Process automation network system with switching function and communication method
By introducing a network switching module into the steel rolling mill's network system, the IP address conflict caused by the addition of new computers was resolved, enabling flexible switching and unique communication between the control module and the network system, thereby improving operational efficiency and security.
Patent Information
- Application Number
- CN202311047173.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-18
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2043-08-18
AI Technical Summary
When a new computer was added to the control room of the steel rolling mill, the L2 system, which uses a designated IP address for communication, caused IP address conflicts in the same network segment, affecting the welding of product labels.
A network switching module is adopted, including first and second network switching modules, which are connected by optical fiber and twisted pair to realize flexible switching between the control module and the network system and avoid IP address conflicts.
The problem of IP address conflict was resolved, ensuring the uniqueness of operation and communication between different control modules, thus improving operational efficiency and security.
Smart Images

Figure CN117061576B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of process automation system technology, and in particular to a process automation network system and communication method with switching function. Background Technology
[0002] With the promotion of information technology and intelligent manufacturing, various computer systems have been widely used in the steel industry.
[0003] Currently, the L2 system on the double-high-strength bar production line of the steel rolling mill tracks the rolling process and sends label data such as the production date, specifications, and weight of the finished products to the robotic label welding system, enabling automatic label engraving and welding. While retaining the original computer in the on-site control room to ensure operation when needed, a new computer needs to be added in the central control room to receive data from the L2 system, as the system requires operation and monitoring. However, because the L2 system uses a designated IP address for communication with other systems, when a new computer is added to the network in the central control room, its IP address also needs to be set to the designated IP address. This results in duplicate IP addresses existing on the same network segment, causing conflicts and hindering normal communication, thus affecting the welding of product labels. Summary of the Invention
[0004] In view of the shortcomings of the prior art described above, one objective of the present invention is to provide a process automation network system and communication method with switching functionality, to solve the problem that when an L2 system uses a designated IP address for communication, adding a computer to the network in the control room can lead to the existence of the same IP address in the same network segment, causing a conflict and thus preventing normal communication and affecting the welding of product labels. A second objective is to provide a process automation network communication method with switching functionality.
[0005] To achieve the above and other related objectives, the present invention provides a process automation network system with switching functionality, comprising:
[0006] The first network system is used to monitor and control relevant data in the billet rolling process;
[0007] The first control module is used to receive the relevant data sent by the first network system;
[0008] The second network system is used to determine the corresponding execution instructions based on the relevant data;
[0009] The second control module is used to monitor and control the operating status of the second network system;
[0010] A network switching module includes a first network switching module, which is used to switch the communication between the first control module or the second control module and the first network system.
[0011] Optionally, the network switching module further includes a second network switching module, which is used to switch the communication between the first control module or the second control module and the second network system, and the second network switching module switches synchronously with the first network switching module.
[0012] Optionally, the first network switching module is connected to the first network system, the first control module, and the second control module, respectively, and the second network switching module is connected to the second network system, the first control module, and the second control module, respectively.
[0013] Optionally, the first control module is connected to the first network switching module and the second network switching module via optical fiber.
[0014] Optionally, the second control module is connected to the first network switching module and the second network switching module via a twisted pair cable.
[0015] Optionally, the first network switching module is connected to the first network system via a twisted-pair cable, and the second network switching module is connected to the second network system via a twisted-pair cable.
[0016] Optionally, both the first network switching module and the second network switching module are one-input, two-output network switches.
[0017] A process automation network communication method with switching functionality, applied to a process automation network system with switching functionality, the method comprising:
[0018] The first network system acquires relevant data during the billet rolling process, including the production date, specifications, and weight of the finished billet.
[0019] The second network system determines the corresponding execution instructions based on the relevant data;
[0020] The communication between the network switching module and the first network system and the second network system is determined based on whether on-site operations are required.
[0021] If on-site operations are required, the first network switching module switches to a network connection between the first network system and the second control module, and the second network switching module switches to a network connection between the second network system and the second control module.
[0022] When no on-site work is required, the first network switching module switches to the network connection between the first network system and the first control module, and the second network switching module switches to the network connection between the second network system and the first control module.
[0023] As described above, the present invention has the following beneficial effects: A first network system tracks the rolling process of the steel billet and sends label data such as the finished product production date, specifications, and weight of the steel billet to a second network system. The second network system automatically completes engraving and label welding based on the label data. A first network switching module switches the communication between the first control module or the second control module and the first network system. When on-site operation is required, the first network switching module switches to a network connection between the first network system and the second control module, and disconnects the network between the first network system and the first control module. When on-site operation is not required, the first network switching module switches to a network connection between the first network system and the first control module, and disconnects the network between the first network system and the second control module. The technical solution proposed in this application effectively solves the conflict problem that occurs when the first network system communicates with other systems under a specified IP address, realizing the operation and communication functions between the first network system and different control modules, thus achieving the beneficial effect of ensuring the uniqueness of communication and operation between the first network system and multiple control modules. Attached Figure Description
[0024] Figure 1 The diagram shown is a schematic representation of a process automation network system with switching functionality as illustrated in an embodiment of this application.
[0025] Figure 2 The flowchart shown is a process automation network communication method with switching function as illustrated in an embodiment of this application.
[0026] Part Number Explanation
[0027] First network system 1, second network system 2, network switching module 3, first network switching module 301, second network switching module 302, first control module 4, second control module 5. Detailed Implementation
[0028] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention.
[0029] Please see Figures 1 to 2It should be noted that the illustrations provided in this embodiment are only schematic representations of the basic concept of the present invention. Therefore, the drawings only show components relevant to the present invention and are not drawn according to the actual number, shape, and size of components in implementation. In actual implementation, the form, quantity, and proportion of each component can be arbitrarily changed, and the component layout may be more complex. The structures, proportions, and sizes shown in the accompanying drawings are only for illustrative purposes to aid those skilled in the art and are not intended to limit the implementation conditions of the present invention. Therefore, they have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to size, without affecting the effects and objectives of the present invention, should still fall within the scope of the technical content disclosed in the present invention. Furthermore, the terms such as "upper," "lower," "left," "right," "middle," and "one" used in this specification are only for clarity of description and are not intended to limit the scope of the present invention. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the present invention.
[0030] Before describing the embodiments of the present invention in detail, the application environment of the present invention will be described first. The technology of the present invention is mainly applied in the field of process automation system technology. The present invention is used to solve the problem that when an L2 system uses a specified IP address for communication, and a new computer needs to be added to the network in the central control room, it will cause the existence of the same IP address in the same network segment, resulting in a conflict, which in turn will prevent normal communication and affect the welding of product labels.
[0031] Please combine Figure 1 As shown, the present invention provides a process automation network system with switching function, comprising:
[0032] In an exemplary embodiment of this application, a first network system 1 is used to monitor and control relevant data of the billet rolling process; a first control module 4 is used to receive relevant data sent by the first network system 1; a second network system 2 is used to determine corresponding execution instructions based on the relevant data; a second control module 5 is used to monitor and control the operating status of the second network system 2; and a network switching module 3 includes a first network switching module 301, which is used to switch the communication between the first control module 4 or the second control module 5 and the first network system 1.
[0033] In this embodiment, the first network system 1 is the L2 system (industrial automation system) of the double high-strength bar production line in the steel rolling mill. The L2 system monitors and controls the billet rolling process and simultaneously collects relevant data during the billet rolling process (including the production date of the finished steel plate, the specifications of the steel plate, the weight of the steel plate, and other label data), sending it to the second network system 2. The second network system 2 is a welding label system, which automatically engraves and welds labels onto the products. Now, according to requirements, a computer needs to be added to the central control room, namely the first control module 4. The first control module 4 receives data from the first network system 1 and operates and monitors the welding label system. The original second control module 5 is the computer for the welding label system in the field operation room, enabling on-site operation when needed. However, due to the L2 system program... When communicating with other systems in the design, a specified IP address (e.g., 192.168.1.100) is used. Now, after a new computer (first control module 4) is added to the network in the central control room, the IP address of this computer also needs to be set to 192.168.1.100. At this time, there will be two conflicting IP addresses in the same network segment, which will prevent normal communication and affect the welding of product labels. Therefore, through the network switching module 3 proposed in this embodiment, when on-site operation is required, the first network switching module 301 cuts off the communication between the first control module 4 and the first network system 1, and connects the communication between the second control module 5 and the first network system 1 to realize on-site operation, so as to avoid the beneficial effects of the first control module 4 and the second control module 5 being of different data sources due to IP address conflict, which would affect communication and equipment operation.
[0034] In an exemplary embodiment of this application, the network switching module 3 further includes a second network switching module 302, which is used to switch the communication between the first control module 4 or the second control module 5 and the second network system 2, and the second network switching module 302 switches synchronously with the first network switching module 301.
[0035] In this embodiment, a second network switching module 302 is connected between the first control module 4, the second control module 5 and the second network system 2. The second network switching module 302 switches synchronously with the first network switching module 301, thereby preventing the second network system 2 from receiving different operation data and instructions from the two computers (i.e., the first control module 4 and the second control module 5), thus having the beneficial effect of avoiding data errors and malfunctions.
[0036] In an exemplary embodiment of this application, the first network switching module 301 is connected to the first network system 1, the first control module 4, and the second control module 5, respectively, and the second network switching module 302 is connected to the second network system 2, the first control module 4, and the second control module 5, respectively.
[0037] In this embodiment, both the first network switching module 301 and the second network switching module 302 have one network input port and two network output ports. The input port of the first network switching module 301 is connected to the first network system 1, and the two output ports of the first network switching module 301 are connected to the first control module 4 and the second control module 5, respectively. The input port of the second network switching module 302 is connected to the second network system 2, and the two output ports of the second network switching module 302 are connected to the first control module 4 and the second control module 5, respectively. The network switching module 3 shown in this embodiment can connect multiple network nodes simultaneously, enabling them to transmit data and communicate. By providing multiple LAN (Local Area Network) ports, the network switching module 3 can connect multiple computers, servers, and other devices to the same network, allowing operators to freely choose the robot computer in the centralized control room or the field control room for data reception and operation as needed. This solves the communication and operation problems, and is convenient, fast, safe, and reliable to operate, without the need for maintenance personnel intervention, thereby effectively improving work efficiency.
[0038] In an exemplary embodiment of this application, the first control module 4 is connected to the first network switching module 301 and the second network switching module 302 via optical fiber.
[0039] In this embodiment, due to the site layout, the network switching module 3 is located in the field operation room, which is far from the central control room. The fiber optic connection can realize long-distance transmission and has high speed, high bandwidth and more secure data transmission, which can effectively meet the distance requirements between the second control module 5 and the network switching module 3.
[0040] In an exemplary embodiment of this application, the second control module 5 is connected to the first network switching module 301 and the second network switching module 302 via twisted-pair cables.
[0041] In this embodiment, the second control module 5 and the network switching module 3 are both located in the field operation room and are relatively close to each other. Therefore, communication between the second control module 5 and the network switching module 3 can be achieved by connecting the second control module 5 with the first network switching module 301 and the second network switching module 302 through twisted-pair cables, which has the beneficial effect of reducing costs.
[0042] In an exemplary embodiment of this application, the first network switching module 301 is connected to the first network system 1 via a twisted pair cable, and the second network switching module 302 is connected to the second network system 2 via a twisted pair cable.
[0043] In an exemplary embodiment of this application, both the first network switching module 301 and the second network switching module 302 are one-input two-output network switches.
[0044] In this embodiment, by employing a one-input, two-output network switch, the local area network (LAN) scale can be effectively expanded, network performance improved, and packet switching and network isolation achieved. Using a one-input, two-output network switch optimizes network management and usage between the centralized control room and the field control room, allowing operators to switch freely as needed. This solves communication problems while ensuring operational uniqueness and security.
[0045] Please see Figure 2 As shown, Figure 2 This is a flowchart illustrating a process automation network communication method with switching function, as shown in an embodiment of this application.
[0046] like Figure 2 As shown in an exemplary embodiment of this application, the process automation network communication method with switching function includes at least steps S110 to S150.
[0047] Step S110: Obtain relevant data during the billet rolling process through the first network system 1. The relevant data includes the production date, specifications, weight, and other data of the finished billet.
[0048] In step S120, the second network system 2 determines the corresponding execution instructions based on the relevant data.
[0049] For example, the second network system 2 determines the execution instructions of the second network system 2 based on the relevant data obtained by the first network system 1, and the second network system 2 realizes automatic engraving of product labels and label welding according to the determined execution instructions.
[0050] Step S130: Determine the communication between the network switching module 3 and the first network system 1 and the second network system 2 based on whether on-site operations are required.
[0051] For example, based on the operator's judgment, whether on-site operation is required, the network switching module can freely switch between the first network system 1, the second network system 2, and the first control module 4 or the second control module 5 for data reception and operation. This solves the communication and operation problems, making the operation convenient, fast, safe, and reliable, without the need for maintenance personnel intervention, thus improving work efficiency.
[0052] In step S140, if on-site operations are required, the first network switching module 301 switches to the first network system 1 and the second control module 5 to connect to the network, and the second network switching module 302 switches to the second network system 2 and the second control module 5 to connect to the network.
[0053] In step S150, if no on-site work is required, the first network switching module 301 switches to the first network system 1 and connects to the first control module 4, and the second network switching module 302 switches to the second network system 2 and connects to the first control module 4.
[0054] The working principle is as follows: the first network system 1 tracks the rolling process of the steel billet and sends the finished product production date, specifications, weight, and other label data of the steel billet to the second network system 2. The second network system 2 automatically completes the engraving and label welding based on the label data. The first network switching module 301 switches the communication between the first control module 4 or the second control module 5 and the first network system 1. When on-site operation is required, the first network switching module 301 switches to connect the first network system 1 and the second control module 5, and disconnects the network between the first network system 1 and the first control module 4. When on-site operation is not required, the first network switching module 301 switches to connect the first network system 1 and the first control module 4, and disconnects the network between the first network system 1 and the second control module 5. The second network switching module 302 switches synchronously with the first network switching module 301 to prevent the label welding robot system from receiving different operation data and instructions from two computers, which could cause data errors and malfunctions. The technical solution proposed in this application can effectively solve the problem of conflict when the first network system 1 and other systems need to communicate under a specified IP address, realize the operation and communication functions between the first network system 1 and different control modules, and thus have the beneficial effect of realizing the uniqueness of communication and operation between the first network system 1 and multi-point control modules.
[0055] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.
Claims
1. A process automation network system with switching functionality, characterized in that, include: The first network system is used to monitor and control relevant data in the billet rolling process; The first control module is used to receive the relevant data sent by the first network system; The second network system is used to determine the corresponding execution instructions based on the relevant data; The second control module is used to monitor and control the operating status of the second network system; A network switching module includes a first network switching module, which is used to switch the communication between the first control module or the second control module and the first network system. The network switching module further includes a second network switching module, which is used to switch the communication between the first control module or the second control module and the second network system, and the second network switching module switches synchronously with the first network switching module. The first control module is connected to the first network switching module and the second network switching module via optical fiber. Both the first network switching module and the second network switching module are one-input two-output network switches; The first network system is the L2 system of the double high-strength bar production line in the steel rolling mill, and the second network system is the welding label system. A new computer is added to the central control room as the first control module. The first control module receives data from the first network system and operates and monitors the welding label system through the first control module. The original second control module is the computer of the welding label system in the field operation room, which performs field operation when needed. Because the L2 system uses a designated IP address for communication with other systems in its programming, the IP address of the newly added first control module in the central control room is also set to the designated IP address after it is connected to the network. This results in two conflicting IP addresses in the same network segment. The network switching module is located in the field control room, which is far from the central control room; the second control module and the network switching module are both located in the field control room, which is short in distance. The second control module is connected to the first network switching module and the second network switching module via twisted-pair cables.
2. The process automation network system with switching function according to claim 1, characterized in that: The first network switching module is connected to the first network system, the first control module, and the second control module, respectively, and the second network switching module is connected to the second network system, the first control module, and the second control module, respectively.
3. The process automation network system with switching function according to claim 2, characterized in that: The second control module is connected to the first network switching module and the second network switching module via twisted-pair cables.
4. The process automation network system with switching function according to claim 2, characterized in that: The first network switching module is connected to the first network system via a twisted-pair cable, and the second network switching module is connected to the second network system via a twisted-pair cable.
5. A process automation network communication method with switching function, applied to the process automation network system with switching function as described in any one of claims 1-4, characterized in that, The method includes: The first network system acquires relevant data during the billet rolling process, including the production date, specifications, and weight of the finished billet. The second network system determines the corresponding execution instructions based on the relevant data; The communication between the network switching module and the first network system and the second network system is determined based on whether on-site operations are required. If on-site operations are required, the first network switching module switches to a network connection between the first network system and the second control module, and the second network switching module switches to a network connection between the second network system and the second control module. When no on-site work is required, the first network switching module switches to the network connection between the first network system and the first control module, and the second network switching module switches to the network connection between the second network system and the first control module.
Citation Information
Patent Citations
Fast reduction of students' study load lotus automatic control device of circulating water pump tripping operation
CN208580323U