Data-driven substation building information model generation method and device

By acquiring the basic information of the substation model, determining the component information of the substation model to be built, and conducting simulation tests, a building information model that meets the standards is generated, which solves the problem of low efficiency in the application of traditional models and improves the efficiency and quality of substation construction.

CN116882008BActive Publication Date: 2026-11-24GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310808931.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-04
Publication Date
2026-11-24
Estimated Expiration
2043-07-04

AI Technical Summary

Technical Problem

Traditional substation simulation construction models are highly specialized when assisting in the construction of substations, resulting in low work efficiency and difficulty in effectively utilizing model data.

Method used

By acquiring basic information about the substation model, including geographical data, scene data, and electrical design data, the component information of the substation model to be built is determined, an initial building information model is generated, and simulation tests are conducted to ensure that the component information passes the tests before it is used as the substation building information model.

Benefits of technology

This improved the efficiency and design quality of substation construction, ensuring that model data could be effectively used during the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116882008B_ABST
    Figure CN116882008B_ABST
Patent Text Reader

Abstract

This application relates to a data-driven method and apparatus for generating building information models (BIMs) for substations. The method includes: responding to a construction task of a target substation and obtaining basic model information of the substation to be built corresponding to the target substation; determining the component information of each substation model to be built based on geographical data, scene data, and electrical design data; determining the substation model data based on the component information of each substation model to be built; generating an initial substation BIM model based on the geographical data, scene data, electrical design data, and the substation model data; conducting simulation tests on the component information of each initial BIM model to obtain test results for each model; and, if the test results of each model indicate that the component information of the initial BIM model has passed the test, using the initial substation BIM model as the substation BIM model of the target substation. This method can improve the efficiency of substation construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of computer technology, and in particular to a data-driven method, apparatus, computer equipment, storage medium, and computer program product for generating building information models of substations. Background Technology

[0002] With the development of computer technology, smart grids have emerged. In the specific construction phase of smart grids, the requirements for substation engineering design are becoming increasingly stringent. With the continuous improvement of science and technology, simulation construction models for substations have also been widely used.

[0003] In traditional technology, the simulation construction model of substation is usually developed using existing power 3D simulation application software. However, the developed simulation construction model of substation is highly specialized and difficult to effectively apply when assisting in the construction of substations, resulting in low efficiency in using the simulation construction model to assist in the construction of substations. Summary of the Invention

[0004] Therefore, it is necessary to provide a data-driven method, apparatus, computer equipment, computer-readable storage medium, and computer program product for generating substation building information models that can effectively apply model data when assisting in the construction of substations and improve the efficiency of substation construction.

[0005] In a first aspect, this application provides a data-driven method for generating a substation building information model. The method includes: responding to a construction task of a target substation, obtaining basic model information of a substation model to be built corresponding to the target substation; the basic model information includes geographic data, scene data, and electrical design data; determining the information of each substation model component corresponding to the substation model to be built based on the geographic data, the scene data, and the electrical design data; determining the substation model data based on the information of each substation model component; generating an initial substation building information model corresponding to the target substation based on the geographic data, the scene data, the electrical design data, and the substation model data; the initial substation building information model includes at least one initial building information model component; performing simulation tests on each initial building information model component to obtain model test results corresponding to each initial building information model component; and, if all model test results indicate that the initial building information model component has passed the test, using the initial substation building information model as the substation building information model of the target substation.

[0006] Secondly, this application also provides a data-driven substation building information model generation device. The device includes: a model data acquisition module, used to respond to the construction task of the target substation and acquire basic model information of the substation to be built corresponding to the target substation; the basic model information includes geographical data, scene data, and electrical design data; a first model determination module, used to determine the information of each substation to be built model component corresponding to the substation to be built model based on the geographical data, the scene data, and the electrical design data, and to determine the substation to be built model data based on the information of each substation to be built model component; a second model determination module, used to generate an initial substation building information model corresponding to the target substation based on the geographical data, the scene data, the electrical design data, and the substation to be built model data; the initial substation building information model includes at least one initial building information model component information; a building model testing module, used to perform simulation tests on each initial building information model component information to obtain model test results corresponding to each initial building information model component information; and a building model determination module, used to use the initial substation building information model as the substation building information model of the target substation when all the model test results indicate that the initial building information model component information has passed the test.

[0007] Thirdly, this application also provides a computer device. The computer device includes a memory and a processor. The memory stores a computer program, and the processor, when executing the computer program, performs the following steps: responding to a construction task of a target substation, obtaining basic model information of a substation model to be built corresponding to the target substation; the basic model information includes geographical data, scene data, and electrical design data; determining the information of each substation model component corresponding to the substation model to be built based on the geographical data, the scene data, and the electrical design data, and determining the substation model data based on the information of each substation model component; generating an initial substation building information model corresponding to the target substation based on the geographical data, the scene data, the electrical design data, and the substation model data; the initial substation building information model includes at least one initial building information model component; performing simulation tests on each initial building information model component to obtain model test results corresponding to each initial building information model component; and, if all model test results indicate that the initial building information model component has passed the test, using the initial substation building information model as the substation building information model of the target substation.

[0008] Fourthly, this application also provides a computer-readable storage medium. The computer-readable storage medium stores a computer program thereon, which, when executed by a processor, performs the following steps: responding to a construction task of a target substation, obtaining basic model information of a substation model to be built corresponding to the target substation; the basic model information includes geographic data, scene data, and electrical design data; determining the information of each substation model component corresponding to the substation model to be built based on the geographic data, the scene data, and the electrical design data, and determining the substation model data based on the information of each substation model component; generating an initial substation building information model corresponding to the target substation based on the geographic data, the scene data, the electrical design data, and the substation model data; the initial substation building information model includes at least one initial building information model component; performing simulation tests on each initial building information model component to obtain model test results corresponding to each initial building information model component; and, if all model test results indicate that the initial building information model component has passed the test, using the initial substation building information model as the substation building information model of the target substation.

[0009] Fifthly, this application also provides a computer program product. The computer program product includes a computer program that, when executed by a processor, performs the following steps: responding to a construction task of a target substation, obtaining basic model information of a substation model to be built corresponding to the target substation; the basic model information includes geographical data, scene data, and electrical design data; determining the information of each substation model component corresponding to the substation model to be built based on the geographical data, the scene data, and the electrical design data, and determining the substation model data based on the information of each substation model component; generating an initial substation building information model corresponding to the target substation based on the geographical data, the scene data, the electrical design data, and the substation model data; the initial substation building information model includes at least one initial building information model component; performing simulation tests on each initial building information model component to obtain model test results corresponding to each initial building information model component; and, if all model test results indicate that the initial building information model component has passed the test, using the initial substation building information model as the substation building information model of the target substation.

[0010] The aforementioned data-driven method, apparatus, computer equipment, storage medium, and computer program product for generating substation building information models (BIMs) involve obtaining basic model information of a substation to be built corresponding to the target substation by responding to the construction task of the target substation. This basic model information includes geographic data, scene data, and electrical design data. Based on the geographic data, scene data, and electrical design data, the information of each component of the substation to be built model is determined, and the model data is determined based on the component information. An initial substation BIM model corresponding to the target substation is generated based on the geographic data, scene data, electrical design data, and the substation model data. This initial BIM model includes at least one initial BIM model component. Simulation tests are performed on each initial BIM model component to obtain model test results. If all model test results indicate that the initial BIM model component has passed the test, the initial BIM model is used as the substation BIM model for the target substation.

[0011] By acquiring geographical data, scene data, and electrical design data of the substation model to be built, the information of each component of the substation model to be built is determined, and the substation model data is further determined. An initial substation building information model is generated by combining the geographical data, scene data, electrical design data, and the substation model data. When all components of the initial substation building information model pass testing, the initial substation building information model is used as the substation building information model for the target substation. Through parametric design of the substation model components, driven modeling is achieved, enabling the effective application of model data in assisting substation construction, thereby improving the efficiency and design quality of substation construction. Attached Figure Description

[0012] Figure 1 This is an application environment diagram of a data-driven substation building information model generation method in one embodiment;

[0013] Figure 2 This is a flowchart illustrating a data-driven substation building information model generation method in one embodiment.

[0014] Figure 3 This is a flowchart illustrating a method for obtaining model test results in one embodiment;

[0015] Figure 4 This is a flowchart illustrating a method for obtaining the building information model of a target substation in one embodiment.

[0016] Figure 5This is a flowchart illustrating the method for obtaining the building information model of the target substation in another embodiment;

[0017] Figure 6 This is a flowchart illustrating the method for generating an initial substation building information model in one embodiment;

[0018] Figure 7 This is a flowchart illustrating a method for obtaining model-integrated coordinate data in one embodiment;

[0019] Figure 8 This is a structural block diagram of a data-driven substation building information model generation device in one embodiment.

[0020] Figure 9 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0022] This application provides a data-driven method for generating substation building information models, which can be applied to, for example... Figure 1In the application environment shown, terminal 102 communicates with server 104 via a network. A data storage system can store the data that server 104 needs to process. The data storage system can be integrated onto server 104, or it can be located in the cloud or on another network server. Server 104, responding to the construction task of the target substation from terminal 102, obtains the basic model information of the substation to be built corresponding to the target substation. The basic model information includes geographic data, scene data, and electrical design data. Based on the geographic data, scene data, and electrical design data, it determines the information of each component of the substation model to be built, and determines the substation model data based on the component information. Based on the geographic data, scene data, electrical design data, and substation model data, it generates an initial substation building information model corresponding to the target substation. The initial substation building information model includes at least one initial building information model component. Simulation tests are performed on each initial building information model component to obtain the model test results corresponding to each component. If all model test results indicate that the initial building information model component has passed the test, the initial substation building information model is used as the substation building information model of the target substation. Terminal 102 can be, but is not limited to, various personal computers, laptops, smartphones, tablets, IoT devices, and portable wearable devices. IoT devices can include smart speakers, smart TVs, smart air conditioners, smart vehicle devices, etc. Portable wearable devices can include smartwatches, smart bracelets, and head-mounted devices. Server 104 can be implemented using a standalone server or a server cluster consisting of multiple servers.

[0023] In one embodiment, such as Figure 2 As shown, a data-driven method for generating substation building information models is provided, which can be applied to... Figure 1 Taking the server in the example, the following steps are included:

[0024] Step 202: Respond to the construction task of the target substation and obtain the basic model information of the substation model to be built corresponding to the target substation.

[0025] The target substation can be a physical substation that needs to be built according to the needs of power grid construction.

[0026] Among them, the model of the substation to be built can be a BIM model of the substation based on the original data constructed according to the construction requirements of the target substation.

[0027] The basic model information can be the fundamental information within the model of the substation to be built. This basic information includes geographic data, scene data, and electrical design data. Geographic data can be geographic information corresponding to the substation model, such as latitude, longitude, altitude, and orientation. Scene data can be actual application data of the application scenario corresponding to the substation model. Electrical design data can be a set of data corresponding to the design of various electrical components in the substation model.

[0028] Specifically, in response to the construction task instruction of the target substation from the terminal, the server obtains the basic model information of the substation to be built corresponding to the target substation from the terminal. This basic model information includes geographic data, scene data, and electrical design data. The server stores the acquired geographic data, scene data, and electrical design data in a storage unit. When the server needs to process the geographic data, scene data, and electrical design data, it retrieves them from the storage unit to volatile storage resources for the central processing unit (CPU) to perform calculations. The geographic data, scene data, and electrical design data can be input to the CPU individually or simultaneously.

[0029] Step 204: Based on geographical data, scene data, and electrical design data, determine the information of each component of the substation model to be built, and based on the information of each component of the substation model to be built, determine the substation model data.

[0030] Among them, the component information of the substation model to be built can be the component information corresponding to each component that makes up the substation model to be built.

[0031] Among them, the model data of the substation to be built can be various parameters used to construct a complete model of the substation to be built.

[0032] Specifically, based on the various geographical data, scene data, and electrical design data in the model of the substation to be built, various substation model components that implement the functions of the model are constructed, and each substation model component has corresponding component information; further, the various substation model components are assembled according to preset rules, and based on the corresponding component information of each substation model component, the substation model data corresponding to the substation model is determined.

[0033] Step 206: Generate the initial substation building information model corresponding to the target substation based on geographical data, scene data, electrical design data, and model data of the substation to be built.

[0034] The initial substation building information model can be a substation BIM model in which each model component has not undergone simulation testing.

[0035] Specifically, since a corresponding preset scene model library is set up for each task of building a substation model to be constructed, meaning that there are multiple scene models corresponding to any given substation model, the scene model with the highest matching degree is selected from the preset scene model library based on geographical data and scene data. This scene model is used to construct the scene model of the substation model to be constructed, and the scene model data of the substation model to be constructed is read from it. Further, the basic coordinate system in the substation model to be constructed is initialized, resulting in an initialized basic coordinate system. The scene model data and the substation model data are then transformed into the initialized basic coordinate system to obtain the comprehensive model coordinate data, which includes scene coordinate data and model coordinate data. The connection relationship between the scene coordinate data and the model coordinate data is configured, and the initial substation building information model is generated in conjunction with the electrical design data.

[0036] Step 208: Simulate and test the information of each initial building information model component to obtain the model test results corresponding to each initial building information model component information.

[0037] The initial building information model component information can be the component information corresponding to each initial building information model component that constitutes the initial substation building information model.

[0038] Among them, the model test results can be the results of whether the initial building information model component information passes the simulation test.

[0039] Specifically, simulated collision tests are performed on each initial building information model component. That is, collision tests are conducted on each initial building information model component separately, and the corresponding information model collision test data is output. For each initial building information model component, there is collision test standard data that meets the requirements of that initial building information model component. Therefore, within the same dimension of the initial building information model component, the information model collision test data is compared with the corresponding collision test standard data to obtain one of the model test results. By comparing all the initial building information model components, the test results of each model can be obtained.

[0040] Step 210: If the test results of each model indicate that the initial building information model component information has passed the test, the initial substation building information model shall be used as the substation building information model of the target substation.

[0041] Among them, the substation building information model can be an initial substation building information model in which all initial building information model component information has passed the test.

[0042] Specifically, if the model test results corresponding to each initial building information model component information all indicate that the initial building information model component information has passed the test, that is, if the collision test results of the initial building information model component information meet the collision test standard data, then the initial substation building information model composed of each initial building information model component information will be used as the substation building information model of the target substation.

[0043] If at least one initial building information model component information has a model test result indicating that the initial building information model component information has failed the test, that is, if the collision test result of the initial building information model component information fails to meet the collision test standard data, for each initial building information model component information that fails the collision test, at least one backup building information model component information is selected from the preset building information model database to replace the initial building information model component information that fails the collision test.

[0044] Furthermore, the backup building information model component with the highest component similarity among the backup building information model components is selected to replace the initial building information model component that failed the test. Thus, the initial substation building information model becomes the updated substation building information model. Based on the updated substation building information model, the process returns to the previous steps: "Perform simulated collision tests on each initial building information model component separately, i.e., output corresponding information model collision test data for each initial building information model component; for each initial building information model component, there is collision test standard data that meets the requirements of that initial building information model component. Therefore, within the same initial building information model component dimension, compare the information model collision test data with the corresponding collision test standard data to obtain one model test result; compare all initial building information model components." This process yields the simulated collision test results.

[0045] If the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information passes the test, that is, if the collision test result of the backup building information model component information meets the collision test standard data, then the substation building information model will be updated as the substation building information model of the target substation.

[0046] If the simulated collision test result for the backup building information model (BIM) component indicates that the backup BIM component failed the test, meaning its collision test result did not meet the collision test standard data, then the backup BIM component used for testing is deleted. The process then returns to the previous step of "selecting the backup BIM component with the highest component similarity among all backup BIM components to replace the initial BIM component that failed the test; thus, the initial substation BIM model becomes the updated substation BIM model." This continues until the simulated collision test result for the backup BIM component indicates that it passed the test. Then, the updated substation BIM model is used as the target substation BIM model. Finally, the target substation BIM model is stored and then holographically displayed. The substation BIM model includes information from each of its components.

[0047] In the aforementioned data-driven substation building information model generation method, basic model information of the substation to be built corresponding to the target substation is obtained by responding to the construction task of the target substation. This basic model information includes geographic data, scene data, and electrical design data. Based on the geographic data, scene data, and electrical design data, the information of each component of the substation to be built model is determined, and the model data is determined based on the component information. An initial substation building information model corresponding to the target substation is generated based on the geographic data, scene data, electrical design data, and the model data. This initial substation building information model includes at least one initial building information model component. Simulation tests are performed on each initial building information model component to obtain the model test results corresponding to each component. If all model test results indicate that the initial building information model component has passed the test, the initial substation building information model is used as the substation building information model of the target substation.

[0048] By acquiring geographical data, scene data, and electrical design data of the substation model to be built, the information of each component of the substation model to be built is determined, and the substation model data is further determined. An initial substation building information model is generated by combining the geographical data, scene data, electrical design data, and the substation model data. When all components of the initial substation building information model pass testing, the initial substation building information model is used as the substation building information model for the target substation. Through parametric design of the substation model components, driven modeling is achieved, enabling the effective application of model data in assisting substation construction, thereby improving the efficiency and design quality of substation construction.

[0049] In one embodiment, such as Figure 3 As shown, simulation tests were conducted on the information of each initial building information model component to obtain the model test results corresponding to each initial building information model component information, including:

[0050] Step 302: Conduct a simulated collision test on the information of each initial building information model component to obtain the information model collision test data corresponding to each initial building information model component information.

[0051] Among them, simulated collision testing can be used to test the model on simulation software to understand the model's impact resistance under collision conditions.

[0052] Among them, the information model collision test data can be the test data generated after simulating collision tests on the initial building information model component information, which can reflect the deformation, elongation, etc. of the initial building information model component information.

[0053] Specifically, simulated collision tests are performed on each initial building information model component information, that is, collision tests are performed on each initial building information model component information and the corresponding information model collision test data is output.

[0054] Step 304: Compare the collision test data of each information model with the collision test standard data corresponding to the information of each initial building information model component to obtain the test results of each model.

[0055] Among them, the collision test standard data can be a standard used to evaluate the collision test data of the information model.

[0056] Specifically, for each initial building information model component, there is collision test standard data that meets the requirements of that initial building information model component. Therefore, within the same dimension of initial building information model component information, the information model collision test data is compared with the corresponding collision test standard data to obtain one of the model test results; by comparing all the initial building information model component information, the test results of each model can be obtained.

[0057] In this embodiment, by conducting simulated collision tests on the information of each initial building information model component and comparing the data obtained from the collision tests with standard data, it can be ensured that different aspects of the initial substation building information model meet the mechanical performance requirements, so that the substation building information model obtained through the initial substation building information model can provide correct simulation data for the construction of the target substation.

[0058] In one embodiment, such as Figure 4 As shown, the method also includes:

[0059] Step 402: If at least one initial building information model component fails the test in any of the model test results, select at least one backup building information model component from the preset building information model database for any initial building information model component that fails the test.

[0060] Among them, the building information model database can be a database for replacing component information when collision anomalies occur in the information of various initial building information model components in the initial substation building information model.

[0061] Among them, the backup building information model component information can be the component information in the building information model database used to replace the initial building information model component information.

[0062] Specifically, if the model test result corresponding to at least one initial building information model component information indicates that the initial building information model component information has failed the test, that is, if the collision test result of the initial building information model component information fails to meet the collision test standard data, for each initial building information model component information that fails the collision test, at least one backup building information model component information is selected from the preset building information model database to replace the initial building information model component information that fails the collision test.

[0063] Step 404: Based on the similarity of each component, select one of the backup building information model components to replace the initial building information model component information that failed the test, and obtain the target substation building information model.

[0064] Component similarity can be the data similarity between information of two components.

[0065] Specifically, the backup building information model component with the highest similarity among the backup building information model components is selected to replace the initial building information model component that failed the test. This transforms the initial substation building information model into an updated substation building information model. Based on the updated substation building information model, the process returns to the previous steps: "Perform simulated collision tests on each initial building information model component separately, i.e., output corresponding information model collision test data for each initial building information model component; for each initial building information model component, there is collision test standard data that meets the requirements of that initial building information model component. Therefore, within the same initial building information model component dimension, compare the information model collision test data with the corresponding collision test standard data to obtain one model test result; compare all initial building information model components." This process yields the simulated collision test results.

[0066] If the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information passes the test, that is, if the collision test result of the backup building information model component information meets the collision test standard data, then the substation building information model will be updated as the substation building information model of the target substation.

[0067] If the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information has failed the test, that is, if the collision test result of the backup building information model component information fails to meet the collision test standard data, then the backup building information model component information just used for testing will be deleted, and the process will return to the step of "selecting the backup building information model component information with the maximum component similarity among the backup building information model component information to replace the initial building information model component information that failed the test, so that the initial substation building information model becomes the updated substation building information model", until the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information has passed the test, then the updated substation building information model will be used as the substation building information model of the target substation.

[0068] In this embodiment, by utilizing the component similarity between the initial building information model component information that failed the test and the backup building information model component information, backup building information model component information for replacing the initial building information model component information that failed the test is determined. This allows for the elimination of the need to rebuild the building information model when the initial building information model has defects, thus improving the efficiency of model safety assessment.

[0069] In one embodiment, such as Figure 5 As shown, based on the similarity of each component, one of the backup building information model components is selected to replace the initial building information model component information that failed the test, resulting in the target substation building information model, including:

[0070] Step 502: Select the backup building information model component information corresponding to the component similarity with the maximum value to replace the initial building information model component information that failed the test, and obtain the updated substation building information model.

[0071] Among them, updating the substation building information model can be the initial BIM model after the original building information model component information that failed the collision test has been replaced with the backup building information model component information.

[0072] Specifically, the backup building information model component information with the highest component similarity is selected from each backup building information model component information and used to replace the initial building information model component information that failed the test. Thus, the initial substation building information model becomes the updated substation building information model.

[0073] Step 504: Based on the updated substation building information model, return to the step of performing simulated collision tests on the information of each initial building information model component to obtain the information model collision test data corresponding to each initial building information model component information, and obtain the simulated collision test results.

[0074] The simulated collision test results can be the results of performing a collision test on the backup building information model component information of the updated substation building information model.

[0075] Specifically, based on the updated substation building information model, the process returns to the following steps: "Perform simulated collision tests on each initial building information model component information separately, that is, output the corresponding information model collision test data for each initial building information model component information; for each initial building information model component information, there is collision test standard data that meets the initial building information model component information; therefore, under the same initial building information model component information dimension, compare the information model collision test data with the corresponding collision test standard data to obtain one of the model test results; compare all initial building information model component information" to obtain the simulated collision test results.

[0076] Step 506: If the simulated collision test results indicate that the backup building information model component information passes the test, the updated substation building information model will be used as the target substation building information model.

[0077] Specifically, if the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information passes the test, that is, if the collision test result of the backup building information model component information meets the collision test standard data, then the substation building information model will be updated as the substation building information model of the target substation.

[0078] Step 508: If the simulated collision test results indicate that the backup building information model component information has failed the test, delete the backup building information model component information and return to the step of selecting the backup building information model component information with the maximum component similarity to replace the initial building information model component information that failed the test, so as to obtain the step of updating the substation building information model, until the updated substation building information model is used as the target substation building information model.

[0079] Specifically, if the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information has failed the test, that is, if the collision test result of the backup building information model component information fails to meet the collision test standard data, then the backup building information model component information just used for testing will be deleted, and the process will return to the step of "selecting the backup building information model component information with the maximum component similarity among each backup building information model component information to replace the initial building information model component information that failed the test, so that the initial substation building information model becomes the updated substation building information model", until the simulated collision test result corresponding to the backup building information model component information indicates that the backup building information model component information has passed the test, then the updated substation building information model will be used as the substation building information model of the target substation.

[0080] In this embodiment, by further performing simulated collision tests on the replacement standby building information model component information, and determining whether the replaced standby building information model component information meets the requirements based on the test results, the corresponding next steps can be taken to ensure that there is no building information model component information in the building information model that has failed the collision test, thereby improving the safety of the building information model.

[0081] In one embodiment, such as Figure 6 As shown, based on geographic data, scene data, electrical design data, and model data of the substation to be built, an initial substation building information model corresponding to the target substation is generated, including:

[0082] Step 602: Determine the comprehensive coordinate data of the substation model based on geographical data, scene data, and model data of the substation to be built.

[0083] Among them, the model comprehensive coordinate data can be the coordinate data obtained by combining the initial basic coordinate system of the substation model to be built with data transformation. The model comprehensive coordinate data includes scene coordinate data and model coordinate data.

[0084] Specifically, based on geographic and scene data, the scene model with the highest matching degree is selected from a preset scene model library to construct the scene model of the substation to be built, and the scene model data of the substation to be built is read from it. Further, the basic coordinate system in the substation to be built model is initialized to obtain an initialized basic coordinate system, and the scene model data and the substation to be built model data are transformed into the initialized basic coordinate system to obtain the comprehensive model coordinate data, which includes scene coordinate data and model coordinate data.

[0085] Step 604: Generate an initial substation building information model based on scene coordinate data, model coordinate data, and electrical design data.

[0086] Among them, scene coordinate data can be the coordinate data of scene data in the model of the substation to be built.

[0087] Among them, the model coordinate data can be the coordinate data derived from the model of the substation to be built in different coordinate systems.

[0088] Specifically, the connection between scene coordinate data and model coordinate data is configured, and the initial substation building information model is generated by combining electrical design data.

[0089] In this embodiment, by using simulated integrated coordinate data as an intermediate medium, an initial substation building information model is further generated. This model can combine scene coordinate data and model coordinate data from the simulated integrated coordinate data to accurately implement the information of each component in the initial substation building information model from two aspects, thereby improving the accuracy of the initial substation building information model.

[0090] In one embodiment, such as Figure 7 As shown, based on geographical data, scene data, and model data of the substation to be built, the comprehensive coordinate data of the substation model to be built is determined, including:

[0091] Step 702: Based on the preset scenario model library corresponding to the substation model to be built, construct the scenario model data of the substation model to be built according to geographical data and scenario data.

[0092] The preset scene model library can be a model library that includes multiple preset scene data, with each scene data having a corresponding model for representation.

[0093] Among them, the scenario model data can be model data constructed in the model of the substation to be built based on the scenario data to represent the scenario data.

[0094] Specifically, based on geographical data and scene data, the scene model with the highest matching degree is selected from the preset scene model library and used to construct the scene model of the substation to be built, and the scene model data of the substation to be built is read from it.

[0095] Step 704: Initialize the basic coordinate system of the substation model to be built, and transform the scene model data and the substation model data to be built into the basic coordinate system to obtain the comprehensive coordinate data of the model.

[0096] The base coordinate system can be the model coordinate system of the substation to be built without any processing.

[0097] Specifically, the basic coordinate system in the model of the substation to be built is initialized to obtain the initialized basic coordinate system, and the scene model data and the model data of the substation to be built are transformed into the initialized basic coordinate system to obtain the comprehensive coordinate data of the model.

[0098] In this embodiment, by relying on a preset scene model library, using geographic data and scene data, scene model data is constructed, and the scene model data and the substation model data to be built are converted into a basic coordinate system. This enables the geographic data, scene data, and the substation model data to be built to be integrated into the coordinate system, achieving a high degree of data interaction uniformity.

[0099] It should be understood that although the steps in the flowcharts of the above embodiments are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the above embodiments may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages of other steps.

[0100] Based on the same inventive concept, this application also provides a data-driven substation building information model generation device for implementing the data-driven substation building information model generation method described above. The solution provided by this device is similar to the solution described in the above method. Therefore, the specific limitations of one or more data-driven substation building information model generation device embodiments provided below can be found in the limitations of the data-driven substation building information model generation method described above, and will not be repeated here.

[0101] In one embodiment, such as Figure 8 As shown, a data-driven substation building information model generation device is provided, comprising: a model data acquisition module 802, a first model determination module 804, a second model determination module 806, a building model testing module 808, and a building model determination module 810, wherein:

[0102] The model data acquisition module 802 is used to respond to the construction task of the target substation and acquire the basic model information of the substation to be built corresponding to the target substation; the basic model information includes geographic data, scene data and electrical design data;

[0103] The first model determination module 804 is used to determine the information of each substation model component corresponding to the substation model to be built based on geographical data, scene data and electrical design data, and to determine the substation model data based on the information of each substation model component.

[0104] The second model determination module 806 is used to generate an initial substation building information model corresponding to the target substation based on geographical data, scene data, electrical design data, and substation model data to be built; the initial substation building information model includes at least one initial building information model component information.

[0105] The building model testing module 808 is used to simulate and test the information of each initial building information model component to obtain the model test results corresponding to the information of each initial building information model component.

[0106] The building model determination module 810 is used to determine the initial substation building information model as the substation building information model of the target substation when the test results of each model indicate that the initial building information model component information has passed the test.

[0107] In one embodiment, the building model testing module 808 is further configured to perform simulated collision tests on the information of each initial building information model component to obtain information model collision test data corresponding to each initial building information model component; and to compare the information model collision test data with the collision test standard data corresponding to each initial building information model component to obtain the test results of each model.

[0108] In one embodiment, the building model determination module 810 is further configured to, in the case that at least one initial building information model component information fails the test in the test results of each model, select at least one backup building information model component information from a preset building information model database for any initial building information model component information that fails the test; each backup building information model component information has a corresponding component similarity with the initial building information model component information that fails the test; based on the component similarity, select one of the backup building information model component information to replace the initial building information model component information that fails the test, thereby obtaining the target substation building information model.

[0109] In one embodiment, the building model determination module 810 is further configured to: select the backup building information model component information corresponding to the maximum component similarity to replace the initial building information model component information that failed the test, thereby obtaining an updated substation building information model; based on the updated substation building information model, return to the step of performing simulated collision tests on each initial building information model component information to obtain information model collision test data corresponding to each initial building information model component information, thereby obtaining simulated collision test results; if the simulated collision test results indicate that the backup building information model component information has passed the test, then the updated substation building information model is used as the target substation building information model; if the simulated collision test results indicate that the backup building information model component information has failed the test, then the backup building information model component information is deleted, and the process returns to the step of selecting the backup building information model component information corresponding to the maximum component similarity to replace the initial building information model component information that failed the test, thereby obtaining an updated substation building information model, until the updated substation building information model is used as the target substation building information model.

[0110] In one embodiment, the second model determination module 806 is further configured to determine the comprehensive coordinate data of the substation model to be built based on geographical data, scene data, and model data of the substation to be built; the comprehensive coordinate data of the model includes scene coordinate data and model coordinate data; and generate an initial substation building information model based on the scene coordinate data, model coordinate data, and electrical design data.

[0111] In one embodiment, the second model determination module 806 is further configured to construct scene model data of the substation to be built based on the preset scene model library corresponding to the substation to be built model, according to geographical data and scene data; initialize the basic coordinate system of the substation to be built model, and convert the scene model data and the substation to be built model data to the basic coordinate system to obtain the comprehensive coordinate data of the model.

[0112] The modules in the aforementioned data-driven substation building information model generation device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the memory of a computer device as software, so that the processor can call and execute the operations corresponding to each module.

[0113] In one embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be as follows: Figure 9 As shown, the computer device includes a processor, memory, and network interface connected via a system bus. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The database stores server data. The network interface communicates with external terminals via a network connection. When the computer program is executed by the processor, it implements a data-driven method for generating a substation building information model.

[0114] Those skilled in the art will understand that Figure 9 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0115] In one embodiment, a computer device is also provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps in the above method embodiments.

[0116] In one embodiment, a computer-readable storage medium is provided storing a computer program that, when executed by a processor, implements the steps in the above method embodiments.

[0117] In one embodiment, a computer program product or computer program is provided, the computer program product or computer program including computer instructions stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and executes the computer instructions, causing the computer device to perform the steps in the above method embodiments.

[0118] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.

[0119] Those skilled in the art will understand that all or part of the processes in the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium. When executed, the computer program can include the processes of the embodiments described above. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, etc., and are not limited to these.

[0120] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0121] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A data-driven method for generating a substation building information model, characterized in that, The method includes: In response to the construction task of the target substation, the basic information of the model of the substation to be built corresponding to the target substation is obtained; the basic information of the model includes geographical data, scene data and electrical design data; Based on the geographical data, the scene data, and the electrical design data, determine the component information of each substation model corresponding to the substation model to be built, and determine the substation model data based on the component information of each substation model to be built. Based on the geographic data, scene data, electrical design data, and the model data of the substation to be built, an initial substation building information model corresponding to the target substation is generated. The initial substation building information model includes at least one initial building information model component. Specifically, based on the geographic data and scene data, the scene model with the highest matching degree is selected from a preset scene model library corresponding to the substation to be built model, and the scene model data in the scene model with the highest matching degree is read. The basic coordinate system of the substation to be built model is initialized, and the scene model data and the substation to be built model data are transformed into the basic coordinate system to obtain comprehensive model coordinate data. The comprehensive model coordinate data includes scene coordinate data and model coordinate data. Based on the scene coordinate data, the model coordinate data, and the electrical design data, the initial substation building information model is generated. Simulation tests are performed on the information of each of the initial building information model components to obtain the model test results corresponding to the information of each of the initial building information model components. If all the test results of the aforementioned models indicate that the initial building information model component information passes the test, the initial substation building information model shall be used as the substation building information model of the target substation.

2. The method according to claim 1, characterized in that, The step of simulating and testing the information of each of the initial building information model components to obtain the model test results corresponding to the information of each of the initial building information model components includes: The initial building information model component information is subjected to a simulated collision test to obtain the information model collision test data corresponding to the initial building information model component information. The collision test data of each information model is compared with the collision test standard data corresponding to the information of each initial building information model component to obtain the test results of each model.

3. The method according to claim 2, characterized in that, The method further includes: If at least one of the model test results indicates that the initial building information model component information has failed the test, for any initial building information model component information that has failed the test, at least one backup building information model component information is selected from a preset building information model database; each of the backup building information model component information and the initial building information model component information that failed the test has a corresponding component similarity. Based on the similarity of each component, one of the backup building information model components is selected to replace the initial building information model component that failed the test, thereby obtaining the target substation building information model.

4. The method according to claim 3, characterized in that, The step of selecting one of the backup building information model components based on the similarity of each component to replace the initial building information model component information that failed the test, thereby obtaining the target substation building information model, includes: The backup building information model component information corresponding to the component similarity with the maximum value is selected to replace the initial building information model component information that failed the test, so as to obtain the updated substation building information model. Based on the updated substation building information model, return to the step of performing simulated collision tests on the information of each of the initial building information model components to obtain the information model collision test data corresponding to each of the initial building information model components, and obtain the simulated collision test results. If the simulated collision test results indicate that the backup building information model component information passes the test, the updated substation building information model will be used as the target substation building information model. If the simulated collision test results indicate that the backup building information model component information has failed the test, the backup building information model component information is deleted, and the process returns to the step of selecting the backup building information model component information with the maximum component similarity to replace the initial building information model component information that failed the test, thereby obtaining the updated substation building information model, until the updated substation building information model is used as the target substation building information model.

5. A data-driven substation building information model generation device, characterized in that, The device includes: The model data acquisition module is used to respond to the construction task of the target substation and acquire the basic model information of the substation to be built corresponding to the target substation; the basic model information includes geographical data, scene data and electrical design data; The first model determination module is used to determine the information of each substation model component corresponding to the substation model to be built based on the geographical data, the scene data and the electrical design data, and to determine the substation model data based on the information of each substation model component. The second model determination module is used to generate an initial substation building information model corresponding to the target substation based on the geographic data, the scene data, the electrical design data, and the model data of the substation to be built. The initial substation building information model includes at least one initial building information model component information. Specifically, based on the geographic data and the scene data, the module selects the scene model with the highest matching degree from a preset scene model library corresponding to the substation to be built model, and reads the scene model data from the scene model with the highest matching degree. The module initializes the basic coordinate system of the substation to be built model, transforms the scene model data and the substation to be built model data into the basic coordinate system, and obtains comprehensive model coordinate data. The comprehensive model coordinate data includes scene coordinate data and model coordinate data. The module generates the initial substation building information model based on the scene coordinate data, the model coordinate data, and the electrical design data. The building model testing module is used to simulate and test the information of each of the initial building information model components to obtain the model test results corresponding to the information of each of the initial building information model components. The building model determination module is used to determine the initial substation building information model as the substation building information model of the target substation when all the model test results indicate that the initial building information model component information has passed the test.

6. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 4.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 4.

8. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Modeling method and system for transformer substation and storage medium

    CN112084665A

  • Building design method and system based on machine learning and BIM technology

    CN115630433A

  • Substation planning method, electronic equipment and storage medium

    CN115829292A