Rhino and revit-based structural pile cap diagram model consistent examination method and system
By combining Rhino, Revit, and Grasshopper, automatic consistency verification between the structural foundation BIM model and 2D drawings was achieved, solving the problem of low efficiency in manual verification, improving verification speed and accuracy, and reducing costs.
Patent Information
- Application Number
- CN202310767022.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-27
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-06-27
AI Technical Summary
In existing technologies, the consistency verification between BIM models and 2D drawings mainly relies on manual methods, resulting in a large workload, long cycle, and low accuracy. This is especially true for the verification of complex components such as structural foundations, where costs are high and efficiency is low.
A parametric platform combining Rhino and Revit with Grasshopper is used to automatically process 2D drawings of structural foundations and generate BIM models. Through steps such as data cleaning, pairing and matching, name verification, and geometric tolerance processing, automatic consistency review between the BIM model and 2D drawings is achieved.
It improves review speed and accuracy, reduces labor costs, shortens the review cycle, and enhances design efficiency and quality, making it suitable for design schemes that undergo multiple revisions.
Smart Images

Figure CN116992524B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of BIM design review technology, and more specifically, relates to a method and system for reviewing the consistency of structural foundation BIM model drawings based on Rhino and Revit. Background Technology
[0002] Currently, the construction industry is strongly encouraged to carry out digital transformation. Building Information Modeling (BIM) is an important technical support for digital transformation. Among them, BIM synchronous forward design is a mainstream project-level BIM technology application process. In this process, it is of great significance to verify the consistency between the BIM model and the two-dimensional drawings.
[0003] Currently, the consistency review of drawings and models is mainly conducted manually, which is extremely labor-intensive. With the increasing size, comprehensiveness, and complexity of projects, especially when reviewing the consistency of structural components such as structural foundations with clear logic, the sheer number of BIM model components, spatial complexity, and numerous component information standards, combined with the massive amount of component information, complex graphic information, and scattered data in existing 2D drawings, significantly increases labor costs, extends the review cycle, and reduces the accuracy and efficiency of the review. Summary of the Invention
[0004] In response to the above-mentioned deficiencies or improvement needs of existing technologies, this invention proposes a method and system for reviewing the consistency of structural foundation BIM model drawings based on Rhino and Revit, which can greatly improve the speed and accuracy of BIM model drawing consistency review and improve design efficiency.
[0005] To achieve the above objectives, according to one aspect of the present invention, a method for reviewing the consistency of structural foundation BIM model drawings based on Rhino and Revit is provided, comprising: S1: Obtain complete 2D drawings of the structural foundation based on the design information, clean and classify the data of the 2D drawings of the structural foundation, and output them as ghdata format 2D drawings of the structural foundation in a grouped file. S2: Obtain the structural foundation BIM model file created based on the two-dimensional drawings of the structural foundation in S1 and the required standard information; S3: Use Revit to read the structural pier BIM model file in S2, and open Grasshopper in Revit through the Revit plugin RhinoInside; S4: Using Grasshopper enabled in S3, data is read from the structural pier BIM model read by Revit in S3 to form a structural pier BIM model dataset. S5: Load the structural pier two-dimensional drawing group files from S1 into Grasshopper opened in S3 to form a structural pier two-dimensional drawing group dataset. S6: Extract the structural pier BIM model dataset from step S4, perform data cleaning, eliminate data without volumetric models, and generate a valid structural pier BIM model dataset and an invalid BIM model report. S7: Reintegrate the data order of the valid structural pier BIM model dataset in S6. Match the top surface center point of the BIM model according to whether it is within the outer contour line range of the structural pier 2D drawing group dataset in S5. If the top surface center point of the BIM model is within the outer contour line range, pair the BIM model with the outer contour line as a group. Adjust the data order in the valid structural pier BIM model dataset according to the order of the structural pier 2D drawing group dataset. At the same time, check whether there are any problems of missing, missing, or duplicate structural pier BIM models based on the number of group data after matching. Generate a missing reconstruction report and a matched structural pier BIM model dataset. S8: Compare the structural foundation component names in the matched structural foundation BIM model dataset in S7 with the structural foundation names in the structural foundation 2D drawing group dataset in S5. If they meet the standard requirements, they are passed; otherwise, they are removed, resulting in a qualified structural foundation BIM model dataset and a naming error report. S9: Perform geometric tolerance processing on the outer contour line of the structural foundation in the grouped dataset of the two-dimensional structural foundation drawing in S5 according to the design requirements, and form a contour line tolerance grid. S10: Extract the top vertex of the geometric data in the qualified pier BIM model dataset named in S8, and calculate the sum of the shortest distances from the top vertex of each structural pier to the outline tolerance grid of S9 at the horizontal elevation. If it is less than the specified tolerance, the spatial position of the structural pier is correct; otherwise, a spatial geometric error pier BIM model dataset is formed. S11: Extract the top surface area data from the geometric data of the S10 spatial geometric error pier BIM model dataset and compare it with the area data of the outer contour line of the structural pier in the S5 structural pier 2D drawing group dataset. If the area difference is outside the area tolerance range, the structural pier component is modeled incorrectly in the geometric model; otherwise, the modeling of the structural pier component is incorrect in the spatial position, and a spatial position error report and a geometric model creation error report are generated. S12: Compile the invalid BIM model report from S6, the naming error report from S8, the spatial location error report from S11, and the geometric model creation error report, and generate a structural foundation drawing consistency review report and output it as an Excel file.
[0006] In some optional implementations, in step S1, the cleaning and data classification of the two-dimensional drawings of the structural foundation, outputting a grouped file of two-dimensional drawings of the structural foundation in ghdata format, includes: Use Rhino to read the 2D drawings of the structural foundation and clean them up, keeping only the data related to the structural foundation. The Grasshopper parametric platform in Rhino is used to read the cleaned 2D structural foundation drawing data, classify and organize the data, and output it as a grouped file of 2D structural foundation drawings in ghdata format.
[0007] In some optional implementations, in step S1, the data classification and organization includes: The data is traversed and distances between their respective origins are calculated. The data with the smallest distances are grouped together for classification and organization.
[0008] For example, the outer contour lines and names of the structural foundations are paired up one by one according to their distance from the origin, and those with the smallest distance are grouped together.
[0009] In some alternative implementations, in step S6, the data cleaning process to eliminate volumeless model data includes: The Python compiler in Grasshopper filters component types by component name, then uses the Element Preview calculator to convert them into mesh models and perform volume calculations. The models are then filtered by volume to eliminate those without volume.
[0010] According to another aspect of the present invention, a structural foundation BIM model consistency review system based on Rhino and Revit is provided, comprising: The drawing processing module is used to obtain complete two-dimensional drawings of the structural foundation based on the design information, and to clean and classify the data of the two-dimensional drawings of the structural foundation, and output them as grouped files of two-dimensional drawings of the structural foundation in ghdata format. The model creation module is used to obtain the structural foundation BIM model file based on the two-dimensional drawings of the structural foundation and the required standard information; The module is enabled to read the structural pier cap BIM model file using Revit and to enable Grasshopper in Revit through the Revit plugin RhinoInside. The model dataset generation module is used to read data from the structural pier BIM model read by Revit through the enabled Grasshopper, and generate a structural pier BIM model dataset. The drawing dataset generation module is used to generate a structural pier two-dimensional drawing group dataset from the grouped files of structural pier drawings loaded in the open Grasshopper. The model validity screening module is used to extract the structural pier BIM model dataset, clean the data, eliminate data without volumetric models, and generate a valid structural pier BIM model dataset and an invalid BIM model report. The model detection module is used to re-integrate the data order of the valid structural pier BIM model dataset. It matches the top surface center point of the BIM model's geometric features to see if it falls within the outer contour line range of the structural pier 2D drawing group dataset. If the top surface center point of the BIM model is within the outer contour line range, the BIM model and the outer contour line are paired together. The data order in the valid structural pier BIM model dataset is adjusted according to the order of the structural pier 2D drawing group dataset. At the same time, the number of paired and matched group data is used to check whether there are any missing, omitted, or duplicate structural pier BIM models. A missing / omitted reconstruction report and a matched structural pier BIM model dataset are generated. The name detection module is used to compare the names of structural foundation components in the matched structural foundation BIM model dataset with the names of structural foundations in the structural foundation 2D drawing group dataset. If they meet the standard requirements, they are passed; otherwise, they are removed, generating a qualified BIM model dataset of structural foundations with names and a name naming error report. The outline processing module is used to perform geometric tolerance processing on the outer outline of the structural foundation in the grouped dataset of the two-dimensional drawings of the structural foundation according to the design requirements, and form an outline tolerance grid. The spatial location detection module is used to extract the top surface vertices of the geometric data in the named qualified pier BIM model dataset, and calculate the sum of the shortest distances from the top surface vertex of each structural pier to the outline tolerance grid on the horizontal elevation. If it is less than the specified tolerance, the spatial location of the structural pier is correct; otherwise, a spatial geometric error pier BIM model dataset is formed. The area detection module is used to extract the top surface area data from the geometric data of the spatial geometric error foundation BIM model dataset and compare it with the area data of the outer contour line of the structural foundation in the structural foundation 2D drawing group dataset. If the area difference is outside the area tolerance range, the structural foundation component is modeled incorrectly in the geometric model; otherwise, the modeling of the structural foundation component is in the spatial position error, and a spatial position error report and a geometric model creation error report are generated. The report output module is used to organize invalid BIM model reports, reports of incorrect naming, reports of incorrect spatial location, and reports of geometric model creation errors, and generate a structural foundation drawing consistency review report and output it as an Excel file.
[0011] In some optional implementations, the step of cleaning and classifying the two-dimensional drawings of the structural foundation, and outputting them as grouped files of two-dimensional structural foundation drawings in ghdata format, includes: Use Rhino to read the 2D drawings of the structural foundation and clean them up, keeping only the data related to the structural foundation. The Grasshopper parametric platform in Rhino is used to read the cleaned 2D structural foundation drawing data, classify and organize the data, and output it as a grouped file of 2D structural foundation drawings in ghdata format.
[0012] In some optional implementations, the data classification and organization includes: The data is traversed and distances between their respective origins are calculated. The data with the smallest distances are grouped together for classification and organization.
[0013] For example, the outer contour lines and names of the structural foundations are paired up one by one according to their distance from the origin, and those with the smallest distance are grouped together.
[0014] In some alternative implementations, the data cleaning, which eliminates volumeless model data, includes: The Python compiler in Grasshopper filters component types by component name, then uses the Element Preview calculator to convert them into mesh models and perform volume calculations. The models are then filtered by volume to eliminate those without volume.
[0015] According to another aspect of the present invention, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps of any of the methods described above.
[0016] In summary, compared with the prior art, the above-described technical solutions conceived by this invention can achieve the following beneficial effects: This invention uses 2D drawings and BIM models of structural foundations as input parameters to automatically review the consistency between the drawings and the model, greatly improving the speed and accuracy of the review process, reducing the review cycle, and improving design quality. Furthermore, since designs often involve multiple revisions, the consistency review of the revised design schemes can be repeatedly performed using this method and system. This invention significantly reduces the workload of reviewing designers and greatly improves the efficiency of BIM model consistency review, providing a new approach to cost reduction and efficiency improvement in projects. Attached Figure Description
[0017] Figure 1 This is a flowchart of a method provided in an embodiment of the present invention; Figure 2 This is a two-dimensional drawing of a structural foundation provided in an embodiment of the present invention; Figure 3 This is a structural foundation BIM model provided in an embodiment of the present invention; Figure 4 This is a two-dimensional drawing of a structural foundation after data cleaning, provided in an embodiment of the present invention; Figure 5 This is a Grasshopper logic diagram of a two-dimensional drawing grouping file for a structural foundation provided in an embodiment of the present invention; Figure 6 This is a schematic diagram of creating a structural foundation BIM model with information but no geometry, provided by an embodiment of the present invention; Figure 7 This is a schematic diagram illustrating the repeated creation of a structural foundation BIM model provided in an embodiment of the present invention; Figure 8 This is a schematic diagram of the outer contour line of a structural foundation in a two-dimensional drawing group dataset provided in an embodiment of the present invention; Figure 9 This is a schematic diagram of the tolerance grid for the outer contour of a structural foundation provided in an embodiment of the present invention; Figure 10 This is a schematic diagram of a drawing consistency review report provided in an embodiment of the present invention. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.
[0019] In this embodiment of the invention, Rhino is the most widely used design software in the construction industry, suitable for use by various disciplines; Revit is the most commonly used BIM modeling software for all disciplines in the construction industry; Grasshopper is a visual programming platform based on the Rhino platform and RhinoInside of Revit, which greatly reduces the difficulty for designers to use the program and has stronger customization capabilities.
[0020] like Figure 1 As shown, the implementation process of this invention utilizes Rhino and Revit to call Grasshopper for automatic consistency review of structural foundation BIM model drawings. The detailed steps of the structural foundation BIM model consistency review method based on Rhino and Revit in this embodiment are as follows: (1) Obtain complete two-dimensional drawings of the structural foundation based on the design information, such as Figure 2 As shown; (2) Obtain the BIM model file for creating the structural foundation BIM model based on the two-dimensional drawings of the structural foundation in (1) and the required standard information, such as... Figure 3 As shown; (3) Use Rhino to read the two-dimensional drawings of the structural foundation in (1), and clean up the two-dimensional drawings of the structural foundation, keeping only the data related to the structural foundation, such as Figure 4 As shown; (4) Using the Grasshopper parametric platform in Rhino, the cleaned structural foundation 2D drawing data from (3) is read using the Layer Reference operator in the LunchBox plugin and the Objects By Selection operator in the Human plugin. The relative distance between the relative origins of the read data is calculated, and the data with the smallest distance are grouped together for data classification and organization, such as... Figure 5 As shown, the output is a grouped file of two-dimensional drawings of the structural foundation in ghdata format; (5) Use Revit to read the structural foundation BIM model file in (2), and open Grasshopper in Revit through the Revit plugin RhinoInside; (6) Using Grasshopper, which is enabled in (5), the structural pier BIM model read by Revit in (5) is read by using the View and Query View Elements calculator in the Revit plugin of Grasshopper to form a structural pier BIM model dataset. (7) Load the structural pier two-dimensional drawing group file from (4) into Grasshopper opened in (5) to form a structural pier two-dimensional drawing group dataset; (8) Extract the structural pier BIM model dataset from step (6), filter the component types by component name using the Python compiler in Grasshopper, then convert it into a mesh model using the Element Preview calculator and perform volume calculation, filtering by volume size to eliminate data without volume models, such as... Figure 6 This generates a dataset of effective structural foundation BIM models and a report of invalid BIM models. (9) To ensure sufficient computational resources during subsequent model review, the effective structural pier BIM model dataset in (8) is reorganized in order, such as... Figure 7 As shown, the top surface center point of the BIM model is traversed according to whether it is within the range of the outer contour line in the structural pier two-dimensional drawing group dataset in (7). If the top surface center point of the BIM model is within the range of the outer contour line, then the BIM model and this outer contour line are a pair. The order of the structural pier two-dimensional drawing group dataset is used to adjust the data order in the effective structural pier BIM model dataset. At the same time, the number of group data after pairing and matching is used to check whether there are problems of missing, missing and duplicate construction of structural pier BIM models, forming a missing reconstruction report and a matched structural pier BIM model dataset. (10) Compare the names of structural foundation components in the matched structural foundation BIM model dataset in (9) with the names of structural foundations in the structural foundation two-dimensional drawing group dataset in (7). If they meet the standard requirements, they are passed; if they do not meet the requirements, they are removed, thus forming a qualified structural foundation BIM model dataset and a report of incorrect naming. (11) The outer contour line of the structural pier in the grouped dataset of the two-dimensional drawings of the structural pier in (7) is as follows: Figure 8 According to design requirements, geometric tolerance processing is performed. The Offset Curve Loose operator is used to offset the outer contour of the structural foundation inwards and outwards according to the design-defined tolerance values. Then, the Mesh Loft operator is used to loft and form the outer contour tolerance mesh, such as... Figure 9 This ensures that the review model will not overfit due to accuracy issues, and forms an outer contour tolerance grid. (12) Extract the top vertex of the geometric data in the qualified pier BIM model dataset named in (10), and calculate the sum of the shortest distances from the top vertex of each structural pier to the outline tolerance grid of (11) at the horizontal elevation. If it is less than the specified tolerance, the spatial position of the structural pier is correct; otherwise, a spatial geometric error pier BIM model dataset is formed. (13) Extract the top surface area data from the geometric data of the spatial geometric error pier BIM model dataset of (12), and compare it with the outer contour area data of the structural pier in the structural pier two-dimensional drawing group dataset of (7). If the area difference is outside the area tolerance range, the structural pier component is modeled incorrectly in geometric model; otherwise, the modeling spatial position of the structural pier component is incorrect, and a spatial position error report and a geometric model creation error report are generated. (14) Compile the invalid BIM model report from (8), the name error report from (10), the spatial location error report from (13), and the geometric model creation error report, and generate a structural foundation drawing consistency review report and output it as an Excel file, such as Figure 10 As shown, in Figure 10 In the detection process, errors in pier name creation and duplicate model creation are detected in parallel. Size and positioning issues are detected as sub-level issues of pier name creation errors. If the pier name is created incorrectly, size and positioning issues do not need to be checked directly, so they are empty. 1 represents a problem and 0 represents no problem.
[0021] This invention breaks through the traditional BIM model drawing consistency review technology by applying the writing of a visual programming program to the BIM model drawing consistency review of structural foundations. This greatly improves the review speed and accuracy, reduces the review cycle, and improves design quality. At the same time, since the design has the attribute of multiple modifications, the consistency review of the adjusted design scheme can also be repeatedly applied to this method and system, which greatly reduces the workload of the reviewing designer and greatly improves the efficiency of BIM model drawing consistency review, providing significant benefits for project cost reduction and efficiency improvement.
[0022] This invention utilizes parametric technology in Rhino and Revit to automatically organize various data of structural foundations in BIM models and various data of two-dimensional drawings according to standardized logic, and performs data comparison, thereby realizing automated model review. This provides designers with a convenient and efficient way to review models, thereby improving design efficiency and quality.
[0023] It should be noted that, depending on the implementation needs, the various steps / components described in this application can be broken down into more steps / components, or two or more steps / components or parts of the operation of steps / components can be combined into new steps / components to achieve the purpose of this invention.
[0024] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for reviewing the consistency of structural foundation BIM model drawings based on Rhino and Revit, characterized in that, include: S1: Obtain complete 2D drawings of the structural foundation based on the design information, clean and classify the data of the 2D drawings of the structural foundation, and output grouped files of the 2D drawings of the structural foundation. S2: Obtain the structural foundation BIM model file created based on the two-dimensional drawings of the structural foundation in S1 and the required standard information; S3: Use Revit to read the structural pier BIM model file in S2, and open Grasshopper in Revit through the Revit plugin RhinoInside; S4: Using Grasshopper enabled in S3, data is read from the structural pier BIM model read by Revit in S3 to form a structural pier BIM model dataset. S5: Load the structural pier two-dimensional drawing group files from S1 into Grasshopper opened in S3 to form a structural pier two-dimensional drawing group dataset. S6: Extract the structural pier BIM model dataset from step S4, perform data cleaning, eliminate data without volumetric models, and generate a valid structural pier BIM model dataset and an invalid BIM model report. S7: Reintegrate the data order of the valid structural pier BIM model dataset in S6. Match the top surface center point of the BIM model according to whether it is within the outer contour line range of the structural pier 2D drawing group dataset in S5. If the top surface center point of the BIM model is within the outer contour line range, pair the BIM model with the outer contour line as a group. Adjust the data order in the valid structural pier BIM model dataset according to the order of the structural pier 2D drawing group dataset. At the same time, check whether there are any problems of missing, missing, or duplicate structural pier BIM models based on the number of group data after matching. Generate a missing reconstruction report and a matched structural pier BIM model dataset. S8: Compare the structural foundation component names in the matched structural foundation BIM model dataset in S7 with the structural foundation names in the structural foundation 2D drawing group dataset in S5. If they meet the standard requirements, they are passed; otherwise, they are removed, resulting in a qualified structural foundation BIM model dataset and a naming error report. S9: Perform geometric tolerance processing on the outer contour line of the structural foundation in the grouped dataset of the two-dimensional structural foundation drawing in S5 according to the design requirements, and form a contour line tolerance grid. S10: Extract the top vertex of the geometric data in the qualified pier BIM model dataset named in S8, and calculate the sum of the shortest distances from the top vertex of each structural pier to the outline tolerance grid of S9 at the horizontal elevation. If it is less than the specified tolerance, the spatial position of the structural pier is correct; otherwise, a spatial geometric error pier BIM model dataset is formed. S11: Extract the top surface area data from the geometric data of the S10 spatial geometric error pier BIM model dataset and compare it with the area data of the outer contour line of the structural pier in the S5 structural pier 2D drawing group dataset. If the area difference is outside the area tolerance range, the structural pier component is modeled incorrectly in the geometric model, and a geometric model creation error report is generated. Otherwise, the spatial position of the structural pier component is incorrectly modeled, and a spatial position error report is generated. S12: Compile the invalid BIM model report from S6, the naming error report from S8, the spatial location error report from S11, and the geometric model creation error report to form a structural foundation drawing consistency review report.
2. The method according to claim 1, characterized in that, In step S1, the cleaning and data classification of the two-dimensional drawings of the structural foundation, outputting a grouped file of two-dimensional drawings of the structural foundation in ghdata format, includes: Use Rhino to read the 2D drawings of the structural foundation and clean them up, keeping only the data related to the structural foundation. The Grasshopper parametric platform in Rhino is used to read the cleaned 2D structural foundation drawing data, classify and organize the data, and output it as a grouped file of 2D structural foundation drawings in ghdata format.
3. The method according to claim 2, characterized in that, In step S1, the data classification and organization includes: The data is traversed and distances between their respective origins are calculated. The data with the smallest distances are grouped together for classification and organization.
4. The method according to any one of claims 1 to 3, characterized in that, In step S6, the data cleaning process, which eliminates data without volumetric models, includes: The component type is filtered by the Python compiler in Grasshopper based on the component name. Then, the ElementPreview calculator is used to convert it into a mesh model and perform volume calculation. The model is then filtered by volume to eliminate data with no volume.
5. A structural foundation BIM model consistency review system based on Rhino and Revit, characterized in that, include: The drawing processing module is used to obtain complete two-dimensional drawings of the structural foundation based on the design information, clean and classify the data of the two-dimensional drawings of the structural foundation, and output grouped files of the two-dimensional drawings of the structural foundation. The model creation module is used to obtain the structural foundation BIM model file based on the two-dimensional drawings of the structural foundation and the required standard information; The module is enabled to read the structural pier cap BIM model file using Revit and to enable Grasshopper in Revit through the Revit plugin RhinoInside. The model dataset generation module is used to read data from the structural pier BIM model read by Revit through the enabled Grasshopper, and generate a structural pier BIM model dataset. The drawing dataset generation module is used to generate a structural pier two-dimensional drawing group dataset from the grouped files of structural pier drawings loaded in the open Grasshopper. The model validity screening module is used to extract the structural pier BIM model dataset, clean the data, eliminate data without volumetric models, and generate a valid structural pier BIM model dataset and an invalid BIM model report. The model detection module is used to re-integrate the data order of the valid structural pier BIM model dataset. It matches the top surface center point of the BIM model's geometric features to see if it falls within the outer contour line range of the structural pier 2D drawing group dataset. If the top surface center point of the BIM model is within the outer contour line range, the BIM model and the outer contour line are paired together. The data order in the valid structural pier BIM model dataset is adjusted according to the order of the structural pier 2D drawing group dataset. At the same time, the number of paired and matched group data is used to check whether there are any missing, omitted, or duplicate structural pier BIM models. A missing / omitted reconstruction report and a matched structural pier BIM model dataset are generated. The name detection module is used to compare the names of structural foundation components in the matched structural foundation BIM model dataset with the names of structural foundations in the structural foundation 2D drawing group dataset. If they meet the standard requirements, they are passed; otherwise, they are removed, generating a qualified BIM model dataset of structural foundations with names and a name naming error report. The outline processing module is used to perform geometric tolerance processing on the outer outline of the structural foundation in the grouped dataset of the two-dimensional drawings of the structural foundation according to the design requirements, and form an outline tolerance grid. The spatial location detection module is used to extract the top surface vertices of the geometric data in the named qualified pier BIM model dataset, and calculate the sum of the shortest distances from the top surface vertex of each structural pier to the outline tolerance grid on the horizontal elevation. If it is less than the specified tolerance, the spatial location of the structural pier is correct; otherwise, a spatial geometric error pier BIM model dataset is formed. The area detection module is used to extract the top surface area data from the geometric data of the spatial geometric error foundation BIM model dataset and compare it with the area data of the outer contour line of the structural foundation in the structural foundation 2D drawing group dataset. If the area difference is outside the area tolerance range, the structural foundation component is modeled incorrectly in the geometric model and a geometric model creation error report is generated. Otherwise, the spatial position of the structural foundation component is modeled incorrectly and a spatial position error report is generated. The report output module is used to compile reports of invalid BIM models, incorrect naming, incorrect spatial location, and incorrect geometric model creation, and generate a structural foundation drawing consistency review report.
6. The system according to claim 5, characterized in that, The process of cleaning and classifying the two-dimensional drawings of the structural foundation, and outputting them as grouped files of two-dimensional structural foundation drawings in ghdata format, includes: Use Rhino to read the 2D drawings of the structural foundation and clean them up, keeping only the data related to the structural foundation. The Grasshopper parametric platform in Rhino is used to read the cleaned 2D structural foundation drawing data, classify and organize the data, and output it as a grouped file of 2D structural foundation drawings in ghdata format.
7. The system according to claim 6, characterized in that, The data classification and organization process includes: The data is traversed and distances between their respective origins are calculated. The data with the smallest distances are grouped together for classification and organization.
8. The system according to any one of claims 5 to 7, characterized in that, The data cleaning process, which eliminates data without volumetric models, includes: The component type is filtered by the Python compiler in Grasshopper based on the component name. Then, the ElementPreview calculator is used to convert it into a mesh model and perform volume calculation. The model is then filtered by volume to eliminate data with no volume.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 4.