An intelligent method and system for flood control scheduling of a reservoir group

By optimizing the flood control scheduling of reservoir groups through intelligent algorithms and steady-state discharge rules, the problems of model complexity and insufficient solution accuracy in traditional methods are solved, and efficient and stable flood control scheduling of reservoir groups is achieved.

CN116882684BActive Publication Date: 2026-11-24HOHAI UNIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310856558.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-12
Publication Date
2026-11-24
Estimated Expiration
2043-07-12

AI Technical Summary

Technical Problem

Traditional reservoir scheduling methods and strategies suffer from problems such as complex model construction, high dimensionality of decision variables, insufficient accuracy of solution methods, and susceptibility to the "curse of dimensionality," resulting in low efficiency of flood control scheduling for reservoir groups.

Method used

An intelligent method for flood control scheduling of reservoir groups is adopted. By collecting long-term operational data of reservoirs, using entropy weight optimization strategy and steady-state discharge rules, and combining decision-makers' experience to construct a dynamic scheduling model, the model is solved using efficient and intelligent algorithms to optimize the scheduling scheme.

Benefits of technology

This improved the management efficiency and decision-making accuracy of flood control scheduling for reservoir groups, generated scheduling schemes that better meet actual needs, effectively avoided flow fluctuations, and improved the practicality and accuracy of scheduling management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116882684B_ABST
    Figure CN116882684B_ABST
Patent Text Reader

Abstract

This invention discloses an intelligent method for flood control scheduling of reservoir groups, comprising: S1, collecting long-sequence operational data of reservoirs; S2, fitting probability curves using multiple probability distribution functions and selecting the best fitting curve; S3, constructing a dynamic boundary scheduling model, scaling the fitting results based on flood characteristics and decision-maker experience, determining adaptive boundary ranges for different characteristic indicators, and dynamically narrowing the model boundary for different time periods; S4, optimizing the scheduling model by combining an improved entropy weight strategy with the whale algorithm, and optimizing the scheduling scheme under the guidance of steady-state discharge rules. This invention can fully leverage the rich experience contained in previous scheduling schemes to guide scheduling, and its peak reduction rate and volatility indicators are superior to traditional intelligent algorithms such as particle swarm optimization. It features fast solution speed, high convergence accuracy, and a more stable optimal scheduling scheme, providing important technical support for the scientific scheduling of large-scale reservoir groups.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of reservoir scheduling, specifically an intelligent method and system for flood control scheduling of a group of reservoirs. Background Technology

[0002] Floods are among the most frequent, widespread, and devastating natural disasters in my country. In recent years, influenced by a combination of human activities and climate change, they have become increasingly frequent and severe, leading to a more serious water security situation in river basins. Reservoir management, as an important means of flood and drought disaster prevention, is constrained by problems such as complex management model construction, high dimensionality of decision variables, insufficient accuracy of solution methods, and susceptibility to the "curse of dimensionality." Summary of the Invention

[0003] The technical problem to be solved by this invention is to provide an intelligent method and system for flood control scheduling of reservoir groups, in order to overcome the shortcomings of traditional scheduling methods and strategies. This method aims to fully utilize the scheduling experience contained in the historical flood scheduling process of the basin, combine it with the scheduling experience of decision-makers to construct a dynamic scheduling model, and solve it using efficient and intelligent algorithms under the guidance of entropy weight optimization strategy and steady-state discharge rules, thereby improving the efficiency of scheduling management and providing practical and innovative technical means for the optimized scheduling of flood control of reservoir groups in the basin.

[0004] To solve the above technical problems, the present invention provides the following technical solution: an intelligent method for flood control scheduling of a reservoir group, comprising the following steps:

[0005] S1. Collect long-term operational data of the reservoir and extract and analyze characteristic indicators under the reservoir flood process;

[0006] S2. Use different distribution functions to fit probability curves to flood characteristic indicators and obtain the best fitting curve;

[0007] S3. Based on the best fitting curve, obtain the fitting values ​​of the feature index under different probabilities, and scale the fitting values ​​to obtain the upper and lower limits of the constraint correction.

[0008] S4. Construct an intelligent optimization model for flood control scheduling with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values;

[0009] S5. Solve the intelligent optimization model for flood control scheduling, including:

[0010] S501, Initialize the population;

[0011] S502. Perform dynamic model boundary correction on the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints.

[0012] S503. Calculate the fitness value of the objective function, sort the population based on the fitness value, select the individual with the smallest fitness in the current population, guide other individuals to update their positions during algorithm update iteration, and update the historical best individual, i.e. the current best scheduling scheme.

[0013] S504, Execute the entropy weight optimization strategy to update the scheduling scheme;

[0014] S505. Execute steady-state discharge rules to optimize the scheduling scheme: By judging the changes in discharge flow between different time periods, control the flow and update the scheduling scheme. Let the iteration number t = t + 1. If the maximum number of iterations is reached, output the final scheduling scheme result; otherwise, return to step S502.

[0015] Furthermore, the aforementioned characteristic indicators include: reservoir inflow, outflow, upstream water level, flow rate variation, and water level variation.

[0016] Furthermore, the aforementioned step S2 includes the following sub-steps:

[0017] S201. Using the long-sequence values ​​of flood characteristic indicators as input, the platform software's built-in functions are used to calculate the control parameters of different flood characteristic indicators under different distribution functions, including the shape, size, and position of the distribution function curves.

[0018] S202. Based on the control parameters corresponding to the distribution function, calculate the fitted value y of the feature index under different probabilities of the distribution function. i ;

[0019] S203. Calculate the error values ​​for different distribution functions according to the MSE principle. The curve with the smallest sum of squared errors is the optimal fitting curve.

[0020]

[0021]

[0022] In the formula, i represents the type of flood characteristic index factor; φ represents the type of distribution function; and θ represents the control parameter. Let y be the measured value of index i in the nth time period under the φ-type distribution function; i The function fit value for index i.

[0023] Furthermore, the aforementioned step S3 specifically includes:

[0024] Based on the preset probability threshold p of the flood control constraint range, the upper and lower bound probabilities of the confidence space are determined as [p-α, p+α]. These upper and lower bound probabilities are substituted into the optimal fitting distribution curve obtained in step S2 to obtain the feature index fitting values ​​under the corresponding probabilities. Then, the fitting values ​​are scaled to obtain the upper and lower bounds of the constraint correction.

[0025]

[0026] In the formula, m represents the constraint type; n represents the total number of time periods; A m,n Characteristic indicators of different constraints at different times; f m (x) is the optimal probability function after fitting m types of constraints; x p This represents the index value corresponding to probability p; The upper and lower limits are used to constrain the correction; τ is the scaling factor; α is the confidence level.

[0027] Furthermore, the aforementioned step S4 specifically includes:

[0028] (1) The objective function of the criterion for maximizing peak reduction rate is as follows:

[0029]

[0030] In the formula: t is the time period number; T is the total number of time periods within the scheduling period; q i,t Let O be the discharge flow of reservoir i during time period t; i,t Let be the interval flood discharge downstream of reservoir i during time period t;

[0031] (2) The constraints include water balance constraints, upper and lower limits of outflow, upper and lower limits of water level, water level at the start and end of regulation, outflow variation constraints, and reservoir capacity constraints.

[0032] The water balance constraint is as follows:

[0033]

[0034] In the formula: V i,t V i,t+1 Let I be the initial and final reservoir capacity of reservoir i in time period t, where t = 1, 2, ..., T; i,t O represents the predicted inflow rate of reservoir i during time period t; i,t Let q be the interval flow rate of reservoir i during time period t; i,t Let A be the discharge flow of reservoir i during time period t; Δt is the calculation time length; A i Represents all upstream reservoirs of reservoir i; τ a→i This represents the propagation time of the flow from upstream reservoir a to reservoir i;

[0035] (3) Model parameter settings, including the model decision space dimension D, the boundary extreme values ​​of decision variables ub and lb, the whale population size N, the maximum number of algorithm iterations T_max, and the scheduling period T.

[0036] Furthermore, the aforementioned step S501 specifically includes:

[0037] Population initialization: The outflow from the reservoir during different scheduling periods is used as a decision variable and encoded within the decision space [lb, ub]. First, a random number generation method is used to generate n D-dimensional vectors u = [u1, u2, ..., u] in the interval [0, 1]. n The vectors are mapped to the model decision space to form an initial population of size N, with each set of vectors corresponding to a scheduling scheme.

[0038] Furthermore, the aforementioned step S502 specifically includes:

[0039] (1) For cases where the upper and lower limits of the water level are violated, let the value exceeding the decision space be equal to the boundary correction value:

[0040]

[0041] In the formula, Z i,t m1 represents the water level of reservoir i at time t; m1 represents the water level constraint. U m1 Adjust the upper and lower limits for water level;

[0042] (2) For cases where the upper and lower limits of the flow are violated, let the value exceeding the decision space be equal to the boundary correction value:

[0043]

[0044] In the formula, q i,t Let m be the discharge flow of reservoir i during time period t; m2 is the discharge flow constraint. U m2 Adjust the upper and lower limits for the discharge flow rate;

[0045] (3) For violations of flow rate fluctuation constraints, the flow rate released in subsequent periods shall be adjusted to meet the flow rate fluctuation constraints:

[0046]

[0047] In the formula, m3 is the flow rate variation constraint, and U m3 To allow for flow rate variation correction values;

[0048] (4) If the water level constraint at the end of the period does not meet the accuracy requirement, the excess water volume will be evenly distributed to each scheduling period, as follows:

[0049]

[0050] In the formula, q i,t Let V be the discharge flow of reservoir i during time period t. end The storage capacity at the end of the scheduling period; U m4 This is the adjusted value for end-of-period storage capacity.

[0051] Furthermore, in step S504 above, the improved entropy value is used for weight calculation, and the entropy weight of each scheduling scheme is calculated according to the following formula:

[0052]

[0053]

[0054] In the formula: e i ' is the improved entropy value of the i-th scheduling scheme; The average information entropy of all scheduling schemes; w i Weighting factors for the i-th group of scheduling schemes;

[0055] Incorporating weighting factors into the algorithm guides its updates and iterations, as detailed below:

[0056]

[0057] A = 2ar - a

[0058] C = 2r

[0059] D=|X(t)-best * (t)|

[0060] In the formula, b is a constant defining the shape of the spiral; l is a random number between [-1, 1]; t is the current iteration number; X(t) and X(t+1) are the target scheduling schemes at the t-th and t+1-th iterations, respectively; best * (t) is the current optimal scheduling scheme; A and C are coefficient vectors; D is the distance between the target scheduling scheme and the current optimal scheduling scheme; p and r are random numbers between [0,1]; a is a linearly decreasing parameter from 2 to 0 as the number of iterations increases.

[0061] Furthermore, in the aforementioned step S505, the execution of the steady-state discharge rule optimization scheduling scheme specifically includes:

[0062] (1) When the discharge state changes, maintain the flow rate for λ time periods by continuously increasing, decreasing, or keeping it constant to maintain the continuity of the discharge process; otherwise, adjust subsequent time periods to meet the conditions:

[0063]

[0064] In the formula, λ is the duration step of the discharge state; q i,t Let q be the discharge flow of reservoir i during time period t; i,t+k Let λ be the discharge flow of reservoir i over k time intervals after time interval t, where k = 1, 2, ..., λ;

[0065] (2) When the change in discharge flow between two adjacent time periods is lower than the threshold, it is determined to be an unnecessary change. The average value of the discharge flow between the two time periods is then taken, as shown in the following formula:

[0066]

[0067] In the formula, q i,t Let q be the discharge flow of reservoir i during time period t; i,limit η is the limit for the discharge flow variation of reservoir i; η is the scaling factor.

[0068] (3) When the discharge flow rate changes continuously over two or more adjacent time periods, it is determined to be frequent fluctuation in discharge flow, which is not allowed. The average value of the continuously changing discharge flow rate during the scheduling period is taken, as shown in the following formula:

[0069]

[0070] In the formula, L represents the number of periods with frequent flow fluctuations; q i,t+l Let be the discharge flow of reservoir i during time period t+l, where l = 1, 2, ..., L.

[0071] Another aspect of this invention proposes an intelligent flood control scheduling system for a group of reservoirs, comprising:

[0072] The data acquisition module is configured to perform the following actions: collect long-sequence operational data of the reservoir, and extract and analyze characteristic indicators under the reservoir flood process;

[0073] The feature index fitting module is configured to perform the following actions: use different distribution functions to fit probability curves to flood feature indices and obtain the best fitting curve;

[0074] The model boundary construction module is configured to perform the following actions: obtain the fitted values ​​of feature indicators under different probabilities based on the best fitting curve, and scale the fitted values ​​to obtain the upper and lower limits of constraint correction.

[0075] The flood control scheduling intelligent optimization model construction module is configured to perform the following actions: construct a flood control scheduling intelligent optimization model with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values;

[0076] The model solving module is used to solve the intelligent optimization model for flood control scheduling, including: initialization unit, boundary correction unit, individual adaptation calculation unit, entropy weight optimization strategy execution unit, and steady-state discharge rule optimization scheduling unit;

[0077] The initialization unit is configured to perform the following action: initialize the population;

[0078] The boundary correction unit is configured to perform the following actions: dynamically correct the model boundary of the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints.

[0079] The individual adaptation calculation unit is configured to perform the following actions: calculate the fitness value of the objective function, sort the population using the fitness value as the evaluation criterion, select the individual with the smallest fitness in the current population, guide other individuals to update their positions during algorithm update iteration, and update the historical best individual, i.e. the current best scheduling scheme.

[0080] The entropy weight optimization strategy execution unit is configured to perform the following action: execute the entropy weight optimization strategy to update the scheduling scheme;

[0081] The steady-state discharge rule optimization scheduling unit is configured to perform the following actions: execute the steady-state discharge rule optimization scheduling scheme: control the flow by judging the changes in discharge flow between different time periods, update the scheduling scheme, and let the iteration number t = t + 1. If the maximum number of iterations is reached, the final scheduling scheme result is output; otherwise, return to the boundary correction unit for execution.

[0082] Compared with the prior art, the beneficial technical effects of the present invention using the above technical solution are as follows:

[0083] 1. This invention uses historical runoff data as a reference and combines expert experience to give the scheduling model a constraint range, constructing a dynamic boundary model, which narrows the search space of decision variables and effectively improves search accuracy and convergence speed;

[0084] 2. This invention constructs a flood control scheduling model with an improved entropy weight optimization strategy. It can combine the stability of the downstream flow curve and assign different weights to guide the generation of the next generation solution, which can effectively improve the solution efficiency and the quality of the optimal solution, and enhance the practicality of the model in solving specific engineering problems.

[0085] 3. This invention establishes a steady-state discharge rule, which can effectively avoid fluctuations in reservoir discharge flow and obtain a dispatching scheme that better meets the expectations of decision-makers during actual dispatching.

[0086] 4. This invention can continuously update the database using reservoir operation data in practical work, continuously extract scheduling experience from it, realize online updates of scheduling rules, improve scheduling management decision-making capabilities and efficiency, and provide practical and innovative technical means for joint scheduling of reservoir groups. Attached Figure Description

[0087] Figure 1 This is a flowchart of the present invention.

[0088] Figure 2 This is a schematic diagram of the steady-state discharge rule.

[0089] Figure 3 A comparison chart of the flood control results of reservoir 1 using various methods.

[0090] Figure 4 A comparison chart of the flood control results of Reservoir 2 using various methods.

[0091] Figure 5 A comparison chart of the flood control results of reservoir 3 using various methods. Detailed Implementation

[0092] To better understand the technical content of the present invention, specific embodiments are described below in conjunction with the accompanying drawings.

[0093] In this invention, various aspects of the invention are described with reference to the accompanying drawings, in which numerous illustrative embodiments are shown. Embodiments of the invention are not limited to those depicted in the drawings. It should be understood that the invention is implemented through any of the various concepts and embodiments described above, as well as the concepts and embodiments described in detail below, because the concepts and embodiments disclosed herein are not limited to any particular implementation. Furthermore, some aspects of the invention disclosed may be used alone or in any suitable combination with other aspects of the invention disclosed.

[0094] like Figure 1 As shown, this invention provides an intelligent method for flood control scheduling of a reservoir group, which includes the following steps:

[0095] S1. Collect long-term operational data of the reservoir, extract and analyze characteristic indicators under the reservoir flood process, including reservoir inflow, outflow, water level in front of the dam, flow rate variation, and water level variation.

[0096] S2. Different distribution functions are used to fit probability curves to flood characteristic indicators to obtain the best-fit curve. In this embodiment, multiple distribution functions such as normal distribution, logistic distribution, exponential distribution, gamma distribution, and Rayleigh distribution are used to fit probability curves to flood characteristic factors. The minimum sum of squared errors (MSE) criterion is used to evaluate the curve fit and select the best-fit curve.

[0097] S201. Using the long-sequence values ​​of flood characteristic indicators as input, use the built-in functions of MATLAB software to find the control parameters of different flood characteristic indicators under different distribution functions, including the shape, size, and position of the distribution function curve;

[0098] S202. Based on the control parameters corresponding to the distribution function, calculate the fitted value y of the feature index under different probabilities of the distribution function. i ;

[0099] S203. Calculate the error values ​​for different distribution functions according to the MSE principle. The curve with the smallest sum of squared errors is the optimal fitting curve.

[0100]

[0101]

[0102] In the formula, i represents the type of flood characteristic index factor; φ represents the type of distribution function; and θ represents the control parameter. Let y be the measured value of index i in the nth time period under the φ-type distribution function; i The function fit value for index i.

[0103] S3. Based on the preset probability threshold p of the flood control constraint range, determine the upper and lower bound probabilities of the confidence space as [p-α, p+α]. Substitute these upper and lower bound probabilities into the optimal fitting distribution curve obtained in step S2 to obtain the feature index fitting values ​​under the corresponding probabilities. Then, scale the fitting values ​​to obtain the upper and lower bounds of the constraint correction.

[0104]

[0105] In the formula, m represents the constraint type; n represents the total number of time periods; A m,n Characteristic indicators of different constraints at different times; f m (x) is the optimal probability function after fitting m types of constraints; x p This represents the index value corresponding to probability p; The upper and lower limits are used to constrain the correction; τ is the scaling factor; α is the confidence level.

[0106] S4. Construct an intelligent optimization model for flood control scheduling with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values;

[0107] (1) The objective function of the criterion for maximizing peak reduction rate is as follows:

[0108]

[0109] In the formula: t is the time period number; T is the total number of time periods within the scheduling period; q i,t Let O be the discharge flow of reservoir i during time period t; i,t Let be the interval flood discharge downstream of reservoir i during time period t;

[0110] (2) The water balance constraints are as follows:

[0111]

[0112] In the formula: V i,t Vi,t+1 Let I be the initial and final reservoir capacity of reservoir i in time period t, where t = 1, 2, ..., T; i,t O represents the predicted inflow rate of reservoir i during time period t; i,t Let q be the interval flow rate of reservoir i during time period t; i,t Let A be the discharge flow of reservoir i during time period t; Δt is the calculation time length; A i Represents all upstream reservoirs of reservoir i; τ a→i This represents the propagation time of the flow from upstream reservoir a to reservoir i;

[0113] (3) Parameter settings, including the model decision space dimension D, the boundary extreme values ​​of decision variables ub and lb, the whale population size N, the maximum number of algorithm iterations T_max and the scheduling period T, setting the objective function and constraints for the maximum peak reduction rate criterion, the constraints including water balance constraints, upper and lower limits of discharge flow constraints, upper and lower limits of water level constraints, water level constraints at the start and end of the scheduling period, discharge flow amplitude constraints, and reservoir capacity constraints;

[0114] S5. Solve the intelligent optimization model for flood control scheduling, including:

[0115] S501. Initialize the population: Encode the outflow from the reservoir during different scheduling periods as decision variables within the allowable range [lb, ub] of the decision space. First, use a random number generation method to generate n sets of D-dimensional vectors u = [u1, u2, ..., u] in the interval [0, 1]. n The vectors are mapped to the model decision space to form an initial population of size N, with each set of vectors corresponding to a scheduling scheme.

[0116] S502. Perform dynamic model boundary correction on the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints.

[0117] (1) For cases where the upper and lower limits of the water level are violated, let the value exceeding the decision space be equal to the boundary correction value:

[0118]

[0119] In the formula, Z i,t m1 represents the water level of reservoir i at time t; m1 represents the water level constraint. U m1 To adjust the upper and lower limits of the water level.

[0120] (2) For cases where the upper and lower limits of the flow are violated, let the value exceeding the decision space be equal to the boundary correction value:

[0121]

[0122] In the formula, q i,t Let m be the discharge flow of reservoir i during time period t; m2 is the discharge flow constraint. U m2 Adjust the upper and lower limits for the discharge flow.

[0123] (3) For violations of flow rate fluctuation constraints, the flow rate released in subsequent periods shall be adjusted to meet the flow rate fluctuation constraints:

[0124]

[0125] In the formula, m3 is the flow rate variation constraint, and U m3 To allow for flow rate variation correction values.

[0126] (4) If the water level constraint at the end of the period does not meet the accuracy requirement, the excess water volume will be evenly distributed to each scheduling period, as follows:

[0127]

[0128] In the formula, q i,t Let V be the discharge flow of reservoir i during time period t. end The storage capacity at the end of the scheduling period; U m4 This is the adjusted value for end-of-period storage capacity.

[0129] S503. Calculate the fitness value of the objective function, and rank the population based on the fitness value, selecting the individual with the lowest fitness in the current population. * This guides other individuals to update their positions during algorithm updates and iterations, while also updating the historical best individual (pbest), which is the current optimal scheduling scheme.

[0130] S504. Execute the entropy weight optimization strategy to update the scheduling scheme. For each group of scheduling schemes, the one with more stable outflow should be considered the best. Based on the concept of entropy weight, the more stable the process, the lower the entropy value, and the more weight should be given when guiding the next generation of population updates. Conversely, the more chaotic the scheduling process, i.e., the higher the entropy value, the lower the weight should be assigned.

[0131] If the entropy value is directly used to assign weights according to the following formula, when e j Setting the weight to →1 will result in an excessively large weight index, leading to chaotic weight allocation and affecting the final calculation of the entropy value for each scheduling scheme.

[0132]

[0133]

[0134] In the formula: e iLet be the information entropy of the i-th scheduling scheme; n be the number of scheduling schemes; and T be the number of scheduling periods.

[0135] To address this issue, an improved entropy value is used for weight calculation. The specific steps are as follows:

[0136]

[0137]

[0138] In the formula: e i ' is the improved entropy value of the i-th scheduling scheme; The average information entropy of all scheduling schemes; w i Weighting factors for the i-th group of scheduling schemes;

[0139] Incorporating weighting factors into the algorithm guides its updates and iterations, as detailed below:

[0140]

[0141] A = 2ar - a

[0142] C = 2r

[0143] D=|X(t)-best * (t)|

[0144] In the formula, b is a constant defining the shape of the spiral; l is a random number between [-1, 1]; t is the current iteration number; X(t) and X(t+1) are the target scheduling schemes at the t-th and t+1-th iterations, respectively; best * (t) is the current optimal scheduling scheme; A and C are coefficient vectors; D is the distance between the target scheduling scheme and the current optimal scheduling scheme; p and r are random numbers between [0,1]; a is a linearly decreasing parameter from 2 to 0 as the number of iterations increases.

[0145] S505, Implement steady-state discharge rule optimization scheduling scheme: (Refer to...) Figure 2 In actual dispatching, considering downstream flood control safety and the operability of the dispatching plan, and to ensure a stable discharge status and avoid frequent fluctuations, the following dispatching strategy is implemented:

[0146] By judging the changes in the outflow between different time periods, the flow is controlled and the scheduling scheme is updated. If the maximum number of iterations is reached (t = t + 1), the final scheduling scheme result is output; otherwise, the process returns to step S502.

[0147] (1) To maintain the continuity of the discharge flow process, when the discharge state changes, it is only allowed if the flow continuously increases, decreases, or remains unchanged for λ time periods; otherwise, subsequent time periods should be adjusted to meet the conditions.

[0148]

[0149] In the formula, λ is the duration step of the discharge state; q i,t Let q be the discharge flow of reservoir i during time period t; i,t+k Let λ be the discharge flow of reservoir i over k time intervals after time interval t, where k = 1, 2, ..., λ;

[0150] (2) When the change in discharge flow between two adjacent time periods is lower than the threshold, it is determined to be an unnecessary change, and the average value of the discharge flow between the two time periods is taken:

[0151]

[0152] In the formula, q i,t Let q be the discharge flow of reservoir i during time period t; i,limit η is the limit for the discharge flow variation of reservoir i; η is the scaling factor.

[0153] (3) When the discharge flow trend changes continuously in two or more adjacent time periods, it is judged as frequent fluctuations in discharge flow, which is not allowed. The average value of the continuously changing discharge flow in the scheduling period is then taken:

[0154]

[0155] In the formula, L represents the number of periods with frequent flow fluctuations; q i,t+l Let be the discharge flow of reservoir i during time period t+l, where l = 1, 2, ..., L;

[0156] Another aspect of this invention proposes an intelligent flood control scheduling system for a group of reservoirs, characterized by comprising:

[0157] The data acquisition module is configured to perform the following actions: collect long-sequence operational data of the reservoir, and extract and analyze characteristic indicators under the reservoir flood process;

[0158] The feature index fitting module is configured to perform the following actions: use different distribution functions to fit probability curves to flood feature indices and obtain the best fitting curve;

[0159] The model boundary construction module is configured to perform the following actions: obtain the fitted values ​​of feature indicators under different probabilities based on the best fitting curve, and scale the fitted values ​​to obtain the upper and lower limits of constraint correction.

[0160] The flood control scheduling intelligent optimization model construction module is configured to perform the following actions: construct a flood control scheduling intelligent optimization model with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values;

[0161] The model solving module is used to solve the intelligent optimization model for flood control scheduling, including: initialization unit, boundary correction unit, individual adaptation calculation unit, entropy weight optimization strategy execution unit, and steady-state discharge rule optimization scheduling unit;

[0162] The initialization unit is configured to perform the following action: initialize the population;

[0163] The boundary correction unit is configured to perform the following actions: dynamically correct the model boundary of the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints.

[0164] The individual adaptation calculation unit is configured to perform the following actions: calculate the fitness value of the objective function, sort the population using the fitness value as the evaluation criterion, select the individual with the smallest fitness in the current population, guide other individuals to update their positions during algorithm update iteration, and update the historical best individual, i.e. the current best scheduling scheme.

[0165] The entropy weight optimization strategy execution unit is configured to perform the following action: execute the entropy weight optimization strategy to update the scheduling scheme;

[0166] The steady-state discharge rule optimization scheduling unit is configured to perform the following actions: execute the steady-state discharge rule optimization scheduling scheme: control the flow by judging the changes in discharge flow between different time periods, update the scheduling scheme, and let the iteration number t = t + 1. If the maximum number of iterations is reached, the final scheduling scheme result is output; otherwise, return to the boundary correction unit for execution.

[0167] To demonstrate the effectiveness of this invention, a joint flood control optimization scheduling model for three reservoirs was established using a group of key reservoirs in a river basin. For comparative analysis, the WOA algorithm, PSO algorithm, and the method of this invention were used to solve the model. The results of each method are compared in Table 1. The optimization scheduling results for reservoirs 1, 2, and 3 are shown in Table 1. Figure 3 , 4 As shown in Figure 5.

[0168] Table 1 Optimized Scheduling Results

[0169]

[0170] As shown in Table 1, the target value obtained after optimization scheduling by this invention is much lower than that of other methods, indicating that this invention has a significant advantage in solution performance. From the perspective of flood control scheduling effectiveness, the average volatility of the scheduling scheme obtained by this invention is the smallest among the three methods. Figure 3 , 4Figure 5 shows that the discharge flow obtained by this method is more stable, indicating that the present invention can effectively avoid flow fluctuations and generate a higher-quality dispatching scheme that is more satisfactory to decision-makers. In terms of peak shaving effect, the maximum discharge flow of each reservoir after dispatching by the present invention is lower than that of other methods, and the highest water level during the reservoir dispatching period is lower than that of other methods, demonstrating a significant peak shaving effect. This indicates that the present method can effectively reduce the flood control risks of reservoirs and downstream areas. In summary, the present invention provides a novel and practical efficient optimization method for flood control dispatching of reservoir groups, generating stable and effective flood control dispatching schemes, which plays an important role in watershed flood control and disaster reduction.

[0171] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

[0172] While the present invention has been described above with reference to preferred embodiments, it is not intended to limit the invention. Those skilled in the art can make various modifications and refinements without departing from the spirit and scope of the invention. Therefore, the scope of protection of the present invention shall be determined by the claims.

Claims

1. An intelligent method for flood control scheduling of a reservoir group, characterized in that, Includes the following steps: S1. Collect long-term operational data of the reservoir and extract and analyze characteristic indicators under the reservoir flood process; S2. Use different distribution functions to fit probability curves to flood characteristic indicators and obtain the best fitting curve; S3. Based on the best fitting curve, obtain the fitting values ​​of the feature index under different probabilities, and scale the fitting values ​​to obtain the upper and lower limits of the constraint correction. S4. Construct an intelligent optimization model for flood control scheduling with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values; S5. Solve the intelligent optimization model for flood control scheduling, including: S501, Initialize the population; S502. Perform dynamic model boundary correction on the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints. S503. Calculate the fitness value of the objective function, sort the population based on the fitness value, select the individual with the smallest fitness in the current population, guide other individuals to update their positions during algorithm update iteration, and update the historical best individual, i.e. the current best scheduling scheme. S504. Execute the entropy weight optimization strategy to update the scheduling scheme; use the improved entropy value to calculate the weight, and calculate the entropy weight of each scheduling scheme according to the following formula: , , In the formula: Let be the improved entropy value of the i-th scheduling scheme; This is the average information entropy of all scheduling schemes; The weighting factor of the i-th group of scheduling schemes; Incorporating weighting factors into the algorithm guides its updates and iterations, as follows: , , , , In the formula, b is a constant defining the shape of the spiral; l' is a random number between [-1, 1]; t' is the current iteration number; , These are the target scheduling schemes for the t'th and t'+1th iterations, respectively; is the current optimal scheduling scheme; A and C are coefficient vectors; D is the distance between the target scheduling scheme and the current optimal scheduling scheme; p and r are random numbers between [0,1]; a is a linearly decreasing parameter from 2 to 0 as the number of iterations increases; S505. Execute the steady-state discharge rule to optimize the scheduling scheme: By judging the changes in discharge flow between different time periods, control the flow and update the scheduling scheme. Let the iteration number t' = t' + 1. If the maximum number of iterations is reached, output the final scheduling scheme result; otherwise, return to step S502. In step S505, the execution of the steady-state discharge rule to optimize the scheduling scheme specifically involves: (1) When the discharge state changes, maintain The flow rate can be continuously increased, decreased, or remained unchanged during a given period to maintain the continuity of the discharge process; otherwise, subsequent periods should be adjusted to meet the conditions. , In the formula, The continuous step size for the discharge state; Let be the discharge flow of reservoir i during time period t; Let be the discharge flow of reservoir i k time intervals after time interval t. ; (2) When the change in discharge flow between two adjacent time periods is lower than the threshold, it is determined to be an unnecessary change, and the average value of the discharge flow between the two time periods is taken as follows: , In the formula, Let be the discharge flow of reservoir i during time period t; Limits the variation of the discharge flow of reservoir i; The scaling factor; (3) When the discharge flow trend changes continuously in two or more adjacent time periods, it is judged as frequent fluctuations in discharge flow, which is not allowed. The average value of the continuously changing discharge flow in the scheduling period is taken as follows: , In the formula, L represents the number of periods of frequent flow fluctuations; Let be the discharge flow of reservoir i during time period t+l. .

2. The intelligent method for flood control scheduling of a reservoir group according to claim 1, characterized in that, The characteristic indicators include: reservoir inflow, outflow, water level in front of the dam, flow rate variation, and water level variation.

3. The intelligent method for flood control scheduling of a reservoir group according to claim 1, characterized in that, Step S2 includes the following sub-steps: S201. Using the long-sequence values ​​of flood characteristic indicators as input, the platform software's built-in functions are used to calculate the control parameters of different flood characteristic indicators under different distribution functions, including the shape, size, and position of the distribution function curves. S202. Based on the control parameters corresponding to the distribution function, calculate the fitted values ​​of the feature index under different probabilities of the distribution function. ; S203. Calculate the error values ​​for different distribution functions according to the MSE principle. The curve with the smallest sum of squared errors is the optimal fitting curve. , , In the formula, i represents the flood characteristic index factor type; It is a distribution function type; For control parameters; For indicator i in The measured value of the nth time period under the distribution function; The function fit value for index i.

4. The intelligent method for flood control scheduling of a reservoir group according to claim 3, characterized in that, Step S3 is as follows: Based on the preset probability threshold p of the constraint range for flood control, the upper and lower bound probabilities of the confidence space are determined as follows: Substitute the upper and lower bound probabilities into the optimal fitting distribution curve obtained in step S2 to obtain the feature index fitting values ​​under the corresponding probabilities. Then, scale the fitting values ​​to obtain the constraint correction upper and lower bounds. : , In the formula, m represents the constraint type; The optimal probability function after fitting m types of constraints; This represents the index value corresponding to probability p; To constrain and adjust the upper and lower limits; The scaling factor; , where is the confidence level.

5. The intelligent method for flood control scheduling of a reservoir group according to claim 4, characterized in that, Step S4 is as follows: (1) The objective function of the criterion for maximizing peak reduction rate is as follows: , In the formula: t is the time period number; T is the total number of time periods within the scheduling period; Let be the discharge flow of reservoir i during time period t; Let be the interval flood discharge downstream of reservoir i during time period t; (2) The constraints include water balance constraints, upper and lower limits of discharge flow, upper and lower limits of water level, water level at the start and end of regulation, discharge flow range constraints, and reservoir capacity constraints. The water balance constraint is as follows: , In the formula: , Let be the initial and final reservoir capacity of reservoir i in time period t, where ; Let be the predicted inflow rate of reservoir i in time period t; Let be the interval flow rate of reservoir i during time period t; Let be the discharge flow of reservoir i during time period t; To calculate the duration; Represents all upstream reservoirs of reservoir i; Indicates the flow rate from the upstream reservoir The propagation time to reach reservoir i; (3) Model parameter settings, including the model decision space dimension D, the boundary extreme values ​​of decision variables ub and lb, the whale population size N, and the maximum number of algorithm iterations. And the scheduling period.

6. The intelligent method for flood control scheduling of a reservoir group according to claim 5, characterized in that, Step S501 is as follows: Initialize the population: Use the outflow from the reservoir during different scheduling periods as decision variables within the allowable range of the decision space. For encoding, firstly, a random number generation method is used to generate n sets of D-dimensional vectors within the interval [0,1]. The vectors are then mapped to the model decision space to form an initial population of size N, with each set of vectors corresponding to a scheduling scheme.

7. The intelligent method for flood control scheduling of a reservoir group according to claim 6, characterized in that, Step S502 specifically includes: (1) For cases where the upper and lower limits of the water level are violated, let the value exceeding the decision space be equal to the boundary correction value: , In the formula, m1 represents the water level of reservoir i at time t; m1 represents the water level constraint. , Adjust the upper and lower limits for water level; (2) For cases where the upper and lower limits of the flow are violated, let the value exceeding the decision space be equal to the boundary correction value: , In the formula, Let m be the discharge flow of reservoir i during time period t; m2 is the discharge flow constraint. , Adjust the upper and lower limits for the discharge flow rate; (3) For violations of flow rate fluctuation constraints, the flow rate released in subsequent periods shall be adjusted to meet the flow rate fluctuation constraints: , In the formula, m3 is the flow rate variation constraint. To allow for flow rate variation correction values; (4) If the water level constraint at the end of the period does not meet the accuracy requirement, the excess water volume will be evenly distributed to each scheduling period, as follows: , In the formula, Let be the discharge flow of reservoir i in time period t. The storage capacity at the end of the scheduling period; This is the adjusted value for end-of-period storage capacity.

8. An intelligent system for flood control scheduling of a reservoir group, applied to the intelligent method for flood control scheduling of a reservoir group as described in claim 1, characterized in that, include: The data acquisition module is configured to perform the following actions: collect long-sequence operational data of the reservoir, and extract and analyze characteristic indicators under the reservoir flood process; The feature index fitting module is configured to perform the following actions: use different distribution functions to fit probability curves to flood feature indices and obtain the best fitting curve; The model boundary construction module is configured to perform the following actions: obtain the fitted values ​​of feature indicators under different probabilities based on the best fitting curve, and scale the fitted values ​​to obtain the upper and lower limits of constraint correction. The flood control scheduling intelligent optimization model construction module is configured to perform the following actions: construct a flood control scheduling intelligent optimization model with the objective function of maximizing peak reduction rate, and add constraints to the model and preset model parameter values; The model solving module is used to solve the intelligent optimization model for flood control scheduling, including: initialization unit, boundary correction unit, individual adaptation calculation unit, entropy weight optimization strategy execution unit, and steady-state discharge rule optimization scheduling unit; The initialization unit is configured to perform the following action: initialize the population; The boundary correction unit is configured to perform the following actions: dynamically correct the model boundary of the initialized scheduling scheme, determine the confidence interval threshold based on the fitting results of flood characteristic indicators and the decision-maker's experience, dynamically reduce the decision space range, and correct the scheduling scheme that violates the constraints. The individual adaptation calculation unit is configured to perform the following actions: calculate the fitness value of the objective function, sort the population using the fitness value as the evaluation criterion, select the individual with the smallest fitness in the current population, guide other individuals to update their positions during algorithm update iteration, and update the historical best individual, i.e. the current best scheduling scheme. The entropy weight optimization strategy execution unit is configured to perform the following action: execute the entropy weight optimization strategy to update the scheduling scheme; The steady-state discharge rule optimization scheduling unit is configured to perform the following actions: execute the steady-state discharge rule optimization scheduling scheme: control the flow by judging the changes in discharge flow between different time periods, update the scheduling scheme, and let the iteration number t'=t'+1. If the maximum number of iterations is reached, the final scheduling scheme result is output; otherwise, return to the boundary correction unit for execution.

Citation Information

Patent Citations

  • Reservoir group flood control dispatching intelligent method and system and medium

    CN116307533A