A charging management chip trim circuit and device

By using the Trim circuit and device of the charging management chip, combined with the MCU module and the automatic test DUT base, the inconsistency problem in parameter matching and packaging testing of lithium battery charging management integrated circuits is solved, realizing precise trim adjustment and convenient test management.

CN116994977BActive Publication Date: 2026-11-24上海芯哲微电子科技股份有限公司
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310963176.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-02
Publication Date
2026-11-24
Estimated Expiration
2043-08-02

AI Technical Summary

Technical Problem

Existing lithium battery charging management integrated circuits have inconsistencies in parameter matching and packaging testing, making it difficult to meet accuracy requirements by simply increasing the integrated circuit area. Furthermore, differences in testing equipment and resources among various packaging and testing companies make it difficult to manage the accuracy of the trim circuit.

Method used

The system employs a charging management chip Trim circuit and device, including an MCU module, a connection module, and a test module. Trim adjustment is performed through the ATMEGA328P integrated chip and the ISP chip. Combined with the MCU module and the automatic test DUT base, manual or automatic verification testing is achieved, thereby improving data consistency management.

Benefits of technology

It enables precise trim adjustment of the lithium battery charging management integrated circuit, improving the convenience of testing and data consistency management, and adapting to the matching requirements of various testing machines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116994977B_ABST
    Figure CN116994977B_ABST
Patent Text Reader

Abstract

This invention discloses a trim circuit and device for a charging management chip, including an MCU module, a connection module, and a test module. One end of the connection module is connected to the MCU module, and the other end is connected to the test module. The test module includes an integrated chip (ATMEGA328P) and an ISP chip. The ISP chip is connected to the integrated chip. A resistor R1 is connected to three pins of the ISP chip, one end of the resistor R1 is connected to an LED, and one end of the LED is grounded. A charging management unit is connected to two and three pins of the integrated chip. This invention, through the cooperation of the MCU module, the connection module, and the test module, can meet the trimming requirements of commonly used lithium battery charging management integrated circuits on the market. It can be manually trimmed using a source meter or matched with various testing machines to judge and manage the consistency of the data of the trimmed sample.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of lithium battery charging management chip technology, specifically relating to a charging management chip Trim circuit and device. Background Technology

[0002] In the modern integrated circuit manufacturing process, every new circuit design undergoes a perfect simulation, and the matching of components is also perfectly combined with the process model of the actual wafer manufacturer.

[0003] Currently, existing integrated circuits typically contain tens of thousands, hundreds of thousands, or even millions of NMOS or PMOS transistors in a single integrated circuit. With so many 1µm x 1µm MOS transistors together, the RDSONOFFSET is roughly on the order of tens to hundreds of megawatts. Examining many such pairs of MOS transistors, the threshold differences between them will follow a certain normal distribution; some will be well-matched, some poorly matched, failing to achieve the perfect final desired matching effect. Therefore, if a certain parameter requires very high precision and cannot be achieved simply by increasing the area of ​​each integrated circuit, trimming can be used to salvage chips whose parameters deviate from the predetermined range after manufacturing.

[0004] However, packaging and testing companies use fuses in their product circuit designs. By burning out a certain number of fuses, they can trim the resistors and capacitors in the circuit to precisely adjust the accuracy of the voltage / current reference source. Furthermore, due to the different testing equipment and resources used by various packaging and testing companies, it is not convenient to judge and manage the consistency of the data of the trimmed samples. Therefore, we need to propose a charging management chip trim circuit and device to solve the above-mentioned problems. Summary of the Invention

[0005] The purpose of this invention is to provide a charging management chip trim circuit and device that can meet the trimming requirements of commonly used lithium battery charging management integrated circuits on the market. It can be manually trimmed using a source meter or matched with various testing machines to judge and manage the consistency of the trimmed sample data, thereby solving the problems mentioned in the background art. To achieve the above objectives, the present invention adopts the following technical solution: A charging management chip Trim circuit includes an MCU module, a connection module, and a test module. One end of the connection module is connected to the MCU module, and the other end of the connection module is connected to the test module. The test module includes an integrated chip (ATMEGA328P) and an ISP chip. The ISP chip is connected to the integrated chip. A resistor R1 is connected to the third pin of the ISP chip. One end of the resistor R1 is connected to an LED, and one end of the LED is grounded. A charging management unit is connected to the second and third pins of the integrated chip. A switch S1 and a resistor RES1 are connected to the first pin of the integrated chip. One end of the resistor RES1 is connected to a 5V voltage. A crystal oscillator is connected between the ninth and tenth pins of the integrated chip, and both ends of the crystal oscillator are connected to a 104 capacitor. One end of the 104 capacitor and one end of the switch S1 are both grounded. The charging management unit includes a chip under test (DUT). Pins one and six of the DUT are each connected to a 2.2uF capacitor to ground. Pin one of the DUT is also connected to a current source. Pin three of the DUT is connected to switch K3. One end of switch K3 is connected to a 1KΩ resistor. One end of the current source connected to the 1KΩ resistor is connected to a voltage source. The other end of switch K3 is connected to a frequency meter. Pin four of the DUT is connected to switch K1. Pin five of the DUT is connected to switches K2 and K4. One end of switch K4 is grounded. One end of switches K1 and K2 is connected to the MCU module and the connection module, respectively.

[0006] Preferably, the connection module includes multiple connection terminals CON, wherein one end of three of the connection terminals CON is connected to the MCU module, and each of the three connection terminals CON is connected to an IO port that is connected to the MCU module.

[0007] Preferably, the MCU module includes an MCU chip, and the MCU chip is provided with a PD port and a PB port that match the IO port.

[0008] Preferably, one pin of the chip under test is the BAT terminal, the sixth pin of the chip under test is the VIN terminal, the sixth pin of the chip under test is also connected to a voltage source two, the BAT terminal and the VIN terminal are connected to ground with a 2.2uF capacitor, voltage source two = 5V, voltage source one = 3.8V, the current value of the monitoring current source is measured, and the current flowing out of BAT is recorded as IBAT_check.

[0009] Preferably, the BAT and VIN terminals of the chip under test are connected to a capacitor to ground. Voltage source two is 5V, and voltage source one increases from 3.8V to 4.5V in 5mV increments. Simultaneously, the current value of the current source is monitored. When the current flowing out of the BAT terminal is ≤50mA, the corresponding voltage value at the BAT terminal is recorded as Vfloat_check. The following two situations may occur: If 400mA≤IBAT_check≤800mA&4.175V≤Vfloat_check≤4.225V, then the TRIMMINGFUSE burn-in was successful. If Vfloat_check ≤ 4.175V, Vfloat_check ≥ 4.225V, or IBAT_check ≤ 400mA, it indicates that the trimming fuse burn-in was unsuccessful and the product was damaged due to FUY. <1> The fuse has blown and cannot be reheated; it can only be treated as a defective product.

[0010] Based on the above-described charging management chip Trim circuit, the present invention also provides a charging management chip Trim device, including a TRIM function box. The connection module and the MCU module are both located on the TRIM function box. The TRIM function box is provided with multiple IO terminals connected to the MCU module. A burn-in verification fixture containing a test chip is fixed on the upper surface of the TRIM function box. The charging management unit is connected to the burn-in verification fixture. An automatic test DUT base is detachably connected to one side of the TRIM function box.

[0011] Preferably, the automatic test DUT base is further provided with a DUT board mounted on its upper end, the DUT board is provided with a DUT metal connector, the DUT metal connector is provided with a chip under test, and there are multiple switching relays on one side of the DUT metal connector.

[0012] Preferably, the connection module includes a horn connector, a straight pin connector, and a straight hole connector. The straight pin connector is fixed on the DUT board, the straight hole connector is fixed on one side of the TRIM function box, and the straight pin connector and the straight hole connector are matched. The horn connector is fixed on the side of the TRIM function box adjacent to the straight hole connector.

[0013] Preferably, the TRIM function box includes an upper shell and a lower shell. The upper shell is fixed to the upper end of the lower shell by bolts. The horn connector is located between the upper shell and the lower shell, and a clearance hole is provided on one side of the lower shell to expose one end of the horn connector.

[0014] Preferably, a plurality of connection switches are fixed at equal intervals on the lower surface of the upper shell, the integrated chip is located on one side of the connection switches, and the integrated chip is provided with a plurality of lead-out connection pins. The Trim circuit and device for a charging management chip proposed in this invention have the following advantages compared with the prior art: 1. This invention, through the cooperation of MCU module, connection module and test module, can meet the TRIMMING requirements of commonly used lithium battery charging management integrated circuits on the market; it can be manually TRIMMING through source table, or it can be matched with various test machines to judge and manage the consistency of the TRIMMING sample data. 2. This invention, through the cooperation of the TRIM function box and the automatic test DUT base, can perform manual or automatic verification tests according to actual production needs, thereby improving the ease of use. Attached Figure Description Figure 1 This is the circuit schematic diagram of the present invention; Figure 2 This is a timing diagram of the CODE Trim model of the present invention; Figure 3 This is a timing diagram of the Ibat Trim of the present invention; Figure 4 This is a schematic diagram of the Vfloat Trim timing of the present invention; Figure 5 This is a schematic diagram of the device structure of the present invention; Figure 6 This is a top view of the TRIM functional box structure of the present invention; Figure 7 This is a bottom view of the TRIM function box structure of the present invention.

[0015] In the diagram: 1. Automatic test DUT base; 2. DUT metal connector; 3. Chip under test; 4. Switch relay; 5. DUT board; 6. Straight pin connector; 7. Straight hole connector; 8. Burn-in verification fixture; 9. TRIM function box; 901. Upper shell; 902. Lower shell; 10. IO terminal block; 11. Horn connector; 12. Test chip; 13. Connection switch; 14. Lead-out connection pin. Detailed Implementation

[0016] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The specific embodiments described herein are merely used to explain the present invention and are not intended to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0017] This invention provides, for example Figure 1-4 The Trim circuit of a charging management chip shown includes an MCU module, a connection module, and a test module. One end of the connection module is connected to the MCU module, and the other end of the connection module is connected to the test module. The test module includes an integrated chip of model ATMEGA328P and an ISP chip. The ISP chip is connected to the integrated chip. A resistor R1 is connected to the third pin of the ISP chip. An LED is connected to one end of the resistor R1. One end of the LED is grounded. The charging management unit is connected to the second and third pins of the integrated chip. A switch S1 and a resistor RES1 are connected to one pin of the integrated chip. One end of the resistor RES1 is connected to a 5V voltage. A crystal oscillator is connected between the ninth and tenth pins of the integrated chip. Both ends of the crystal oscillator are connected to a 104 capacitor. One end of the 104 capacitor and one end of the switch S1 are grounded. The charging management unit includes a chip under test (DUT) 3. Pins 1 and 6 of DUT 3 are connected to a 2.2uF capacitor to ground. Pin 1 of DUT 3 is also connected to a current source. Pin 3 of DUT 3 is connected to a switch K3. One end of switch K3 is connected to a 1KΩ resistor. One end of the current source connected to the 1KΩ resistor is connected to a voltage source. The other end of switch K3 is connected to a frequency meter. Pin 4 of DUT 3 is connected to a switch K1. Pin 5 of DUT 3 is connected to switches K2 and K4. One end of switch K4 is grounded. One end of switches K1 and K2 is connected to the MCU module and the connection module. The connection module includes multiple connection terminals CON, three of which are connected to the MCU module at one end, and three of these terminals CON are connected to I / O ports that are also connected to the MCU module. Figure 1 In the schematic diagram, the signals of IO ports 1-14 can be found in the attached... Figure 1 The MCU signal terminals are measured from left to right at positions 1-14; the actual number of 0s and 1s can be compared.

[0018] The MCU module includes an MCU chip, which has PD and PB ports that match the I / O ports.

[0019] One pin of the chip under test 3 is the BAT terminal, and the sixth pin of the chip under test 3 is the VIN terminal. The sixth pin of the chip under test 3 is also connected to voltage source two. The BAT terminal and the VIN terminal are connected to ground with a 2.2uF capacitor. Voltage source two = 5V, voltage source one = 3.8V. Monitor the current value of the current source, and the current flowing out of BAT is recorded as IBAT_check.

[0020] The BAT and VIN terminals of the chip under test 3 are connected to a capacitor to ground. Voltage source two is 5V, and voltage source one increases from 3.8V to 4.5V in 5mV increments. Simultaneously, the current value of the current source is monitored. When the current flowing out of the BAT terminal is ≤50mA, the corresponding voltage value at the BAT terminal is recorded as Vfloat_check. The following two situations will occur: If 400mA≤IBAT_check≤800mA&4.175V≤Vfloat_check≤4.225V, then the TRIMMINGFUSE burn-in was successful. If Vfloat_check ≤ 4.175V, Vfloat_check ≥ 4.225V, or IBAT_check ≤ 400mA, it indicates that the trimming fuse burn-in was unsuccessful and the product was damaged due to FUY. <1> The fuse has blown and cannot be reheated; it can only be treated as a defective product.

[0021] Fuse type: Refer to JX4284AMR-G (if it is JX4284BMR-G, JX4284CMR-G or JX4284DMR-G, refer to the appendix). Figure 2 and attached Figure 1 -CODE-TRIM timing diagram) When VIN is powered on, the KEY pin is connected to the internal pull-up resistor connected to VIN. The LED port's initial voltage is 0V, and the number of rising edge pulses at the LED port corresponds to the number of fuses that burned out (FUY). <9> To FUY <1> The rising and falling edges of the LED input are less than 5µs, the high-level pulse width of the LED input is 50µs, and the low-level pulse width is greater than 50µs.

[0022] Then, the initial input voltage of KEY is VIN voltage. The programming begins after the falling edge of the KEY input, and the fuse FUY can be continuously programmed without powering back on. <9> To FUY <1> All you need to do is keep inputting pulses to the LED. The number of pulses is cumulative, and you can repeat this process to burn all the fuses. According to the testing and trimming (fuse burn-in) process for the JX4284 charging management chip, the sequence is as follows: Step 1: Charging Current Test 1 - Reference Appendix Figure 3 and attached Figure 1 Connect a 102 capacitor to ground at both the BAT and VIN terminals. VIN (voltage source 2) = 5V, BAT (voltage source 1) = 3.8V. Monitor the current value of (current source 1) and record the current flowing out of BAT as IBAT. If IBAT ≥ 800mA or IBAT ≤ 50mA, this chip is considered defective and is outside the process design range. It is judged as FAIL and scrapped. If IBAT ≥ 50mA or IBAT < 400mA, this chip is considered to have abnormal fabrication parameters and is not within the scope of end customer's design and use. Trim processing is required. This current TRIM, FUY within the LED port of the chip under test. <9> FUY <8> FUY <7> FUY <6> FUY <5> FUY <3> FUY <2> FUY <1> The FUSE position does not need to be considered, but FUY <4> The FUSE bit is set to H for 50µs, then changed to L for 50µs, and then set to L for 1ms in the KEY port to burn out the fuse. If IBAT ≥ 400mA or IBAT ≤ 800mA, this chip will not undergo Trim processing within the end customer's design usage range; in this case, the FUY in the LED port of the chip under test... <9> FUY <8> FUY <7> FUY <6> FUY <5> FUY <4> FUY <3> FUY <2> FUY <1> The FUSE bit does not need to be considered. Step 2: Charging Voltage Test 1 - Reference Appendix Figure 4 and attached Figure 1 Connect a 102 capacitor to ground at both the BAT and VIN terminals. VIN (voltage source 2) = 5V. Increase the voltage of BAT (voltage source 1) from 3.8V to 4.5V in 5mV increments. Simultaneously monitor the current value of (current source 1). When the current flowing out of BAT is ≤50mA, the corresponding voltage value of BAT (voltage source 1) is recorded as Vfloat. If Vfloat≥4.572V or Vfloat≤3.805V, this chip is considered defective, outside the process design scope, and is judged as FAIL and scrapped. If Vfloat ≥ 3.805V or Vfloat ≤ 4.572V, this chip will undergo Trim processing. The actual test values ​​and TRIMMING (FUSE) results are as follows: First, the default value for LED is L and the default value for KEY is H; When 3.805V ≤ Vfloat ≤ 3.828V, the chip under test needs to pass through the FUY port of the LED. <9> FUSE position H time 50uS, then changes to L time 50uS, then KEY sets L time 1Ms. <9> After setting L, 1, it becomes higher, and the FUY inside the LED port... <8> FUY <7> FUY <6> FUY <5> FUSE set time 50µs ( <8> <7> <6> <5> After setting H (4), the time to change L is 50µs. The FUSE function in the KEY port remains at H, and the FUY function in the LED port remains at H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.829V ≤ Vfloat ≤ 3.852V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <5> After setting L (2), it becomes higher, and the FUY inside the LED port... <8> FUY <7> FUY <6> FUSE set time 50µs ( <8> <7> <6> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.853V ≤ Vfloat ≤ 3.876V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <6> After setting L (2), it becomes higher, and the FUY inside the LED port... <8> FUY <7> FUY <5> FUSE set time 50µs ( <8> <7> <5> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.877V ≤ Vfloat ≤ 3.900V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <6> <5> After setting L (3), the height increases, and the FUY inside the LED port... <8> FUY <7> FUSE set time 50µs ( <8> <7> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.901V ≤ Vfloat ≤ 3.924V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <7> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <7> After setting L (2), it becomes higher, and the FUY inside the LED port... <8> FUY <6> FUY <5> FUSE set time 50µs ( <8> <6> <5> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.925V ≤ Vfloat ≤ 3.948V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <7> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <7> <5> After setting L (3), the height increases, and the FUY inside the LED port... <8> FUY <6> FUSE set time 50µs ( <8> <6> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.949V ≤ Vfloat ≤ 3.972V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <7> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <7> <6> After setting L (3), the height increases, and the FUY inside the LED port... <8> FUY <5> FUSE set time 50µs ( <8> <5> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.973V ≤ Vfloat ≤ 3.996V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <7> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <7> <6> <5> After setting L (4), the height increases, and the FUY inside the LED port... <8> FUSE set time 50µs ( <8> Set H, 1) then change L for 50µs, FUSE in KEY port holds H, FUY in LED port <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 3.997V ≤ Vfloat ≤ 4.020V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> After setting L (2), it becomes higher, and the FUY inside the LED port... <7> FUY <6> FUY <5> FUSE set time 50µs ( <7> <6> <5> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.021V ≤ Vfloat ≤ 4.044V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <5> After setting L (3), the height increases, and the FUY inside the LED port... <7> FUY <6> FUSE set time 50µs ( <7> <6> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.045V ≤ Vfloat ≤ 4.068V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <6> After setting L (3), the height increases, and the FUY inside the LED port... <7> FUY <5> FUSE set time 50µs ( <7> <5> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.069V ≤ Vfloat ≤ 4.092V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <6> <5> After setting L (4), the height increases, and the FUY inside the LED port... <7> FUSE set time 50µs ( <7> Set H, 1) then change L for 50µs, FUSE in KEY port holds H, FUY in LED port <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.093V ≤ Vfloat ≤ 4.116V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <7> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <7> After setting L (3), the height increases, and the FUY inside the LED port... <6> FUY <5> FUSE set time 50µs ( <6> <5> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.117V ≤ Vfloat ≤ 4.140V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <7> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <7> <5> After setting L (4), the height increases, and the FUY inside the LED port... <6> FUSE set time 50µs ( <6> Set H, 1) then change L for 50µs, FUSE in KEY port holds H, FUY in LED port <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.141V ≤ Vfloat ≤ 4.164V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <7> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <7> <6> After setting L (4), the height increases, and the FUY inside the LED port... <5> FUSE set time 50µs ( <5> Set H, 1) then change L for 50µs, FUSE in KEY port holds H, FUY in LED port <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.165V ≤ Vfloat ≤ 4.188V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <7> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <9> <8> <7> <6> <5> After setting L, 5 units, the height increases, and the LED port internal FUY <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.189V ≤ Vfloat ≤ 4.212V, the chip under test needs to pass through the FUY port in the LED port. <9> FUY <8> FUY <7> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to H time 1ms. <9> <8> <7> <6> <5> After setting H, 5, the height increases, and the LED port internal FUY <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. When 4.213V ≤ Vfloat ≤ 4.236V, the chip under test needs to pass through the FUY port of the LED. <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY sets L time 1Ms. <5> After setting L, 1, it becomes higher, and the FUY inside the LED port... <9> FUY <7> FUY <6> FUY <5> FUSE set time 50µs ( <9> <7> <6> <5> After setting H (4), the time to change L is 50µs. The FUSE function in the KEY port remains at H, and the FUY function in the LED port remains at H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. When 4.237V ≤ Vfloat ≤ 4.260V, the chip under test needs to pass through the FUY port of the LED. <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY sets L time 1Ms. <6> After setting L, 1, it becomes higher, and the FUY inside the LED port... <9> FUY <8> FUY <7> FUY <5> FUSE set time 50µs ( <9> <8> <7> <5> After setting H (4), the time to change L is 50µs. The FUSE function in the KEY port remains at H, and the FUY function in the LED port remains at H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.261V ≤ Vfloat ≤ 4.284V, the chip under test needs to pass through the FUY port in the LED port. <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <6> <5> After setting L (2), it becomes higher, and the FUY inside the LED port... <8> FUY <7> FUY <6> FUSE set time 50µs ( <9> <8> <7> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.285V ≤ Vfloat ≤ 4.308V, the chip under test needs to pass through the FUY port in the LED port. <7> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <7> After setting L, 1, it becomes higher, and the FUY inside the LED port... <9> FUY <8> FUY <6> FUY <5> FUY <5> FUSE set time 50µs ( <9> <8> <6> <5> After setting H (4), the time to change L is 50µs. The FUSE function in the KEY port remains H, and the FUY function in the LED port remains H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.309V ≤ Vfloat ≤ 4.332V, the chip under test needs to pass through the FUY port in the LED port. <7> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <7> <5> After setting L (2), it becomes higher, and the FUY inside the LED port... <9> FUY <8> FUY <6> FUSE set time 50µs ( <9> <8> <6> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.333V ≤ Vfloat ≤ 4.356V, the chip under test needs to pass through the FUY port in the LED port. <7> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <7> <6> After setting L (2), it becomes higher, and the FUY inside the LED port... <9> FUY <8> FUY <5> FUSE set time 50µs ( <9> <8> <5> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.357V ≤ Vfloat ≤ 4.380V, the chip under test needs to pass through the FUY port of the LED. <7> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <7> <6> After setting L (3), the height increases, and the FUY inside the LED port... <9> FUY <8> FUSE set time 50µs ( <9> <8> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.381V ≤ Vfloat ≤ 4.404V, the chip under test needs to pass through the FUY port in the LED port. <8> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> After setting L, 1, it becomes higher, and the FUY inside the LED port... <9> FUY <7> FUY <6> FUY <5> FUSE set time 50µs ( <9> <7> <6> <5> After setting H (4), the time to change L is 50µs. The FUSE function in the KEY port remains at H, and the FUY function in the LED port remains at H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.405V ≤ Vfloat ≤ 4.428V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <5> After setting L (2), it becomes higher, and the FUY inside the LED port... <9> FUY <7> FUY <6> FUSE set time 50µs ( <9> <7> <6> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.429V ≤ Vfloat ≤ 4.452V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <6> After setting L (2), it becomes higher, and the FUY inside the LED port... <9> FUY <7> FUY <5> FUSE set time 50µs ( <9> <7> <6> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.453V ≤ Vfloat ≤ 4.476V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <6> <5> After setting L (3), the height increases, and the FUY inside the LED port... <9> FUY <7> FUSE set time 50µs ( <9> <7> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.477V ≤ Vfloat ≤ 4.500V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <7> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <7> After setting L (2), it becomes higher, and the FUY inside the LED port... <9> FUY <6> FUY <5> FUSE set time 50µs ( <9> <6> <5> After setting H (3), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.501V≤Vfloat≤4.524V, the chip under test needs to pass the 8th pulse of LED, the 7th LED, the 5th LED set H for 50µs and then L for 50µs, then KEY set L for 1ms and then goes high. The 6th and 9th LEDs set H for 50µs and then L for 50µs, KEY remains H. The 4th LED pulse (current adjustment bit) needs to be determined based on the Ibat charging current to determine whether it is adjusted. The 3rd and 2nd LED pulses (model adjustment bit) need to be determined based on the customer-specified model code. The 4th LED pulse is set H for 50µs, then L for 50µs, then KEY set L for 1ms to ensure the fuse is burned out. Continuing from above, when 4.525V ≤ Vfloat ≤ 4.548V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <7> FUY <6> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <7> <6> After setting L (3), the height increases, and the FUY inside the LED port... <9> FUY <5> FUSE set time 50µs ( <9> <5> After setting H (2), the time to change L is 50µs. The FUSE in the KEY port remains H, and the FUY in the LED port... <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Continuing from above, when 4.549V ≤ Vfloat ≤ 4.572V, the chip under test needs to pass through the FUY port in the LED port. <8> FUY <7> FUY <6> FUY <5> FUSE position H time 50uS, then changes to L time 50uS, then KEY set to L time 1ms. <8> <7> <6> <5> After setting L (4), the height increases, and the FUY inside the LED port... <9> FUY <5> FUSE set time 50µs ( <9> After setting H (2), the time to change L is 50µs. The FUSE function in the KEY port remains at H, and the FUY function in the LED port remains at H. <4> FUSE (current adjustment setting) needs to be determined based on the Ibat charging current (set H / L), FUY <3> FUY <2> FUSE (Model Adjustment) requires adjustment based on the customer-specified model code (set to H / L). FUY <1> FUSE is a bit that sets H for 50µs, then changes to L for 50µs, and then sets FUSE L for 1ms in the KEY port to burn out the fuse. Based on the above-described charging management chip Trim circuit, the present invention also provides a charging management chip Trim device, such as... Figure 5-7As shown, the system includes a TRIM function box 9, on which both the connection module and the MCU module are located. The TRIM function box 9 has multiple I / O terminals 10 connected to the MCU module. A burn-in verification fixture 8 containing a test chip 12 is fixed to the upper surface of the TRIM function box 9. The charging management unit is connected to the burn-in verification fixture 8. An automatic test DUT base 1 is detachably connected to one side of the TRIM function box 9. The system also includes a DUT board 5 mounted on the upper end of the automatic test DUT base 1. A DUT metal connector 2 is mounted on the DUT board 5, and a chip under test 3 is mounted on the DUT metal connector 2. Multiple switching relays 4 are located on one side of the DUT metal connector 2.

[0023] The connection module includes a horn connector 11, a straight pin connector 6, and a straight hole connector 7. The straight pin connector 6 is fixed on the DUT board 5, the straight hole connector 7 is fixed on one side of the TRIM function box 9, and the straight pin connector 6 and the straight hole connector 7 are matched. The horn connector 11 is fixed on the side of the TRIM function box 9 adjacent to the straight hole connector 7.

[0024] TRIM Function Box 9 includes an upper shell 901 and a lower shell 902. The upper shell 901 is fixed to the upper end of the lower shell 902 by bolts. The horn connector 11 is located between the upper shell 901 and the lower shell 902, and a clearance hole is provided on one side of the lower shell 902 to expose one end of the horn connector 11.

[0025] Multiple connection switches 13 are fixed at equal intervals on the lower surface of the upper shell 901. An integrated chip is located on one side of the connection switch 13, and multiple lead-out connection pins 14 are provided on the integrated chip.

[0026] In automatic testing mode, manually debug and verify that the product to be tested by TRIM is not placed in the SOT23-6L fixture, leaving it empty; power supply for the test signal of the product under test: the test power supply supplies power to the chip under test through the test power supply's horn connector, TRIM function box, DB25 straight hole connector, DB25 straight pin connector, DUT board, DUT metal connector, and then connects to the corresponding VIN_PIN and BAT_PIN of the product; test signal feedback of the product under test: after the corresponding VIN_PIN and BAT_PIN are connected to the test power supply through the relevant accessories, the test power supply detects its Vfloat voltage and Ibat current, calculates the TRIM CODE, and then transmits it to the MCU module in the TRIM function box; power supply for the TRIM signal of the product under test: the TRIM CODE generated by the MCU module in the TRIM function box is supplied to the chip under test through the DB25 straight hole connector, DB25 straight pin connector, DUT board, DUT metal connector, and then connects to the corresponding LED_PIN and KEY_PIN of the product; the automatic test DUT base plays a supporting and fixing role, ensuring that the product under test is in the correct position; In manual verification testing, the product to be tested by TRIM is placed in the SOT23-6L fixture for manual debugging and verification. Accessories such as DB25 straight-hole connectors, DB25 straight-pin connectors, DUT boards, and DUT metal connectors are supplied to the chip under test (DUT) without the use of a test power source. The DUT is connected to the corresponding VIN_PIN and BAT_PIN of the product via the test power source's horn connector and TRIM function box. Test signal feedback: After the corresponding VIN_PIN and BAT_PIN are connected to the test power source via the TRIM function box and horn connector, the test power source detects the Vfloat voltage and Ibat current, calculates the TRIM CODE, and then transmits it to the MCU module in the TRIM function box. TRIM signal action: The TRIM CODE generated by the MCU module in the TRIM function box is connected to the corresponding LED_PIN and KEY_PIN of the product to supply the DUT. In both manual and automatic TRIM testing, the MCU module's IO signal terminals can be easily connected to the input interface of an oscilloscope or logic analyzer to capture dynamic CODE waveforms and compare them with pre-generated TRIM CODEs for analysis.

[0027] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A Trim circuit for a charging management chip, characterized in that: The system includes an MCU module, a connection module, and a test module. One end of the connection module is connected to the MCU module, and the other end is connected to the test module. The test module includes an integrated chip (ATMEGA328P) and an ISP chip. The ISP chip is connected to the integrated chip. A resistor R1 is connected to the third pin of the ISP chip. One end of the resistor R1 is connected to an LED, and one end of the LED is grounded. A charging management unit is connected to the second and third pins of the integrated chip. A switch S1 and a resistor RES1 are connected to the first pin of the integrated chip. One end of the resistor RES1 is connected to a 5V voltage. A crystal oscillator is connected between the ninth and tenth pins of the integrated chip, and both ends of the crystal oscillator are connected to a 104 capacitor. One end of the 104 capacitor and one end of the switch S1 are both grounded. The charging management unit includes a chip under test (3). One and six pins of the chip under test (3) are connected to a 2.2uF capacitor to ground. One pin of the chip under test (3) is also connected to a current source. Three pins of the chip under test (3) are connected to a switch K3. One end of the switch K3 is connected to a 1KΩ resistor. One end of the current source at one end of the 1KΩ resistor is connected to a voltage source. The other end of the switch K3 is connected to a frequency meter. Four pins of the chip under test (3) are connected to a switch K1. Five pins of the chip under test (3) are connected to switches K2 and K4. One end of the switch K4 is grounded. One end of the switches K1 and K2 are connected to the MCU module and the connection module. The MCU module includes an MCU chip, which is equipped with PD and PB ports that match the IO ports; one pin of the chip under test (3) is the BAT terminal, the six pins of the chip under test (3) are the VIN terminal, and the six pins of the chip under test (3) are also connected to a voltage source two. The BAT terminal and the VIN terminal are connected to ground with a 2.2uF capacitor. When the voltage source two = 5V and the voltage source one = 3.8V, the current value of the current source is monitored, and the current flowing out of BAT is recorded as IBAT_check. When voltage source two = 5V, and voltage source one increases from 3.8V to 4.5V in 5mV increments, the current value of the current source is monitored simultaneously. When the current flowing out of the BAT terminal is ≤50mA, the corresponding voltage value at the BAT terminal is recorded as Vfloat_check. The following two situations will exist: If 400mA≤IBAT_check≤800mA&4.175V≤Vfloat_check≤4.225V, then the TRIMMINGFUSE burn-in was successful. If Vfloat_check ≤ 4.175V, Vfloat_check ≥ 4.225V, or IBAT_check ≤ 400mA, it indicates that the trimming fuse burn-in was unsuccessful and the product was damaged due to FUY. <1> The fuse has blown and cannot be reheated; it can only be treated as a defective product.

2. The Trim circuit for a charging management chip according to claim 1, characterized in that: The connection module includes multiple connection terminals CON, one end of three of the connection terminals CON is connected to the MCU module, and the three connection terminals CON are connected to I / O ports that are connected to the MCU module.

3. A charging management chip Trim device, based on the charging management chip Trim circuit according to any one of claims 1-2, characterized in that: The TRIM function box (9) is included. The connection module and the MCU module are both located on the TRIM function box (9). The TRIM function box (9) is provided with multiple IO terminals (10) connected to the MCU module. The upper surface of the TRIM function box (9) is fixed with a burn-in verification fixture (8) containing a test chip (12). The charging management unit is connected to the burn-in verification fixture (8). An automatic test DUT base (1) is detachably connected to one side of the TRIM function box (9).

4. The charging management chip Trim device according to claim 3, characterized in that: It also includes an automatic test DUT base (1) with a DUT board (5) installed on the upper end, a DUT metal connector (2) on the DUT board (5), a chip under test (3) on the DUT metal connector (2), and multiple switching relays (4) on one side of the DUT metal connector (2).

5. The charging management chip Trim device according to claim 4, characterized in that: The connection module includes a horn connector (11), a straight pin connector (6), and a straight hole connector (7). The straight pin connector (6) is fixed on the DUT board (5), and the straight hole connector (7) is fixed on one side of the TRIM function box (9). The straight pin connector (6) and the straight hole connector (7) are matched. The horn connector (11) is fixed on the side of the TRIM function box (9) adjacent to the straight hole connector (7).

6. The charging management chip Trim device according to claim 5, characterized in that: The TRIM function box (9) includes an upper shell (901) and a lower shell (902). The upper shell (901) is fixed to the upper end of the lower shell (902) by bolts. The horn connector (11) is located between the upper shell (901) and the lower shell (902), and a clearance hole is provided on one side of the lower shell (902) for exposing one end of the horn connector (11).

7. The charging management chip Trim device according to claim 6, characterized in that: The lower surface of the upper shell (901) is fixed with multiple connection switches (13) at equal intervals. The integrated chip is located on one side of the connection switch (13), and the integrated chip is provided with multiple lead-out connection pins (14).

Citation Information

Patent Citations

  • System and method for realizing SOC test trimming based on MCU

    CN115993520A

  • Single section lithium batteries management chip failure detector circuit

    CN204719192U

  • Universal USB single-channel high-side power distribution switch testing device

    CN215768899U