Method, device and equipment for estimating pollution negative growth new increase and decrease amount and storage medium
Patent Information
- Application Number
- CN202310897875.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-20
- Publication Date
- 2026-09-25
- Estimated Expiration
- 2043-07-20
AI Technical Summary
[0004]本申请的主要目的在于提供一种污染负荷新增消减量的估算方法、装置、设备及存储介质,以解决现有技术中对于城市雨污分流改造工程新增污染负荷削减计算有局限性,导致计算结果不准确,进而影响后续改造工程的问题
[0060]本申请通过获取预设区域的改造前布局和改造后布局,并基于预设区域的点云数据分别生成改造前有限元模型和改造后有限元模型,并分别对两个有限元模型基于预设自然时长周期的若干个降雨量数据进行降水数据模拟,得到改造前有效负荷和改造后有效负荷,再对改造后有效负荷与改造前有效负荷的第一差值赋予污染排放系数,最后通过污染排放系数、综合径流系数、污染物浓度计算得到污染负荷新增消减量。本申请针对目前城市雨污分流改造工程情况复杂、涉及资料收集难度大、污染负荷计算繁琐等弊端,提出了一种城市雨污分流改造工程污染负荷新增削减量估算方法,通过降水数据、计算区域面积、雨污分流改造工程设计资料、溢流污染物浓度检测值等计算得到城市雨污分流改造工程污染负荷新增削减量。本申请充分利用工程设计报告以及其他易获取资料,可实现对雨污分流改造工程新增污染负荷削减量的估算,大大提高了工作效率,具有显著的社会效益和技术经济效益。
Smart Images

Figure CN117057180B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of pollution prevention and control technology, and in particular to a method, apparatus, equipment and storage medium for estimating the increase or decrease of pollution load. Background Technology
[0002] In recent years, to support the river chief system's water pollution prevention and control tasks, many regions have required calculations of the increased pollution load reduction for newly constructed urban stormwater and sewage separation projects. These calculations primarily focus on common pollutant indicators such as chemical oxygen demand (COD), ammonia nitrogen, total nitrogen, and total phosphorus. Traditional methods for calculating engineering pollution load reduction include comparing water quality and quantity data from sewage treatment plants, and calculating urban non-point source pollution loads based on initial runoff pollution reduction.
[0003] Currently, traditional methods for calculating pollution load reduction in engineering projects include comparing water quality and quantity data from wastewater treatment plants, and calculating urban non-point source pollution load based on initial runoff pollution reduction. However, if a wastewater treatment plant is not specifically designated for a particular stormwater and wastewater separation project, its pollution load reduction cannot be allocated to that area. Therefore, these methods have limitations in calculating the increased pollution load reduction for urban stormwater and wastewater separation projects, leading to inaccurate results and consequently affecting subsequent projects. Summary of the Invention
[0004] The main objective of this application is to provide a method, apparatus, equipment, and storage medium for estimating the reduction of new pollution load, in order to solve the problem that the existing technology has limitations in calculating the reduction of new pollution load in urban stormwater and sewage diversion projects, resulting in inaccurate calculation results and thus affecting subsequent renovation projects.
[0005] To achieve the above objectives, this application provides the following technical solution:
[0006] A method for estimating the increase or decrease in pollution load, wherein the increase or decrease in pollution load is based on diversion and renovation projects in a preset area, and the method for estimating the increase or decrease in pollution load includes:
[0007] Obtain the layout before and after the modification of the preset area, and generate the finite element model before and after the modification based on the point cloud data of the preset area.
[0008] Several rainfall data points for the preset area are obtained based on a preset natural time period;
[0009] Based on all rainfall data, the pre-modification finite element model and the post-modification finite element model were simulated using preset software to obtain the effective load before and after the modification.
[0010] Obtain the first difference between the effective load after the modification and the effective load before the modification;
[0011] A pollution emission coefficient is assigned to the first difference according to a preset strategy;
[0012] Obtain the comprehensive runoff coefficient and pollutant concentration of the preset area;
[0013] The increase or decrease in pollution load in the preset area is calculated using a preset algorithm based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration.
[0014] As a further improvement to this application, the pre-modification and post-modification layouts of the preset area are obtained, and finite element models before and after modification are generated based on the point cloud data of the preset area, including:
[0015] Obtain the design report for the preset area;
[0016] The design report is used to generate first point cloud data based on the preset area using preset software;
[0017] The elevation information of the preset area is obtained and the elevation information is output to the first point cloud data to obtain the finite element model before the modification based on the preset area;
[0018] Obtain the renovation report for the preset area;
[0019] The transformation report is used to generate second point cloud data based on the preset area using the preset software;
[0020] The elevation information is output as the second point cloud data to obtain the modified finite element model based on the preset region.
[0021] As a further improvement to this application, based on all rainfall data, precipitation data simulations are performed on the finite element model before and after the modification using preset software to obtain the effective load before and after the modification, including:
[0022] A preset unit precipitation amount is assigned to the finite element model before the modification, and the first total precipitation amount when the finite element model before the modification starts to drain is obtained.
[0023] The first remaining amount of the first total precipitation is obtained at preset intervals;
[0024] Determine whether the first remaining amount is less than or equal to a preset threshold;
[0025] If so, then obtain the second difference between the first total precipitation and the first surplus, and define the second difference as the effective load before the modification;
[0026] The preset unit precipitation is assigned to the modified three-dimensional finite element model to obtain the second total precipitation when the modified three-dimensional finite element model starts to drain water.
[0027] The second remaining amount of the second total precipitation is obtained at intervals of the preset time.
[0028] Determine whether the second margin is less than or equal to the preset threshold;
[0029] If so, then obtain the third difference between the second total precipitation and the second surplus, and define the third difference as the effective load after the modification.
[0030] As a further improvement to this application, a pollution emission coefficient is assigned to the first difference according to a preset strategy, including:
[0031] Obtain the pre-modification drainage system assembly from the finite element model of the pre-modification system;
[0032] Obtain the sewage riser layout and rainwater riser layout of the drainage system assembly before the renovation;
[0033] Obtain the junction of the sewage riser layout and the rainwater riser layout;
[0034] The confluence length and divergence length of the original drainage system assembly are obtained from the confluence.
[0035] The pollution emission coefficient is defined based on the ratio of the diversion length to the merging length.
[0036] As a further improvement to this application, the pollution emission coefficient is defined based on the ratio of the diversion length to the merging length, including:
[0037] When the ratio is 0, a first pollution emission coefficient is assigned;
[0038] When the ratio value is within the first preset range, a second pollution emission coefficient is assigned;
[0039] When the ratio value is within the second preset range, a third pollution emission coefficient is assigned.
[0040] As a further improvement to this application, obtaining the comprehensive runoff coefficient and pollutant concentration of the preset area includes:
[0041] The proportion of runoff generated by effective rainfall is obtained according to the preset outdoor drainage design standards, and the runoff proportion is defined as the comprehensive runoff coefficient.
[0042] Obtain the water quality monitoring report of the layout before the modification, and obtain the pollutant concentration in the water quality monitoring report.
[0043] As a further improvement to this application, the pollution load reduction of the preset area is calculated using a preset algorithm based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration, including:
[0044] The reduction in pollution load is calculated according to equation (1):
[0045] fh=H·ΔF·a·q·c·10 -9 (1);
[0046] Wherein, fh is the amount of pollution load reduction, H is the average annual precipitation of the preset area, ΔF is the first difference, a is the comprehensive runoff coefficient, q is the pollution emission coefficient, and c is the pollutant concentration.
[0047] To achieve the above objectives, this application also provides the following technical solutions:
[0048] An apparatus for estimating the increase or decrease in pollution load, wherein the apparatus is applied to the above-described method for estimating the increase or decrease in pollution load, the apparatus comprising:
[0049] The finite element model generation module is used to obtain the layout before and after the modification of the preset area, and generate the finite element model before and after the modification based on the point cloud data of the preset area.
[0050] The rainfall data acquisition module is used to acquire several rainfall data points for the preset area based on a preset natural time period;
[0051] The effective load simulation module is used to simulate precipitation data on the finite element model before and after the modification based on all rainfall data and through preset software, so as to obtain the effective load before and after the modification.
[0052] The first difference acquisition module is used to acquire the first difference between the effective load after the modification and the effective load before the modification.
[0053] A pollution emission coefficient assignment module is used to assign a pollution emission coefficient to the first difference according to a preset strategy.
[0054] The coefficient and concentration acquisition module is used to acquire the comprehensive runoff coefficient and pollutant concentration of the preset area;
[0055] The pollution load reduction calculation module is used to calculate the pollution load reduction of the preset area based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration using a preset algorithm.
[0056] To achieve the above objectives, this application also provides the following technical solutions:
[0057] An electronic device includes a processor and a memory coupled to the processor, the memory storing program instructions executable by the processor; when the processor executes the program instructions stored in the memory, it implements a method for estimating the increase or decrease of pollution load as described above.
[0058] To achieve the above objectives, this application also provides the following technical solutions:
[0059] A storage medium storing program instructions that, when executed by a processor, implement a method for estimating the increase or decrease of pollution load as described above.
[0060] This application obtains the pre-renovation and post-renovation layouts of a preset area, and generates pre-renovation and post-renovation finite element models based on point cloud data of the preset area. It then simulates precipitation data for each of the two finite element models using several rainfall data points over a preset natural time period to obtain the pre-renovation and post-renovation effective loads. A pollution emission coefficient is assigned to the first difference between the post-renovation and pre-renovation effective loads. Finally, the increase or decrease in pollution load is calculated using the pollution emission coefficient, comprehensive runoff coefficient, and pollutant concentration. This application addresses the shortcomings of current urban stormwater and sewage separation renovation projects, such as complexity, difficulty in data collection, and cumbersome pollution load calculations. It proposes a method for estimating the increase or decrease in pollution load in urban stormwater and sewage separation renovation projects. The method calculates the increase or decrease in pollution load using precipitation data, the area of the calculation region, stormwater and sewage separation renovation project design data, and overflow pollutant concentration detection values. This application fully utilizes engineering design reports and other readily available data, enabling the estimation of the increase or decrease in pollution load in stormwater and sewage separation renovation projects, greatly improving work efficiency and demonstrating significant social and technical-economic benefits. Attached Figure Description
[0061] Figure 1 A schematic diagram of the process steps for an embodiment of the method for estimating the increase or decrease in pollution load according to this application;
[0062] Figure 2 A schematic diagram of functional modules of an embodiment of the pollution load reduction estimation device of this application;
[0063] Figure 3 This is a schematic diagram of the structure of an embodiment of the electronic device of this application;
[0064] Figure 4 This is a schematic diagram of the structure of one embodiment of the storage medium of this application. Detailed Implementation
[0065] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.
[0066] The terms "first," "second," and "third" in this application are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first," "second," or "third" may explicitly or implicitly include at least one of that feature. In the description of this application, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified. All directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of this application are only used to explain the relative positional relationships and movements between components in a specific orientation (as shown in the figures). If the specific orientation changes, the directional indications also change accordingly. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to these processes, methods, products, or devices.
[0067] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a mutually exclusive, independent, or alternative embodiment. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0068] like Figure 1 As shown, this embodiment provides an example of a method for estimating the increase or decrease in pollution load. In this embodiment, the increase or decrease in pollution load is based on the diversion and renovation project of a preset area. The method for estimating the increase or decrease in pollution load includes the following steps:
[0069] Step S1: Obtain the layout before and after the modification of the preset area, and generate the finite element model before and after the modification based on the point cloud data of the preset area.
[0070] Step S2: Obtain several rainfall data points for a preset area based on a preset natural time period.
[0071] Preferably, the preset natural duration period can be set to a natural hour, a natural day, a natural week, a natural month, a natural year, or other units of natural duration; rainfall data can be obtained directly from the meteorological bureau, which is easy to obtain.
[0072] Step S3: Based on all rainfall data, use preset software to simulate the precipitation data of the finite element model before and after the modification to obtain the effective load before and after the modification.
[0073] Step S4: Obtain the first difference between the effective load after the modification and the effective load before the modification.
[0074] Step S5: Assign a pollution emission coefficient to the first difference according to a preset strategy.
[0075] Step S6: Obtain the comprehensive runoff coefficient and pollutant concentration of the preset area.
[0076] Step S7: Calculate the increase or decrease in pollution load in the preset area based on the pollution emission coefficient, comprehensive runoff coefficient, and pollutant concentration using a preset algorithm.
[0077] Furthermore, step S1 specifically includes the following steps:
[0078] Step S11: Obtain the design report for the preset area.
[0079] Step S12: Generate first point cloud data based on a preset area from the design report using preset software.
[0080] Step S13: Obtain the elevation information of the preset area and output the elevation information to the first point cloud data to obtain the finite element model before the modification based on the preset area.
[0081] Step S14: Obtain the renovation report for the preset area.
[0082] Step S15: The modification report is used to generate second point cloud data based on a preset area using preset software.
[0083] Step S16: Output the elevation information as the second point cloud data to obtain the modified finite element model based on the preset area.
[0084] Preferably, the layout before and after the renovation can be determined by collecting the construction drawings and reports of the preset area (such as residential areas, urban areas, factories, etc., areas with drainage pipe networks), as well as the design reports (preliminary design reports or construction design reports) of the rainwater and sewage separation renovation project. All of the aforementioned reports are complete and easily accessible in practical applications.
[0085] Furthermore, step S3 specifically includes the following steps:
[0086] Step S31: Assign a preset unit precipitation amount to the finite element model before the modification, and obtain the first total precipitation amount when the finite element model before the modification starts to drain.
[0087] Step S32: Obtain the first surplus of the first total precipitation at preset intervals.
[0088] Step S33: Determine whether the first surplus is less than or equal to the preset threshold.
[0089] Step S34: If the first margin is less than or equal to the preset threshold, then obtain the second difference between the first total precipitation and the first margin, and define the second difference as the effective load before the modification.
[0090] Step S35: Assign a preset unit precipitation amount to the modified three-dimensional finite element model and obtain the second total precipitation amount when the modified three-dimensional finite element model starts to drain water.
[0091] Step S36: Obtain the second surplus of the second total precipitation at preset intervals.
[0092] Step S37: Determine whether the second surplus is less than or equal to the preset threshold.
[0093] Step S38: If the second margin is less than or equal to the preset threshold, then obtain the third difference between the second total precipitation and the second margin, and define the third difference as the effective load after the modification.
[0094] Preferably, the effective load before and after the renovation are the reduction of the self-rainfall load of the preset area before and after the renovation, respectively, in millimeters. It can be understood as the pollution load that the drainage network of the preset area can accommodate or quickly handle, which can be marked as R0. Rainfall less than R0 can currently be fully treated by the sewage treatment plant and does not generate pollution load.
[0095] Preferably, R0 can be 10 mm. Based on existing technical parameters and the sewage treatment situation in various types of areas, 10 mm is deducted (that is, it is assumed that rainfall less than 10 mm can be fully treated by sewage treatment plants and will not generate pollution load).
[0096] Furthermore, step S5 specifically includes the following steps:
[0097] Step S51: Obtain the pre-modification drainage system assembly from the finite element model.
[0098] Step S52: Obtain the sewage riser layout and rainwater riser layout of the drainage system assembly before the renovation.
[0099] Step S53: Obtain the intersection of the sewage riser layout and the rainwater riser layout.
[0100] Step S54: Obtain the merging length and diverging length of the drainage system assembly before the modification based on the confluence.
[0101] Step S55: Define the pollution emission coefficient based on the ratio of the diversion length to the merging length.
[0102] Furthermore, step S55 specifically includes the following steps:
[0103] Step S551: When the ratio is 0, assign a first pollution emission coefficient.
[0104] Step S552: When the ratio value is within the first preset range, assign a second pollution emission coefficient.
[0105] Step S553: When the ratio value is within the second preset range, assign a third pollution emission coefficient.
[0106] Preferably, the pollution emission coefficient can be divided into 3 to 5 levels based on the pre-designed area's rainwater and sewage separation status before the renovation, and a pollution emission coefficient is assigned to each level, as shown in Table 1. The higher the coefficient, the greater the comparison before and after the renovation, and the greater the reduction benefit of the new pollution load generated after the renovation.
[0107]
[0108] Table 1
[0109] Preferably, in this embodiment, the pollution emission coefficient is based on the average renovation investment of the three types of communities, which is taken as 1; the average renovation investment per unit area of the three types of communities is taken as 1; the average renovation investment per unit area of the three types of communities is taken as the ratio of the average renovation investment per unit area of the three types of communities, which is 0.19, 0.32, and 1 respectively (because the average renovation investment per unit area of the two types of communities is more than that of the three types of communities in this example, it is taken as 1).
[0110] Furthermore, step S6 specifically includes the following steps:
[0111] Step S61: Obtain the proportion of runoff generated by effective rainfall according to the preset outdoor drainage design standard, and define the runoff proportion as the comprehensive runoff coefficient.
[0112] Step S62: Obtain the water quality monitoring report of the layout before the modification, and obtain the pollutant concentration in the water quality monitoring report.
[0113] Preferably, the comprehensive runoff coefficient can be set with reference to the outdoor drainage design standard, please refer to Table 2:
[0114] densely built urban areas 0.60~0.70 Urban building dense area 0.45~0.60 Sparsely built urban areas 0.20~0.45
[0115] Table 2
[0116] Furthermore, step S7 specifically includes the following steps:
[0117] Step S71, calculate the increase or decrease in pollution load according to equation (1):
[0118] fh=H·ΔF·a·q·c·10 -9 (1).
[0119] Where fh is the amount of pollution load reduction, H is the average annual precipitation of the preset area, ΔF is the first difference, a is the comprehensive runoff coefficient, q is the pollution emission coefficient, and c is the pollutant concentration.
[0120] This embodiment obtains the pre-renovation and post-renovation layouts of a preset area, and generates pre-renovation and post-renovation finite element models based on the point cloud data of the preset area. It then simulates rainfall data for each of the two finite element models based on several rainfall data points over a preset natural duration period, obtaining the pre-renovation and post-renovation effective loads. A pollution emission coefficient is assigned to the first difference between the post-renovation and pre-renovation effective loads. Finally, the increase or decrease in pollution load is calculated using the pollution emission coefficient, comprehensive runoff coefficient, and pollutant concentration. This application addresses the shortcomings of current urban stormwater and sewage separation renovation projects, such as complexity, difficulty in data collection, and cumbersome pollution load calculations. It proposes a method for estimating the increase or decrease in pollution load in urban stormwater and sewage separation renovation projects. The method calculates the increase or decrease in pollution load using rainfall data, the area of the calculation region, stormwater and sewage separation renovation project design data, and overflow pollutant concentration detection values. This application fully utilizes engineering design reports and other readily available data, enabling the estimation of the increase or decrease in pollution load in stormwater and sewage separation renovation projects, greatly improving work efficiency and demonstrating significant social and technical-economic benefits.
[0121] like Figure 2 As shown, this embodiment provides an example of a device for estimating the increase and decrease of pollution load. In this embodiment, the device for estimating the increase and decrease of pollution load is applied to the method for estimating the increase and decrease of pollution load as described in the above embodiment. The device includes a finite element model generation module 1, a rainfall data acquisition module 2, an effective load simulation module 3, a first difference acquisition module 4, a pollution emission coefficient assignment module 5, a coefficient and concentration acquisition module 6, and a pollution load increase and decrease calculation module 7, which are connected in sequence.
[0122] The finite element model generation module 1 is used to obtain the pre-renovation and post-renovation layouts of a preset area, and generate pre-renovation and post-renovation finite element models based on the point cloud data of the preset area; the rainfall data acquisition module 2 is used to obtain several rainfall data points of the preset area based on a preset natural duration period; the effective load simulation module 3 is used to simulate precipitation data of the pre-renovation and post-renovation finite element models using preset software based on all rainfall data, and obtain the pre-renovation and post-renovation effective loads; the first difference acquisition module 4 is used to obtain the first difference between the post-renovation and pre-renovation effective loads; the pollution emission coefficient assignment module 5 is used to assign a pollution emission coefficient to the first difference according to a preset strategy; the coefficient and concentration acquisition module 6 is used to obtain the comprehensive runoff coefficient and pollutant concentration of the preset area; and the pollution load increase and reduction calculation module 7 is used to calculate the pollution load increase and reduction of the preset area based on the pollution emission coefficient, comprehensive runoff coefficient, and pollutant concentration using a preset algorithm.
[0123] Furthermore, the finite element model generation module includes a first finite element model generation sub-module, a second finite element model generation sub-module, a third finite element model generation sub-module, a fourth finite element model generation sub-module, a fifth finite element model generation sub-module, and a sixth finite element model generation sub-module that are electrically connected in sequence; the sixth finite element model generation sub-module is electrically connected to the rainfall data acquisition module.
[0124] The system comprises the following modules: a first finite element model generation submodule for obtaining a design report for a preset area; a second finite element model generation submodule for generating first point cloud data based on the preset area using preset software from the design report; a third finite element model generation submodule for obtaining elevation information of the preset area and outputting the elevation information to the first point cloud data to obtain a finite element model before modification based on the preset area; a fourth finite element model generation submodule for obtaining a modification report for the preset area; a fifth finite element model generation submodule for generating second point cloud data based on the preset area using preset software from the modification report; and a sixth finite element model generation submodule for outputting elevation information to the second point cloud data to obtain a finite element model after modification based on the preset area.
[0125] Furthermore, the effective load simulation module includes a first effective load simulation submodule, a second effective load simulation submodule, a third effective load simulation submodule, a fourth effective load simulation submodule, a fifth effective load simulation submodule, a sixth effective load simulation submodule, a seventh effective load simulation submodule, and an eighth effective load simulation submodule that are electrically connected in sequence; the first effective load simulation submodule is electrically connected to the rainfall data acquisition module, and the eighth effective load simulation submodule is electrically connected to the first difference acquisition module.
[0126] The system comprises the following modules: a first effective load simulation submodule, which assigns a preset unit of precipitation to the finite element model before the modification and obtains the first total precipitation when the finite element model before the modification starts draining; a second effective load simulation submodule, which obtains the first surplus of the first total precipitation at preset intervals; a third effective load simulation submodule, which determines whether the first surplus is less than or equal to a preset threshold; a fourth effective load simulation submodule, which, if the first surplus is less than or equal to the preset threshold, obtains the second difference between the first total precipitation and the first surplus, and defines the second difference as the effective load before the modification; a fifth effective load simulation submodule, which assigns a preset unit of precipitation to the 3D finite element model after the modification and obtains the second total precipitation when the 3D finite element model after the modification starts draining; a sixth effective load simulation submodule, which obtains the second surplus of the second total precipitation at preset intervals; a seventh effective load simulation submodule, which determines whether the second surplus is less than or equal to a preset threshold; and an eighth effective load simulation submodule, which, if the second surplus is less than or equal to the preset threshold, obtains the third difference between the second total precipitation and the second surplus, and defines the third difference as the effective load after the modification.
[0127] Furthermore, the pollution emission coefficient assignment module includes a first pollution emission coefficient assignment module, a second pollution emission coefficient assignment module, a third pollution emission coefficient assignment module, a fourth pollution emission coefficient assignment module, and a fifth pollution emission coefficient assignment module that are electrically connected in sequence; the first pollution emission coefficient assignment module is electrically connected to the first difference acquisition module, and the fifth pollution emission coefficient assignment module is electrically connected to the coefficient and concentration acquisition module.
[0128] Specifically, the first pollution emission coefficient assignment module is used to obtain the pre-renovation drainage system assembly from the finite element model; the second pollution emission coefficient assignment module is used to obtain the sewage riser layout and rainwater riser layout of the pre-renovation drainage system assembly; the third pollution emission coefficient assignment module is used to obtain the junction of the sewage riser layout and the rainwater riser layout; the fourth pollution emission coefficient assignment module is used to obtain the merging length and diverging length of the pre-renovation drainage system assembly based on the junction; and the fifth pollution emission coefficient assignment module is used to define the pollution emission coefficient based on the ratio of the diverging length to the merging length.
[0129] Furthermore, the fifth pollution emission coefficient assignment module also includes a first pollution emission coefficient assignment unit, a second pollution emission coefficient assignment unit, and a third pollution emission coefficient assignment unit that are electrically connected in sequence; the first pollution emission coefficient assignment unit is electrically connected to the fourth pollution emission coefficient assignment module, and the third pollution emission coefficient assignment unit is electrically connected to the coefficient and concentration acquisition module.
[0130] The first pollution emission coefficient assignment unit is used to assign a first pollution emission coefficient when the ratio value is 0; the second pollution emission coefficient assignment unit is used to assign a second pollution emission coefficient when the ratio value is within a first preset range; and the third pollution emission coefficient assignment unit is used to assign a third pollution emission coefficient when the ratio value is within a second preset range.
[0131] Furthermore, the coefficient and concentration acquisition module includes a first coefficient and concentration acquisition sub-module and a second coefficient and concentration acquisition sub-module that are electrically connected in sequence; the first coefficient and concentration acquisition sub-module is electrically connected to the third pollution emission coefficient assignment unit, and the second coefficient and concentration acquisition sub-module is electrically connected to the pollution load increase and reduction calculation module.
[0132] The first coefficient and concentration acquisition submodule is used to obtain the proportion of runoff generated by effective rainfall according to the preset outdoor drainage design standards, and the runoff proportion is defined as the comprehensive runoff coefficient; the second coefficient and concentration acquisition submodule is used to obtain the water quality monitoring report of the layout before the renovation, and obtain the pollutant concentration in the water quality monitoring report.
[0133] Furthermore, the pollution load reduction calculation module includes a pollution load reduction calculation submodule electrically connected to the second coefficient and concentration acquisition submodule.
[0134] The submodule for calculating the increase and decrease of pollution load is used to calculate the increase and decrease of pollution load according to equation (1): fh=H·ΔF·a·q·c·10 -9 (1).
[0135] Where fh is the amount of pollution load reduction, H is the average annual precipitation of the preset area, ΔF is the first difference, a is the comprehensive runoff coefficient, q is the pollution emission coefficient, and c is the pollutant concentration.
[0136] Figure 3 This is a schematic diagram of the structure of an electronic device according to an embodiment of this application. Figure 3 As shown, the electronic device 8 includes a processor 81 and a memory 82 coupled to the processor 81.
[0137] The memory 82 stores program instructions for implementing a fault detection method for an oil-immersed transformer according to any of the above embodiments.
[0138] The processor 81 is used to execute program instructions stored in the memory 82 for fault detection of the oil-immersed transformer.
[0139] The processor 81 can also be referred to as a CPU (Central Processing Unit). The processor 81 may be an integrated circuit chip with signal processing capabilities. The processor 81 can also be a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components. A general-purpose processor can be a microprocessor or any conventional processor.
[0140] Furthermore, Figure 4 This is a schematic diagram of the structure of a storage medium according to an embodiment of this application. See also: Figure 4 In this embodiment of the application, the storage medium 9 stores program instructions 91 capable of implementing all the above methods. These program instructions 91 can be stored in the storage medium in the form of a software product, including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) or processor to execute all or part of the steps of the methods in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks, or terminal devices such as computers, servers, mobile phones, and tablets.
[0141] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces, or indirect coupling or communication connection between apparatuses or units, and may be electrical, mechanical, or other forms.
[0142] Furthermore, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated units described above can be implemented in hardware or as software functional units. The above are merely embodiments of this application and do not limit the patent scope of this application. Any equivalent structural or procedural transformations made based on the description and drawings of this application, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this application.
Claims
1. A method for estimating the increase or decrease in pollution load, wherein the increase or decrease in pollution load is based on diversion and renovation projects in a preset area, characterized in that, The methods for estimating the increase or decrease in pollution load include: Obtain the layout before and after the modification of the preset area, and generate the finite element model before and after the modification based on the point cloud data of the preset area. Several rainfall data points for the preset area are obtained based on a preset natural time period; Based on all rainfall data, the pre-modification finite element model and the post-modification finite element model were simulated using preset software to obtain the effective load before and after the modification. Obtain the first difference between the effective load after the modification and the effective load before the modification; A pollution emission coefficient is assigned to the first difference according to a preset strategy; Obtain the comprehensive runoff coefficient and pollutant concentration of the preset area; The pollution load reduction of the preset area is calculated using a preset algorithm based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration. According to a preset strategy, a pollution emission coefficient is assigned to the first difference, including: Obtain the pre-modification drainage system assembly from the finite element model of the pre-modification system; Obtain the sewage riser layout and rainwater riser layout of the drainage system assembly before the renovation; Obtain the junction of the sewage riser layout and the rainwater riser layout; The confluence length and divergence length of the original drainage system assembly are obtained from the confluence. The pollution emission coefficient is defined based on the ratio of the diversion length to the merging length. The pollution load reduction of the preset area is calculated using a preset algorithm based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration, including: The increase or decrease in pollution load is calculated according to equation (1): (1); in, The additional reduction amount for the aforementioned pollution load, The average annual precipitation of the preset area. The first difference, The comprehensive runoff coefficient is... The pollution emission coefficient is mentioned above. The concentration of the pollutant is [value missing].
2. The method for estimating the increase or decrease in pollution load according to claim 1, characterized in that, Obtain the pre-modification and post-modification layouts of the preset area, and generate pre-modification and post-modification finite element models based on the point cloud data of the preset area, including: Obtain the design report for the preset area; The design report is used to generate first point cloud data based on the preset area using preset software; The elevation information of the preset area is obtained and the elevation information is output to the first point cloud data to obtain the finite element model before the modification based on the preset area; Obtain the renovation report for the preset area; The transformation report is used to generate second point cloud data based on the preset area using the preset software; The elevation information is output as the second point cloud data to obtain the modified finite element model based on the preset region.
3. The method for estimating the increase or decrease in pollution load according to claim 1, characterized in that, Based on all rainfall data, precipitation data simulations were performed on the finite element models before and after the modification using pre-set software to obtain the effective load before and after the modification, including: A preset unit precipitation amount is assigned to the finite element model before the modification, and the first total precipitation amount when the finite element model before the modification starts to drain is obtained. The first remaining amount of the first total precipitation is obtained at preset intervals; Determine whether the first remaining amount is less than or equal to a preset threshold; If so, then obtain the second difference between the first total precipitation and the first surplus, and define the second difference as the effective load before the modification; The preset unit precipitation is assigned to the modified finite element model to obtain the second total precipitation when the modified finite element model starts to drain; The second remaining amount of the second total precipitation is obtained at intervals of the preset time. Determine whether the second margin is less than or equal to the preset threshold; If so, then obtain the third difference between the second total precipitation and the second surplus, and define the third difference as the effective load after the modification.
4. The method for estimating the increase or decrease in pollution load according to claim 1, characterized in that, The pollution emission coefficient is defined based on the ratio of the diversion length to the merging length, including: When the ratio is 0, a first pollution emission coefficient is assigned; When the ratio value is within the first preset range, a second pollution emission coefficient is assigned; When the ratio value is within the second preset range, a third pollution emission coefficient is assigned.
5. The method for estimating the increase or decrease in pollution load according to claim 1, characterized in that, Obtaining the comprehensive runoff coefficient and pollutant concentration of the preset area includes: The proportion of runoff generated by effective rainfall is obtained according to the preset outdoor drainage design standards, and the runoff proportion is defined as the comprehensive runoff coefficient. Obtain the water quality monitoring report of the layout before the modification, and obtain the pollutant concentration in the water quality monitoring report.
6. A device for estimating the increase or decrease in pollution load, wherein the device is applied to a method for estimating the increase or decrease in pollution load as described in any one of claims 1 to 5, characterized in that, The device for estimating the increase or decrease in pollution load includes: The finite element model generation module is used to obtain the layout before and after the modification of the preset area, and generate the finite element model before and after the modification based on the point cloud data of the preset area. The rainfall data acquisition module is used to acquire several rainfall data points for the preset area based on a preset natural time period; The effective load simulation module is used to simulate precipitation data on the finite element model before and after the modification based on all rainfall data and through preset software, so as to obtain the effective load before and after the modification. The first difference acquisition module is used to acquire the first difference between the effective load after the modification and the effective load before the modification. A pollution emission coefficient assignment module is used to assign a pollution emission coefficient to the first difference according to a preset strategy. The coefficient and concentration acquisition module is used to acquire the comprehensive runoff coefficient and pollutant concentration of the preset area; The pollution load reduction calculation module is used to calculate the pollution load reduction of the preset area based on the pollution emission coefficient, the comprehensive runoff coefficient, and the pollutant concentration using a preset algorithm.
7. An electronic device, characterized in that, The system includes a processor and a memory coupled to the processor, the memory storing program instructions executable by the processor; when the processor executes the program instructions stored in the memory, it implements a method for estimating the increase or decrease of pollution load as described in any one of claims 1 to 5.
8. A storage medium, characterized in that, The storage medium stores program instructions, which, when executed by a processor, implement a method for estimating the increase or decrease of pollution load as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Rainwater storage pond space distribution planning method
CN111723976A
Method for automatically generating existing structure finite element model based on three-dimensional point cloud
CN113868904A