一种自然通风直接空冷凝汽器的冲洗方法
By performing hot flushing of the direct air-cooled condenser during commissioning, connecting rainwater wells with temporary pipes and valves, and combining the operation of vacuum pumps and feed water pumps, the problems of time consumption and water quality before equipment start-up in existing technologies have been solved, enabling rapid commissioning and long-term operation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA ENERGY CONSTR GRP NORTHWEST ELECTRIC POWER RES INST CO LTD
- Filing Date
- 2023-08-14
- Publication Date
- 2026-07-17
AI Technical Summary
In existing flushing methods for natural ventilation direct air condensers, a significant amount of time is required before equipment startup, and the water quality is often difficult to meet requirements, affecting the long-term operation of the equipment.
During the commissioning process, hot flushing of the natural ventilation direct air condenser is carried out simultaneously. Temporary pipes and valves are used to connect to the rainwater well. The cooling triangle is flushed and circulated for cleaning. Combined with the operation of vacuum pumps and feed water pumps, hot flushing and water quality testing are achieved.
It saves valuable time before equipment startup, improves condensate water quality, shortens equipment commissioning time, extends equipment operating cycle, and reduces material costs.
Smart Images

Figure CN116989612B_ABST
Abstract
Citation Information
Patent Citations
Direct air cooling system thermal state washing waste water drain-off system
CN103776274A
Direct air-cooling system adopting natural ventilation
CN105403065A