Method and apparatus for controlling inrush current, storage medium and processor
By triggering a drive signal in the switching power supply circuit to control the relay to engage and the Boost-PFC circuit to charge, the problem of excessive inrush current during startup of the switching power supply is solved, achieving effective control of the inrush current and meeting the specifications.
Patent Information
- Application Number
- CN202210452414.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-27
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-04-27
AI Technical Summary
The inrush current during startup of a switching power supply is relatively large, making it difficult for the startup inrush current of the switching power supply to meet the specifications.
The relay is controlled to engage by triggering the first drive signal. The relay is engaged when there is an intersection between the target AC input voltage and the PFC bus voltage. After the relay is engaged, the second drive signal is triggered to charge the bus capacitor using the Boost-PFC circuit, thus optimizing the charging process and reducing the inrush current.
It effectively reduces the inrush current during the startup of the switching power supply, ensuring it meets specifications. It also optimizes the boosting method and rate of the bus voltage, avoiding inrush current caused by excessive voltage difference.
Smart Images

Figure CN117013813B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of switching power supply technology, and more specifically, to a method and apparatus for controlling inrush current, a storage medium, and a processor. Background Technology
[0002] Excessive inrush current during startup is a common problem in many switching power supply designs. Currently, many circuit designs incorporate soft-start circuits for surge control to prevent excessive input current from charging downstream inductors and capacitors. In high-power systems, surge suppression is typically achieved using series resistors, which are then short-circuited by bidirectional thyristors, SRC (Self-Regulating Transmission Unit), or relays after the input capacitor is fully charged. However, the instant these switching devices short-circuit the resistor, the voltage originally applied to the soft-start resistor is instantly applied to the downstream bus capacitor. Therefore, the voltage difference between the bus voltage and the input AC voltage often results in a significant inrush current.
[0003] To address the generation of the aforementioned inrush current, most current solutions involve reducing the bus capacitor capacity, reducing the soft-start resistor, and controlling the delayed engagement time of the relay, etc. However, these methods have many limitations.
[0004] Furthermore, during the startup process of a switching power supply, a soft-start resistor is typically used to limit excessive charging current during startup. However, the industry standard design typically involves a single activation, and when the soft-start circuit relay activates, the soft-start resistor is short-circuited, causing the voltage originally applied across the soft-start resistor to suddenly increase across the PFC bus capacitor, resulting in a large input inrush current charging the bus capacitor.
[0005] In addition, after a typical switching power supply is powered on, it first passes through an input filter circuit, and then... Figure 1 The diagram shows the soft-start circuit and the Boost-PFC circuit. Before the soft-start relay is energized and the power switch is not turned on, the AC input first charges the bus capacitor through the soft-start resistor, then through the PFC inductor L and diode D1. Once the bus voltage stabilizes, the relay energizes. At this point, a large voltage difference will occur between the AC input Vin and the Boost-PFC circuit within a very short time. This voltage difference will charge the bus capacitor, resulting in a large current.
[0006] For example, taking a 50Hz 220V AC input voltage as an example, its peak voltage is 311V, and one cycle is 20ms. However, the actual relay operating time may only be about 1ms. Therefore, when the soft-start resistor is not selected appropriately, the voltage difference before and after the relay is energized may be tens of volts. In addition, since the output bus capacitors are mostly multiple large capacitors of several hundred microfarads connected in parallel, the formula... The calculated impact current value could reach tens of amperes.
[0007] There is currently no effective solution to the problem that the startup inrush current of switching power supplies is too large, making it difficult for the startup inrush current of switching power supplies to meet the specifications. Summary of the Invention
[0008] The main objective of this application is to provide a method, device, storage medium, and processor for controlling inrush current, in order to solve the problem in the related art that the inrush current during the startup of a switching power supply is too large, making it difficult for the startup inrush current of the switching power supply to meet the specifications.
[0009] To achieve the above objectives, according to one aspect of this application, a method for controlling inrush current is provided. This method is applied in a switching power supply circuit, the switching power supply circuit including a soft-start circuit and a Boost-PFC circuit, the soft-start circuit including a relay, and the Boost-PFC circuit including a bus capacitor. The method includes: triggering a first drive signal, wherein the first drive signal is used to instruct the relay to perform a energizing operation; after a target AC input voltage reaches its peak value, if the target AC input voltage and the PFC bus voltage intersect, responding to the first drive signal, controlling the relay to be in an energized state, wherein the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, triggering a second drive signal, wherein the second drive signal is used to instruct the Boost-PFC circuit to charge the bus capacitor; responding to the second drive signal, charging the bus capacitor to control the inrush current during startup of the switching power supply circuit.
[0010] Furthermore, after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts, the method further includes: acquiring the inrush current and the target inrush current; if the inrush current is greater than the target inrush current, restarting the switching power supply circuit to control the relay to be in the open state; triggering the first drive signal, and after the target AC input voltage reaches its peak value, but before the target AC input voltage and the PFC bus voltage intersect, responding to the first drive signal to control the relay to be in the closed state.
[0011] Further, in response to the second drive signal, charging the bus capacitor to control the inrush current when the switching power supply circuit starts up includes: responding to the second drive signal and using the Boost-PFC circuit to charge the bus capacitor to obtain a charged bus voltage; and controlling the inrush current when the switching power supply circuit starts up based on the charged bus voltage and the target AC input voltage.
[0012] Further, triggering the first drive signal includes: acquiring the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; determining the time to trigger the first drive signal based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; and triggering the first drive signal when the time to trigger the first drive signal is reached.
[0013] Further, responding to the first drive signal includes: acquiring design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; determining the time to respond to the first drive signal based on the design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; and responding to the first drive signal when the time to respond to the first drive signal is reached.
[0014] Furthermore, the boost rate of the Boost-PFC circuit is set via software code.
[0015] To achieve the above objectives, according to another aspect of this application, a control device for inrush current is provided. This device is used in a switching power supply circuit, which includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. The device includes: a first trigger unit for triggering a first drive signal, wherein the first drive signal is used to instruct the relay to engage; a first response unit for responding to the first drive signal and controlling the relay to engage after the target AC input voltage reaches its peak value, if the target AC input voltage and the PFC bus voltage intersect, wherein the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; a second trigger unit for triggering a second drive signal after the relay engages, if the target AC input voltage is less than the PFC bus voltage, wherein the second drive signal is used to instruct the Boost-PFC circuit to charge the bus capacitor; and a second response unit for responding to the second drive signal to charge the bus capacitor to control the inrush current during startup of the switching power supply circuit.
[0016] Furthermore, the device further includes: a first acquisition unit, configured to acquire the inrush current and a target inrush current after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts; a first restart unit, configured to restart the switching power supply circuit if the inrush current is greater than the target inrush current, to control the relay to be in an open state; and a first processing unit, configured to trigger the first drive signal and, after the target AC input voltage reaches its peak value but before the target AC input voltage intersects with the PFC bus voltage, respond to the first drive signal to control the relay to be in a closed state.
[0017] Furthermore, the second response unit includes: a first response module, used to respond to the second drive signal and use the Boost-PFC circuit to charge the bus capacitor to obtain a charged bus voltage; and a first control module, used to control the inrush current when the switching power supply circuit starts up based on the charged bus voltage and the target AC input voltage.
[0018] Further, the first triggering unit includes: a first acquisition module, used to acquire the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; a first determination module, used to determine the time to trigger the first driving signal based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; and a first triggering module, used to trigger the first driving signal when the time to trigger the first driving signal is reached.
[0019] Further, the first response unit includes: a second acquisition module, used to acquire the design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; a second determination module, used to determine the time to respond to the first drive signal based on the design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; and a second response module, used to respond to the first drive signal when the time to respond to the first drive signal is reached.
[0020] Furthermore, the boost rate of the Boost-PFC circuit is set via software code.
[0021] To achieve the above objectives, according to another aspect of this application, a computer-readable storage medium is provided, the storage medium storing a program, wherein the program executes the inrush current control method described in any one of the above claims.
[0022] To achieve the above objectives, according to another aspect of this application, a processor is provided for running a program, wherein the program executes the inrush current control method described in any one of the above claims.
[0023] This application, when applied to a switching power supply circuit, includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. The application employs the following steps: triggering a first drive signal, wherein the first drive signal instructs the control relay to engage; after the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, responding to the first drive signal, the relay is controlled to engage, wherein the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; after the relay engages, if the target AC input voltage is less than the PFC bus voltage, triggering a second drive signal, wherein the second drive signal instructs the Boost-PFC circuit to charge the bus capacitor; responding to the second drive signal, the bus capacitor is charged to control the inrush current during startup of the switching power supply circuit. This solves the problem in related technologies where the inrush current during startup of the switching power supply is large, making it difficult to meet the specifications of the switching power supply. The drive signal triggers the control relay to engage. After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the drive signal is triggered to keep the relay engaged. Then, after the relay engages, if the target AC input voltage is less than the PFC bus voltage, a drive signal is triggered to charge the bus capacitor. The drive signal is triggered to charge the bus capacitor, thereby controlling the inrush current during the startup of the switching power supply circuit. This reduces the inrush current during startup of the switching power supply, thus achieving the effect of ensuring that the startup inrush current of the switching power supply meets the specifications. Attached Figure Description
[0024] The accompanying drawings, which form part of this application, are used to provide a further understanding of this application. The illustrative embodiments and descriptions of this application are used to explain this application and do not constitute an undue limitation of this application. In the drawings:
[0025] Figure 1 This is a circuit diagram of a soft-start circuit and a Boost-PFC circuit in a switching power supply circuit in the prior art;
[0026] Figure 2 This is a flowchart of the inrush current control method provided according to the embodiments of this application;
[0027] Figure 3This is a schematic diagram showing the waveform of the AC voltage input to the switching power supply circuit in the embodiments of this application and the relay pull-in time t2 being located at or after t4;
[0028] Figure 4 This is a schematic diagram showing the waveform of the AC voltage input to the switching power supply circuit in the embodiment of this application and the relay energizing time t2 being before t4;
[0029] Figure 5 This is a schematic diagram of an inrush current control device provided according to an embodiment of this application. Detailed Implementation
[0030] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0031] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, other embodiments obtained by those of ordinary skill in the art without creative effort should all fall within the scope of protection of the present application.
[0032] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate for the embodiments of this application described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products, or apparatuses.
[0033] The present invention will now be described in conjunction with preferred implementation steps. Figure 1 These are circuit diagrams of soft-start circuits and Boost-PFC circuits in existing switching power supply circuits, such as... Figure 1 As shown, the switching power supply circuit includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a soft-start relay and a soft-start resistor, while the Boost-PFC circuit includes a power switching transistor and a bus capacitor. Figure 2 This is a flowchart of an inrush current control method provided according to an embodiment of this application, and the method is applied to, for example... Figure 1In the switching power supply circuit shown, such as Figure 2 As shown, the method includes the following steps:
[0034] Step S201: Trigger the first drive signal, wherein the first drive signal is used to instruct the control relay to perform a energizing operation.
[0035] Figure 3 This is a schematic diagram showing the waveform of the AC voltage input to the switching power supply circuit in the embodiments of this application, and the relay activation time t2 being located at or after t4. Figure 4 This is a schematic diagram showing the waveform of the AC voltage input to the switching power supply circuit in the embodiments of this application, and the relay activation time t2 being before t4. Figure 3 and Figure 4 As shown, at time t0, the drive signal that controls the soft-start relay to engage is issued.
[0036] Step S202: After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, respond to the first drive signal and control the relay to be in the energized state. Here, the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor.
[0037] In this embodiment, Figure 3 , Figure 4 Points t1 and t4 represent the intersection of the maximum PFC bus voltage achievable by charging the PFC bus capacitor before the soft-start relay engages and the input voltage, respectively. Point t2 represents the moment the soft-start relay is fully engaged. Additionally, Figure 4 Point t3 in the equation represents the intersection of the PFC bus voltage and the AC input voltage, i.e., the moment when the PFC bus voltage equals the AC input voltage. It's important to note that if the soft-start relay's engagement time t2 occurs at or after point t4, i.e., as shown... Figure 3 As shown, since no current flows during this time period, Figure 3 There is no intersection point between the PFC bus voltage and the AC input voltage (i.e., point t3). Therefore, as... Figure 3As shown, after the AC input voltage reaches its peak, when or after an intersection point exists between the AC input voltage and the PFC bus voltage, the drive signal for controlling the soft-start relay to close, which is issued at time t0, is responded to, and the soft-start relay is controlled to close. That is, when time t2 is at or after time t4, the drive signal for controlling the soft-start relay to close, which is issued at time t0, is responded to, and the soft-start relay is controlled to close. Thus, the actual closing point of the soft-start relay is ensured to be near t4. However, in traditional designs, the drive signal for controlling the soft-start relay to close is usually issued at the AC zero-crossing point. For example, taking a power frequency of 50Hz as an example, a quarter cycle is 5ms. When the operation time of the soft-start relay is also 5ms, the soft-start relay will be fully closed at the peak value of the AC input voltage, which will lead to a very large voltage difference between Vac and Vpfc.
[0038] In step S203, after the relay completes the closing operation, if the target AC input voltage is less than the PFC bus voltage, a second drive signal is triggered, wherein the second drive signal is used to instruct to charge the bus capacitor by using the Boost-PFC circuit.
[0039] In this embodiment, Figure 3 , Figure 4 t5 in is the time when the PFC power switch tube is controlled to start driving, and t6 and t7 are two moments in the second half cycle of the waveform corresponding to the AC voltage input to the switching power supply circuit when the AC input voltage equals the PFC bus voltage. That is, as shown in Figure 3 after the soft-start relay is closed and before time t6 (when the AC input voltage is less than the PFC bus voltage), the PFC power switch tube is controlled to start driving at time t5 to charge the bus capacitor. However, in traditional designs, when the PFC power switch tube is controlled to start driving, the PFC bus voltage has already reached the peak value of the AC input voltage, so it is ensured that circuits similar to L and D1 in the circuit shown in Figure 1 can no longer be used to charge the bus capacitor. In this application, by adopting the method of driving the PFC power switch tube to start driving in advance, that is, at time t5, when Vac < Vpfc, the BOOST step-up circuit is used to charge the bus capacitor, so that the amplitude of the input inrush current will be greatly reduced in the next half cycle.
[0040] In step S204, the bus capacitor is charged in response to the second drive signal to control the inrush current when the switching power supply circuit starts.
[0041] In this embodiment, in Figure 3During the t5 to t6 phase, the PFC Boost circuit is used to charge the downstream bus capacitor. During the t6 to t7 phase, the voltage difference between Vac and Vpfc is already very small. By the end of this half-cycle, the basic PFC bus voltage has almost risen to 311V. Therefore, the inrush current during the startup of the switching power supply circuit can be reduced.
[0042] Through the above steps S201 to S204, a drive signal is triggered to control the relay to perform a energizing operation. After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the relay is controlled to be in an energized state in response to the drive signal. Then, after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, a drive signal to charge the bus capacitor is triggered, and the bus capacitor is charged in response to the drive signal. This controls the inrush current when the switching power supply circuit starts up, thereby reducing the inrush current when the switching power supply starts up, and thus achieving the effect of making the starting inrush current of the switching power supply meet the specifications of the switching power supply.
[0043] Optionally, in the inrush current control method provided in the embodiments of this application, after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts, the method further includes: acquiring the inrush current and the target inrush current; if the inrush current is greater than the target inrush current, restarting the switching power supply circuit to control the relay to be in the open state; triggering the first drive signal, and after the target AC input voltage reaches its peak value, and before there is an intersection between the target AC input voltage and the PFC bus voltage, responding to the first drive signal to control the relay to be in the energized state.
[0044] In this embodiment, when by means of Figure 3 As shown, when point t2 is at point t4 or after point t4, the drive signal for controlling the soft-start relay to engage is issued at time t0, and the soft-start relay is controlled to engage. However, the resulting inrush current during power supply startup does not meet the desired expectation; that is, the startup inrush current is still larger than the expected startup inrush current. This can be addressed by... Figure 4 As shown, before point t4, the drive signal for activating the soft-start relay issued at time t0 is responded to at point t2. By controlling the activation of the soft-start relay, the startup inrush current of the switching power supply is reduced. Additionally, during the time interval t2 to t3, the PFC bus voltage will slightly increase due to the activation of the soft-start relay. It is important to note that time t2 is determined by time t0; therefore, time t0 can be controlled via software, thereby controlling points t2 and t3. Therefore, in practical designs, a method like this can also be used. Figure 3In the manner shown, the t2 point may be selected to be controlled at the t4 point or after the t4 point, that is, the moment when the soft-start relay is fully closed is controlled to be at the moment when Vac<Vpfc. However, the actual specific circuit design selection also needs to consider whether the amplitude of the input inrush current wave head in the second half cycle meets the requirements, so it can also refer to Figure 4 In the manner shown, controlling t2 and t3 before the t4 time can disperse some energy and also optimize the overall design.
[0045] In summary, by controlling the closing time of the soft-start relay, it is possible to avoid an excessive voltage difference between the Vac peak and Vpfc during the half cycle when the soft-start relay is closed. In addition, by controlling the relay drive signal wave generation time t0 and delaying the relay closing time, it is ensured that the relay closing time t2 point is located in the time period of Vac<Vpfc or in the range where the difference between Vac and Vpfc is extremely small, so as to reduce excessive uncontrolled rectification caused by relay closing, and at the same time, it can control the inrush current wave head when the switching power supply starts to almost completely disappear.
[0046] Optionally, in the method for controlling inrush current provided by the embodiment of the present application, charging the bus capacitor in response to the second driving signal to control the inrush current when the switching power supply circuit starts includes: responding to the second driving signal, and using a Boost-PFC circuit to charge the bus capacitor to obtain the charged bus voltage; and controlling the inrush current when the switching power supply circuit starts according to the charged bus voltage and the target AC input voltage.
[0047] For example, Figure 3 and Figure 4 In the t5 to t6 stage shown, the Boost boost circuit of the PFC is used to charge the post-stage bus capacitor, and in the t6 to t7 stage, the voltage difference between Vac and Vpfc at this time is already extremely small, and the PFC bus voltage has almost been raised to 311V at the end of this half cycle, that is, the inrush current when the switching power supply starts is reduced. However, in the conventional practice, the PFC main circuit generally works normally only after the bus voltage rises to the peak value of the AC input voltage. However, in the present application, during the process from when the soft-start relay is closed to when the PFC bus voltage rises to the peak value of the AC input voltage, the PFC drive is controlled to generate waves in advance by using the time period of Vac<Vpfc, so that the Boost circuit starts to work, that is, the Boost circuit is used to continue to boost the bus voltage in the time period of Vac<Vpfc.
[0048] In summary, during the period from the soft-start relay pulling-in to the PFC bus voltage rising to the peak value of the AC input voltage, the PFC driver is controlled to utilize the time period when Vac < Vpfc to generate waveforms in advance, so that the Boost circuit starts to operate, thereby optimizing the boosting mode and rate of the PFC bus voltage in this stage, and avoiding a large inrush current caused by an excessive voltage difference between the subsequent peak of the AC input voltage and the PFC bus voltage.
[0049] Optionally, in the method for controlling inrush current provided by the embodiment of the present application, triggering the first driving signal includes: acquiring a target grid frequency, an operation time of the relay, and design parameters of the switching power supply circuit; determining a time for triggering the first driving signal according to the target grid frequency, the operation time of the relay, and the design parameters of the switching power supply circuit; and triggering the first driving signal when the time for triggering the first driving signal is reached.
[0050] For example, Figure 3 and Figure 4 the selection of the t0 point may take into account the actual grid frequency, the operation time of the relay, and is closely related to the design requirements of the specific rectifier. Specifically, the time for triggering the relay pull-in driving signal is determined according to the actual grid frequency, the operation time of the relay, and the design of the specific rectifier, and the relay pull-in driving signal is triggered when this time is reached. That is, the t0 moment can be adjusted according to the grid frequency and specific hardware conditions.
[0051] Through the above solution, the time for triggering the relay pull-in driving signal can be quickly determined, and the relay pull-in driving signal can be triggered according to this time.
[0052] Optionally, in the method for controlling inrush current provided by the embodiment of the present application, responding to the first driving signal includes: acquiring design parameters of a target grid frequency, a target AC input voltage, and a PFC bus voltage; determining a time for responding to the first driving signal according to the target grid frequency, the target AC input voltage, and the design parameters of the PFC bus voltage; and responding to the first driving signal when the time for responding to the first driving signal is reached.
[0053] For example, Figure 3 and Figure 4The selection of points t1 and t4 is related to the grid frequency, input voltage, and the rectifier's design for the PFC bus voltage. Furthermore, the actual activation point t2 of the soft-start relay is near t4. Therefore, based on the grid frequency, input voltage, and the rectifier's design for the PFC bus voltage, the maximum intersection point t4 between the PFC bus voltage and the input voltage that can be achieved by charging the PFC bus capacitor before the soft-start relay activates is determined. Point t2 is then determined based on point t4. Finally, when point t2 is reached, the drive signal for activating the soft-start relay, issued at time t0, is responded to, and the soft-start relay is activated.
[0054] The above method can quickly determine the time of intersection between the maximum PFC bus voltage and the input voltage that can be achieved by charging the PFC bus capacitor before the soft start relay is energized, and the timing of controlling the soft start relay to energize can be determined based on this time.
[0055] Optionally, in the inrush current control method provided in the embodiments of this application, the boost rate of the Boost-PFC circuit is set by software code.
[0056] For example, the boost rate of a Boost-PFC circuit can be controlled by software.
[0057] The above-described scheme allows for convenient control of the boost rate of the Boost-PFC circuit. Furthermore, by boosting the PFC bus voltage through the Boost circuit, the boost rate can be precisely controlled via software. This minimizes the voltage difference between Vac and Vpfc before the next half-cycle peak, significantly reducing the inrush current.
[0058] In summary, the inrush current control method provided in this application is applied to a switching power supply circuit. The switching power supply circuit includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. By triggering a first drive signal, which is used to instruct the control relay to perform a energizing operation; after the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the relay is controlled to be in an energized state in response to the first drive signal. The target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, a second drive signal is triggered, which is used to instruct the Boost-PFC circuit to charge the bus capacitor; in response to the second drive signal, the bus capacitor is charged to control the inrush current when the switching power supply circuit starts up. This solves the problem in related technologies where the inrush current during the startup of the switching power supply is large, making it difficult for the startup inrush current of the switching power supply to meet the specifications. The drive signal triggers the control relay to engage. After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the drive signal is triggered to keep the relay engaged. Then, after the relay engages, if the target AC input voltage is less than the PFC bus voltage, a drive signal is triggered to charge the bus capacitor. The drive signal is triggered to charge the bus capacitor, thereby controlling the inrush current during the startup of the switching power supply circuit. This reduces the inrush current during startup of the switching power supply, thus achieving the effect of ensuring that the startup inrush current of the switching power supply meets the specifications.
[0059] It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases the steps shown or described may be executed in a different order than that shown here.
[0060] This application also provides a device for controlling inrush current. It should be noted that the device for controlling inrush current in this application can be used to execute the method for controlling inrush current provided in this application. The following describes the device for controlling inrush current provided in this application.
[0061] Figure 5 This is a schematic diagram of an inrush current control device according to an embodiment of this application. The device is applied in a switching power supply circuit, which includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor, such as... Figure 5As shown, the device includes: a first trigger unit 501, a first response unit 502, a second trigger unit 503, and a second response unit 504.
[0062] Specifically, the first triggering unit 501 is used to trigger a first driving signal, wherein the first driving signal is used to instruct the control relay to perform a energizing operation;
[0063] The first response unit 502 is used to respond to the first drive signal and control the relay to be in the energized state if there is an intersection between the target AC input voltage and the PFC bus voltage after the target AC input voltage reaches its peak value. The target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor.
[0064] The second triggering unit 503 is used to trigger a second drive signal if the target AC input voltage is less than the PFC bus voltage after the relay completes the energizing operation. The second drive signal is used to indicate that the bus capacitor is charged using the Boost-PFC circuit.
[0065] The second response unit 504 is used to respond to the second drive signal and charge the bus capacitor to control the inrush current when the switching power supply circuit starts up.
[0066] In summary, the inrush current control device provided in this application embodiment is applied in a switching power supply circuit. The switching power supply circuit includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. A first drive signal is triggered by a first trigger unit 501, wherein the first drive signal is used to instruct the control relay to perform a energizing operation. After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the first response unit 502 responds to the first drive signal and controls the relay to be in an energized state. Here, the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor. After the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, the second trigger unit 503 triggers a second drive signal, wherein the second drive signal is used to instruct the use of the Boost-PFC circuit. The bus capacitor is charged; the second response unit 504 responds to the second drive signal to charge the bus capacitor, thereby controlling the inrush current when the switching power supply circuit starts up. This solves the problem in related technologies where the inrush current during the startup of the switching power supply is too large, making it difficult to meet the specifications of the switching power supply. By triggering the drive signal to control the relay to perform the energizing operation, and after the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the drive signal is triggered to control the relay to be in the energizing state. Then, after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, the drive signal to charge the bus capacitor is triggered, and the bus capacitor is charged in response to the drive signal, thereby controlling the inrush current when the switching power supply circuit starts up. This reduces the inrush current during the startup of the switching power supply, thus achieving the effect of making the startup inrush current of the switching power supply meet the specifications of the switching power supply.
[0067] Optionally, in the inrush current control device provided in the embodiments of this application, the device further includes: a first acquisition unit, used to acquire the inrush current and the target inrush current after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts; a first restart unit, used to restart the switching power supply circuit if the inrush current is greater than the target inrush current, so as to control the relay to be in the open state; and a first processing unit, used to trigger the first drive signal and, after the target AC input voltage reaches its peak value and before there is an intersection between the target AC input voltage and the PFC bus voltage, respond to the first drive signal to control the relay to be in the energized state.
[0068] Optionally, in the inrush current control device provided in the embodiments of this application, the second response unit includes: a first response module, used to respond to the second drive signal and use a Boost-PFC circuit to charge the bus capacitor to obtain the charged bus voltage; and a first control module, used to control the inrush current when the switching power supply circuit starts up based on the charged bus voltage and the target AC input voltage.
[0069] Optionally, in the inrush current control device provided in the embodiments of this application, the first triggering unit includes: a first acquisition module, used to acquire the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; a first determination module, used to determine the time to trigger the first driving signal based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; and a first triggering module, used to trigger the first driving signal when the time to trigger the first driving signal is reached.
[0070] Optionally, in the inrush current control device provided in the embodiments of this application, the first response unit includes: a second acquisition module, used to acquire design parameters of the target power grid frequency, the target AC input voltage, and the PFC bus voltage; a second determination module, used to determine the time to respond to the first drive signal based on the design parameters of the target power grid frequency, the target AC input voltage, and the PFC bus voltage; and a second response module, used to respond to the first drive signal when the time to respond to the first drive signal is reached.
[0071] Optionally, in the inrush current control device provided in the embodiments of this application, the boost rate of the Boost-PFC circuit is set by software code.
[0072] The control device for the inrush current includes a processor and a memory. The first trigger unit 501, the first response unit 502, the second trigger unit 503, and the second response unit 504 are all stored in the memory as program units. The processor executes the program units stored in the memory to achieve the corresponding functions.
[0073] The processor contains a core, which retrieves the corresponding program unit from memory. One or more cores can be configured, and their parameters can be adjusted to ensure the switching power supply's startup inrush current meets the power supply's specifications.
[0074] The memory may include non-permanent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0075] This invention provides a computer-readable storage medium storing a program thereon, which, when executed by a processor, implements the method for controlling the inrush current.
[0076] This invention provides a processor for running a program, wherein the program executes the control method for the inrush current during runtime.
[0077] This invention provides a device including a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, it performs the following steps: triggering a first drive signal, wherein the first drive signal is used to instruct the relay to perform a energizing operation; after the target AC input voltage reaches its peak value, if the target AC input voltage and the PFC bus voltage intersect, responding to the first drive signal, controlling the relay to be in an energized state, wherein the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, triggering a second drive signal, wherein the second drive signal is used to instruct the Boost-PFC circuit to charge the bus capacitor; responding to the second drive signal, charging the bus capacitor to control the inrush current during startup of the switching power supply circuit.
[0078] The processor, when executing the program, also implements the following steps: after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts, the method further includes: acquiring the inrush current and the target inrush current; if the inrush current is greater than the target inrush current, restarting the switching power supply circuit to control the relay to be in the open state; triggering the first drive signal, and after the target AC input voltage reaches its peak value, but before the target AC input voltage and the PFC bus voltage intersect, responding to the first drive signal to control the relay to be in the closed state.
[0079] The processor also performs the following steps when executing the program: in response to the second drive signal, charging the bus capacitor to control the inrush current when the switching power supply circuit starts up includes: in response to the second drive signal, charging the bus capacitor using the Boost-PFC circuit to obtain the charged bus voltage; and controlling the inrush current when the switching power supply circuit starts up based on the charged bus voltage and the target AC input voltage.
[0080] When the processor executes the program, it also performs the following steps: triggering the first drive signal includes: acquiring the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; determining the time to trigger the first drive signal based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; and triggering the first drive signal when the time to trigger the first drive signal is reached.
[0081] When the processor executes the program, it also performs the following steps: responding to the first drive signal includes: acquiring the design parameters of the target power grid frequency, the target AC input voltage, and the PFC bus voltage; determining the time to respond to the first drive signal based on the design parameters of the target power grid frequency, the target AC input voltage, and the PFC bus voltage; and responding to the first drive signal when the time to respond to the first drive signal is reached.
[0082] The processor also performs the following steps when executing the program: the boost rate of the Boost-PFC circuit is set via software code. The device mentioned in this article can be a server, PC, tablet, mobile phone, etc.
[0083] This application also provides a computer program product, which, when executed on a data processing device, is suitable for executing an initialization program having the following method steps: triggering a first drive signal, wherein the first drive signal is used to instruct the control of the relay to perform a energizing operation; after the target AC input voltage reaches its peak value, if the target AC input voltage and the PFC bus voltage intersect, in response to the first drive signal, controlling the relay to be in an energized state, wherein the target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor; after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, triggering a second drive signal, wherein the second drive signal is used to instruct the use of the Boost-PFC circuit to charge the bus capacitor; in response to the second drive signal, charging the bus capacitor to control the inrush current when the switching power supply circuit starts up.
[0084] When executed on a data processing device, it is also suitable to execute an initialization program with the following method steps: after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts, the method further includes: acquiring the inrush current and a target inrush current; if the inrush current is greater than the target inrush current, restarting the switching power supply circuit to control the relay to be in an open state; triggering the first drive signal, and after the target AC input voltage reaches its peak value, but before the target AC input voltage and the PFC bus voltage intersect, responding to the first drive signal to control the relay to be in a closed state.
[0085] When executed on a data processing device, it is also suitable to execute an initialization program with the following method steps: in response to the second drive signal, charging the bus capacitor to control the inrush current when the switching power supply circuit starts up includes: in response to the second drive signal, charging the bus capacitor using the Boost-PFC circuit to obtain a charged bus voltage; and controlling the inrush current when the switching power supply circuit starts up based on the charged bus voltage and the target AC input voltage.
[0086] When executed on a data processing device, it is also suitable to execute an initialization program with the following method steps: triggering a first drive signal includes: acquiring a target power grid frequency, the operating time of the relay, and design parameters in the switching power supply circuit; determining the time to trigger the first drive signal based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; and triggering the first drive signal when the time to trigger the first drive signal is reached.
[0087] When executed on a data processing device, it is also suitable to execute an initialization program having the following method steps: responding to the first drive signal includes: acquiring design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; determining the time to respond to the first drive signal based on the design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage; and responding to the first drive signal when the time to respond to the first drive signal is reached.
[0088] When executed on a data processing device, it is also suitable to execute an initialization program with the following method steps: the boost rate of the Boost-PFC circuit is set by software code.
[0089] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0090] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0091] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0092] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0093] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0094] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.
[0095] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.
[0096] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless further limited, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.
[0097] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0098] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.
Claims
1. A method for controlling inrush current, characterized in that, The method is applied in a switching power supply circuit, which includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. Trigger a first drive signal, wherein the first drive signal is used to instruct the relay to perform an engaging operation; After the target AC input voltage reaches its peak value, if there is an intersection between the target AC input voltage and the PFC bus voltage, the relay is controlled to be in the energized state in response to the first drive signal. The target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor. After the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, a second drive signal is triggered, wherein the second drive signal is used to indicate that the bus capacitor is charged using the Boost-PFC circuit; In response to the second drive signal, the bus capacitor is charged to control the inrush current when the switching power supply circuit starts up. The first drive signal is triggered by: Obtain the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit; The timing for triggering the first drive signal is determined based on the target power grid frequency, the operating time of the relay, and the design parameters in the switching power supply circuit. When the time for triggering the first drive signal is reached, the first drive signal is triggered.
2. The method according to claim 1, characterized in that, After charging the bus capacitor in response to the second drive signal to control the inrush current during startup of the switching power supply circuit, the method further includes: Obtain the impact current and the target impact current; If the inrush current is greater than the target inrush current, the switching power supply circuit is restarted to control the relay to be in the off state. The first drive signal is triggered, and after the target AC input voltage reaches its peak value, but before the target AC input voltage and the PFC bus voltage intersect, the first drive signal is triggered to control the relay to be in the energized state.
3. The method according to claim 1, characterized in that, In response to the second drive signal, charging the bus capacitor to control the inrush current during startup of the switching power supply circuit includes: In response to the second drive signal, the bus capacitor is charged using the Boost-PFC circuit to obtain the charged bus voltage; The inrush current during startup of the switching power supply circuit is controlled based on the bus voltage after charging and the target AC input voltage.
4. The method according to claim 1, characterized in that, Responding to the first drive signal includes: Obtain the design parameters for the target grid frequency, the target AC input voltage, and the PFC bus voltage; The response time to the first drive signal is determined based on the design parameters of the target grid frequency, the target AC input voltage, and the PFC bus voltage. When the time for responding to the first drive signal is reached, respond to the first drive signal.
5. The method according to claim 1, characterized in that, The boost rate of the Boost-PFC circuit is set via software code.
6. A control device for inrush current, characterized in that, The device is used in a switching power supply circuit, which includes a soft-start circuit and a Boost-PFC circuit. The soft-start circuit includes a relay, and the Boost-PFC circuit includes a bus capacitor. A first triggering unit is used to trigger a first driving signal, wherein the first driving signal is used to instruct the relay to perform an engaging operation; The first response unit is configured to respond to the first drive signal and control the relay to be in an engaged state if there is an intersection between the target AC input voltage and the PFC bus voltage after the target AC input voltage reaches its peak value. The target AC input voltage is the AC voltage input to the switching power supply circuit, and the PFC bus voltage is the voltage of the bus capacitor. The second triggering unit is used to trigger a second drive signal after the relay completes the energizing operation, if the target AC input voltage is less than the PFC bus voltage, wherein the second drive signal is used to indicate that the bus capacitor is charged using the Boost-PFC circuit. The second response unit is used to respond to the second drive signal and charge the bus capacitor to control the inrush current when the switching power supply circuit starts up. The first triggering unit includes: a first acquisition module, used to acquire the target power grid frequency, the relay's operating time, and the design parameters in the switching power supply circuit; a first determination module, used to determine the time to trigger the first driving signal based on the target power grid frequency, the relay's operating time, and the design parameters in the switching power supply circuit; and a first triggering module, used to trigger the first driving signal when the time to trigger the first driving signal is reached.
7. The apparatus according to claim 6, characterized in that, The device further includes: The first acquisition unit is used to acquire the inrush current and the target inrush current after charging the bus capacitor in response to the second drive signal to control the inrush current when the switching power supply circuit starts. The first restart unit is used to restart the switching power supply circuit if the inrush current is greater than the target inrush current, so as to control the relay to be in the open state. The first processing unit is configured to trigger the first drive signal and, after the target AC input voltage reaches its peak value but before the target AC input voltage intersects with the PFC bus voltage, respond to the first drive signal and control the relay to be in an engaged state.
8. A computer-readable storage medium, characterized in that, The storage medium stores a program, wherein the program executes the inrush current control method according to any one of claims 1 to 5.
9. A processor, characterized in that, The processor is used to run a program, wherein the program executes the inrush current control method according to any one of claims 1 to 5.
Citation Information
Patent Citations
Slow start circuit compatible with single-phase, two-phase and three-phase power and control method
CN114301273A
