A method and system for predicting the capacity of a battery cell
By constructing a capacity prediction formula and fitting the relationship between the depth of discharge and open-circuit voltage of a reference cell, the problem of high cost in lithium battery cell capacity testing is solved, achieving high-precision and low-cost cell capacity prediction.
Patent Information
- Application Number
- CN202311013375.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-11
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-08-11
AI Technical Summary
Existing lithium battery cell capacity testing is costly, equipment modification costs are huge, algorithm development is difficult, and existing capacity prediction methods are complex and time-consuming.
By constructing a capacity prediction formula and fitting the relationship between the depth of discharge, formation cutoff voltage, and open-circuit voltage of a reference cell after a preset resting period, the formation capacity and formation cutoff voltage of the cell under test can be obtained, and its capacity can be predicted.
It reduces testing costs and energy consumption, simplifies process maintenance, and improves capacity prediction accuracy. The prediction deviation is within ±1% of the rated capacity, meeting product specification requirements.
Smart Images

Figure CN117031300B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of battery testing technology, and in particular to a method and system for predicting battery cell capacity. Background Technology
[0002] Lithium-ion batteries are a type of battery that uses lithium metal or lithium alloys as the positive / negative electrode materials and a non-aqueous electrolyte solution. Currently, during the manufacturing process of lithium-ion batteries, the cell capacity needs to be tested to determine whether the cell meets the design specifications.
[0003] However, the existing testing workshops themselves have huge costs in terms of construction, equipment, and energy consumption. Traditional cell capacity testing requires fully charging and discharging each cell to confirm its accurate capacity. Currently, existing capacity prediction methods require collecting all parameters of each cell from the front end, and then performing algorithm fitting. This results in huge equipment modification costs, and the algorithm is difficult to develop and requires long-term training. Summary of the Invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the technical defects of the prior art, such as the huge cost of predicting the capacity of battery cells and the difficulty in establishing algorithms.
[0005] To address the aforementioned technical problems, this invention provides a method for predicting battery cell capacity, comprising the following steps:
[0006] The fitting relationship between the depth of discharge, formation cutoff voltage and open-circuit voltage after a preset resting time of the reference cell is obtained, and a capacity prediction formula is constructed.
[0007] Obtain the formation capacity and formation cutoff voltage of the battery cell under test;
[0008] Obtain the open-circuit voltage of the battery cell under test after it has been formed and left to stand for a preset period of time;
[0009] Based on the formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula of the cell under test, the predicted capacity of the cell under test is obtained.
[0010] Preferably, the step of obtaining the fitting relationship between the depth of discharge of the reference cell, the formation cutoff voltage, and the open-circuit voltage after a preset resting period, and constructing the capacity prediction formula, includes:
[0011] Obtain a first reference group, which includes multiple battery cells. Perform a formation operation on each battery cell in the first reference group and record the formation capacity Q1 and formation cutoff voltage V1 of each battery cell.
[0012] Record the first static voltage V2 of the first reference group after static formation;
[0013] The cells of the first reference group are charged or discharged to obtain full charge capacity or full discharge capacity, which is denoted as Q2.
[0014] Based on the formation capacity Q1 and Q2 of each cell, the formation discharge depth (DOD) of the cells in the first reference group is calculated.
[0015] Calculate the open-circuit voltage V5 of the first reference group of cells after a preset resting time.
[0016] The discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group were fitted to obtain the voltage-formation discharge depth formula.
[0017] Based on the voltage-deep-formation-discharge formula and the full-discharge capacity calculation formula, the capacity prediction formula is obtained, where Q2 = Q1 / DOD.
[0018] Preferably, the calculation of the open-circuit voltage V5 after the first reference group of cells has been left to stand for a preset period of time includes:
[0019] A second reference group is obtained, which includes multiple battery cells. A formation operation is performed on the second reference group, and the formation operation of the second reference group is the same as that of the first reference group.
[0020] Record the second static voltage V3 of the second reference group after static formation;
[0021] The second reference group was left to stand still for a preset time period, and the open circuit voltage V4 of the battery cell was recorded.
[0022] Based on the second settling voltage and the open-circuit voltage, plot the settling voltage-open-circuit voltage fitting curve;
[0023] Substitute the first static voltage V2 into the static voltage-open circuit voltage fitting curve to obtain the open circuit voltage V5 corresponding to the first static voltage.
[0024] Preferably, the voltage-deep formation discharge formula is: DOD = K1 * V1 n +K2*V5 m +K3*V1*V5, where n and m are both natural numbers, 1≤n≤3, 1≤m≤3.
[0025] Preferably, a formation operation is performed on each cell in the first reference group, including:
[0026] The cell formation process uses constant current charging at 0.1C-0.5C.
[0027] Preferably, the preset time period for the second reference group to be left to stand is 2 to 5 days.
[0028] Preferably, the formation process of the battery cell under test is the same as that of the first reference group and the second reference group.
[0029] Preferably, the voltage-deep-formation-discharge formula is obtained using geogebra.
[0030] Preferably, the cells of the first reference group and the second reference group are prepared under the same process parameters.
[0031] This invention discloses a battery cell capacity prediction system, comprising:
[0032] The fitting module is used to obtain the fitting relationship between the discharge depth of the reference cell, the formation cutoff voltage, and the open circuit voltage after a preset resting time, and to construct a capacity prediction formula.
[0033] The test module is used to obtain the formation capacity and formation cutoff voltage of the cell under test; and to obtain the open circuit voltage of the cell under test after it has been formed and left to stand for a preset period of time.
[0034] The prediction module predicts the capacity of the cell under test based on its formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula.
[0035] This invention discloses a cell capacity prediction system, wherein the fitting module includes:
[0036] The first test unit is used to acquire a first reference group, which includes multiple battery cells. It performs a formation operation on each battery cell in the first reference group, recording the formation capacity Q1 and formation cutoff voltage V1 for each cell. After the formation is completed, the first reference group is left to stand, and the first standing voltage V2 is recorded. The cells in the first reference group are charged or discharged to obtain the full charge capacity or full discharge capacity, denoted as Q2. Based on the formation capacity and full charge capacity of each cell, the depth of formation discharge (DOD) of the cells in the first reference group is calculated.
[0037] The second test unit is used to acquire a second reference group, which includes multiple battery cells. The second reference group is subjected to a formation operation, and the formation operation of the second reference group is the same as the formation operation of the first reference group. The second reference group is left to stand after formation, and the second standing voltage V3 is recorded. The second reference group is left to stand for a preset time period, and the open circuit voltage V4 of the battery cells is recorded.
[0038] The fitting unit is used to plot a static voltage-open circuit voltage fitting curve based on the second static voltage and the open circuit voltage; substitute the first static voltage V2 into the static voltage-open circuit voltage fitting curve to obtain the open circuit voltage V5 corresponding to the first static voltage; fit the discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group to obtain the voltage-formation discharge depth formula; and obtain the capacity prediction formula based on the voltage-formation discharge depth formula and the full discharge capacity calculation formula, where Q2=Q1 / DOD.
[0039] The technical solution of the present invention has the following advantages compared with the prior art:
[0040] 1. This invention constructs a capacity prediction formula and predicts the capacity of the cell under test by testing its formation capacity, formation cutoff voltage, and open circuit voltage.
[0041] 2. This invention, through its method for predicting the capacity of battery cells, can reduce testing costs, significantly reduce energy consumption, lower labor costs, and simplify process maintenance.
[0042] 3. The present invention has high capacity prediction accuracy and high parameter correlation, with a prediction deviation range of ±1% of the rated capacity, which meets product specification requirements. Attached Figure Description
[0043] Figure 1 This is a flowchart of the cell capacity prediction method of the present invention;
[0044] Figure 2 A schematic diagram for constructing a capacity prediction formula;
[0045] Figure 3 A schematic diagram for predicting the capacity of a battery cell under test. Detailed Implementation
[0046] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, so that those skilled in the art can better understand and implement the present invention. However, the embodiments described are not intended to limit the present invention.
[0047] Reference Figure 1 As shown, this invention discloses a method for predicting battery cell capacity, comprising the following steps:
[0048] The fitting relationship between the depth of discharge, formation cutoff voltage and open-circuit voltage after a preset resting time of the reference cell is obtained, and a capacity prediction formula is constructed.
[0049] Obtain the formation capacity and formation cutoff voltage of the battery cell under test;
[0050] Obtain the open-circuit voltage of the battery cell under test after it has been formed and left to stand for a preset period of time;
[0051] Based on the formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula of the cell under test, the predicted capacity of the cell under test is obtained.
[0052] The working principle of this invention is as follows: By constructing a capacity prediction formula, this invention predicts the capacity of the battery cell under test by testing its formation capacity, formation cutoff voltage, and open-circuit voltage. This method of predicting battery cell capacity reduces testing costs, significantly lowers energy consumption and labor costs, and simplifies process maintenance. This invention also features high capacity prediction accuracy, high parameter correlation, and a prediction deviation range of ±1% of the rated capacity, meeting product specification requirements.
[0053] Reference Figure 2 As shown, the fitting relationship between the depth of discharge, formation cutoff voltage, and open-circuit voltage after a preset resting time of a reference cell is obtained, and a capacity prediction formula is constructed, including:
[0054] Obtain a first reference group, which includes multiple battery cells. Perform a formation operation on each battery cell in the first reference group, using a constant current charging method of 0.1C-0.5C. Record the formation capacity Q1 and formation cutoff voltage V1 for each battery cell.
[0055] The first reference group after static formation records the first static voltage V2 after formation; here, V2 is the on-cabinet voltage of the cell, that is, the initial voltage when entering the capacity cabinet.
[0056] The cells of the first reference group are charged or discharged to obtain full charge capacity or full discharge capacity, which is denoted as Q2.
[0057] Based on the formation capacity Q1 and full charge / full discharge capacity Q2 of each cell, the formation discharge depth DOD of the first reference group cells is calculated as Q1 / Q2.
[0058] Calculate the open-circuit voltage V5 of the first reference group of cells after a preset resting time.
[0059] The discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group were fitted to obtain the voltage-formation discharge depth formula.
[0060] Based on the voltage-deep-formation-discharge formula and the full-discharge capacity calculation formula, the capacity prediction formula is obtained, where Q2 = Q1 / DOD.
[0061] In this invention, a first reference group is set up and tested. Formation, resting, and charge / discharge operations are performed sequentially to calculate the depth of formation discharge. The capacity prediction formula is then obtained using the voltage-depth of formation discharge formula and the full-discharge capacity calculation formula. In this way, after the cell under test is formed, only the formation capacity, formation cutoff voltage, and open-circuit voltage of the cell need to be collected to calculate the cell's capacity, resulting in low energy consumption and cost. Existing capacity prediction methods require collecting all parameters of each cell from the front end and then fitting an algorithm, which incurs huge equipment modification costs and makes algorithm development difficult and requires long-term training. Compared to existing technologies, this invention only requires pre-constructing the capacity prediction formula; subsequently, by obtaining the three parameters of the cell under test, the cell's capacity can be predicted. The method is simple and has high testing accuracy.
[0062] Furthermore, the open-circuit voltage V5 of the first reference group cells after being left to stand for a preset period of time is calculated, including:
[0063] A second reference group is obtained, which includes multiple battery cells. A formation operation is performed on the second reference group, and the formation operation of the second reference group is the same as the formation operation process of the first reference group.
[0064] The second reference group after static formation records the second static voltage V3 after formation. Here, V3 is the starting voltage of the cell entering the capacity cabinet. No charging or discharging is performed afterward. The cell is then pulled to room temperature static state.
[0065] The second reference group was left to stand for a preset period of time, and the open circuit voltage V4 of the battery cell was recorded. The preset period of time for the second reference group to stand was 2 to 5 days.
[0066] Based on the second settling voltage and the open-circuit voltage, plot the settling voltage-open-circuit voltage fitting curve;
[0067] Substitute the first static voltage V2 into the static voltage-open circuit voltage fitting curve to obtain the open circuit voltage V5 corresponding to the first static voltage.
[0068] In this embodiment, the formation operation of the second reference group is the same as that of the first reference group. By performing formation operation and resting on the second reference group, a resting voltage-open circuit voltage fitting curve is obtained. Then, by substituting the first resting voltage V2 of the first reference group into the resting voltage-open circuit voltage fitting curve, the open circuit voltage V5 corresponding to the cell in the first reference group is obtained.
[0069] Specifically, the voltage-deep-of-discharge formula is: DOD = K1 * V1 n +K2*V5 m+K3*V1*V5, where n and m are natural numbers, 1≤n≤3, 1≤m≤3. Multiple sets of V1, V5, and DOD values are obtained through testing, resulting in multiple sets of data. These data sets are then substituted into DOD=K1*V1. n +K2*V5 m By adding K3*V1*V5, the specific values of K1, K2, K3, n, and m can be calculated. Specifically, the voltage-deep-of-discharge formula is obtained through geogebra.
[0070] Furthermore, the formation process of the cell under test is the same as that of the first and second reference groups. This improves the accuracy of capacity prediction for the cell under test.
[0071] The cells in the first and second reference groups were manufactured under the same process parameters. Therefore, the capacity prediction formulas obtained from the first and second reference groups are more accurate.
[0072] This invention discloses a battery cell capacity prediction system, including a fitting module, a testing module, and a prediction module.
[0073] The fitting module is used to obtain the fitting relationship between the discharge depth, formation cutoff voltage and open circuit voltage after a preset resting time of the reference cell, and to construct the capacity prediction formula.
[0074] The test module is used to obtain the formation capacity and formation cutoff voltage of the cell under test; and to obtain the open circuit voltage of the cell under test after it has been formed and left to stand for a preset period of time.
[0075] The prediction module predicts the capacity of the cell under test based on its formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula.
[0076] In this invention, the capacity prediction of the battery cell under test can be achieved by combining the fitting module, the testing module, and the prediction module.
[0077] Furthermore, the fitting module includes a first test unit, a second test unit, and a fitting unit.
[0078] The first test unit is used to acquire a first reference group, which includes multiple battery cells. A formation operation is performed on each battery cell in the first reference group, and the formation capacity Q1 and formation cutoff voltage V1 of each battery cell are recorded. After the formation is completed, the first reference group is left to stand, and the first standing voltage V2 after formation is recorded. The battery cells in the first reference group are charged or discharged to obtain the full charge capacity or full discharge capacity, which is recorded as Q2. Based on the formation capacity and full charge capacity of each battery cell, the formation discharge depth DOD of the battery cells in the first reference group is calculated.
[0079] The second test unit is used to obtain a second reference group, which includes multiple battery cells. The second reference group is subjected to a formation operation, and the formation operation of the second reference group is the same as the formation operation process of the first reference group. After the second reference group is formed, the second settling voltage V3 is recorded. The second reference group is settling for a preset time period, and the open circuit voltage V4 of the battery cells is recorded.
[0080] The fitting unit is used to plot a static voltage-open circuit voltage fitting curve based on the second static voltage and open circuit voltage; substituting the first static voltage V2 into the static voltage-open circuit voltage fitting curve, the open circuit voltage V5 corresponding to the first static voltage is obtained; the discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group are fitted to obtain the voltage-formation discharge depth formula; based on the voltage-formation discharge depth formula and the full discharge capacity calculation formula, the capacity prediction formula is obtained, where Q2 = Q1 / DOD. In this invention, by setting the first reference group and the second reference group, the capacity prediction formula can be obtained. By setting the capacity prediction formula, the formation capacity, formation cutoff voltage, and open circuit voltage of the cell under test can be obtained, and the capacity of the cell under test can be calculated.
[0081] The technical solutions of the present invention will be further described and explained below with reference to specific embodiments.
[0082] 1. Select Group A 1000EA cells and perform formation using a 0.3C current, constant current and constant voltage charging until 3.4V cutoff. Record the formation capacity Q1 and the formation off-cabin voltage V1.
[0083] 2. When the cells in Group A arrive at the capacity testing procedure, the capacity test is carried out normally. Record the cell’s cabinet voltage (initial voltage entering the capacity cabinet) V2 and the full discharge capacity Q2.
[0084] 3. Calculate the depth of discharge (DOD) of the cells in group A: DOD = Q1 / Q2;
[0085] 4. Obtain the capacity calculation formula Q. 总 =Q2=Q1 / DOD;
[0086] 5. Select Group B 1000EA cells and use the same process as Group A for formation, then proceed to the capacity testing process normally.
[0087] 6. The starting voltage V3 of the B group cells when entering the capacity cabinet is measured in the capacity testing process. No further charging or discharging is performed. The cells are then flow-pulled to the room temperature resting process.
[0088] 7. The open-circuit voltage V4 of the B group cells was measured after being subjected to "room temperature resting for 2 days" and then drawn to the OCV1 process.
[0089] 8. Establish the voltage change trend of Group B cells before and after "2 Days of standing at room temperature", that is, the correlation formula between V4 and V3, which is denoted as "voltage change formula".
[0090] 9. Substitute the measured voltage V2 of Group A into the "voltage change formula" to obtain the open circuit voltage OCV1 if Group A cells skip the capacity testing process after formation and are left to stand at room temperature for 2 days. Record this as V5.
[0091] 10. Fit the DOD of group A cells with V1 and V5 to obtain the correlation formula between the formation DOD, the formation end voltage V1, and (OCV1 open circuit voltage) V5 of this type of cell. This formula is denoted as the "voltage-discharge depth formula": DOD = K1 * V1 n +K2*V5 m +K3*V1*V5, where n and m are both natural numbers, 1≤n≤3, 1≤m≤3;
[0092] 11. The voltage-depth of discharge formula is: DOD = K1 * V1 n +K2*V5 m Substituting "+K3*V1*V5" into the "Full Capacity Calculation Formula Q"... 满放容量 =Q2=Q1 / DOD” yields the capacity prediction formula Q 预测容量 =Q 总 =Q1 / DOD=Q1 / (K1*V1) n +K2*V5 m +K3*V1*V5)”
[0093] 12. Reference Figure 3 As shown, the electroforming process of newly produced battery cells records Q1 and V1 for each cell;
[0094] 13. Newly produced battery cells skip the capacity testing process and are left to stand at room temperature for 2 days.
[0095] 14. After the newly produced battery cells are left to stand, they enter the OCV1 testing process to measure the open circuit voltage V5 of each battery cell.
[0096] 15. Substitute the Q1, V1, and V5 values corresponding to each cell into the "capacity prediction formula Q". 预测容量 =Q1 / DOD=Q1 / (K1*V1) n +K2*V5 m +K3*V1*V5)”, to obtain the predicted capacity.
[0097] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0098] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0099] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0100] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0101] Obviously, the above embodiments are merely illustrative examples for clear explanation and are not intended to limit the implementation. Those skilled in the art will recognize that other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations here. However, obvious variations or modifications derived therefrom are still within the scope of protection of this invention.
Claims
1. A method for predicting battery cell capacity, characterized in that, Includes the following steps: By obtaining the fitting relationship between the depth of discharge, formation cutoff voltage, and open-circuit voltage after a preset resting period of a reference cell, a capacity prediction formula is constructed, including: Obtain a first reference group, which includes multiple battery cells. Perform a formation operation on each battery cell in the first reference group and record the formation capacity Q1 and formation cutoff voltage V1 of each battery cell. Record the first static voltage V2 of the first reference group after static formation; The cells of the first reference group are charged or discharged to obtain full charge capacity or full discharge capacity, which is denoted as Q2. Based on the formation capacity Q1 and Q2 of each cell, the formation discharge depth (DOD) of the cells in the first reference group is calculated. The open-circuit voltage V5 of the first reference group of cells after being left to stand for a preset period of time is calculated, including: A second reference group is obtained, which includes multiple battery cells. A formation operation is performed on the second reference group, and the formation operation of the second reference group is the same as that of the first reference group. Record the second static voltage V3 of the second reference group after static formation; The second reference group was left to stand still for a preset time period, and the open circuit voltage V4 of the battery cell was recorded. Based on the second settling voltage and the open-circuit voltage, plot the settling voltage-open-circuit voltage fitting curve; Substitute the first static voltage V2 into the static voltage-open circuit voltage fitting curve to obtain the open circuit voltage V5 corresponding to the first static voltage; The discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group were fitted to obtain the voltage-formation discharge depth formula. Based on the voltage-deep formation discharge formula and the full discharge capacity calculation formula, the capacity prediction formula is obtained, where Q2=Q1 / DOD; Obtain the formation capacity and formation cutoff voltage of the battery cell under test; Obtain the open-circuit voltage of the battery cell under test after it has been formed and left to stand for a preset period of time; Based on the formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula of the cell under test, the predicted capacity of the cell under test is obtained.
2. The method for predicting cell capacity according to claim 1, characterized in that, The voltage-deep formation discharge formula is: DOD=K1 V1n+K2 V5m+K3 V1 V5, where n and m are both natural numbers, 1≤n≤3, 1≤m≤3.
3. The method for predicting cell capacity according to claim 1, characterized in that, Formation operations are performed on each cell in the first reference group, including: The cell formation process uses constant current charging at 0.1C-0.5C.
4. The method for predicting cell capacity according to claim 1, characterized in that, The preset time period for the second reference group to be left to stand is 2 to 5 days.
5. The method for predicting cell capacity according to claim 1, characterized in that, The formation process of the battery cell under test is the same as that of the first reference group and the second reference group.
6. The method for predicting cell capacity according to claim 1, characterized in that, The voltage-formation depth of discharge formula was obtained using geogebra.
7. The method for predicting cell capacity according to claim 1, characterized in that, The battery cells in the first and second reference groups were prepared under the same process parameters.
8. A cell capacity prediction system, characterized in that, include: The fitting module is used to obtain the fitting relationship between the discharge depth of the reference cell, the formation cutoff voltage, and the open circuit voltage after a preset resting time, and to construct a capacity prediction formula. The test module is used to obtain the formation capacity and formation cutoff voltage of the cell under test; and to obtain the open circuit voltage of the cell under test after it has been formed and left to stand for a preset period of time. The prediction module predicts the capacity of the cell under test based on the formation capacity, formation cutoff voltage, open circuit voltage, and capacity prediction formula of the cell under test. The fitting module includes: The first test unit is used to acquire a first reference group, which includes multiple battery cells. It performs a formation operation on each battery cell in the first reference group, recording the formation capacity Q1 and formation cutoff voltage V1 for each cell. After the formation is completed, the first reference group is left to stand, and the first standing voltage V2 is recorded. The cells in the first reference group are charged or discharged to obtain the full charge capacity or full discharge capacity, denoted as Q2. Based on the formation capacity and full charge capacity of each cell, the depth of formation discharge (DOD) of the cells in the first reference group is calculated. The second test unit is used to acquire a second reference group, which includes multiple battery cells. The second reference group is subjected to a formation operation, and the formation operation of the second reference group is the same as the formation operation of the first reference group. The second reference group is left to stand after formation, and the second standing voltage V3 is recorded. The second reference group is left to stand for a preset time period, and the open circuit voltage V4 of the battery cells is recorded. The fitting unit is used to plot a static voltage-open circuit voltage fitting curve based on the second static voltage and the open circuit voltage; substitute the first static voltage V2 into the static voltage-open circuit voltage fitting curve to obtain the open circuit voltage V5 corresponding to the first static voltage; fit the discharge depth DOD, formation cutoff voltage V1, and open circuit voltage V5 of the first reference group to obtain the voltage-formation discharge depth formula; and obtain the capacity prediction formula based on the voltage-formation discharge depth formula and the full discharge capacity calculation formula, where Q2=Q1 / DOD.
Citation Information
Patent Citations
Battery Capacity Estimation by DCIR
US20110037475A1
Sealed-type secondary battery remaining capacity prediction method, remaining capacity prediction system, battery internal information acquisition method, and battery control method
WO2017158923A1
