一种载体桩的施工设备

By using a compression and lifting mechanism in conjunction with a limiting block in the carrier pile construction equipment, the problem of slow casing descent speed was solved, enabling rapid descent and convenient disassembly, thus improving construction efficiency and ease of operation.

CN117107758BActive Publication Date: 2026-07-17ZHONGCHENG RURAL ECOLOGICAL ENVIRONMENTAL PROTECTION ENG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
ZHONGCHENG RURAL ECOLOGICAL ENVIRONMENTAL PROTECTION ENG CO LTD
Filing Date
2023-08-30
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing carrier pile construction equipment has a slow casing descent speed, resulting in low work efficiency, and cannot be lowered with external force, which is inconvenient to use.

Method used

The protective cylinder is squeezed and limited between the fixed components by the extrusion mechanism. The moving seat is pushed downward by the thrust of the lifting mechanism to lower the protective cylinder. Combined with the cooperation of the limiting block and the hammer, the protective cylinder can be quickly lowered and hammered.

Benefits of technology

It increases the descent speed of the casing, enhances construction efficiency, facilitates the rapid descent and disassembly of the casing, and improves the ease of operation and precision of the construction equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117107758B_ABST
    Figure CN117107758B_ABST
Patent Text Reader

Abstract

本发明提供一种载体桩的施工设备,包括施工设备本体,所述施工设备本体包括底座,所述底座上焊接固定有支撑架,所述支撑架之间活动安装有活动座,所述活动座上活动安装有固定组件,所述固定组件的内部活动安装有防护筒,所述防护筒的内部活动安装有夯锤。该一种载体桩的施工设备,在使用时将挤压机构将防护筒挤压限位在固定组件之间,通过升降机构的推力使活动座整体向下推动防护筒向下移动,为防护筒的下降提供助力,便于后期防护筒的快速下降使用,后期升降机构无法推动防护筒下降后,将夯锤移动至最顶部,将限位块露出,夯锤通过限位块对防护筒夯击,从而完成防护筒的再次下降使用。
Need to check novelty before this filing date? Find Prior Art