A target decomposition method and device, electronic equipment and storage medium
By acquiring and analyzing the total amount, date category, and characteristic data of the objectives, and using the model to calculate the task volume for each time period and execution node, the problem of inaccurate task volume at execution nodes is solved, thereby improving the accuracy of objective decomposition and the efficiency of achieving corporate objectives.
Patent Information
- Application Number
- CN202311159891.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-08
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2043-09-08
AI Technical Summary
In existing technologies, when senior managers break down target tasks based on experience, the task quantities at each execution node are inaccurate, which may affect the achievement of corporate goals.
By acquiring the total amount, date category, and daily target quantity impact characteristics of the targets to be decomposed, the task quantity for each time period is determined using the daily target quantity model and the time period target quantity model. Based on the characteristic data of the execution unit, the decomposed task quantity for each execution node is calculated.
This improved the accuracy of target decomposition, ensuring that each execution node completes its tasks within the appropriate timeframe, and thus increasing the efficiency of achieving corporate goals.
Smart Images

Figure CN117057582B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of computer applications, and more specifically, to a method, apparatus, electronic device, and storage medium for decomposing a target. Background Technology
[0002] To facilitate rapid corporate growth, senior management in various companies sets goals for the organization. Each company has multiple execution units capable of carrying out these top-level goals. Senior management, based on experience, breaks down these goals into smaller, manageable tasks for each execution node within the execution units, ensuring that each node completes its assigned task.
[0003] However, the task breakdown for each execution node obtained by managers based on experience is inaccurate and may even lead to the failure to achieve the target, thus affecting the company's development. Summary of the Invention
[0004] In view of this, the purpose of this application is to provide a method, apparatus, electronic device and storage medium for decomposing a target, which can determine the execution node of each execution unit corresponding to the target type, the decomposition task volume of each time period of the date to be determined, and improve the accuracy of target decomposition.
[0005] In a first aspect, embodiments of this application provide a method for decomposing a target, the method comprising:
[0006] Obtain the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity impact characteristic data corresponding to the target type of the target to be decomposed on the date to be determined;
[0007] Among them, the total amount of targets to be decomposed refers to the total amount of targets within the planned completion time of the targets to be decomposed, determined based on the completion status of the targets to be decomposed up to the date to be determined.
[0008] Based on the total amount of the target to be decomposed, date category, and daily target amount impact characteristics data, determine the time period target amount for each time period on the date to be determined;
[0009] Based on the time-period target volume for each time period of the date to be determined, determine the execution node of each execution unit corresponding to the target type, and the decomposed task volume for each time period of the date to be determined; where the decomposed task volume refers to the task volume corresponding to the execution task type of the execution node.
[0010] In one possible implementation, based on the total target amount to be decomposed, date category, and daily target amount influence characteristic data, the time-period target amount for each time period on the date to be determined is determined, including:
[0011] From the daily target volume mapping table corresponding to the target type, determine the historical daily target volume corresponding to the date category; the daily target volume mapping table stores the date category and the historical daily target volume.
[0012] Input the total target amount to be decomposed, the historical daily target amount, and the data on the influence characteristics of the daily target amount into the daily target amount model to obtain the daily target amount on the date to be determined.
[0013] Among them, the daily target quantity model is trained by taking the total sample target quantity, the historical daily target quantity corresponding to the sample date, and the sample data of the daily target quantity influence characteristics as the model input, and the daily target quantity of the sample date as the model output.
[0014] Based on the daily target quantity for the date to be determined, determine the time-period target quantity for each time period on the date to be determined.
[0015] In one possible implementation, determining the time-period target quantity for each time period on the date to be determined, based on the daily target quantity on the date to be determined, includes:
[0016] Obtain the time period category and the time period target quantity impact characteristic data corresponding to the target type for each time period of the date to be determined;
[0017] From the time period target quantity mapping table corresponding to the target type, determine the historical time period target quantity corresponding to the time period category of each time period; wherein, the time period target quantity mapping table stores the time period category and the historical time period target quantity.
[0018] The daily target quantity for the date to be determined, the historical target quantities for each time period, and the data on the impact characteristics of the target quantities for each time period are input into the time period target quantity model to obtain the time period target quantity for each time period on the date to be determined.
[0019] The time-period target quantity model is trained by taking the daily sample target quantity, the historical time-period target quantity for each time period corresponding to the sample date, and the sample data of the time-period target quantity influence characteristics as model inputs, and the time-period target quantity for each time period of the sample date as model outputs.
[0020] In one possible implementation, based on the time-period target volume for each time period of the date to be determined, the execution node corresponding to the target type for each execution unit is determined, and the decomposed task volume for each time period of the date to be determined includes:
[0021] Obtain the target quantity impact characteristic data of each execution unit for each time period corresponding to the target type;
[0022] From the execution unit time period target quantity mapping table corresponding to the target type, determine the historical execution unit time period target quantity for each execution unit in each time period; wherein, the execution unit time period target quantity mapping table stores the execution unit and the historical execution unit time period target quantity;
[0023] The time-period target quantities for each time period of the date to be determined, the historical time-period target quantities of each execution unit in each time period, and the influence characteristic data of the time-period target quantities of the execution units are input into the execution unit time-period target quantity model to obtain the time-period target quantities of each execution unit in each time period of the date to be determined.
[0024] Based on the time-period target volume of each execution unit in each time period of the date to be determined, determine the execution node of each execution unit corresponding to the target type, and the decomposed task volume in each time period of the date to be determined.
[0025] In one possible implementation, based on the time-period target quantity of each execution unit in each time period of the date to be determined, the execution node corresponding to the target type of each execution unit is determined, and the decomposed task quantity in each time period of the date to be determined includes:
[0026] Obtain the execution category of the execution node corresponding to the target type for each execution unit, and the time period target quantity impact characteristic data of the execution node corresponding to the target type for each time period;
[0027] From the execution node time period task volume mapping table corresponding to the target type, determine the historical execution node time period task volume for each time period corresponding to the execution category of each execution node; wherein, the execution node time period task volume mapping table stores the execution node and the historical execution node time period task volume respectively;
[0028] The time-period target quantity of each execution unit in each time period of the date to be determined, the historical time-period task quantity of each execution node in each time period, and the influence characteristic data of the time-period target quantity of the execution node are input into the time-period task quantity model of the execution node to obtain the decomposed task quantity of each execution unit and the execution node corresponding to the target type in each time period of the date to be determined.
[0029] In one possible implementation, obtaining the date to be determined includes:
[0030] According to a preset time interval, the date that is a preset number of days after the current date will be determined as the date to be determined.
[0031] In one possible implementation, obtaining the total number of targets to be decomposed includes:
[0032] Obtain the total planned target amount within the planned completion time for the target to be decomposed, as well as the actual target amount and planned target amount as of the date to be determined;
[0033] Based on the total planned target, the actual target achieved, and the planned target achieved, calculate the total target to be decomposed corresponding to the date to be determined.
[0034] Secondly, embodiments of this application also provide a target decomposition apparatus, the target decomposition apparatus comprising:
[0035] The acquisition module is used to acquire the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity impact feature data corresponding to the target type of the target to be decomposed on the date to be determined;
[0036] Among them, the total amount of targets to be decomposed refers to the total amount of targets within the planned completion time of the targets to be decomposed, determined based on the completion status of the targets to be decomposed up to the date to be determined.
[0037] The determination module is used to determine the time period target quantity for each time period on the date to be determined, based on the total target quantity to be decomposed, date category, and daily target quantity influence characteristic data.
[0038] The determination module is also used to determine the execution node of each execution unit corresponding to the target type based on the time period target quantity of each time period of the date to be determined, and the decomposed task quantity of each time period of the date to be determined; wherein, the decomposed task quantity refers to the task quantity corresponding to the execution task type of the execution node.
[0039] Thirdly, embodiments of this application also provide an electronic device, including: a processor, a storage medium, and a bus. The storage medium stores machine-readable instructions executable by the processor. When the electronic device is running, the processor communicates with the storage medium via the bus, and the processor executes the machine-readable instructions to perform the steps of the decomposition method as described in any of the objectives of the first aspect.
[0040] Fourthly, embodiments of this application also provide a computer-readable storage medium storing a computer program, which, when executed by a processor, performs the steps of the decomposition method as described in any of the objectives of the first aspect.
[0041] This application provides a method, apparatus, electronic device, and storage medium for decomposing a target. The method includes: acquiring the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined; determining the time-period target quantity for each time period on the date to be determined based on the total amount of the target to be decomposed, the date category, and the daily target quantity influence characteristic data; and determining the execution node of each execution unit corresponding to the target type and the decomposition task quantity for each time period on the date to be determined based on the time-period target quantity for each time period on the date to be determined. This application, by using the total amount of the target to be decomposed, the date category corresponding to the date to be determined, and the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined, can determine the execution node of each execution unit corresponding to the target type and the decomposition task quantity for each time period on the date to be determined, thereby improving the accuracy of task quantity determination. Attached Figure Description
[0042] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0043] Figure 1 A flowchart of a target decomposition method provided in an embodiment of this application is shown;
[0044] Figure 2 A flowchart of another method for decomposing an objective provided in an embodiment of this application is shown;
[0045] Figure 3 A schematic diagram of the structure of a target decomposition device provided in an embodiment of this application is shown;
[0046] Figure 4 A schematic diagram of the structure of an electronic device provided in an embodiment of this application is shown. Detailed Implementation
[0047] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. It should be understood that the accompanying drawings in this application are for illustrative and descriptive purposes only and are not intended to limit the scope of protection of this application. Furthermore, it should be understood that the schematic drawings are not drawn to scale. The flowcharts used in this application illustrate operations implemented according to some embodiments of this application. It should be understood that the operations in the flowcharts may not be implemented in sequence, and steps without logical contextual relationships may be reversed or implemented simultaneously. In addition, those skilled in the art, guided by the content of this application, may add one or more other operations to the flowcharts, or remove one or more operations from the flowcharts.
[0048] Furthermore, the described embodiments are merely some, not all, of the embodiments of this application. The components of the embodiments of this application described and illustrated herein can typically be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0049] To enable those skilled in the art to utilize the content of this application, and in conjunction with the specific application scenario of "computer application field," the following implementation methods are provided. For those skilled in the art, the general principles defined herein can be applied to other embodiments and application scenarios without departing from the spirit and scope of this application. Although this application is primarily described within the "computer application field," it should be understood that this is merely an exemplary embodiment.
[0050] It should be noted that the term "comprising" will be used in the embodiments of this application to indicate the presence of the features declared thereafter, but does not exclude the addition of other features.
[0051] The following is a detailed description of a target decomposition method provided in an embodiment of this application.
[0052] Reference Figure 1 The diagram shown is a flowchart illustrating a target decomposition method provided in an embodiment of this application. The specific execution process of the target decomposition method is as follows:
[0053] S101. Obtain the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined.
[0054] S102. Based on the total amount of the target to be decomposed, the date category, and the impact characteristics of the daily target amount, determine the time period target amount for each time period on the date to be determined.
[0055] S103. Based on the time period target quantity for each time period of the date to be determined, determine the execution node of each execution unit corresponding to the target type, and the decomposed task quantity for each time period of the date to be determined.
[0056] This application provides a method, apparatus, electronic device, and storage medium for decomposing a target. The method includes: acquiring the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined; determining the time-period target quantity for each time period on the date to be determined based on the total amount of the target to be decomposed, the date category, and the daily target quantity influence characteristic data; and determining the execution node of each execution unit corresponding to the target type and the decomposition task quantity for each time period on the date to be determined based on the time-period target quantity for each time period on the date to be determined. This application, by using the total amount of the target to be decomposed, the date category corresponding to the date to be determined, and the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined, can determine the execution node of each execution unit corresponding to the target type and the decomposition task quantity for each time period on the date to be determined, thereby improving the accuracy of target decomposition.
[0057] The exemplary steps of the embodiments of this application are described below:
[0058] S101. Obtain the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence characteristic data corresponding to the target type of the target to be decomposed on the date to be determined.
[0059] In this embodiment, the target to be decomposed carries a target type; the total target amount refers to the total target amount within the planned completion time of the target to be decomposed, determined based on the completion status of the target to be decomposed up to the date to be determined; the planned completion time refers to the longest completion time for the target to be decomposed set by the company's senior management, that is, the target to be decomposed to be completed within the planned completion time. Each target type of target to be decomposed has its own target quantity influence characteristics, and the daily target quantity influence characteristic data refers to the data on the target quantity influence characteristics that can affect the completion amount of the target to be decomposed on the date to be determined. The date to be determined includes year, month, and day.
[0060] The date category for the date to be determined includes multiple date categories across different date dimensions. Specifically, these include the date category based on the solar term, the date category based on its position within a week, the date category based on the holiday, and the date category based on its position within a holiday. The solar term dimension refers to the first solar term preceding the date, including categories such as Beginning of Spring, Rain Water, Awakening of Insects, Spring Equinox, Pure Brightness, Grain Rain, Beginning of Summer, Grain Buds, Grain in Ear, Summer Solstice, Minor Heat, Major Heat, Beginning of Autumn, End of Heat, White Dew, Autumn Equinox, Cold Dew, Frost's Descent, Beginning of Winter, Minor Snow, Major Snow, Winter Solstice, Minor Cold, and Major Cold. The position within a week refers to the date categories such as Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, and Sunday. The holiday dimension includes the date categories such as New Year's Day, Spring Festival, Pure Brightness Festival, Labor Day, Dragon Boat Festival, Mid-Autumn Festival, National Day, Mid-Autumn Festival and National Day, and non-holidays. The position within a holiday refers to the day of the holiday, categorized as the first day, second day, third day, fourth day, fifth day, sixth day, and seventh day.
[0061] Furthermore, obtaining the date to be determined includes determining the date a preset number of days after the current date as the date to be determined, according to a preset time interval.
[0062] In this application embodiment, assuming the preset time interval is one day and the preset number of days is seven days, then every other day, the date that is the preset number of days after the current date is determined as the date to be determined; for example, if the current date is March 2, 2023, then the dates to be determined include March 3, 2023, March 4, 2023, March 5, 2023, March 6, 2023, March 7, 2023, March 8, 2023, and March 9, 2023.
[0063] S102. Based on the total amount of the target to be decomposed, the date category, and the impact characteristics of the daily target amount, determine the time period target amount for each time period on the date to be determined.
[0064] In this application embodiment, the time period target quantity includes the planned completion target quantity of the target to be decomposed for each time period on the date to be determined.
[0065] The target quantity for each time period on the date to be determined is determined by the following steps:
[0066] The first step is to determine the historical daily target quantity corresponding to the date category from the daily target quantity mapping table corresponding to the target type; the daily target quantity mapping table stores the date category and the historical daily target quantity.
[0067] In this embodiment, the historical daily target quantity corresponding to the date category includes the historical daily target quantity corresponding to the date category of each date dimension and the target type for the date to be determined; the number of historical daily target quantities is the same as the number of date dimensions corresponding to the date category of the date to be determined. The daily target quantity mapping table contains the historical daily target quantity corresponding to each date category of each date dimension and the target type; the number of date categories stored in the daily target quantity mapping table is the sum of the number of date categories in the solar term dimension, the number of date categories in the position dimension of the week, the number of date categories in the holiday dimension, and the number of date categories in the position dimension of the holiday, which is determined through historical data.
[0068] Here, for each date category corresponding to each date dimension, the average daily target quantity of historical data with the same date category as the date dimension and the target type is determined as the historical daily target quantity of the date category corresponding to the date dimension in the daily target quantity mapping table of the target type.
[0069] The second step is to input the total target amount to be decomposed, the historical daily target amount, and the data on the influence characteristics of the daily target amount into the daily target amount model to obtain the daily target amount on the date to be determined.
[0070] Among them, the daily target quantity model is trained by taking the total sample target quantity, the historical daily target quantity corresponding to the sample date, and the sample data of the daily target quantity influence characteristics as the model input, and the daily target quantity of the sample date as the model output.
[0071] The third step is to determine the time-period target quantity for each period on the date to be determined, based on the daily target quantity for the date to be determined.
[0072] Specifically, obtain the time period category and the time period target quantity impact characteristic data corresponding to the target type for each time period of the date to be determined.
[0073] In the embodiments of this application, each type of target to be decomposed has its own target quantity influence characteristics. The time period target quantity influence characteristic data refers to the task quantity influence characteristic data that can affect the completion amount of the target to be decomposed in each time period of the date to be determined.
[0074] The time period category includes multiple time period dimensions, specifically the time period category of the current time period dimension, the time period category of the weather dimension, and the time period category of the wind speed level. The current time period dimension refers to the time period category of the current time period within the day. The weather dimension includes time period categories such as sunny, cloudy, overcast, light rain, moderate rain, heavy rain, rainstorm, light snow, moderate snow, heavy snow, blizzard, fog, hail, sandstorm, and typhoon.
[0075] Specifically, from the time period target quantity mapping table corresponding to the target type, the historical time period target quantity corresponding to each time period category is determined; wherein, the time period target quantity mapping table stores the time period category and the historical time period target quantity.
[0076] In this embodiment, the historical time-period target quantity corresponding to the time-period category includes the historical time-period target quantity corresponding to the time-period category of each time-period dimension and the target type. The number of historical time-period target quantities is the same as the number of time-period dimensions corresponding to the time-period categories of each time-period. The time-period target quantity mapping table contains the historical time-period target quantity corresponding to each time-period category of each time-period dimension and the target type. The number of time-period categories stored in the time-period target quantity mapping table is the sum of the number of time-period categories contained in each time-period dimension, which is determined through historical data, and the determination method is the same as that of the daily target quantity mapping table.
[0077] Specifically, the daily target quantity for the date to be determined, the historical time-period target quantities for each time period, and the data on the impact characteristics of the time-period target quantities will be input into the time-period target quantity model to obtain the time-period target quantities for each time period on the date to be determined.
[0078] The time-period target quantity model is trained by taking the daily sample target quantity, the historical time-period target quantity for each time period corresponding to the sample date, and the sample data of the time-period target quantity influence characteristics as the model input, and the time-period target quantity for each time period of the sample date as the model output.
[0079] S103. Based on the time period target quantity for each time period of the date to be determined, determine the execution node of each execution unit corresponding to the target type, and the decomposed task quantity for each time period of the date to be determined.
[0080] In this embodiment, each execution unit can be used to complete the target to be decomposed; for example, the first and second branches of a company are both execution units of the company. To complete the target to be decomposed, multiple execution nodes need to execute tasks corresponding to their respective execution task types. For example, if the target type of the target to be decomposed is passenger throughput, and the execution nodes include basic security checkpoints, then the decomposed task volume of the basic security checkpoints should be the decomposed task volume of execution task types such as the number of people served and passenger flow rate. The target type of the target to be decomposed and the execution task type of the execution nodes can be the same or different, depending on the actual situation.
[0081] The decomposed task quantity refers to the task quantity corresponding to the execution task type of the execution node. The decomposed task quantity includes the planned task quantity to be completed by each execution node of each execution unit corresponding to the target type in each time period of the date to be determined.
[0082] Specifically, the execution nodes corresponding to the target type for each execution unit are determined through the following steps, along with the decomposed task volume for each time period on the date to be determined:
[0083] The first step is to obtain the target quantity impact characteristic data of each execution unit for each time period, corresponding to the target type.
[0084] In the embodiments of this application, each type of target to be decomposed has its own target quantity influence characteristics. The target quantity influence characteristic data of the execution unit time period refers to the task quantity influence characteristic data of the execution unit in each time period of the date to be determined, which can influence the completion amount of the target to be decomposed.
[0085] The second step is to determine the historical execution unit time-period target quantity for each execution unit in each time period from the execution unit time-period target quantity mapping table corresponding to the target type; wherein, the execution unit time-period target quantity mapping table stores the execution unit and the historical execution unit time-period target quantity.
[0086] In the embodiments of this application, the historical execution unit time-period target quantity of each execution unit in each time period includes the historical execution unit time-period target quantity of each execution unit in each time period that corresponds to the time period category of each time period dimension and the target type; the number of historical execution unit time-period target quantities is the same as the number of execution units; similar to the daily target quantity mapping table.
[0087] The third step is to input the time-period target quantity for each time period of the date to be determined, the historical time-period target quantity of each execution unit in each time period, and the influence characteristic data of the time-period target quantity of the execution unit into the execution unit time-period target quantity model to obtain the time-period target quantity of each execution unit in each time period of the date to be determined.
[0088] The fourth step is to determine the execution nodes corresponding to the target type for each execution unit and the decomposed task volume for each time period on the date to be determined, based on the time period target volume of each execution unit.
[0089] Specifically, the execution category of the execution node corresponding to the target type of each execution unit and the time period target quantity influence feature data of the execution node corresponding to the target type in each time period are obtained.
[0090] In the embodiments of this application, the execution category of the execution node refers to the execution method of the execution node when performing a task; for example, the execution task type of the execution node is security inspection, where the execution category of security inspection includes categories such as ordinary security inspection, special security inspection and explosion-proof security inspection.
[0091] Specifically, from the execution node time period task volume mapping table corresponding to the target type, the historical execution node time period task volume corresponding to each execution node execution category is determined; wherein, the execution node time period task volume mapping table stores the execution node and the historical execution node time period task volume.
[0092] In the embodiments of this application, the task volume mapping table for execution node time periods is determined by historical data, and the determination process is the same as that for the daily target volume mapping table.
[0093] Specifically, the time-period target quantity of each execution unit in each time period of the date to be determined, the historical time-period task quantity of each execution node in each time period, and the influence characteristic data of the time-period target quantity of the execution node are input into the time-period task quantity model of the execution node, so as to obtain the decomposed task quantity of each execution unit corresponding to the target type in each time period of the date to be determined.
[0094] Reference Figure 2 The diagram shown is a flowchart illustrating another target decomposition method provided in this application embodiment, used to obtain the total number of targets to be decomposed. The exemplary steps of this application embodiment are described below:
[0095] S201. Obtain the total planned target amount within the planned completion time for the target to be decomposed, as well as the actual completed target amount and the planned completed target amount up to the date to be determined.
[0096] In this application's implementation, the planned target total refers to the total amount of targets to be decomposed set by the company's senior management. The actual completed target amount refers to the target amount that has been completed up to the date to be determined; the planned completed target amount refers to the sum of the decomposed target amounts obtained through the method of this application up to the date to be determined.
[0097] S202. Based on the total planned target, the actual target achieved, and the planned target achieved, calculate the total target to be decomposed corresponding to the date to be determined.
[0098] The total amount of targets to be decomposed has the same planned completion time as the total amount of planned targets.
[0099] Specifically, determine whether the actual completed target amount is less than the planned target amount; if the actual completed target amount is less than the planned target amount, calculate the total amount of the target to be decomposed corresponding to the date to be determined using the following formula:
[0100]
[0101] Among them, T dynamic T represents the total amount of the target to be decomposed corresponding to the date to be determined. initial For the planned target total, W pTo achieve the target quantity as planned, W j This refers to the actual amount of the target quantity achieved.
[0102] In this embodiment of the application, if the actual completed target amount is less than the planned completed target amount, it indicates that the completion rate of the execution node is low. Then, the above formula is used to set higher requirements for the execution node so as to complete the initially set total planned target amount.
[0103] Specifically, if the actual completed target amount is greater than or equal to the planned completed target amount, the total amount of the target to be decomposed corresponding to the date to be determined is calculated using the following formula:
[0104]
[0105] Among them, T dynamic T represents the total amount of the target to be decomposed corresponding to the date to be determined. initial For the planned target total, W p To achieve the target quantity as planned, W j This refers to the actual amount of the target quantity achieved.
[0106] In this embodiment of the application, if the actual completed target amount is greater than or equal to the planned completed target amount, it indicates that the completion rate of the execution node is high, and then the above formula can be used to set lower requirements for the execution node.
[0107] This application provides another method for decomposing a target, which can dynamically adjust the total amount of tasks to be decomposed based on the actual completion status, so as to improve the accuracy of target decomposition.
[0108] Based on the same inventive concept, this application also provides a target decomposition device corresponding to the target decomposition method. Since the principle of the device in this application is similar to the target decomposition method described above in this application, the implementation of the device can refer to the implementation of the method, and the repeated parts will not be described again.
[0109] Reference Figure 3 The diagram shown is a schematic representation of a target decomposition apparatus provided in an embodiment of this application. The target decomposition apparatus includes:
[0110] The acquisition module 301 is used to acquire the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence feature data corresponding to the target type of the target to be decomposed on the date to be determined;
[0111] Among them, the total amount of targets to be decomposed refers to the total amount of targets within the planned completion time of the targets to be decomposed, determined based on the completion status of the targets to be decomposed up to the date to be determined.
[0112] The determination module 302 is used to determine the time period target quantity for each time period on the date to be determined based on the total target quantity to be decomposed, date category, and daily target quantity influence characteristic data.
[0113] The determination module 302 is further configured to determine the execution node of each execution unit corresponding to the target type based on the time period target quantity of each time period of the date to be determined, and the decomposed task quantity of each execution unit in each time period of the date to be determined; wherein, the decomposed task quantity refers to the task quantity corresponding to the execution task type of the execution node.
[0114] In one possible implementation, the determining module 302 is specifically used to determine the historical daily target quantity corresponding to the date category from the daily target quantity mapping table corresponding to the target type; wherein the daily target quantity mapping table stores the date category and the historical daily target quantity; inputting the total target quantity to be decomposed, the historical daily target quantity, and the daily target quantity influence feature data into the daily target quantity model to obtain the daily target quantity on the date to be determined; wherein the daily target quantity model is trained by using the sample target quantity, the historical daily target quantity corresponding to the sample date, and the daily target quantity influence feature sample data as model input, and the daily target quantity of the sample date as model output; and determining the time period target quantity for each time period on the date to be determined based on the daily target quantity on the date to be determined.
[0115] In one possible implementation, the determining module 302 is further configured to:
[0116] Obtain the time period category and the time period target quantity impact characteristic data corresponding to the target type for each time period of the date to be determined;
[0117] From the time period target quantity mapping table corresponding to the target type, determine the historical time period target quantity corresponding to the time period category of each time period; wherein, the time period target quantity mapping table stores the time period category and the historical time period target quantity.
[0118] The daily target quantity for the date to be determined, the historical time-period target quantities for each time period, and the data on the impact characteristics of the time-period target quantities are input into the time-period target quantity model to obtain the time-period target quantities for each time period on the date to be determined.
[0119] The time-period target quantity model is trained by taking the daily sample target quantity, the historical time-period target quantity for each time period corresponding to the sample date, and the sample data of the time-period target quantity influence characteristics as model inputs, and the time-period target quantity for each time period of the sample date as model outputs.
[0120] In one possible implementation, the determining module 302 is specifically used to obtain the execution unit time period target quantity influence feature data corresponding to the target type for each execution unit in each time period; determine the historical execution unit time period target quantity for each execution unit in each time period from the execution unit time period target quantity mapping table corresponding to the target type; wherein, the execution unit time period target quantity mapping table stores the execution unit and the historical execution unit time period target quantity; input the time period target quantity for each time period of the date to be determined, the historical execution unit time period target quantity for each execution unit in each time period, and the execution unit time period target quantity influence feature data into the execution unit time period target quantity model to obtain the time period target quantity for each execution unit in each time period of the date to be determined; and determine the decomposed task quantity of the execution node corresponding to the target type for each execution unit in each time period of the date to be determined based on the time period target quantity of each execution unit in each time period of the date to be determined.
[0121] In one possible implementation, the determining module 302 is further configured to:
[0122] Obtain the execution category of the execution node corresponding to the target type for each execution unit, and the time period target quantity impact feature data of the execution node corresponding to the target type for each time period;
[0123] From the execution node time period task volume mapping table corresponding to the target type, determine the historical execution node time period task volume for each time period corresponding to the execution category of each execution node; wherein, the execution node time period task volume mapping table stores the execution node and the historical execution node time period task volume respectively;
[0124] The time-period target quantity of each execution unit in each time period of the date to be determined, the historical time-period task quantity of each execution node in each time period, and the influence characteristic data of the time-period target quantity of the execution node are input into the time-period task quantity model of the execution node to obtain the decomposed task quantity of each execution unit and the execution node corresponding to the target type in each time period of the date to be determined.
[0125] In one possible implementation, the acquisition module 301 is further configured to:
[0126] According to a preset time interval, the date that is a preset number of days after the current date will be determined as the date to be determined.
[0127] In one possible implementation, the acquisition module 301 is further configured to:
[0128] Obtain the total planned target amount within the planned completion time for the target to be decomposed, as well as the actual target amount and planned target amount as of the date to be determined;
[0129] Based on the total planned target, the actual target achieved, and the planned target achieved, calculate the total target to be decomposed corresponding to the date to be determined.
[0130] This application provides a target decomposition device that can determine the execution nodes of each execution unit corresponding to the target type, and the decomposition task volume for each time period of the date to be determined, thereby improving the accuracy of task volume determination.
[0131] like Figure 4 As shown in the embodiment of this application, an electronic device 400 includes a processor 401, a memory 402, and a bus. The memory 402 stores machine-readable instructions that can be executed by the processor 401. When the electronic device is running, the processor 401 communicates with the memory 402 through the bus. The processor 401 executes the machine-readable instructions to perform the steps of the decomposition method as described above.
[0132] Specifically, the memory 402 and processor 401 mentioned above can be general-purpose memory and processor, without any specific limitations. When the processor 401 runs the computer program stored in the memory 402, it can execute the decomposition method of the above-mentioned target.
[0133] Corresponding to the above-mentioned decomposition method for the objective, this application embodiment also provides a computer-readable storage medium storing a computer program, which, when run by a processor, executes the steps of the above-mentioned decomposition method for the objective.
[0134] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems and devices described above can be referred to the corresponding processes in the method embodiments, and will not be repeated here. In the several embodiments provided in this application, it should be understood that the disclosed systems, devices, and methods can be implemented in other ways. The device embodiments described above are merely illustrative. For example, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. Furthermore, multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the displayed or discussed mutual coupling or direct coupling or communication connection can be through some communication interfaces; the indirect coupling or communication connection of devices or modules can be electrical, mechanical, or other forms.
[0135] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0136] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.
[0137] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a processor-executable, non-volatile, computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the information processing methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, ROM, RAM, magnetic disks, or optical disks.
[0138] The above are merely specific embodiments of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for decomposing a target, characterized in that, The decomposition method of the target includes: Obtain the total number of targets to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity impact characteristic data corresponding to the target type of the target to be decomposed on the date to be determined; Wherein, the total amount of the target to be decomposed refers to the total amount of the target within the planned completion time of the target to be decomposed, determined based on the completion status of the target to be decomposed up to the date to be determined; Based on the total target amount to be decomposed, the date category, and the daily target amount influence feature data, the time-period target amount for each period of the date to be determined is determined, including: determining the historical daily target amount corresponding to the date category from the daily target amount mapping table corresponding to the target type; wherein the daily target amount mapping table stores the date category and the historical daily target amount; inputting the total target amount to be decomposed, the historical daily target amount, and the daily target amount influence feature data into the daily target amount model to obtain the daily target amount for the date to be determined; wherein the daily target amount model is trained by using the sample target amount, the historical daily target amount corresponding to the sample date, and the daily target amount influence feature sample data as model input, and the daily target amount of the sample date as model output; and determining the time-period target amount for each period of the date to be determined based on the daily target amount for the date to be determined. Based on the time-period target quantities for each time period of the date to be determined, the decomposed task quantities for each execution node corresponding to the target type of each execution unit in each time period of the date to be determined are determined, including: obtaining the execution unit time-period target quantity impact feature data corresponding to the target type of each execution unit in each time period of each time period from the execution unit time-period target quantity mapping table corresponding to the target type; wherein, the execution unit time-period target quantity mapping table stores the execution unit and the historical execution unit time-period target quantities; inputting the time-period target quantities for each time period of the date to be determined, the historical execution unit time-period target quantities for each execution unit in each time period of each time period of each execution unit, and the execution unit time-period target quantity impact feature data into the execution unit time-period target quantity model to obtain the time-period target quantities for each execution unit in each time period of the date to be determined; based on the time-period target quantities for each execution unit in each time period of the date to be determined, the decomposed task quantities for each execution node corresponding to the target type of each execution unit in each time period of the date to be determined are determined; wherein, the decomposed task quantities refer to the task quantities corresponding to the execution task types of the execution nodes.
2. The target decomposition method according to claim 1, characterized in that, The step of determining the time-period target quantity for each time period on the date to be determined, based on the daily target quantity on the date to be determined, includes: Obtain the time period category and the time period target quantity impact feature data corresponding to the target type for each time period of the date to be determined; From the time period target quantity mapping table corresponding to the target type, determine the historical time period target quantity corresponding to the time period category of each time period; wherein, the time period target quantity mapping table stores the time period category and the historical time period target quantity. The daily target quantity for the date to be determined, the historical time-period target quantities for each time period, and the time-period target quantity influence characteristic data are input into the time-period target quantity model to obtain the time-period target quantities for each time period on the date to be determined. The time-period target quantity model is obtained by training the model with the daily sample target quantity, the historical time-period target quantity for each time period corresponding to the sample date, and the sample data of the time-period target quantity influence characteristics as model inputs, and the time-period target quantity for each time period of the sample date as model outputs.
3. The target decomposition method according to claim 2, characterized in that, The step of determining the decomposed task volume of each execution unit corresponding to the target type for each execution unit in each time period of the date to be determined, based on the time period target volume of each execution unit in each time period of the date to be determined, includes: Obtain the execution category of the execution node corresponding to the target type for each execution unit, and the time period target quantity impact feature data of the execution node corresponding to the target type for each time period; From the execution node time period task volume mapping table corresponding to the target type, determine the historical execution node time period task volume for each time period corresponding to the execution category of each execution node; wherein, the execution node time period task volume mapping table stores the execution node and the historical execution node time period task volume respectively; The time-period target quantity of each execution unit in each time period of the date to be determined, the historical execution node time-period task quantity of each execution node in each time period, and the influence feature data of the execution node time-period target quantity are input into the execution node time-period task quantity model to obtain the decomposed task quantity of each execution unit and the execution node corresponding to the target type in each time period of the date to be determined.
4. The method for decomposing a target according to any one of claims 1 to 3, characterized in that, Obtaining the date to be determined includes: According to a preset time interval, the date that is a preset number of days after the current date will be determined as the date to be determined.
5. The target decomposition method according to claim 4, characterized in that, Obtaining the total number of targets to be decomposed includes: Obtain the total planned target amount of the target to be decomposed within the planned completion time, and the actual completed target amount and planned completed target amount up to the date to be determined; Based on the total planned target, the actual target achieved, and the planned target achieved, calculate the total target to be decomposed corresponding to the date to be determined.
6. A target decomposition device, characterized in that, The device for disintegrating the target includes: The acquisition module is used to acquire the total amount of the target to be decomposed and the date category corresponding to the date to be determined, as well as the daily target quantity influence feature data corresponding to the target type of the target to be decomposed on the date to be determined. Wherein, the total amount of the target to be decomposed refers to the total amount of the target within the planned completion time of the target to be decomposed, determined based on the completion status of the target to be decomposed up to the date to be determined; The determination module is used to determine the time-period target quantity for each time period of the date to be determined based on the total target quantity to be decomposed, the date category, and the daily target quantity influence feature data. This includes: determining the historical daily target quantity corresponding to the date category from a daily target quantity mapping table corresponding to the target type; wherein the daily target quantity mapping table stores the date category and the historical daily target quantity; inputting the total target quantity to be decomposed, the historical daily target quantity, and the daily target quantity influence feature data into a daily target quantity model to obtain the daily target quantity for the date to be determined; wherein the daily target quantity model is trained by using the sample target quantity, the historical daily target quantity corresponding to the sample date, and the daily target quantity influence feature sample data as model input, and the daily target quantity of the sample date as model output; and determining the time-period target quantity for each time period of the date to be determined based on the daily target quantity for the date to be determined. The determining module is further configured to determine the decomposed task volume of each execution unit corresponding to the target type in each time period of the date to be determined, based on the time period target volume of each time period of the date to be determined, including: obtaining the execution unit time period target volume influence feature data of each execution unit corresponding to the target type in each time period; determining the historical execution unit time period target volume of each execution unit in each time period from the execution unit time period target volume mapping table corresponding to the target type; wherein, the execution unit time period target volume mapping table stores the execution unit and the historical execution unit time period target volume; inputting the time period target volume of each time period of the date to be determined, the historical execution unit time period target volume of each execution unit in each time period, and the execution unit time period target volume influence feature data into the execution unit time period target volume model to obtain the time period target volume of each execution unit in each time period of the date to be determined; determining the decomposed task volume of each execution unit corresponding to the target type in each time period of the date to be determined based on the time period target volume of each execution unit in each time period of the date to be determined; wherein, the decomposed task volume refers to the task volume corresponding to the execution task type of the execution node.
7. An electronic device, characterized in that, include: The device includes a processor, a storage medium, and a bus, wherein the storage medium stores machine-readable instructions executable by the processor, and when the electronic device is in operation, the processor communicates with the storage medium via the bus, and the processor executes the machine-readable instructions to perform the steps of the method for decomposing the target as described in any one of claims 1 to 5.
8. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, performs the steps of the decomposition method of the target as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Data processing method and device, readable storage medium and electronic equipment
CN111539591A
Task data prediction method and device, storage medium and electronic device
CN112418509A