Linear tracking control method, device and terminal for intelligent rolling of earth-rock dam
By employing an intelligent linear tracking control method and utilizing electronic fences and real-time coordinate processing technology, the problem of unstable compaction quality in traditional earth-rock dam construction has been solved, achieving efficient and uniform compaction construction and improving construction quality and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SINOHYDRO BUREAU 5
- Filing Date
- 2023-08-16
- Publication Date
- 2026-07-21
AI Technical Summary
In traditional earth-rock dam construction, the quality of compaction operations is unstable, the labor intensity is high, and the setting and monitoring of compaction paths are complex, resulting in uneven construction quality.
An intelligent linear tracking control method is adopted. By constructing an electronic fence and a total rolling path, and using a Kalman filter model and drift improvement algorithm to obtain real-time coordinates, the movement path of the rolling vehicle is precisely controlled to ensure that the vehicle travels along the preset path.
It improved construction quality and efficiency, ensured uniform compaction, and enhanced the stability and safety of earth-rock dams.
Smart Images

Figure CN117032240B_ABST