A method for determining peak value of ecological regulation flow of a diversion-type power station
By determining the peak ecological dispatch flow in diversion-type power plants and combining habitat simulation and flow trend diagrams, the problem of balancing power generation and ecological benefits in the ecological dispatch of diversion-type power plants is solved. This provides a fast and effective method applicable to the engineering design and environmental protection measures of diversion-type power plants.
Patent Information
- Application Number
- CN202310669232.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-07
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-06-07
AI Technical Summary
Existing technologies fail to effectively consider both the economic and ecological benefits of hydroelectric power plants, and cannot take into account the mutual constraints between the two during ecological dispatch, resulting in ecological dispatch having a significant impact on the power plant's power generation benefits or insufficient ecological benefits.
By determining the multi-year average flow and full-capacity flow of the units at the dam site of the diversion power station, and combining the inflow during the spawning season of representative fish species, the minimum ecological water demand is calculated using the habitat simulation method. A trend chart of the flow fluctuation rate and cumulative power generation flow downstream of the dam is drawn, and the intersection point is found to determine the peak flow for ecological dispatch, so as to balance ecological and power generation benefits.
This method achieves the simultaneous consideration of power generation and ecological benefits of diversion power stations during ecological scheduling, and provides a simple and rapid method for determining peak flow, offering a reference for subsequent engineering design and environmental protection measures.
Smart Images

Figure CN116842862B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a method for determining the peak flow of ecological dispatching in a diversion-type power station, belonging to the field of water conservancy and hydropower engineering technology. Background Technology
[0002] Mitigating the adverse impacts of hydropower development on river ecosystems has always been a key focus of the industry. Scientific research and engineering practice have shown that optimizing the operation and scheduling of hydropower stations, and coordinating the ecological needs of the river ecosystem with the flood control and power generation functions of the stations, can mitigate the impact of power station operation on the river ecosystem. This scheduling method, which takes into account the ecological needs of the river, is called "ecological scheduling." Currently, research and application of ecological scheduling mainly focus on control cascade projects at the basin level. For example, the Three Gorges Reservoir improves the spawning conditions of the four major freshwater fish species in the middle reaches of the Yangtze River by freeing up its large regulating capacity before the flood season. Specifically, the scheduling method involves increasing the downstream flow during the spawning season to artificially create a significant rise in water levels in the downstream river channel, thereby meeting the hydrological requirements for the spawning and reproduction of these fish species. According to monitoring results, the ecological scheduling of the Three Gorges Reservoir has played a positive role in the population recovery of the four major freshwater fish species in the middle and lower reaches of the Yangtze River. Diversion-type hydropower stations typically have small reservoirs with virtually no regulation capacity. The diversion of water for power generation creates a reduced-flow section between the dam site and the hydropower station. Although ecological flow is released at the dam site, the flow rate remains relatively constant, causing the hydrological process of the reduced-flow section downstream of the dam to lose its natural rhythm. Since fish spawning requires certain flow fluctuations as a stimulus, it is necessary to consider implementing ecological regulation to create a specific hydrological process to meet the hydrological needs of fish during the spawning season in the reduced-flow section. For diversion-type hydropower stations, releasing all flow through the dam site during ecological regulation will significantly impact the power generation efficiency; conversely, releasing too little flow will affect the ecological benefits of ecological regulation. Therefore, it is necessary to comprehensively analyze the interrelationship between power generation efficiency and ecological benefits and develop a method for determining the peak flow rate suitable for ecological regulation in diversion-type hydropower stations.
[0003] Chinese patent document CN115689058A discloses a method for ecological scheduling of large reservoir projects. First, it determines the ecological habits and spawning habitat conditions of representative fish species in the protected river section. The river section where these representative fish species are distributed is selected as the protected section. A river hydrodynamic model is constructed to simulate the hydrological situation of this section under different hydrological conditions, including flow velocity and water depth. Based on long-term natural hydrological data, the frequency-based method is used to select ecological scheduling targets and propose preliminary requirements for the ecological scheduling scheme. The constructed hydrodynamic model is used to simulate the flow process proposed in the preliminary ecological scheduling scheme, calculating whether the flow velocity and water depth of the protected river section under different hydrological conditions can meet the spawning conditions of the representative fish species. After comparing habitat indicators and optimizing the scheme, the ecological scheduling requirements of the reservoir project in different typical years are determined, and a final recommended ecological scheduling scheme is derived. This method is suitable for the ecological scheduling needs of large reservoirs in different typical years and effectively protects the river ecosystem downstream of the reservoir dam.
[0004] However, this method is not applicable to run-of-river power plants, and while considering ecological benefits, it does not comprehensively consider the economic benefits of power generation. Summary of the Invention
[0005] To address the aforementioned technical problems, this invention provides a method for determining the peak flow of ecological dispatching in diversion-type power stations.
[0006] This invention is achieved through the following technical solution:
[0007] A method for determining the peak flow of an ecological dispatching hydropower station includes the following steps:
[0008] Step 1: Determine the multi-year average flow rate Q at the dam site of the diversion-type hydropower station. p and the full-capacity Q of the diversion-type power station unit m ;
[0009] Step 2: Identify the concentrated spawning period of representative fish species. Select the daily average natural inflow at the dam site of the hydroelectric power station during the concentrated spawning period of representative fish species in different typical years to form a population sample N.
[0010] Step 3: Using the habitat simulation method, calculate the minimum ecological water demand Q0 for representative fish species during their concentrated spawning period;
[0011] Step 4: Using the minimum ecological water demand flow rate Q0 as the baseline, and with the flow rate q as the increment, successively accumulate to obtain a series of equally spaced calculated flow rates Q. i (i = 0, 1, 2, 3...), and calculate the different computational flow rates Q. i The corresponding downstream flow fluctuation rate B and cumulative diversion power generation flow Q in the overall sample N z ;
[0012] Step 5: Analyze the downstream flow fluctuation rate B data sequence and the cumulative diversion power generation flow Q obtained in Step 4. z The data sequence is normalized, and then the flow rate Q is calculated. i The x-axis represents the normalized downstream flow fluctuation rate B data series, and the y-axis represents the normalized cumulative water diversion and power generation flow Q. z Using the data sequence as the secondary ordinate, plot the trend of the downstream flow fluctuation rate B and the cumulative water diversion for power generation Q. z Trend chart;
[0013] Step 6: Compare the downstream flow fluctuation rate B trend chart with the cumulative diversion power generation flow Q. z The flow value corresponding to the intersection of the trend chart is determined as the peak flow Q of the ecological dispatch flow of the diversion power station.
[0014] In step two, the daily average natural water flow at the dam site of the diversion power station during the concentrated spawning period of representative fish in years with abundant water, normal water, and dry water are selected to form a population sample N.
[0015] The method for calculating the minimum ecological water demand Q0 using habitat simulation in step three includes the following steps:
[0016] A. Establish a River2D planar hydrodynamic model based on shallow water equations;
[0017] B. Calculate representative fish species at different flow rates Q a The weighted usable area of the habitat A is then used to calculate the flow rate Q. a With the habitat-weighted usable area A as the x-axis and the habitat-weighted usable area A as the y-axis, an AQ structure is established. a Relationship curve;
[0018] C. Based on the AQ established in step B a The relationship curve uses the flow rate value corresponding to the inflection point of the curve as the minimum ecological water demand Q0 for representative fish during the concentrated spawning period.
[0019] The flow rate Q a Calculate using the following formula:
[0020] Q a =yQ p ;
[0021] Where y is the percentage of flow, and 0≤y≤1;
[0022] The weighted usable area A of the habitat is calculated according to the following formula:
[0023]
[0024] CSI i =V i ×D i ×C i ;
[0025] Where n is the number of computational units in the partition, CSI i The comprehensive habitat suitability value for each calculation unit, A i To calculate the area of a cell, V i D represents the suitability value for the flow rate. i is the suitability value for water depth, and Ci is the suitability value for the channel index.
[0026] Vi, D i The principles for determining the values of Vi and Ci are as follows: First, determine the range of preferred flow velocity, water depth, and channel index based on the ecological characteristics of representative fish species; if the calculated values of flow velocity, water depth, and channel index given by the River2D planar hydrodynamic model fall within the range of preferred flow velocity, water depth, and channel index, then Vi and D... i and C i The value corresponds to the calculated value given by the River2D planar hydrodynamic model, and vice versa. i D i and C i The value is 0.
[0027] In step four, the flow rate Q is calculated. i Calculate using the following formula:
[0028] Q i =Q0+i×q(i=1,2,3...);
[0029] Q i ≤Q p .
[0030] Different calculated flow rates Q in step four i The calculation method for the downstream flow fluctuation rate B in the overall sample N is as follows:
[0031] In the overall sample N, if the daily average natural water inflow is less than Q i Or greater than Q i With the full-load flow rate Q of the diversion power station unit m When the sum of these two values is equal, if the flow rate of the downstream diversion channel of a hydroelectric power station rises and falls synchronously with the daily average natural inflow, then the flow rate of the downstream diversion channel is considered to be fluctuating; otherwise, according to Q... i The downstream flow at the controlled dam site is not volatile; the number of days with volatility in the overall sample N is counted, and the percentage of these days out of the total sample N is calculated. This percentage is the downstream flow volatility B, expressed by the formula:
[0032]
[0033] Where n is the number of days with fluctuations in the overall sample N, and N1 is the number of samples in the overall sample N.
[0034] In step four, to ensure that the hydroelectric power station units maintain a certain power generation during the ecological dispatch period, an accumulated diversion power generation flow Q is introduced. z The power generation of a run-of-river power station is represented by the average daily natural water inflow Q. l Greater than Q i At that time, the run-of-river power station units can generate electricity normally until the full-capacity flow rate Q of the run-of-river power station units is reached. m The cumulative water diversion for power generation in the overall sample N during the ecological scheduling period is calculated as Q. z Calculate using the following formula:
[0035]
[0036] Among them, Q j This represents the average daily water diversion flow for power generation.
[0037] When Q l ≤Q i At that time, Q j =0;
[0038] When Q i <Q l ≤Q m +Q i At that time, Q j =Q l -Q i ;
[0039] When Q m +Q i <Q l At that time, Q j =Q m .
[0040] In step five, the downstream flow fluctuation rate B and the cumulative diversion and power generation flow Q are calculated according to the following formulas. z Normalization is performed:
[0041]
[0042] Where x represents the data before normalization; x' represents the data after normalization, x'∈[0,1], x max x represents the maximum value in the data sequence before normalization. min This is the minimum value in the data sequence before normalization.
[0043] Based on the peak ecological dispatch flow Q of the diversion power station determined in step six, the downstream flow at the dam site is controlled according to the following method:
[0044] When the natural inflow is less than the peak ecological dispatch flow Q of the diversion power station, the discharge flow at the dam site equals the natural inflow.
[0045] When the peak ecological dispatch flow of the diversion-type hydropower station Q ≤ natural inflow flow ≤ peak ecological dispatch flow of the diversion-type hydropower station Q + full-load flow Q m At that time, the discharge flow at the dam site equals the peak flow Q of the ecological dispatch flow of the diversion power station;
[0046] When the natural inflow rate is greater than the peak ecological dispatch flow rate of the diversion power station (Q) + the full-load flow rate (Q) m At that time, the discharge flow at the dam site = natural inflow flow - full discharge flow Q m .
[0047] The beneficial effects of this invention are as follows:
[0048] 1. Taking full account of the engineering characteristics of water diversion power stations, the flow fluctuation rate downstream of the dam is introduced to reflect the ecological benefits of ecological scheduling, and the cumulative water diversion power generation flow is introduced to reflect the power generation benefits of ecological scheduling. By finding their intersection, the peak flow during the ecological scheduling period is determined as the upper limit, which can simultaneously take into account the power generation benefits and ecological benefits of water diversion power stations.
[0049] 2. This method is simple in principle and can quickly determine the peak flow during the ecological scheduling of water diversion power stations, providing a reference for the subsequent engineering design and environmental protection measures of water diversion power stations. Attached Figure Description
[0050] Figure 1 This is the AQ curve for Example 1;
[0051] Figure 2 The following are trend charts of downstream flow fluctuation and cumulative diversion power generation flow for Example 1. Detailed Implementation
[0052] The technical solution of the present invention is further described below, but the scope of protection is not limited to what is described.
[0053] The present invention discloses a method for determining the peak flow of an ecological dispatching hydropower station, comprising the following steps:
[0054] Step 1: Determine the multi-year average flow rate Q at the dam site of the diversion-type hydropower station. p and the full-capacity Q of the diversion-type power station unit m .
[0055] Step 2: Identify the peak spawning period of representative fish species. Select the daily average natural inflow at the dam site of the diversion-type hydropower station during the peak spawning period of representative fish species in different typical years to form a population sample N. Determine the peak spawning period of representative fish species based on the fish survey results of the river section where the diversion-type hydropower station is located.
[0056] Step 3: Using the habitat simulation method, calculate the minimum ecological water demand Q0 for representative fish species during their concentrated spawning period.
[0057] Step 4: Using the minimum ecological water demand flow rate Q0 as the baseline, and with the flow rate q as the increment, successively accumulate to obtain a series of equally spaced calculated flow rates Q. i (i = 0, 1, 2, 3...), and calculate the different computational flow rates Q. i The corresponding downstream flow fluctuation rate B and cumulative diversion power generation flow Q in the overall sample N z .
[0058] Step 5: Analyze the downstream flow fluctuation rate B data sequence and the cumulative water diversion and power generation flow Q obtained in Step 4. z The data sequence is normalized, and then the flow rate Q is calculated. i The x-axis represents the normalized downstream flow fluctuation rate B data series, and the y-axis represents the normalized cumulative water diversion and power generation flow Q. z Using the data sequence as the secondary ordinate, plot the trend of the downstream flow fluctuation rate B and the cumulative water diversion for power generation Q. z Trend chart;
[0059] Step 6: Compare the downstream flow fluctuation rate B trend chart with the cumulative diversion power generation flow Q. z The flow value corresponding to the intersection of the trend chart is determined as the peak flow Q of the ecological dispatch flow of the diversion power station.
[0060] In step two, the daily average natural water flow at the dam site of the water diversion power station during the concentrated spawning period of representative fish in high-water, normal-water, and low-water years is selected to form a population sample N.
[0061] The method for calculating the minimum ecological water demand Q0 using habitat simulation in step three includes the following steps:
[0062] A. The method of increasing the flow rate in the river channel is adopted, specifically based on the shallow water equation to establish a River2D plane hydrodynamic model;
[0063] B. Calculate representative fish species at different flow rates Q a The weighted usable area of the habitat A is then used to calculate the flow rate Q. a With the habitat-weighted usable area A as the x-axis and the habitat-weighted usable area A as the y-axis, an AQ structure is established. a Relationship curve;
[0064] C. Based on the AQ established in step B a The relationship curve uses the flow rate value corresponding to the inflection point of the curve as the minimum ecological water demand Q0 for representative fish during the concentrated spawning period.
[0065] The flow rate Q a Calculate using the following formula:
[0066] Q a =yQ p ;
[0067] Where y is the percentage of flow, and 0≤y≤1;
[0068] The weighted usable area A of the habitat is calculated according to the following formula:
[0069]
[0070] CSI i =V i ×D i ×C i ;
[0071] Where n is the number of computational units in the partition, CSI i The comprehensive habitat suitability value for each calculation unit, A i To calculate the area of a cell, V i D represents the suitability value for the flow rate. i C represents the suitability value for water depth. i This is the suitability value for the channel index. When using it, the channel index takes into account the condition of the seabed and cover.
[0072] The V i D i and C i The principle for determining the value is as follows: first, determine the range of preferred flow velocity, water depth, and channel index based on the ecological characteristics of representative fish species; if the calculated values of flow velocity, water depth, and channel index given by the River2D planar hydrodynamic model fall within the range of preferred flow velocity, water depth, and channel index, then V i D i and C i The value corresponds to the calculated value given by the River2D planar hydrodynamic model, and vice versa. i D i and C i The value is 0.
[0073] In step four, the flow rate Q is calculated. i Calculate using the following formula:
[0074] Qi =Q0+i×q(i=1,2,3...);
[0075] Q i ≤Q p .
[0076] Different calculated flow rates Q in step four i The calculation method for the downstream flow fluctuation rate B in the overall sample N is as follows:
[0077] In the overall sample N, if the daily average natural water inflow is less than Q i Or greater than Q i With the full-load flow rate Q of the diversion power station unit m When the sum of these two values is equal, if the flow rate of the downstream diversion channel of a hydroelectric power station rises and falls synchronously with the daily average natural inflow, then the flow rate of the downstream diversion channel is considered to be fluctuating; otherwise, according to Q... i The downstream flow at the controlled dam site is not volatile; the number of days with volatility in the overall sample N is counted, and the percentage of these days out of the total sample N is calculated. This percentage is the downstream flow volatility B, expressed by the formula:
[0078]
[0079] Where n is the number of days with fluctuations in the overall sample N, and N1 is the number of samples in the overall sample N.
[0080] In step four, to ensure that the hydroelectric power station units maintain a certain power generation during the ecological dispatch period, an accumulated diversion power generation flow Q is introduced. z The power generation of a run-of-river power station is represented by the average daily natural water inflow Q. l Greater than Q i At that time, the run-of-river power station units can generate electricity normally until the full-capacity flow rate Q of the run-of-river power station units is reached. m The cumulative water diversion for power generation in the overall sample N during the ecological scheduling period is calculated as Q. z Calculate using the following formula:
[0081]
[0082] Among them, Q j This represents the average daily water diversion flow for power generation.
[0083] When Q l ≤Q i At that time, Q j =0;
[0084] When Q i <Q l ≤Q m +Q iAt that time, Q j =Q l -Q i ;
[0085] When Q m +Q i <Q l At that time, Q j =Q m .
[0086] In step five, the downstream flow fluctuation rate B and the cumulative diversion and power generation flow Q are calculated according to the following formulas. z Normalization is performed:
[0087]
[0088] Where x represents the data before normalization; x' represents the data after normalization, x'∈[0,1], x max x represents the maximum value in the data sequence before normalization. min This is the minimum value in the data sequence before normalization.
[0089] Based on the peak ecological dispatch flow Q of the diversion power station determined in step six, the downstream flow at the dam site is controlled according to the following method:
[0090] When the natural inflow is less than the peak ecological dispatch flow Q of the diversion power station, the discharge flow at the dam site equals the natural inflow.
[0091] When the peak ecological dispatch flow of the diversion-type hydropower station Q ≤ natural inflow flow ≤ peak ecological dispatch flow of the diversion-type hydropower station Q + full-load flow Q m At that time, the discharge flow at the dam site equals the peak flow Q of the ecological dispatch flow of the diversion power station;
[0092] When the natural inflow rate is greater than the peak ecological dispatch flow rate of the diversion power station (Q) + the full-load flow rate (Q) m At that time, the discharge flow at the dam site = natural inflow flow - full discharge flow Q m .
[0093] Example 1:
[0094] The following example uses a diversion-type hydropower station in Southwest China as an example to illustrate a method for determining the peak flow of ecological dispatching in a diversion-type hydropower station. The specific implementation steps are as follows:
[0095] Step 1: Multi-year average flow rate Q at the power station dam site p 948m 3 / s, full-capacity power generation of the power plant unit Q m 1230m 3 / s;
[0096] Step 2: Based on the results of several aquatic ecological surveys, the concentrated spawning periods for representative fish species are from March 15 to April 30 and from September 1 to September 30, totaling 231 days. The daily average natural water inflow during March 15 to April 30 and from September 1 to September 30 are selected from typical high-water years (P=10%), normal-water years (P=50%), and low-water years (P=90%) to form a population sample N.
[0097] Step 3: Determine the minimum ecological water demand Q0 for representative fish species during their peak spawning season using habitat simulation method:
[0098] Because human disturbance was minimal and the river channel remained undisturbed in the study section, the impact of substrate and cover on species abundance and distribution was not considered; therefore, the channel index was set to 1, and only the effects of water depth and flow velocity were taken into account. Based on relevant research, representative fish species preferred water depths ranging from 0.5 to 1.5 m and flow velocities ranging from 0.5 to 2.0 m / s, respectively, using the multi-year average flow rate Q at the dam site as a reference. p Using 7.5%, 10%, 15%, 20%, 30%, 35%, 40%, 45%, 50%, and 60% as the calculated flow rates, AQ curves for representative fish species were obtained, as shown in the attached figure. Figure 1 As shown, by appendix Figure 1 The inflection point yielded a minimum ecological water demand Q0 of 379.2 m³ for representative fish species during their peak spawning season. 3 / s.
[0099] Step 4: Using the minimum ecological water demand flow rate Q0 as the benchmark, with a flow rate q = 50 m³ / h 3 / s is the increment, resulting in a series of calculated flows Q. i (i = 1, 2, 3 ...), and calculate the computational flow rate Q. i The corresponding downstream flow fluctuation rate B and cumulative diversion power generation flow Q z As shown in Table 1:
[0100] Table 1. Downstream flow fluctuation rate and cumulative water diversion for power generation corresponding to different calculated flow rates.
[0101]
[0102]
[0103] Step 5: Normalize the downstream flow fluctuation rate B and the cumulative diversion power generation flow Qz using the following formula:
[0104]
[0105] The normalized data are shown in Table 2:
[0106] Table 2 normalizes the downstream flow fluctuation rate and cumulative diversion power generation flow for different calculated flow rates.
[0107]
[0108] To calculate the flow rate Q i (i = 0, 1, 2, 3...) is the x-axis, the normalized downstream flow fluctuation B data series is the y-axis, and the normalized cumulative water diversion for power generation Q is the y-axis. z Using the data sequence as the secondary ordinate, plot different flow rates Q. i The following are the trend charts of downstream flow fluctuation rate and cumulative diversion power generation flow rate under (i = 0, 1, 2, 3...): Figure 2 As shown.
[0109] Step Six: From the attached Figure 2 Read the downstream flow fluctuation rate B data sequence and the cumulative water diversion power generation flow Q. z The flow rate value corresponding to the intersection of the data sequences is determined as the peak flow rate Q for the ecological dispatching of the diversion-type hydropower station. In this embodiment, the peak flow rate Q for the ecological dispatching of the diversion-type hydropower station is determined to be 558.6 m³. 3 / s, meaning the natural inflow is less than 558.6m³. 3 When the flow rate is / s, the discharge at the dam site is controlled according to the actual inflow; the natural inflow is greater than or equal to 558.6m³ / s. 3 / s, less than or equal to 1788.6m 3 At a speed of / s, the dam site is at 558.6m. 3 / s control decentralization; natural inflow greater than 1788.6m³ 3 At a flow rate of / s, while ensuring that the diversion turbines operate at full capacity, the remaining flow is discharged from the dam site.
Claims
1. A method for determining the peak flow of an ecologically controlled hydroelectric power station, characterized in that: Includes the following steps: Step 1: Determine the multi-year average flow rate at the dam site of the diversion-type hydropower station. Q p and the full-capacity of the diversion-type power station unit Q m ; Step 2: Identify the peak spawning period of representative fish species. Select the daily average natural inflow at the dam site of the hydroelectric power station during the peak spawning period of representative fish species in different typical years to form a population sample. N ; Step 3: Using habitat simulation, calculate the minimum ecological water demand for representative fish species during their peak spawning season. Q 0 ; Step 4: Using the minimum ecological water demand flow rate Q 0 Based on flow rate q As an increment, a series of equally spaced calculated flow rates are obtained by sequentially accumulating these values. Q i , i =0, 1, 2, 3... and calculate the different computational flows. Q i In the overall sample N The corresponding downstream flow fluctuation rate B and cumulative diversion power generation flow Q z ; Calculating the flow rate in step four Q i Calculate using the following formula: , i =1,2,3……; ; Different calculation flows in step four Q i In the overall sample N The corresponding downstream flow fluctuation rate B The calculation method is as follows: In the overall sample N In the middle, if the average daily natural water inflow is less than Q i or greater than Q i With the full-flow rate of the diversion power station unit Q m When the sum of these two values is equal, and the flow rate of the downstream diversion channel of a hydroelectric power station rises and falls synchronously with the daily average natural inflow, then the flow rate of the downstream diversion channel is considered to be fluctuating; otherwise, according to... Q i Controlling the discharge flow at the dam site ensures it remains stable; statistical analysis of the overall sample is performed. N The number of days with volatility was calculated as a percentage of the total sample. N The percentage of the sample size is the downstream flow fluctuation rate. B This can be expressed as a formula: ; in, n For the overall sample N The number of days with fluctuations N 1 represents the overall sample. N The number of samples in; In step four, to ensure that the hydroelectric power station units maintain a certain power generation during the ecological dispatch period, the accumulated diverted water power generation flow is introduced. Q z This represents the power generation of a run-of-river power station unit, which is the average daily natural water inflow. Q l Greater than Q i At that time, the run-of-river power station units can generate electricity normally until they reach the full power generation capacity of the run-of-river power station units. Q m Overall sample during the statistical ecological scheduling period N Cumulative value of water diversion for power generation, cumulative water diversion for power generation Q z Calculate using the following formula: ; in, Q j This represents the average daily water diversion flow for power generation. when Q l ≤ Q i hour, Q j =0; when Q i < Q l ≤ Q m + Q i hour, Q j = Q l - Q i ; when Q m + Q i < Q l hour, Q j = Q m ; Step 5: Analyze the downstream flow fluctuation rate obtained in Step 4. B Data sequences and cumulative diversion power generation flow Q z The data sequence is normalized, and then the flow is calculated. Q i The x-axis is... i =0, 1, 2, 3..., representing the normalized downstream flow fluctuation rate. B The data sequence is the main vertical axis, with the normalized cumulative water diversion and power generation flow as the horizontal axis. Q z Using the data sequence as the secondary ordinate, plot the downstream flow fluctuation rate. B Trend chart and cumulative hydropower generation flow Q z Trend chart; Step 6: Calculate the downstream flow fluctuation rate. B Trend chart and cumulative hydropower generation flow Q z The flow value corresponding to the intersection of the trend chart is determined as the peak flow for ecological dispatching of the hydroelectric power station. Q。 2. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 1, characterized in that: In step two, the daily average natural inflow at the dam site of the diversion-type hydropower station during the peak spawning seasons of representative fish species in high-water, normal-water, and low-water years is selected to form a general sample. N .
3. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 1, characterized in that: In step three, the habitat simulation method is used to calculate the minimum ecological water demand. Q 0 The method includes the following steps: A. Establish a River2D planar hydrodynamic model based on shallow water equations; B. Calculate representative fish species at different flow rates Q a Weighted available area of habitat A Then by traffic Q a The horizontal axis represents the habitat-weighted usable area. A Establish a y-axis as the vertical axis. A - Q a Relationship curve; C. Based on the establishment in step B A - Q a The relationship curve uses the flow rate corresponding to the inflection point of the curve as the minimum ecological water requirement for representative fish species during their peak spawning season. Q 0 .
4. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 3, characterized in that: The flow Q a Calculate using the following formula: Q a = yQ p ; in, y The percentage is the flow rate, and 0 ≤ y ≤1; The weighted available area of the habitat A Calculate using the following formula: ; ; in, n The number of computational units is the number of units to be divided. CSI i The overall habitat suitability value for each calculation unit, A i To calculate the area of the unit, V i The suitable value for the flow rate, D i This represents the suitability value for water depth. C i This is the suitability value of the river channel index.
5. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 4, characterized in that: The V i , D i and C i The principle for determining the values is as follows: First, determine the range of preferred flow velocity, water depth, and channel index based on the ecological characteristics of representative fish species; if the calculated values of flow velocity, water depth, and channel index given by the River2D planar hydrodynamic model fall within the range of preferred flow velocity, water depth, and channel index, then... V i , D i and C i The value corresponds to the calculated value given by the River2D planar hydrodynamic model, and vice versa. V i , D i and C i The value is 0.
6. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 1, characterized in that: In step five, the downstream flow fluctuation rate is calculated using the following formula. B and cumulative diversion power generation flow Q z Normalization is performed: in, x The data before normalization; x 'This is the data after normalization.' x '∈[0,1], x max The maximum value in the data sequence before normalization; x min This is the minimum value in the data sequence before normalization.
7. The method for determining the peak flow of ecological dispatching in a diversion-type hydropower station as described in claim 1, characterized in that: Based on the peak ecological dispatch flow of the diversion power station determined in step six. Q The discharge flow at the dam site shall be controlled using the following methods: When the natural inflow is less than the peak ecological dispatch flow of the diversion power station Q At that time, the discharge flow at the dam site equals the natural inflow flow; When the peak flow of the ecological dispatching hydropower station Q ≤Natural inflow flow≤Peak flow rate of ecological dispatching power station Q+ Full flow Q m At that time, the discharge flow at the dam site equals the peak value of the ecological dispatch flow of the diversion power station. Q ; When the natural inflow rate is greater than the peak ecological dispatch flow rate of the diversion power station Q+ Full flow Q m At that time, the discharge flow at the dam site = natural inflow flow - full discharge flow. Q m .
Citation Information
Patent Citations
Method for determining ecological scheduling of large reservoir project
CN115689058A
Branch alternative habitat construction method based on dam dismantling and local micro-landform manual intervention
CN111651895A
Hydropower station discharged ecological flow evaluation method and device, storage medium and equipment
CN115423182A