and variance of electricity prices, and the returns and risks when the integrated energy system of the park participates in the electricity market. By setting different user risk preference coefficients in the interactive operation optimization model, it can effectively solve the difficulties in interactive operation when the integrated energy system of the park participates in the electricity spot market. It can effectively achieve a balance between different fluctuations in returns and risks according to user preferences, economically and reliably meeting the energy needs of the integrated energy system of the park.

[0354] Next, with Figure 2 Taking a typical integrated energy system M in a park as an example, this application introduces the implementation method provided in this application.

[0355] (1) Determine the components of the park's integrated energy system, the operating parameters of each component, the historical values ​​of day-ahead and real-time electricity prices, and the predicted values ​​of day-ahead and real-time electricity prices for each operating day.

[0356] in,

[0357] Figure 2 This is a schematic diagram of the energy supply structure of the integrated energy system M in the park provided in an embodiment of this application;

[0358] like Figure 2 As shown,

[0359] In the park's integrated energy system M, the external power grid serves as the energy input, and electric energy storage is used to regulate the purchased electricity to jointly meet the power demand; the centralized energy station generates air conditioning hot water and delivers it to each building, which meets the heating demand through fan coil units; the thermal storage electric boiler system meets the hot water demand through heat exchangers; the centralized energy station includes a ground source heat pump system and a thermal storage electric boiler system. Detailed equipment parameters of the park's integrated energy system M are shown in Table 1.

[0360] Table 1 Equipment parameters of the integrated energy system M in the park

[0361]

[0362] like Figure 2 As shown,

[0363] A complete scheduling cycle for the park's integrated energy system M is 00:00-24:00;

[0364] The initial scheduling time for the park's integrated energy system M is 00:00;

[0365] The scheduling interval for the park's integrated energy system M is 1 hour.

[0366] The initial value of the heat storage tank of the integrated energy system M in the park is 0, and the initial value of the electricity storage is 0; the start-up and shutdown costs of the ground source heat pump and the electric boiler are 40.0 yuan / time and 120.0 yuan / time, respectively.

[0367] For the integrated energy system M in the park, two scenarios are set up for verification to optimize the interactive operation of the integrated energy system M in the electricity spot market:

[0368] Scenario 1: The integrated energy system M in the park only participates in the day-ahead market. Based on different risk preferences, different objective functions are used to compare the operating costs and risks of the integrated energy system M in the park.

[0369] Scenario 2: The park's integrated energy system M participates in the day-ahead market and the real-time market. Based on different risk preferences, different objective functions are used to compare the operating costs and risks of the park's integrated energy system M.

[0370] The computer hardware environment for the optimization calculation of the park's integrated energy system M is an Intel(R) Core(TM) i7-9700 CPU with a main frequency of 3.00GHz and 24GB of memory; the software environment is a Windows 10 operating system.

[0371] The experiment shows that the operating costs and risks of the park's integrated energy system M under different risk preferences in the above scenario are shown in Table 2.

[0372] Table 2 Comparison of the operating results of the park's integrated energy system M under different risk preferences in Scenario 1

[0373]

[0374] As shown in Table 2, as the risk appetite decreases, the operating cost of the integrated energy system M in the park increases, while the risk of operating cost fluctuations decreases.

[0375] The operating costs under different risk appetites fall between those of the maximum return strategy and the minimum risk strategy;

[0376] The lower operating costs come with higher volatility risk. Compared to the maximum return strategy, the park's integrated energy system M, under the lowest risk scenario, reduces price volatility by 10.11%, while costs increase by only 3.16%.

[0377] This paper further analyzes the power purchase strategies of the integrated energy system M in the park under high-risk, medium-risk, and low-risk conditions by combining the power purchase strategies of the integrated energy system M in the park under high-risk, medium-risk, and low-risk conditions.

[0378] in,

[0379] Figure 3 The load value of the integrated energy system M in the park provided in the embodiments of this application;

[0380] Figure 4 A schematic diagram of day-ahead market and real-time market electricity value provided for embodiments of this application;

[0381] Figure 5 A schematic diagram illustrating the day-ahead and real-time market electricity price fluctuation risk values ​​provided in this application embodiment;

[0382] Figure 6 This application provides a schematic diagram of the system electricity purchase for the integrated energy system M in the park under different risk preferences, as part of a scenario provided in this embodiment.

[0383] Figure 7 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in a park under a high-risk preference scenario, provided in an embodiment of this application.

[0384] Figure 8 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in the park under a risk preference scenario provided in the embodiments of this application.

[0385] Figure 9 This is a schematic diagram illustrating the internal power distribution of the integrated energy system M in a park under a low-risk preference scenario, as provided in the embodiments of this application.

[0386] Figure 7 , Figure 8 , Figure 9 The exhibition showcased the power purchase strategies of the park's integrated energy system M under high-risk, medium-risk, and low-risk conditions.

[0387] like Figure 7 , Figure 8 , Figure 9 As shown,

[0388] Since the energy storage devices of the park's integrated energy system M are typically charged at the beginning of the day and depleted at the end of the day, the amount of electricity purchased is basically the same during the periods from 1 to 4 a.m. and from 10 p.m. to 12 a.m.

[0389] Compared to other options, the high-risk strategy allows for the purchase of more electricity between 5 a.m. and 7 a.m., and less between 1 p.m. and 4 p.m.

[0390] This is Figure 4 The daytime electricity price shows that the trough and peak times coincide.

[0391] However, as Figure 5As shown, since the electricity price fluctuation range is smallest at 1 pm, the low-risk strategy tends to buy less electricity at 8 am and more electricity at 1 pm.

[0392] This has led to higher operating costs for the park's integrated energy system M to some extent, but it has also reduced the risk of fluctuations.

[0393] The medium-risk strategy falls between the maximum return and minimum risk strategies, balancing the reduction of operating costs and the reduction of risk.

[0394] Based on the experiment, the operating costs and risks of the park's integrated energy system M under different risk preferences in Scenario 2 are shown in Table 3.

[0395] Table 3 Comparison of the operating results of the park's integrated energy system M under different risk preferences in Scenario 2

[0396]

[0397]

[0398] further,

[0399] Figure 10 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under a high-risk preference scenario, as provided in the embodiments of this application.

[0400] Figure 11 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under risk preference in Scenario 2, as provided in the embodiments of this application.

[0401] Figure 12 This is a schematic diagram illustrating the system electricity purchase and market allocation of the integrated energy system M in the park under a low-risk preference scenario, as provided in the embodiments of this application. Figure 10 , Figure 11 , Figure 12 The power purchase strategies of the park's integrated energy system M under high-risk, medium-risk, and low-risk conditions were identified.

[0402] like Figure 10 , Figure 11 , Figure 12 As shown,

[0403] As risk appetite increases, the park's integrated energy system M achieves better returns by accepting more volatility risk.

[0404] The above experimental results demonstrate that the regulation method for the park energy system to interact with different markets provided in this application embodiment remains effective in day-ahead and real-time markets with drastic fluctuations, and can achieve a balance between risk and return.

[0405] The following describes the park energy system operation and control device provided in the embodiments of this application. The park energy system operation and control device described below can be referred to in correspondence with the park energy system operation and control method described above.

[0406] See Figure 13 , Figure 13 This is a schematic diagram of the structure of a park energy system operation and control device disclosed in an embodiment of this application.

[0407] like Figure 13 As shown, the energy system operation and control device of the park may include:

[0408] The first determining unit 101 is used to determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price for the operating day, and predicted real-time electricity price for the operating day of the comprehensive energy system of the target park.

[0409] The second determining unit 102 is used to determine the interactive operation constraints of the target park integrated energy system after setting the user risk preference coefficient of the target park integrated energy system, based on the energy supply structure of the target park integrated energy system and the operating parameters of each energy supply device. The interactive operation constraints of the target park integrated energy system include the operating constraints of the energy supply devices of the target park integrated energy system, the operating constraints of the energy storage devices of the target park integrated energy system, and the system load supply and demand balance constraints of the target park integrated energy system.

[0410] The calculation unit 103 is used to calculate the revenue and risk of the day-ahead market and the real-time market at different time periods based on the day-ahead historical electricity price value, the real-time historical electricity price value, the day-ahead electricity price forecast value of the operating day and the real-time electricity price forecast value of the operating day, as well as to calculate the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets.

[0411] The third determining unit 104 is used to determine the interactive operation scheduling scheme of the target park integrated energy system based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operation in different markets, and the objective function selected by the user.

[0412] The fourth determining unit 105 is used to determine the scheduling plan of the target park integrated energy system within a scheduling cycle based on the interactive operation and scheduling scheme of the target park integrated energy system. The scheduling plan of the target park integrated energy system within a scheduling cycle includes the expected operating cost and cost fluctuation risk of the target park integrated energy system within a scheduling cycle, the total amount of electricity purchased by the target park integrated energy system in each time period and the market allocation situation, the operating conditions and functional power of each energy supply device in the target park integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park integrated energy system.

[0413] As can be seen from the technical solutions described above, when it is necessary to regulate the participation of the integrated energy system of the park in market interaction, the device provided in this application embodiment can determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price for the operating day of the target park integrated energy system; and after setting the user risk preference coefficient of the target park integrated energy system, further determine the interactive operation constraints of the target park integrated energy system based on the energy supply structure and operating parameters of each energy supply equipment. These interactive operation constraints may include operating constraints of the energy supply equipment, operating constraints of the energy storage equipment, and system load supply-demand balance constraints. Setting these interactive operation constraints can better ensure that the target park integrated energy system can better participate in the interactive operation of various markets according to user preferences. After determining the interactive operation constraints of the target park's integrated energy system, the revenue and risk of the daytime and real-time markets at different time periods can be calculated based on the historical daytime electricity price, historical real-time electricity price, the predicted daytime electricity price for the operating day, and the predicted real-time electricity price for the operating day. This also allows for the calculation of the revenue and risk of the target park's integrated energy system participating in interactive operations in different markets. This enables the determination of an interactive operation scheduling scheme for the target park's integrated energy system based on the interactive operation constraints, the revenue and risk of the target park's integrated energy system participating in interactive operations in different markets, and the objective function selected by the user. The interactive operation scheduling scheme for the target park's integrated energy system can guide better scheduling of the interactive operation of the target park's integrated energy system and helps to better schedule the operation of each energy supply or storage device within the target park's integrated energy system. Therefore, after determining the interactive operation and dispatch scheme of the target park's integrated energy system, the dispatch plan for the target park's integrated energy system within a dispatch cycle can be determined based on the interactive operation and dispatch scheme. The dispatch plan for the target park's integrated energy system within a dispatch cycle may include the expected operating costs and cost fluctuation risks of the target park's integrated energy system within a dispatch cycle, the total amount of electricity purchased by the target park's integrated energy system in each time period and the market allocation situation, the operating conditions and functional power of each energy supply device in the target park's integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park's integrated energy system.

[0414] As described above, the device provided in this application comprehensively considers the returns and risks of the day-ahead and real-time markets, the mean and variance of electricity prices, and the balance of returns and risks when the integrated energy system of the park participates in the electricity market. By setting different user risk preference coefficients in the interactive operation optimization model, it can effectively determine the interactive operation scheme for the integrated energy system of the park to participate in the electricity market under different user risk preferences. This can effectively solve the difficulties in interactive operation when the integrated energy system of the park participates in the electricity spot market. It can effectively achieve a balance between different fluctuations in returns and risks according to user preferences, and economically and reliably meet the energy demand of the integrated energy system of the park.

[0415] The specific processing flow of each unit included in the above-mentioned park energy system operation and control device can be found in the relevant introduction of the park energy system operation and control method section above, and will not be repeated here.

[0416] The park energy system operation and control device provided in this application embodiment can be applied to park energy system operation and control equipment, such as terminals: mobile phones, computers, etc. Optionally, Figure 14 The hardware structure block diagram of the park's energy system operation and control equipment is shown. (Refer to...) Figure 14 The hardware structure of the park's energy system operation and control equipment may include: at least one processor 1, at least one communication interface 2, at least one memory 3, and at least one communication bus 4.

[0417] In this embodiment, the number of processor 1, communication interface 2, memory 3, and communication bus 4 is at least one, and processor 1, communication interface 2, and memory 3 communicate with each other through communication bus 4.

[0418] Processor 1 may be a central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of this application.

[0419] Memory 3 may include high-speed RAM, and may also include non-volatile memory, such as at least one disk storage device;

[0420] The memory stores a program, and the processor can call the program stored in the memory. The program is used to implement the various processing flows in the aforementioned terminal park energy system operation and control scheme.

[0421] This application embodiment also provides a readable storage medium that can store a program suitable for processor execution, the program being used to: implement the various processing flows of the aforementioned terminal in the park energy system operation and control scheme.

[0422] Finally, it should be noted that in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0423] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.

[0424] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Various embodiments can be combined with each other. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A park energy system operation regulation method, characterized in that, include: Determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price, and predicted real-time electricity price for the target park's integrated energy system. After setting the user risk preference coefficient of the target park integrated energy system, the interactive operation constraints of the target park integrated energy system are determined based on the energy supply structure and operating parameters of each energy supply device. The interactive operation constraints of the target park integrated energy system include the operating constraints of the energy supply devices, the operating constraints of the energy storage devices, and the system load supply and demand balance constraints. Based on the historical day-ahead electricity price, the historical real-time electricity price, the predicted day-ahead electricity price for the operating day, and the predicted real-time electricity price for the operating day, the revenue and risk of the day-ahead market and the real-time market at different time periods are calculated, as well as the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets are calculated. Based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operations in different markets, and the objective function selected by the user, the interactive operation scheduling scheme of the target park integrated energy system is determined. Based on the interactive operation and scheduling scheme of the target park integrated energy system, the scheduling plan of the target park integrated energy system within a scheduling cycle is determined. The scheduling plan of the target park integrated energy system within a scheduling cycle includes the expected operating cost and cost fluctuation risk of the target park integrated energy system within a scheduling cycle, the total amount of electricity purchased by the target park integrated energy system in each time period and the market allocation, the operating conditions and functional power of each energy supply device in the target park integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park integrated energy system. The objective function selected by the user includes the objective function that maximizes the benefit, the objective function that minimizes the risk, and the objective function that maximizes the utility. The operational constraints of the energy supply equipment, the operational constraints of the energy storage equipment, and the system load supply-demand balance constraints of the integrated energy system of the target park include: The operating constraints for the energy supply equipment of the target park's integrated energy system are set as follows: in, a type of the energy supply device of the target park integrated energy system; represents the heat production of the energy supply device of the target park integrated energy system at the time instant; represents the heat production of the energy supply device of the target park integrated energy system at the time instant; This indicates that the energy supply equipment of the target park's integrated energy system is in Power consumption at any given moment; This indicates that the energy supply equipment of the target park's integrated energy system is in Power of auxiliary equipment at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Performance coefficients at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in The start / stop status at any given moment; This indicates that the energy supply equipment of the target park's integrated energy system is in The lower limit of heat production at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in The upper limit of heat production at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Performance coefficients at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Load rate at any given time; The operating constraints for the energy storage equipment in the target park's integrated energy system are set as follows: in, Indicates the type of energy storage equipment in the target park's integrated energy system; This represents the energy self-loss rate of the energy storage equipment in the target park's integrated energy system; This indicates that the energy storage equipment in the target park's integrated energy system is in Energy stored at any time; This indicates that the energy storage equipment in the target park's integrated energy system is in Energy stored at any time; This indicates that the energy storage equipment in the target park's integrated energy system is in The charging power at any given moment; This indicates that the energy storage equipment in the target park's integrated energy system is in The power output at any given moment; This indicates the charging efficiency of the energy storage equipment in the target park's integrated energy system; This indicates the energy release efficiency of the energy storage equipment in the target park's integrated energy system; This indicates that the energy storage equipment in the target park's integrated energy system is in The charging status indicator at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The constant energy release status indicator; This indicates the scheduling time interval of the integrated energy system of the target park; This indicates that the energy storage equipment in the target park's integrated energy system is in The lower limit of charging power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The upper limit of charging power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The lower limit of the energy release power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The upper limit of the energy release power at any given time; This indicates the upper limit of the energy storage capacity of the energy storage devices in the target park's integrated energy system; The system load supply and demand balance constraint condition of the target park's integrated energy system is set as follows: in, This indicates that the target park's integrated energy system is in The heat output of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The heat output power of the ground source heat pump at any given time; This indicates that the target park's integrated energy system is in The heating power of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The hot water supply power of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The heating capacity of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in The hot water storage tank's power output for hot water supply at any given time; This indicates that the target park's integrated energy system is in The charging power of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in The energy release capacity of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in System electrical load at any given time; This indicates that the target park's integrated energy system is in System heat load at any given time; This indicates that the target park's integrated energy system is in The system hot water load at any given time; This indicates that the target park's integrated energy system is in The power consumption of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The power consumption of a ground source heat pump at any given time; This indicates that the target park's integrated energy system is in The energy storage charging power at any given moment; This indicates that the target park's integrated energy system is in The power of electrical energy storage and release at any given moment; This indicates that the target park's integrated energy system is in Purchased power at any given time.

2. The method according to claim 1, characterized in that, The formulas for calculating the returns and risks of the day-ahead market and the real-time market at different time periods include: in, Represented as Expected market returns prior to the current timeframe; Represented as Real-time market expected returns; Represented as Electricity prices in the market prior to the time; Represented as Real-time market electricity prices; express Risks arising from electricity price fluctuations in the market prior to the timeframe; express The risks associated with real-time market fluctuations in electricity prices; N represents the total number of days in the historical data; Indicates the first in historical data sky Historical electricity prices in the market prior to the current date; Indicates the first in historical data sky Real-time historical electricity prices in the market.

3. The method according to claim 1, characterized in that, The formula for calculating the benefits and risks of the target park's integrated energy system participating in different market interactions includes: in, express The total cost of purchased electricity for the target park's integrated energy system at the specified time. This indicates the proportion of the target park's integrated energy system participating in the real-time market; This indicates the scheduling interval of the integrated energy system of the target park; express Risks arising from fluctuations in market electricity prices prior to the timeframe; express The risks associated with real-time fluctuations in market electricity prices; N represents the total number of days in the historical data; Indicates the first in historical data sky Historical electricity prices in the market prior to the current date; Indicates the first in historical data sky Real-time historical electricity prices in the market.

4. The method according to claim 1, characterized in that, The objective function that maximizes the profit includes: in, This represents a set of operational strategies for the target park's integrated energy system to participate in the market; express The target park's integrated energy system's electricity purchased from the day-ahead market at the specified time. express The target park's integrated energy system's purchased electricity from the real-time market at that time; This represents the start-up and shutdown penalty costs of different energy supply equipment in the target park's integrated energy system; express The start / stop status of different energy supply equipment in the target park's integrated energy system at any given time.

5. The method according to claim 1, characterized in that, The objective function that minimizes risk includes: in, This indicates the operational strategy for the target park's integrated energy system to participate in the market. Operational risks; The market indicated that the day before yesterday Time-of-use electricity pricing; Indicates real-time market Time-of-use electricity pricing; This indicates that the target park's integrated energy system is currently in the market. Electricity purchased from outside sources during a given period; This indicates that the target park's integrated energy system is in the real-time market. Electricity purchased from outside sources during a given period; This indicates that the market was in [a certain state] recently. Time-of-use electricity pricing and real-time market Correlation coefficients between time-of-use electricity prices; This indicates the time period during which the target park's integrated energy system participates in the real-time market; This indicates the time period during which the target park's integrated energy system participates in the day-ahead market.

6. The method according to claim 1, characterized in that, The objective function that maximizes utility includes: in, The utility function representing the target park's integrated energy system's participation in market-based electricity purchases; A represents the risk aversion coefficient of the target park's integrated energy system operation; This indicates that the market was in [a certain state] recently. Time-of-use electricity pricing and real-time market Correlation coefficients between time-of-use electricity prices; This indicates the time period during which the target park's integrated energy system participates in the real-time market; This indicates the time period during which the target park's integrated energy system participates in the day-ahead market; This indicates the operational strategy for the target park's integrated energy system to participate in the market. Operational risks; This indicates that the target park's integrated energy system participates in the day-ahead market. Risks during specific time periods; This indicates that the target park's integrated energy system participates in the real-time market. Risks during specific time periods; The market indicated that the day before yesterday Time-of-use electricity pricing; Indicates real-time market Time-of-use electricity pricing; This indicates that the target park's integrated energy system is currently in the market. Electricity purchased from outside sources during a given period; This indicates that the target park's integrated energy system is in the real-time market. Electricity purchased from outside sources during a given period; express The target park's integrated energy system's electricity purchased from the day-ahead market at the specified time. express The target park's integrated energy system's purchased electricity from the real-time market at that time; This represents the start-up and shutdown penalty costs of different energy supply equipment in the target park's integrated energy system; express The start / stop status of different energy supply equipment in the target park's integrated energy system at any given time.

7. A control device for the operation of an energy system in a park, characterized in that, include: The first determining unit is used to determine the energy supply structure, energy supply equipment, operating parameters of each energy supply equipment, historical day-ahead electricity price, historical real-time electricity price, predicted day-ahead electricity price for the operating day, and predicted real-time electricity price for the operating day of the comprehensive energy system of the target park. The second determining unit is used to determine the interactive operation constraints of the target park integrated energy system after setting the user risk preference coefficient of the target park integrated energy system, based on the energy supply structure of the target park integrated energy system and the operating parameters of each energy supply device. The interactive operation constraints of the target park integrated energy system include the operating constraints of the energy supply devices of the target park integrated energy system, the operating constraints of the energy storage devices of the target park integrated energy system, and the system load supply and demand balance constraints of the target park integrated energy system. The calculation unit is used to calculate the revenue and risk of the daytime market and the real-time market at different time periods based on the daytime historical electricity price value, the real-time historical electricity price value, the daytime predicted electricity price value of the operating day and the real-time predicted electricity price value of the operating day, as well as to calculate the revenue and risk of the target park's integrated energy system participating in the interactive operation of different markets. The third determining unit is used to determine the interactive operation scheduling scheme of the target park integrated energy system based on the interactive operation constraints of the target park integrated energy system, the benefits and risks of the target park integrated energy system participating in interactive operation in different markets, and the objective function selected by the user. The fourth determining unit is used to determine the scheduling plan of the target park integrated energy system within a scheduling cycle based on the interactive operation and scheduling scheme of the target park integrated energy system. The scheduling plan of the target park integrated energy system within a scheduling cycle includes the expected operating cost and cost fluctuation risk of the target park integrated energy system within a scheduling cycle, the total amount of electricity purchased by the target park integrated energy system in each time period and the market allocation, the operating conditions and functional power of each energy supply device in the target park integrated energy system, and the operating conditions and energy supply power of each energy storage device in the target park integrated energy system. The objective function selected by the user includes the objective function that maximizes the benefit, the objective function that minimizes the risk, and the objective function that maximizes the utility. The operational constraints of the energy supply equipment, the operational constraints of the energy storage equipment, and the system load supply-demand balance constraints of the integrated energy system of the target park include: The operating constraints for the energy supply equipment of the target park's integrated energy system are set as follows: in, This indicates the type of energy supply equipment in the target park's integrated energy system; This indicates that the energy supply equipment of the target park's integrated energy system is in The amount of heat generated at any given moment; This indicates that the energy supply equipment of the target park's integrated energy system is in Power consumption at any given moment; This indicates that the energy supply equipment of the target park's integrated energy system is in Power of auxiliary equipment at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Performance coefficients at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in The start / stop status at any given moment; This indicates that the energy supply equipment of the target park's integrated energy system is in The lower limit of heat production at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in The upper limit of heat production at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Performance coefficients at any given time; This indicates that the energy supply equipment of the target park's integrated energy system is in Load rate at any given time; The operating constraints for the energy storage equipment in the target park's integrated energy system are set as follows: in, Indicates the type of energy storage equipment in the target park's integrated energy system; This represents the energy self-loss rate of the energy storage equipment in the target park's integrated energy system; This indicates that the energy storage equipment in the target park's integrated energy system is in Energy stored at any time; This indicates that the energy storage equipment in the target park's integrated energy system is in Energy stored at any time; This indicates that the energy storage equipment in the target park's integrated energy system is in The charging power at any given moment; This indicates that the energy storage equipment in the target park's integrated energy system is in The power output at any given moment; This indicates the charging efficiency of the energy storage equipment in the target park's integrated energy system; This indicates the energy release efficiency of the energy storage equipment in the target park's integrated energy system; This indicates that the energy storage equipment in the target park's integrated energy system is in The charging status indicator at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The constant energy release status indicator; This indicates the scheduling time interval of the integrated energy system of the target park; This indicates that the energy storage equipment in the target park's integrated energy system is in The lower limit of charging power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The upper limit of charging power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The lower limit of the energy release power at any given time; This indicates that the energy storage equipment in the target park's integrated energy system is in The upper limit of the energy release power at any given time; This indicates the upper limit of the energy storage capacity of the energy storage devices in the target park's integrated energy system; The system load supply and demand balance constraint condition of the target park's integrated energy system is set as follows: in, This indicates that the target park's integrated energy system is in The heat output of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The heat output power of the ground source heat pump at any given time; This indicates that the target park's integrated energy system is in The heating power of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The hot water supply power of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The heating capacity of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in The hot water storage tank's power output for hot water supply at any given time; This indicates that the target park's integrated energy system is in The charging power of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in The energy release capacity of the hot water storage tank at any given time; This indicates that the target park's integrated energy system is in System electrical load at any given time; This indicates that the target park's integrated energy system is in System heat load at any given time; This indicates that the target park's integrated energy system is in The system hot water load at any given time; This indicates that the target park's integrated energy system is in The power consumption of the electric boiler at any given time; This indicates that the target park's integrated energy system is in The power consumption of a ground source heat pump at any given time; This indicates that the target park's integrated energy system is in The energy storage charging power at any given moment; This indicates that the target park's integrated energy system is in The power of electrical energy storage and release at any given moment; This indicates that the target park's integrated energy system is in Purchased power at any given time.

8. A device for controlling the operation of an energy system in a park, characterized in that, include: One or more processors, and memory; The memory stores computer-readable instructions, which, when executed by the one or more processors, implement the steps of the park energy system operation control method as described in any one of claims 1 to 6.

9. A readable storage medium, characterized in that: The readable storage medium stores computer-readable instructions, which, when executed by one or more processors, cause the one or more processors to implement the steps of the park energy system operation control method as described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Opportunity constraint planning-based commercial park comprehensive energy system optimization scheduling method

    CN110533225A

  • Risk-constrained Optimization of Virtual Power Plants in Pool and Future Markets

    US20220284458A1